Loading...
HomeMy WebLinkAbout4406_BlueRidgePaper_VertExpSWMgmtPlan_DIN27269_20170103 STORMWATER MANAGEMENT PLAN FOR LANDFILL NO. 6 AREA D VERTICAL INCREASE Prepared for EVERGREEN PACKAGING CANTON, NORTH CAROLINA November 2016 ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 i TABLE OF CONTENTS Section No. Title Page No. 1.0 INTRODUCTION............................................................................................................... 1-1 1.1 Facility Information ............................................................................................1-2 1.2 Project Description ............................................................................................1-3 1.3 Site Description .................................................................................................1-3 1.4 Adjacent Properties ...........................................................................................1-3 2.0 WATERSHED STORMWATER FLOWS .......................................................................... 2-1 2.1 Pre-Development Conditions ............................................................................2-1 2.2 Post-Development Conditions ...........................................................................2-3 2.3 Comparison of Peak Flows ...............................................................................2-4 3.0 PERFORMANCE STANDARDS ....................................................................................... 3-1 3.1 Culvert Inlet/Outlet Protection ...........................................................................3-1 3.2 Drainage Channels ...........................................................................................3-1 3.3 Detention Basins ...............................................................................................3-2 3.4 Rock Filters .......................................................................................................3-3 4.0 PLANNED SEDIMENT AND EROSION CONTROL PRACTICES .................................... 4-1 5.0 CONSTRUCTION SCHEDULE ......................................................................................... 5-1 LIST OF APPENDICES A SOILS MAP B-1 PRE-DEVELOPMENT STORMWATER ANALYSIS B-2 POST-DEVELOPMENT STORMWATER ANALYSIS ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 ii LIST OF FIGURES Figure No. Title Page No. 1-1 SITE LOCATION MAP ...................................................................................................1-4 LIST OF TABLES Table No. Title Page No. 2-1 COMPARISON OF PRE- AND POST-DEVELOPMENT PEAK FLOWS 25-YR/24-HOUR STORM EVENT .....................................................................................2-4 3-1 COMPARISON OF PRE- AND POST-DEVELOPMENT RUNOFF VELOCITIES 10-YR/24-HOUR STORM EVENT ................................................................................3-2 ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 1-1 STORMWATER MANAGEMENT PLAN FOR LANDFILL NO. 6 AREA D VERTICAL INCREASE 1.0 INTRODUCTION This Stormwater Management Plan (SMP) is designed for the vertical increase activities at Landfill No. 6, Area D North, located in Canton, North Carolina (see Figure 1-1). This plan was designed to comply with the Haywood County Erosion and Sediment Control Ordinance. The ordinance requires that the post-development velocities in the receiving water course remain equal to or less than the velocity determined for the 10-year storm prior to development. This SMP also evaluated pre- and post-development peak stormwater discharge from the 2, 10, and 25 year storm. As designed, uncontaminated runoff for post-development conditions at the site will be managed with two proposed detention basins. Leachate within waste filling areas will be directed into the leachate collection system through a series of perforated underdrain pipes embedded in the stone base of the landfill liner system. Runoff collected in the leachate collection system is discharged to an existing leachate pond located within Landfill No. 6 property limits. All drainage structures for the proposed development were designed to accommodate runoff from the 25-year/24-hour storm event and all detention basins were designed for the 25- year/24-hour storm event. Stormwater analyses performed for the proposed detention basins indicate the ponds have capacity to attenuate peak flows from the 2-, 10-, and 25-year storm events in post development conditions to pre-development peak flows. An erosion and sedimentation control plan will be provided when Evergreen proposes to install the final cover system. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 1-2 The post-development surface water peak velocities were evaluated in applicable areas which are affected by the landfill vertical increase. Stormwater flows were calculated using a computer modeling system called HydroCAD (Version 10.0) by Applied Microcomputer Systems of Chocorua, New Hampshire. The methods utilized in HydroCAD are based on the Soil Conservations Services (SCS) Technical Release No. 20 (TR20) Methodology for determining runoff peak flow values and flood hydrographs. A 24-hour, Type II storm with antecedent moisture condition (AMC) 2 was used to model the runoff characteristics of the site. Models were created for post-development site conditions using 2-, 10-, and 25-year storm events. The post-development condition consists of Area D filled to elevations 30-ft above the surface of the existing perimeter access road (i.e., 30-ft above the rim). The sides of the Area D, when filled above the rim, will be sloped at 4 feet horizontal to 1 foot vertical (4H:1V) around the east, south and western perimeter; at 3H:1V along the northern slope; and the crown will be sloped at about 10 percent from north to south. A proposed geosynthetic/soil cover system is anticipated to include 4-inches of topsoil over 24-inches of onsite soil above other layers. A comparison is made between the pre-development and post-development conditions and is located in Section 2.3 of this plan. 1.1 Facility Information Facility Name: Landfill No. 6 – Area D Location: 1155 Incinerator Road, Canton, North Carolina Property ID#: 8647-76-6665 Latitude: 35° 32' 47" N Longitude: 82° 52' 49" W Property Owner: Evergreen Packaging (Evergreen) 175 Main Street P.O. Box 4000 Canton, NC 28716 Contact: Mr. John R. Frazier Jr. Telephone: (828) 646-2028 ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 1-3 1.2 Project Description The purpose of vertical increase project is to increase the capacity of Area D, which is located at Evergreen Packaging’s Landfill No. 6 by raising the waste grades 30 feet above the rim. The site is located in Haywood County, Canton, North Carolina, and is situated north of and within the watershed of the Pigeon River which is classified as a Class C water body (See Figure 1-1). The closure of the Area D will consist of waste grading, installation of a gas collection system, a cover system, culverts, catch basins, and detention basins. 1.3 Site Description Currently, Area D is an active landfill and all stormwater runoff is collected in the leachate collection system. In the proposed vertical increase, Area D is anticipated to be covered with an engineered system consisting of a gas collection system, overlain by a geomembrane cover and a drainage geocomposite, overlain by 24 inches of on-site soils and 4 inches of topsoil. The topsoil with be fertilized, seeded and mulched. 12-inch diameter storm drain pipe located beneath the landfill liner conveys runoff from the north side of Area D North to an existing detention basin (P1) located to the south of Area D South. Surface water drainage flows overland through a series of rock and vegetated drainage ditches, detention basins, culverts, and natural drainage swales (reach R1) before entering into the Pigeon River approximately 700 feet south of Area D North. A portion of the runoff in the future Area E is conveyed to the west via a 12-inch culvert. At the culvert outlet, the flow combines with surface water flow from the areas adjacent to the landfill and flows overland through a series of rock and vegetated drainage ditches, detention basins, culverts, and natural drainage swales (reach R2) before entering into the Pigeon River approximately 2900 feet southwest of the proposed Area E. A 36-inch culvert passes under the north dike of the proposed Area E and discharges at the same location as the 12-inch culvert. There are three other reaches that discharge stormwater from the west side to the Pigeon River (reaches R3, 4 and 5). 1.4 Adjacent Properties Land use near Landfill No. 6 is primarily farmland, residential and undeveloped properties. SME ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE \\ n s e r v e r \ C F S \ B r p p \ N C \ 6 d - n \ A c a d \ F i g u r e s \ S I T E L O C . d w g , 1 1 / 3 0 / 2 0 1 6 1 : 1 5 : 3 5 P M , p a f ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 2-1 2.0 WATERSHED STORMWATER FLOWS 2.1 Pre-Development Conditions For modeling purposes, predevelopment conditions are site conditions as of March 5, 2008 (prior to construction of landfill Area D South). The study area for the Area D vertical increase watershed consists of approximately 85.5 acres in pre-development conditions. Ground cover consists of wooded areas on the northwest portion of the watershed with the remaining areas being a mix of brush/meadow and sand/gravel. Site stormwater flows overland to the south and west to the property line. Stormwater flows eventually contribute to the Pigeon River approximately 700 feet south of Area D South. Land use within the study area consists of approximately 28.6 acres of woods cover (HSG B), 4.3 acres of gravel access roads (HSG B), 38.4 acres of brush/grass mix (HSG B), and 0.80 acres of other impervious area (paved parking, roofs, etc.). Based on NRCS soils mapping site soils are Evard-Cowee and Hayesville and are classified as hydraulic soil group (HSG) B for the purposes of this analysis. The soils map is included in Appendix A. The watershed is subdivided into six subcatchments for modeling purposes. Maximum pre- development discharge velocities for the 10-year/24-hour storm event were generated for each subcatchment and analyzed at five analysis points along or within the landfill property boundary and are shown on Drawing D-100, Pre-development Stormwater Management Plan which is included in Appendix B-1. Subcatchment 1 (SC-1) consists of approximately 37.0 acres in existing conditions and is located west of previously constructed landfill Areas A, B, C, F, G, and H. Vegetated drainage swales within the subcatchment discharge to the south. A spring located within SC-1 is intercepted by a small, previously constructed detention basin (Pond P-1) with 24-inch culvert outlet device. Stormwater is discharged from the basin southerly into a riprap drainage channel (Reach R1) where it eventually crosses the property boundary and enters the Pigeon River. Subcatchment 2 (SC-2) consists of approximately 24.3 acres and is located to the north of SC-1. This subcatchment is bounded by the westerly property line and contains a portion of ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 2-2 Interstate 40 to the north. Stormwater within SC-2 flows westerly in wooded overland and channelized flow before it crosses the property line. Runoff leaving the property flows through natural drainage ways (Reach R-2) which are tributary to the Pigeon River. Subcatchment 3 (SC-3) consists of approximately 3.5 acres and is located west of SC-1 and is bounded by the westerly property line. Stormwater within SC-3 flows westerly in wooded overland and channelized flow before it crosses the property line. Runoff leaving the property flows through natural drainage ways (Reach R3) which are tributary to the Pigeon River. Subcatchment 4 (SC-4) consists of approximately 7.3 acres and is located southwest of SC-1 and is bounded by the westerly property line. Stormwater within SC-4 flows westerly in wooded overland and channelized flow before it crosses the property line. Runoff leaving the property flows through natural drainage ways (Reach R4) which are tributary to the Pigeon River. Subcatchment 5 (SC-5) consists of approximately 5.3 acres of wooded land and is located northwest of SC-2 and is bounded by the westerly property line. Stormwater within SC-5 flows westerly in wooded overland and channelized flow before it crosses the property line. Runoff leaving the property flows through natural drainage ways (Reach R5) which are tributary to the Pigeon River. Runoff from an off-site subcatchment (OS1) located north of SC-2 flows through the northwest corner of the landfill property. The off-site subcatchment is approximately 8.1 acres consisting of mostly woods and residential house lots. Runoff from the subcatchment flows under Interstate I-40 within a 36-inch diameter culvert where it combines with flow from Subcatchment 2. A combined flow of 126.1 cfs was calculated from the 25-year/24-hour duration storm as measured at the Pigeon River Analysis Point. Predevelopment stormwater peak flows for each analysis point are shown in Table 2-1 or Section 2.3. In addition to determining peak flows from each subcatchment, a combined pre-development peak flow was calculated to model the project’s contribution to the Pigeon River. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 2-3 2.2 Post-Development Conditions In the post-development conditions, SC-1 is divided into nine separate areas (1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H, and 1I) and, as in pre-development conditions, will convey stormwater in a southerly direction. Subcatchments 1A and 1I are located adjacent to Area D on the north and south sides respectively. The remaining subcatchments of SC-1 are located within the footprint of Area D and the adjacent access roads. The configuration of the individual subcatchments within the Area D change slightly due to the vertical increase from the proposed condition for closure when the area was only filled up to the rim. In the post development condition, the site was divided into seventeen subcatchments: 1A-I, 2A, 2B(1), 2B(2), 2C, 2D, 3, 4, 5, and OS1 (an off-site subcatchment located on the north side of Interstate 40). The post-development subcatchment areas are shown on Drawing D-101, Post-Development Stormwater Plan. Post-development stormwater analysis printouts are located in Appendix B-2. Subcatchments 1B through 1H are located primarily in the landfill footprint. In the proposed condition the land use of these subcatchments will be meadow ungrazed and minor areas of gravel roads. The cover soils were modelled as having a hydrologic soil group (HSG) classification of C with a curve runoff number of 71 and roads were modelled as gravel and a HSG B. Each of the drainage areas has a 24 culvert outlet that discharges to a catch basin located in the gravel roads. The stormwater is conveyed to south end of Area D where it discharges into Detention Pond 1. The stormwater runoff from the cover system will be conveyed to detention Pond 1 via two 36-inch culverts, one on the west side and one on the east side of the pump station located at the south end of Area D. Subcatchments 1I, OS, 2A, 2B(1), 2B(2), 2C, 2D, 3, 4, and 5 discharge stormwater in a westerly direction from the site and then eventually drain to the Pigeon River south of the site. These areas remain relatively unchanged since the construction of Area D North. Therefore, the data from the August 2013 “EROSION AND SEDIMENT CONTROL PLAN FOR LANDFILL No. 6 AREA D NORTH” was used to provide consistency between analyses. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 2-4 Post-development stormwater peak flows for each analysis point are shown in Table 2-1 of Section 2.3. 2.3 Comparison of Peak Flows TABLE 2-1 COMPARISON OF PRE- AND POST-DEVELOPMENT PEAK FLOW 25-YR/24-HOUR STORM EVENT Analysis Point Pre-Development Flow (cfs) Post-Development Flow (cfs) Difference (cfs) 1 (SC-1) 113.2 103.8 (-) 9.4 2 (SC-2) 89.6 68.7 (-) 20.9 3 (SC-3) 7.9 7.9 0.0 4 (SC-4) 18.3 12.8 (-) 5.5 5 (SC-5) 15.3 13.5 (-) 1.8 Pigeon River 128.2 117.6 (-) 10.6 As indicated in Table 2-1, peak runoff rates for post-development conditions at Landfill No. 6 will be less than or equal to those of predevelopment conditions. Therefore, peak velocities in off- site drainage facilities will not increase existing flow rates. This decrease is due in part to the addition of detention basins, longer time of concentrations, and changes in cover types. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 3-1 3.0 PERFORMANCE STANDARDS Permanent erosion and sediment control measures will be designed to provide protection from a rainfall event equivalent in magnitude to the 25-year/24-hour storm event (6.0 inches). Area D will be closed in Phases. At each phase the owner shall provide an erosion and sediment control plan designed to comply with the Haywood County Erosion and Sediment Control Ordinance. Temporary erosion and sediment control measures are designed to provide protection from a rainfall event equivalent in magnitude to the 2-year/24-hour storm event (3.5 inches) in an unvegetated state. 3.1 Culvert Inlet/Outlet Protection Design of the culvert inlet and outlet protection shall be based on stormwater flows from the 25- year/24-hour storm event. Inlet protection of culverts located in the lined area of the landfill will have concrete headwalls and ditch protection. 3.2 Drainage Channels Drainage channels were modeled as trapezoidal channels with 3:1 sideslopes, 3-foot bottom width, and a minimum depth of 2 feet. Channel linings will be designed using a 2-year/24-hour storm event for temporary channels and 25-yr /24-hour storm event for permanent channels. Pond 1 will require future modifications as Area D has the final cover system installed. The HydroCAD model indicates that the top of the dike should be raised two feet to attenuate stormwater flows being discharge from Area D. Discharge velocities at each respective analysis point were analyzed to ensure channel velocities in proposed conditions are less than or equal to existing conditions channel velocities. The following table shows 10-year/24-hour runoff velocities as modeled for pre- and post- development conditions as measured at Analysis Points 1 through 5 at the landfill property line. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 3-2 TABLE 3-1 COMPARISON OF PRE- AND POST-DEVELOPMENT RUNOFF VELOCITIES 10-YR/24-HOUR STORM EVENT Analysis Point Pre-Development Flow (fps) Post-Development Flow (fps) Difference 1 (Pond 1 Discharge) 3.9 3.6 (-) 0.3 2 (SC-2) 3.4 3.0 (-) 0.4 3 (SC-3) 2.0 2.0 0.0 4 (SC-4) 3.2 2.9 (-) 0.3 5 (SC-5) 1.6 1.6 0.0 All of the analysis points have equal or less than peak velocities compared to the pre- development conditions. 3.3 Detention Basins An existing detention basin (Pond P-1) located at the toe of slope at the southern dike of Area D will require future modifications as Area D has the final cover system installed. The HydroCAD model indicates that the top of the dike should be raised two feet to attenuate stormwater flows being discharge from Area D. Modifications to Pond 1 will require addressing the underdrain discharge in the pond. The intent of the underdrain piping is to convey clean surface water from a proposed detention basin (Pond P-3) located in Area E into existing Detention Pond 1 (Pond P-1) located south of Area D South The under drain also ensures that the phreatic surface is a minimum of 10 feet below the primary liner grade. Stormwater analyses performed for runoff from Area E indicates the Detention Pond 1 has sufficient capacity to detain peak flows from the 25-year storm. A detention basin (Pond P-3) is located in the southwest corner of Area E. The pond is designed with an outlet control structure, orifice holes, a beehive grate spillway, and a 12-inch storm drain outlet pipe. The outlet control structure is designed to detain flows while sediments settle out prior to the discharge of stormwater. The 12-inch underdrain outlet pipe will connect to the existing 12-inch underdrain associated with Area D South Pond P-2 that conveys flow beneath the Area D South liner system. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 3-3 A P4 detention basin is located in the northwest corner of Area E. The pond is designed with an outlet control structure, orifice holes, a beehive grate spillway, and a 12-inch storm drain outlet pipe. The outlet control structure is designed to detain flows while sediments settle out prior to the discharge of stormwater. The 12-inch outlet pipe discharges to a drainage swale that is stabilized with a riprap apron located northwest of the landfill. The detention basins, outlet control structures, and culvert outlets associated with the landfill development for Area D are shown on Drawing D-101, Post-Development Stormwater Management Plan. 3.4 Rock Filters Rock filters will be specified around the culvert inlets and within the ditches tributary to Detention Basin 3 (Pond P-3) to retard velocities and reduce the potential for sediment from entering the culvert. The rock filters shall be removed after the site is stabilized as approved by the owner or its representative. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 4-1 4.0 PLANNED SEDIMENT AND EROSION CONTROL PRACTICES Proposed erosion and sedimentation control practices include the following: 1. Construction Sequence Schedule (Practice 6.01) – A construction sequence schedule is included in this plan as Section 5.0. 2. Surface Roughening (Practice 6.03) – To aid in the establishment of vegetative cover, all slopes receiving a vegetative growth media will be tracked with appropriate equipment to create grooves perpendicular to the slope. 3. Topsoiling (Practice 6.04) – A vegetative growth media will be added to a depth of four inches in all specified areas. Specifications for topsoil materials are will be provided with the closure design. 4. Permanent Seeding (Practice 6.11.1) – Permanent seeding will be applied to all areas disturbed by construction. Specifications for Seeding will be included in the closure design. 5. Mulching (Practice 6.14.1) – Mulch will be applied to all seeded areas to limit erosion. See Specification Section 329219.00 in Appendix D of the Design Report. 6. Grass-Lined Channels (Practice 6.30.1). All grass-lined channels will be lined with erosion control blankets until vegetation is stabilized in the channel. Channel stabilization design will be included in the closure design. 7. Siltation Fence (Practice 6.62.1). Siltation fence will be installed along the clearing limit lines where siltation is likely to occur. Siltation fence will be installed in areas noted on the closure drawings. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 4-2 Dust Control (Practice 6.84.1). Should excessive dust become a problem with construction it will be controlled by application of water in a fine spray with a water truck. ____________________ 2016brpp-SMP-vertical exp Sevee & Maher Engineers, Inc. November 30, 2016 5-1 5.0 CONSTRUCTION SCHEDULE The following construction schedule shall be maintained throughout the project: 1. Obtain plan approval and other applicable permits. 2. Clearly mark limits of work and limits of clearing. 3. Hold pre-construction conference at least one week prior to commencement of construction. 4. Install silt fence as indicated for the perimeter/access roads and other affected areas. 5. Perform clearing and grubbing required for the perimeter/access roads, borrow areas, and other affected areas. 6. Perform construction activities for the perimeter/access roads and other affected areas. 7. Install turf reinforcement mat and riprap in ditches, where specified. 8. Remove temporary silt fence upon completion of project and remove other erosion control measures when all areas are stabilized. Estimated time before final stabilization – 9 months from final seeding. APPENDIX A SOILS MAP % / / / / / / / Pigeon River Bo w e n B r a n c h Thic k e t y C r e e k Patt o n B r a n c h Th i c k e t y R d Incinerator Rd Ha y w o o d A v e Haynes Farm Rd Pilgrim Way Ja m e s S t B o b s L n R i v e r v i e w D r Thu n d e r R d Munich Ln Ca n d l e l i g h t C i r Ell e n A v e Ma n d y L n Beaver R d Green St Linda Ln L e d f o r d S t Br o w n C o v e R d W a r r e n C o v e R d Moody R i d g e R d Co g b u r n H a y e s F a r m R d Henli n e D r P u p p y D o g T r l Sno w W h i t e D r Ra m b o L n Lee Ln C o z y C r e e k R d 5 HaC2 EvE EvD EvD EvD EvD 5 BkC2 EvD RoA BrC EvD EvD RoA EvD HaC2 EvD DsB Cx A SdC EvD E v D DsB BoD2 SuA BoD 2 EvD Ev D EvD BkB2 HaC2 DsB TrE EvD ScB HaC2 Sd C W CxA SdD HaC2 SdC DsB HeC W EvE HaC2 EvE HaC2 DsC BkC2 CxA 328800 328800 329000 329000 329200 329200 329400 329400 329600 329600 329800 329800 330000 330000 330200 330200 330400 330400 330600 330600 330800 330800 39 3 4 6 0 0 39 3 4 6 0 0 39 3 4 8 0 0 39 3 4 8 0 0 39 3 5 0 0 0 39 3 5 0 0 0 39 3 5 2 0 0 39 3 5 2 0 0 39 3 5 4 0 0 39 3 5 4 0 0 39 3 5 6 0 0 39 3 5 6 0 0 39 3 5 8 0 0 39 3 5 8 0 0 39 3 6 0 0 0 39 3 6 0 0 0 0 1,000 2,000 3,000500Feet 0 200 400 600100 Meters± 35° 33' 13'' 82 ° 5 1 ' 5 4 ' ' 35° 32' 24'' 82 ° 5 1 ' 5 3 ' ' 35° 32' 23'' 35° 33' 12'' 82 ° 5 3 ' 2 2 ' ' 82 ° 5 3 ' 2 3 ' ' Map Scale: 1:10,700 if printed on A size (8.5" x 11") sheet. Soil Map—Haywood County Area, North Carolina(Landfill No. 6, Canton, North Carolina) Natural ResourcesNatural ResourcesNatural ResourcesNatural ResourcesConservation ServiceConservation ServiceConservation ServiceConservation Service Web Soil SurveyNational Cooperative Soil Survey 6/7/2013Page 1 of 3 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Units Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Gully Short Steep Slope Other Political Features Cities Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Map Scale: 1:10,700 if printed on A size (8.5" × 11") sheet. The soil surveys that comprise your AOI were mapped at 1:12,000. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 17N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Haywood County Area, North Carolina Survey Area Data: Version 11, Jul 16, 2012 Date(s) aerial images were photographed: 9/15/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map–Haywood County Area, North Carolina (Landfill No. 6, Canton, North Carolina) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/7/2013 Page 2 of 3 Map Unit Legend Haywood County Area, North Carolina (NC606) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 5 Udorthents-Urban land complex, 2 to 50 percent slopes 111.7 24.5% BkB2 Braddock clay loam, 2 to 8 percent slopes, eroded 2.8 0.6% BkC2 Braddock clay loam, 8 to 15 percent slopes, eroded 16.4 3.6% BoD2 Braddock clay loam, 15 to 30 percent slopes, eroded, stony 10.5 2.3% BrC Braddock-Urban land complex, 2 to 15 percent slopes 9.3 2.0% CxA Cullowhee-Nikwasi complex, 0 to 2 percent slopes, frequently flooded 8.7 1.9% DsB Dillsboro loam, 2 to 8 percent slopes 13.3 2.9% DsC Dillsboro loam, 8 to 15 percent slopes 0.1 0.0% EvD Evard-Cowee complex, 15 to 30 percent slopes 144.5 31.7% EvE Evard-Cowee complex, 30 to 50 percent slopes 28.5 6.2% HaC2 Hayesville clay loam, 8 to 15 percent slopes, eroded 63.9 14.0% HeC Hayesville-Urban land complex, 2 to 15 percent slopes 0.5 0.1% RoA Rosman fine sandy loam, 0 to 2 percent slopes, occasionally flooded 19.0 4.2% ScB Saunook loam, 2 to 8 percent slopes 1.3 0.3% SdC Saunook loam, 8 to 15 percent slopes, stony 8.3 1.8% SdD Saunook loam, 15 to 30 percent slopes, stony 2.2 0.5% SuA Statler loam, 0 to 3 percent slopes, rarely flooded 4.1 0.9% TrE Trimont gravelly loam, 30 to 50 percent slopes, stony 1.3 0.3% W Water 9.6 2.1% Totals for Area of Interest 456.1 100.0% Soil Map–Haywood County Area, North Carolina Landfill No. 6, Canton, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 6/7/2013 Page 3 of 3 APPENDIX B-1 STORMWATER ANALYSIS – PRE-DEVELOPMENT S M E E N V I R O N M E N T A L C I V I L G E O T E C H N I C A L W A T E R C O M P L I A N C E 4 B l a n c h a r d R o a d , P O B o x 8 5 A , C u m b e r l a n d C e n t e r , M a i n e 0 4 0 2 1 P h o n e 2 0 7 . 8 2 9 . 5 0 1 6 F a x 2 0 7 . 8 2 9 . 5 6 9 2 w w w . s m e m a i n e . c o m \\nserver\CFS\Brpp\NC\Vertical Increase\Acad\Plans\Existing SMP.dwg, 11/30/2016 1:32:39 PM, paf 1 SC 1 2 SC 2 3 SC 3 4 SC 4 5 SC 5 OS SC OFFSITE R1 AP-1 TO RIVER R2 AP-2 TO RIVERR2D REACH 2D R3 AP-3 TO RIVER R4 AP-4 TO RIVER R5 AP-5 TO RIVER 1P DETENTION POND 1 AP-1 Analysis Point 1 AP-2 Analysis Point 2 AP-3 Analysis Point 3 AP-4 Analysis Point 4 AP-5 Analysis Point 5 AP-6 PIGEON RIVER CONTRIBUTION Routing Diagram for PRE-2016 11.29Prepared by {enter your company name here}, Printed 11/29/2016 HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Subcat Reach Pond Link AREA D VERTICAL EXPANSION PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 2HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 1.930 70 1/2 acre lots, 25% imp, HSG B (OS) 38.370 67 EX-Brush/Grass mix, Poor, HSG B (1, 2, 3, 4) 4.320 85 EX-Gravel roads, HSG B (1, 2, 4) 0.800 98 EX-Paved parking & roofs (2, 4) 0.070 85 Gravel roads, HSG B (5) 0.060 58 Meadow, non-grazed, HSG B (5) 1.780 98 Paved parking, HSG B (5, OS) 0.020 98 Roofs, HSG B (5) 38.100 55 Woods, Good, HSG B (1, 2, 3, 4, 5, OS) AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 3HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1: SC 1 Runoff = 23.98 cfs @ 12.13 hrs, Volume= 2.158 af, Depth> 0.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 12.660 55 Woods, Good, HSG B * 2.560 85 EX-Gravel roads, HSG B * 21.770 67 EX-Brush/Grass mix, Poor, HSG B 36.990 64 Weighted Average 36.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.8 100 0.1000 0.15 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 7.0 690 0.1070 1.64 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.2 823 0.0830 11.62 2,324.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=0.00' D=10.00' Z= 2.0 '/' Top.W=40.00' n= 0.100 Earth, dense brush, high stage 0.1 63 0.1110 12.48 39.19 Pipe Channel, D-E 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.025 Corrugated metal 0.3 188 0.0430 10.19 4,238.01 Trap/Vee/Rect Channel Flow, E-F Bot.W=40.00' D=8.00' Z= 2.0 & 1.0 '/' Top.W=64.00' n= 0.100 Earth, dense brush, high stage 19.4 1,864 Total Summary for Subcatchment 2: SC 2 Runoff = 17.56 cfs @ 12.09 hrs, Volume= 1.420 af, Depth> 0.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 9.820 55 Woods, Good, HSG B * 1.620 85 EX-Gravel roads, HSG B * 12.100 67 EX-Brush/Grass mix, Poor, HSG B * 0.770 98 EX-Paved parking & roofs 24.310 64 Weighted Average 23.540 96.83% Pervious Area 0.770 3.17% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 4HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 80 0.2125 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 4.9 350 0.0570 1.19 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.6 460 0.0760 4.92 196.97 Parabolic Channel, C-D W=30.00' D=2.00' Area=40.0 sf Perim=30.4' n= 0.100 Earth, dense brush, high stage 0.1 40 0.1000 9.77 17.27 Pipe Channel, D-E 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 2.1 210 0.0290 1.68 20.21 Trap/Vee/Rect Channel Flow, E-F Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 0.4 100 0.0200 4.37 7.72 Pipe Channel, F-G 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 0.6 80 0.0500 2.21 26.54 Trap/Vee/Rect Channel Flow, G-H Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 16.4 1,320 Total Summary for Subcatchment 3: SC 3 Runoff = 1.34 cfs @ 12.05 hrs, Volume= 0.120 af, Depth> 0.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 2.840 55 Woods, Good, HSG B * 0.000 85 EX-Gravel roads, HSG B * 0.630 67 EX-Brush/Grass mix, Poor, HSG B * 0.000 98 EX-Paved parking & roofs 3.470 57 Weighted Average 3.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1290 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 116 0.1290 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 0.7 241 0.1040 5.79 463.51 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 11.5 457 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 5HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 4.35 cfs @ 12.09 hrs, Volume= 0.372 af, Depth> 0.61" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 3.250 55 Woods, Good, HSG B * 0.140 85 EX-Gravel roads, HSG B * 3.870 67 EX-Brush/Grass mix, Poor, HSG B * 0.030 98 EX-Paved parking & roofs 7.290 62 Weighted Average 7.260 99.59% Pervious Area 0.030 0.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 3.76 cfs @ 12.04 hrs, Volume= 0.270 af, Depth> 0.61" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 4.330 55 Woods, Good, HSG B 0.070 85 Gravel roads, HSG B 0.810 98 Paved parking, HSG B 0.060 58 Meadow, non-grazed, HSG B 0.020 98 Roofs, HSG B 5.290 62 Weighted Average 4.460 84.31% Pervious Area 0.830 15.69% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 6HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 145 0.1300 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.4 330 0.1500 3.83 45.97 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Very weedy reaches w/pools 0.4 170 0.0300 6.46 51.67 Trap/Vee/Rect Channel Flow, D-E Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' n= 0.030 Earth, grassed & winding 12.0 745 Total Summary for Subcatchment OS: SC OFFSITE Runoff = 6.87 cfs @ 12.04 hrs, Volume= 0.474 af, Depth> 0.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.5 384 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 12.4 1,219 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 21.44 cfs @ 12.20 hrs, Volume= 2.157 af Outflow = 21.19 cfs @ 12.27 hrs, Volume= 2.148 af, Atten= 1%, Lag= 4.1 min AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 7HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.54 fps, Min. Travel Time= 2.4 min Avg. Velocity = 1.14 fps, Avg. Travel Time= 5.4 min Peak Storage= 3,091 cf @ 12.23 hrs Average Depth at Peak Storage= 1.16' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 296.79 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.191 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 23.26 cfs @ 12.11 hrs, Volume= 1.891 af Outflow = 12.07 cfs @ 12.64 hrs, Volume= 1.827 af, Atten= 48%, Lag= 31.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.06 fps, Min. Travel Time= 20.6 min Avg. Velocity = 1.06 fps, Avg. Travel Time= 40.2 min Peak Storage= 14,988 cf @ 12.29 hrs Average Depth at Peak Storage= 0.92' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 279.24 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,550.0' Slope= 0.0380 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,535.00' Summary for Reach R2D: REACH 2D Inflow Area = 8.100 ac, 17.93% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 6.87 cfs @ 12.04 hrs, Volume= 0.474 af Outflow = 6.19 cfs @ 12.14 hrs, Volume= 0.471 af, Atten= 10%, Lag= 6.2 min AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 8HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.61 fps, Min. Travel Time= 3.6 min Avg. Velocity = 1.39 fps, Avg. Travel Time= 9.2 min Peak Storage= 1,338 cf @ 12.08 hrs Average Depth at Peak Storage= 0.36' Bank-Full Depth= 6.00' Flow Area= 114.0 sf, Capacity= 1,999.45 cfs 4.00' x 6.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 2.5 '/' Top Width= 34.00' Length= 770.0' Slope= 0.0273 '/' Inlet Invert= 2,688.00', Outlet Invert= 2,667.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 0.41" for 2-Yr Storm event Inflow = 1.34 cfs @ 12.05 hrs, Volume= 0.120 af Outflow = 0.47 cfs @ 12.79 hrs, Volume= 0.114 af, Atten= 65%, Lag= 44.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.98 fps, Min. Travel Time= 28.9 min Avg. Velocity = 0.62 fps, Avg. Travel Time= 46.0 min Peak Storage= 818 cf @ 12.31 hrs Average Depth at Peak Storage= 0.17' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 9HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Reach R4: AP-4 TO RIVER Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 0.61" for 2-Yr Storm event Inflow = 4.35 cfs @ 12.09 hrs, Volume= 0.372 af Outflow = 4.14 cfs @ 12.18 hrs, Volume= 0.370 af, Atten= 5%, Lag= 5.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.08 fps, Min. Travel Time= 2.8 min Avg. Velocity = 0.91 fps, Avg. Travel Time= 6.4 min Peak Storage= 699 cf @ 12.13 hrs Average Depth at Peak Storage= 0.45' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 0.61" for 2-Yr Storm event Inflow = 3.76 cfs @ 12.04 hrs, Volume= 0.270 af Outflow = 0.98 cfs @ 13.17 hrs, Volume= 0.250 af, Atten= 74%, Lag= 67.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 0.90 fps, Min. Travel Time= 48.3 min Avg. Velocity = 0.56 fps, Avg. Travel Time= 77.1 min Peak Storage= 2,827 cf @ 12.36 hrs Average Depth at Peak Storage= 0.30' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 10HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond 1P: DETENTION POND 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 23.98 cfs @ 12.13 hrs, Volume= 2.158 af Outflow = 21.44 cfs @ 12.20 hrs, Volume= 2.157 af, Atten= 11%, Lag= 4.2 min Primary = 21.44 cfs @ 12.20 hrs, Volume= 2.157 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 2,591.22' @ 12.20 hrs Surf.Area= 1,772 sf Storage= 2,865 cf Plug-Flow detention time= 1.2 min calculated for 2.157 af (100% of inflow) Center-of-Mass det. time= 0.9 min ( 896.4 - 895.4 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 18,389 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 10 0 0 2,588.00 500 255 255 2,590.00 637 1,137 1,392 2,592.00 2,492 3,129 4,521 2,594.00 3,333 5,825 10,346 2,596.00 4,710 8,043 18,389 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 3.14 sf #2 Secondary 2,595.50'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=21.41 cfs @ 12.20 hrs HW=2,591.21' (Free Discharge) 1=Culvert (Inlet Controls 21.41 cfs @ 6.81 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=2,587.00' (Free Discharge) 2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Link AP-1: Analysis Point 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 21.44 cfs @ 12.20 hrs, Volume= 2.157 af Primary = 21.44 cfs @ 12.20 hrs, Volume= 2.157 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 11HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-2: Analysis Point 2 Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 0.70" for 2-Yr Storm event Inflow = 23.26 cfs @ 12.11 hrs, Volume= 1.891 af Primary = 23.26 cfs @ 12.11 hrs, Volume= 1.891 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 0.41" for 2-Yr Storm event Inflow = 1.34 cfs @ 12.05 hrs, Volume= 0.120 af Primary = 1.34 cfs @ 12.05 hrs, Volume= 0.120 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 0.61" for 2-Yr Storm event Inflow = 4.35 cfs @ 12.09 hrs, Volume= 0.372 af Primary = 4.35 cfs @ 12.09 hrs, Volume= 0.372 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 0.61" for 2-Yr Storm event Inflow = 3.76 cfs @ 12.04 hrs, Volume= 0.270 af Primary = 3.76 cfs @ 12.04 hrs, Volume= 0.270 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.450 ac, 3.61% Impervious, Inflow Depth > 0.66" for 2-Yr Storm event Inflow = 24.94 cfs @ 12.26 hrs, Volume= 4.709 af Primary = 24.94 cfs @ 12.26 hrs, Volume= 4.709 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 12HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1: SC 1 Runoff = 67.96 cfs @ 12.11 hrs, Volume= 5.248 af, Depth> 1.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 12.660 55 Woods, Good, HSG B * 2.560 85 EX-Gravel roads, HSG B * 21.770 67 EX-Brush/Grass mix, Poor, HSG B 36.990 64 Weighted Average 36.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.8 100 0.1000 0.15 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 7.0 690 0.1070 1.64 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.2 823 0.0830 11.62 2,324.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=0.00' D=10.00' Z= 2.0 '/' Top.W=40.00' n= 0.100 Earth, dense brush, high stage 0.1 63 0.1110 12.48 39.19 Pipe Channel, D-E 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.025 Corrugated metal 0.3 188 0.0430 10.19 4,238.01 Trap/Vee/Rect Channel Flow, E-F Bot.W=40.00' D=8.00' Z= 2.0 & 1.0 '/' Top.W=64.00' n= 0.100 Earth, dense brush, high stage 19.4 1,864 Total Summary for Subcatchment 2: SC 2 Runoff = 49.13 cfs @ 12.07 hrs, Volume= 3.452 af, Depth> 1.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 9.820 55 Woods, Good, HSG B * 1.620 85 EX-Gravel roads, HSG B * 12.100 67 EX-Brush/Grass mix, Poor, HSG B * 0.770 98 EX-Paved parking & roofs 24.310 64 Weighted Average 23.540 96.83% Pervious Area 0.770 3.17% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 13HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 80 0.2125 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 4.9 350 0.0570 1.19 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.6 460 0.0760 4.92 196.97 Parabolic Channel, C-D W=30.00' D=2.00' Area=40.0 sf Perim=30.4' n= 0.100 Earth, dense brush, high stage 0.1 40 0.1000 9.77 17.27 Pipe Channel, D-E 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 2.1 210 0.0290 1.68 20.21 Trap/Vee/Rect Channel Flow, E-F Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 0.4 100 0.0200 4.37 7.72 Pipe Channel, F-G 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 0.6 80 0.0500 2.21 26.54 Trap/Vee/Rect Channel Flow, G-H Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 16.4 1,320 Total Summary for Subcatchment 3: SC 3 Runoff = 5.50 cfs @ 12.02 hrs, Volume= 0.350 af, Depth> 1.21" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 2.840 55 Woods, Good, HSG B * 0.000 85 EX-Gravel roads, HSG B * 0.630 67 EX-Brush/Grass mix, Poor, HSG B * 0.000 98 EX-Paved parking & roofs 3.470 57 Weighted Average 3.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1290 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 116 0.1290 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 0.7 241 0.1040 5.79 463.51 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 11.5 457 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 14HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 13.32 cfs @ 12.07 hrs, Volume= 0.945 af, Depth> 1.56" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 3.250 55 Woods, Good, HSG B * 0.140 85 EX-Gravel roads, HSG B * 3.870 67 EX-Brush/Grass mix, Poor, HSG B * 0.030 98 EX-Paved parking & roofs 7.290 62 Weighted Average 7.260 99.59% Pervious Area 0.030 0.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 11.22 cfs @ 12.02 hrs, Volume= 0.687 af, Depth> 1.56" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 4.330 55 Woods, Good, HSG B 0.070 85 Gravel roads, HSG B 0.810 98 Paved parking, HSG B 0.060 58 Meadow, non-grazed, HSG B 0.020 98 Roofs, HSG B 5.290 62 Weighted Average 4.460 84.31% Pervious Area 0.830 15.69% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 15HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 145 0.1300 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.4 330 0.1500 3.83 45.97 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Very weedy reaches w/pools 0.4 170 0.0300 6.46 51.67 Trap/Vee/Rect Channel Flow, D-E Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' n= 0.030 Earth, grassed & winding 12.0 745 Total Summary for Subcatchment OS: SC OFFSITE Runoff = 18.77 cfs @ 12.03 hrs, Volume= 1.152 af, Depth> 1.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.5 384 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 12.4 1,219 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 1.70" for 10-yr Storm event Inflow = 76.31 cfs @ 12.16 hrs, Volume= 5.246 af Outflow = 63.00 cfs @ 12.22 hrs, Volume= 5.231 af, Atten= 17%, Lag= 3.8 min AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 16HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.58 fps, Min. Travel Time= 1.7 min Avg. Velocity = 1.40 fps, Avg. Travel Time= 4.4 min Peak Storage= 6,843 cf @ 12.19 hrs Average Depth at Peak Storage= 1.97' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 296.79 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.191 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 1.70" for 10-yr Storm event Inflow = 66.39 cfs @ 12.08 hrs, Volume= 4.599 af Outflow = 43.73 cfs @ 12.45 hrs, Volume= 4.502 af, Atten= 34%, Lag= 21.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.04 fps, Min. Travel Time= 14.0 min Avg. Velocity = 1.29 fps, Avg. Travel Time= 33.0 min Peak Storage= 37,057 cf @ 12.21 hrs Average Depth at Peak Storage= 1.68' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 279.24 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,550.0' Slope= 0.0380 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,535.00' Summary for Reach R2D: REACH 2D Inflow Area = 8.100 ac, 17.93% Impervious, Inflow Depth > 1.71" for 10-yr Storm event Inflow = 18.77 cfs @ 12.03 hrs, Volume= 1.152 af Outflow = 17.84 cfs @ 12.10 hrs, Volume= 1.146 af, Atten= 5%, Lag= 4.5 min AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 17HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.03 fps, Min. Travel Time= 2.6 min Avg. Velocity = 1.69 fps, Avg. Travel Time= 7.6 min Peak Storage= 2,766 cf @ 12.06 hrs Average Depth at Peak Storage= 0.64' Bank-Full Depth= 6.00' Flow Area= 114.0 sf, Capacity= 1,999.45 cfs 4.00' x 6.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 2.5 '/' Top Width= 34.00' Length= 770.0' Slope= 0.0273 '/' Inlet Invert= 2,688.00', Outlet Invert= 2,667.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 1.21" for 10-yr Storm event Inflow = 5.50 cfs @ 12.02 hrs, Volume= 0.350 af Outflow = 2.88 cfs @ 12.44 hrs, Volume= 0.340 af, Atten= 48%, Lag= 24.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.70 fps, Min. Travel Time= 16.6 min Avg. Velocity = 0.80 fps, Avg. Travel Time= 35.4 min Peak Storage= 2,912 cf @ 12.16 hrs Average Depth at Peak Storage= 0.40' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 18HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Reach R4: AP-4 TO RIVER Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 1.56" for 10-yr Storm event Inflow = 13.32 cfs @ 12.07 hrs, Volume= 0.945 af Outflow = 12.81 cfs @ 12.13 hrs, Volume= 0.942 af, Atten= 4%, Lag= 3.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 2.95 fps, Min. Travel Time= 2.0 min Avg. Velocity = 1.13 fps, Avg. Travel Time= 5.1 min Peak Storage= 1,550 cf @ 12.10 hrs Average Depth at Peak Storage= 0.76' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 1.56" for 10-yr Storm event Inflow = 11.22 cfs @ 12.02 hrs, Volume= 0.687 af Outflow = 4.34 cfs @ 12.72 hrs, Volume= 0.657 af, Atten= 61%, Lag= 41.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.41 fps, Min. Travel Time= 30.7 min Avg. Velocity = 0.70 fps, Avg. Travel Time= 61.8 min Peak Storage= 8,002 cf @ 12.21 hrs Average Depth at Peak Storage= 0.60' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 19HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond 1P: DETENTION POND 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 1.70" for 10-yr Storm event Inflow = 67.96 cfs @ 12.11 hrs, Volume= 5.248 af Outflow = 76.31 cfs @ 12.16 hrs, Volume= 5.246 af, Atten= 0%, Lag= 2.9 min Primary = 33.80 cfs @ 12.16 hrs, Volume= 4.864 af Secondary = 42.52 cfs @ 12.16 hrs, Volume= 0.381 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 2,596.01' @ 12.16 hrs Surf.Area= 4,710 sf Storage= 18,389 cf Plug-Flow detention time= 3.1 min calculated for 5.246 af (100% of inflow) Center-of-Mass det. time= 2.9 min ( 868.3 - 865.4 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 18,389 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 10 0 0 2,588.00 500 255 255 2,590.00 637 1,137 1,392 2,592.00 2,492 3,129 4,521 2,594.00 3,333 5,825 10,346 2,596.00 4,710 8,043 18,389 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 3.14 sf #2 Secondary 2,595.50'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=33.71 cfs @ 12.16 hrs HW=2,595.97' (Free Discharge) 1=Culvert (Inlet Controls 33.71 cfs @ 10.73 fps) Secondary OutFlow Max=38.61 cfs @ 12.16 hrs HW=2,595.98' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 38.61 cfs @ 1.80 fps) Summary for Link AP-1: Analysis Point 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 1.70" for 10-yr Storm event Inflow = 76.31 cfs @ 12.16 hrs, Volume= 5.246 af Primary = 76.31 cfs @ 12.16 hrs, Volume= 5.246 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 20HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-2: Analysis Point 2 Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 1.70" for 10-yr Storm event Inflow = 66.39 cfs @ 12.08 hrs, Volume= 4.599 af Primary = 66.39 cfs @ 12.08 hrs, Volume= 4.599 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 1.21" for 10-yr Storm event Inflow = 5.50 cfs @ 12.02 hrs, Volume= 0.350 af Primary = 5.50 cfs @ 12.02 hrs, Volume= 0.350 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 1.56" for 10-yr Storm event Inflow = 13.32 cfs @ 12.07 hrs, Volume= 0.945 af Primary = 13.32 cfs @ 12.07 hrs, Volume= 0.945 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 1.56" for 10-yr Storm event Inflow = 11.22 cfs @ 12.02 hrs, Volume= 0.687 af Primary = 11.22 cfs @ 12.02 hrs, Volume= 0.687 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.450 ac, 3.61% Impervious, Inflow Depth > 1.64" for 10-yr Storm event Inflow = 89.00 cfs @ 12.25 hrs, Volume= 11.673 af Primary = 89.00 cfs @ 12.25 hrs, Volume= 11.673 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 21HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1: SC 1 Runoff = 91.84 cfs @ 12.11 hrs, Volume= 6.940 af, Depth> 2.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 12.660 55 Woods, Good, HSG B * 2.560 85 EX-Gravel roads, HSG B * 21.770 67 EX-Brush/Grass mix, Poor, HSG B 36.990 64 Weighted Average 36.990 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.8 100 0.1000 0.15 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 7.0 690 0.1070 1.64 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.2 823 0.0830 11.62 2,324.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=0.00' D=10.00' Z= 2.0 '/' Top.W=40.00' n= 0.100 Earth, dense brush, high stage 0.1 63 0.1110 12.48 39.19 Pipe Channel, D-E 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.025 Corrugated metal 0.3 188 0.0430 10.19 4,238.01 Trap/Vee/Rect Channel Flow, E-F Bot.W=40.00' D=8.00' Z= 2.0 & 1.0 '/' Top.W=64.00' n= 0.100 Earth, dense brush, high stage 19.4 1,864 Total Summary for Subcatchment 2: SC 2 Runoff = 66.27 cfs @ 12.07 hrs, Volume= 4.566 af, Depth> 2.25" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 9.820 55 Woods, Good, HSG B * 1.620 85 EX-Gravel roads, HSG B * 12.100 67 EX-Brush/Grass mix, Poor, HSG B * 0.770 98 EX-Paved parking & roofs 24.310 64 Weighted Average 23.540 96.83% Pervious Area 0.770 3.17% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 22HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 80 0.2125 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 4.9 350 0.0570 1.19 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.6 460 0.0760 4.92 196.97 Parabolic Channel, C-D W=30.00' D=2.00' Area=40.0 sf Perim=30.4' n= 0.100 Earth, dense brush, high stage 0.1 40 0.1000 9.77 17.27 Pipe Channel, D-E 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 2.1 210 0.0290 1.68 20.21 Trap/Vee/Rect Channel Flow, E-F Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 0.4 100 0.0200 4.37 7.72 Pipe Channel, F-G 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.025 Corrugated metal 0.6 80 0.0500 2.21 26.54 Trap/Vee/Rect Channel Flow, G-H Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Earth, dense brush, high stage 16.4 1,320 Total Summary for Subcatchment 3: SC 3 Runoff = 7.94 cfs @ 12.02 hrs, Volume= 0.483 af, Depth> 1.67" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 2.840 55 Woods, Good, HSG B * 0.000 85 EX-Gravel roads, HSG B * 0.630 67 EX-Brush/Grass mix, Poor, HSG B * 0.000 98 EX-Paved parking & roofs 3.470 57 Weighted Average 3.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1290 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 116 0.1290 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 0.7 241 0.1040 5.79 463.51 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 11.5 457 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 23HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 18.28 cfs @ 12.07 hrs, Volume= 1.264 af, Depth> 2.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 3.250 55 Woods, Good, HSG B * 0.140 85 EX-Gravel roads, HSG B * 3.870 67 EX-Brush/Grass mix, Poor, HSG B * 0.030 98 EX-Paved parking & roofs 7.290 62 Weighted Average 7.260 99.59% Pervious Area 0.030 0.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 15.33 cfs @ 12.02 hrs, Volume= 0.919 af, Depth> 2.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 4.330 55 Woods, Good, HSG B 0.070 85 Gravel roads, HSG B 0.810 98 Paved parking, HSG B 0.060 58 Meadow, non-grazed, HSG B 0.020 98 Roofs, HSG B 5.290 62 Weighted Average 4.460 84.31% Pervious Area 0.830 15.69% Impervious Area AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 24HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 145 0.1300 1.80 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 1.4 330 0.1500 3.83 45.97 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 10.0 '/' Top.W=22.00' n= 0.100 Very weedy reaches w/pools 0.4 170 0.0300 6.46 51.67 Trap/Vee/Rect Channel Flow, D-E Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' n= 0.030 Earth, grassed & winding 12.0 745 Total Summary for Subcatchment OS: SC OFFSITE Runoff = 25.24 cfs @ 12.02 hrs, Volume= 1.523 af, Depth> 2.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.5 384 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 12.4 1,219 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 2.25" for 25-Yr Storm event Inflow = 113.18 cfs @ 12.10 hrs, Volume= 6.938 af Outflow = 91.36 cfs @ 12.17 hrs, Volume= 6.922 af, Atten= 19%, Lag= 3.8 min AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 25HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.94 fps, Min. Travel Time= 1.6 min Avg. Velocity = 1.49 fps, Avg. Travel Time= 4.1 min Peak Storage= 8,626 cf @ 12.14 hrs Average Depth at Peak Storage= 2.30' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 296.79 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.191 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 2.25" for 25-Yr Storm event Inflow = 89.61 cfs @ 12.08 hrs, Volume= 6.083 af Outflow = 62.74 cfs @ 12.40 hrs, Volume= 5.972 af, Atten= 30%, Lag= 19.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.38 fps, Min. Travel Time= 12.6 min Avg. Velocity = 1.36 fps, Avg. Travel Time= 31.2 min Peak Storage= 47,596 cf @ 12.19 hrs Average Depth at Peak Storage= 1.99' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 279.24 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,550.0' Slope= 0.0380 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,535.00' Summary for Reach R2D: REACH 2D Inflow Area = 8.100 ac, 17.93% Impervious, Inflow Depth > 2.26" for 25-Yr Storm event Inflow = 25.24 cfs @ 12.02 hrs, Volume= 1.523 af Outflow = 23.98 cfs @ 12.09 hrs, Volume= 1.517 af, Atten= 5%, Lag= 4.2 min AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 26HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 5.50 fps, Min. Travel Time= 2.3 min Avg. Velocity = 1.82 fps, Avg. Travel Time= 7.0 min Peak Storage= 3,422 cf @ 12.05 hrs Average Depth at Peak Storage= 0.75' Bank-Full Depth= 6.00' Flow Area= 114.0 sf, Capacity= 1,999.45 cfs 4.00' x 6.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 2.5 '/' Top Width= 34.00' Length= 770.0' Slope= 0.0273 '/' Inlet Invert= 2,688.00', Outlet Invert= 2,667.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 1.67" for 25-Yr Storm event Inflow = 7.94 cfs @ 12.02 hrs, Volume= 0.483 af Outflow = 4.64 cfs @ 12.38 hrs, Volume= 0.472 af, Atten= 42%, Lag= 21.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.97 fps, Min. Travel Time= 14.4 min Avg. Velocity = 0.86 fps, Avg. Travel Time= 32.9 min Peak Storage= 4,043 cf @ 12.14 hrs Average Depth at Peak Storage= 0.50' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 27HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Reach R4: AP-4 TO RIVER Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 2.08" for 25-Yr Storm event Inflow = 18.28 cfs @ 12.07 hrs, Volume= 1.264 af Outflow = 17.65 cfs @ 12.12 hrs, Volume= 1.261 af, Atten= 3%, Lag= 3.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 3.25 fps, Min. Travel Time= 1.8 min Avg. Velocity = 1.21 fps, Avg. Travel Time= 4.8 min Peak Storage= 1,937 cf @ 12.09 hrs Average Depth at Peak Storage= 0.88' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 2.08" for 25-Yr Storm event Inflow = 15.33 cfs @ 12.02 hrs, Volume= 0.919 af Outflow = 6.65 cfs @ 12.63 hrs, Volume= 0.884 af, Atten= 57%, Lag= 36.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Max. Velocity= 1.61 fps, Min. Travel Time= 26.9 min Avg. Velocity = 0.74 fps, Avg. Travel Time= 58.5 min Peak Storage= 10,754 cf @ 12.19 hrs Average Depth at Peak Storage= 0.73' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 28HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond 1P: DETENTION POND 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 2.25" for 25-Yr Storm event Inflow = 91.84 cfs @ 12.11 hrs, Volume= 6.940 af Outflow = 113.18 cfs @ 12.10 hrs, Volume= 6.938 af, Atten= 0%, Lag= 0.0 min Primary = 34.30 cfs @ 12.10 hrs, Volume= 5.921 af Secondary = 78.88 cfs @ 12.10 hrs, Volume= 1.017 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 2,596.25' @ 12.10 hrs Surf.Area= 4,710 sf Storage= 18,389 cf Plug-Flow detention time= 2.9 min calculated for 6.938 af (100% of inflow) Center-of-Mass det. time= 2.7 min ( 859.8 - 857.1 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 18,389 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 10 0 0 2,588.00 500 255 255 2,590.00 637 1,137 1,392 2,592.00 2,492 3,129 4,521 2,594.00 3,333 5,825 10,346 2,596.00 4,710 8,043 18,389 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CMP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 n= 0.025 Corrugated metal, Flow Area= 3.14 sf #2 Secondary 2,595.50'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=34.25 cfs @ 12.10 hrs HW=2,596.22' (Free Discharge) 1=Culvert (Inlet Controls 34.25 cfs @ 10.90 fps) Secondary OutFlow Max=75.29 cfs @ 12.10 hrs HW=2,596.23' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 75.29 cfs @ 2.30 fps) Summary for Link AP-1: Analysis Point 1 Inflow Area = 36.990 ac, 0.00% Impervious, Inflow Depth > 2.25" for 25-Yr Storm event Inflow = 113.18 cfs @ 12.10 hrs, Volume= 6.938 af Primary = 113.18 cfs @ 12.10 hrs, Volume= 6.938 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"PRE-2016 11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 29HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-2: Analysis Point 2 Inflow Area = 32.410 ac, 6.86% Impervious, Inflow Depth > 2.25" for 25-Yr Storm event Inflow = 89.61 cfs @ 12.08 hrs, Volume= 6.083 af Primary = 89.61 cfs @ 12.08 hrs, Volume= 6.083 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.470 ac, 0.00% Impervious, Inflow Depth > 1.67" for 25-Yr Storm event Inflow = 7.94 cfs @ 12.02 hrs, Volume= 0.483 af Primary = 7.94 cfs @ 12.02 hrs, Volume= 0.483 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 7.290 ac, 0.41% Impervious, Inflow Depth > 2.08" for 25-Yr Storm event Inflow = 18.28 cfs @ 12.07 hrs, Volume= 1.264 af Primary = 18.28 cfs @ 12.07 hrs, Volume= 1.264 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.290 ac, 15.69% Impervious, Inflow Depth > 2.08" for 25-Yr Storm event Inflow = 15.33 cfs @ 12.02 hrs, Volume= 0.919 af Primary = 15.33 cfs @ 12.02 hrs, Volume= 0.919 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.450 ac, 3.61% Impervious, Inflow Depth > 2.18" for 25-Yr Storm event Inflow = 128.24 cfs @ 12.26 hrs, Volume= 15.511 af Primary = 128.24 cfs @ 12.26 hrs, Volume= 15.511 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs APPENDIX B-2 STORMWATER ANALYSIS – POST-DEVELOPMENT SME ENVIRONMENTAL CIVIL GEOTECHNICAL WATER COMPLIANCE 4 Blanchard Road, PO Box 85A, Cumberland Center, Maine 04021 Phone 207.829.5016 Fax 207.829.5692 www.smemaine.com \\ n s e r v e r \ C F S \ B r p p \ N C \ V e r t i c a l I n c r e a s e \ A c a d \ P l a n s \ P r o p o s e d S M P . d w g , 1 1 / 3 0 / 2 0 1 6 1 : 0 8 : 2 5 P M , p a f 1A SC 1A 1B SC 1B 1C SC 1C 1D SC 1D 1E SC 1E 1F SC 1F 1G SC-G 1H SC 1H 1I SC 1I 2A SC 2A 2B(1) SC 2B (1) 2B(2) SC 2B (2) 2C SC 2C 2D SC 2D 3 SC 3 4 SC 4 5 SC 5 OS OFFSITE R1 AP-1 TO RIVER R1A Northend 6DN ditch R1B 36" SD R1F 24" SD R2 AP-2 TO RIVER R3 AP-3 TO RIVER R4 AP-4 TO RIVER R5 AP-5 TO RIVER CBCD CB #1 CBEG CB #2 CBFCB #3 CBHCB #4 P1 DETENTION POND 1 P1C CB P1D CB P1E CB P1F CB P1G CB P1H CB P3 DETENTION BASIN 3 P4 DETENTION BASIN 4 P6 Pooling Area, Catch Basin, 36-in Culvert AP-1 Analysis Point 1 AP-2 Analysis Point 2 AP-3 Analysis Point 3 AP-4 Analysis Point 4 AP-5 Analysis Point 5 AP-6 PIGEON RIVER CONTRIBUTION Routing Diagram for POST-6D- veritcal expansion11.29Prepared by {enter your company name here}, Printed 11/29/2016 HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Subcat Reach Pond Link AREA D VERTICAL EXPANSION POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 2HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 1.930 70 1/2 acre lots, 25% imp, HSG B (OS) 0.818 56 Brush, Fair, HSG B (2A) 4.355 85 Gravel roads, HSG B (1A, 1B, 1C, 1D, 1I, 2A, 2B(1), 2B(2), 2D, 3, 4) 0.063 96 Gravel surface, HSG B (1H) 22.083 58 Meadow, non-grazed, HSG B (1A, 1I, 2A, 2B(1), 2B(2), 2C, 2D, 3, 4, 5) 33.990 71 Meadow, non-grazed, HSG C (1B, 1C, 1D, 1E, 1F, 1G, 1H) 2.540 98 Paved parking, HSG B (2D, 5, OS) 0.020 98 Roofs, HSG B (5) 19.476 55 Woods, Good, HSG B (2B(1), 2B(2), 2C, 2D, 3, 4, 5, OS) 0.485 85 gravel road (1E, 1F, 1G) 85.760 65 TOTAL AREA AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 3HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=185,362 sf 0.00% Impervious Runoff Depth=0.53"Subcatchment 1A: SC 1A Flow Length=377' Tc=8.7 min CN=60 Runoff=2.86 cfs 0.188 af Runoff Area=352,836 sf 0.00% Impervious Runoff Depth=1.06"Subcatchment 1B: SC 1B Flow Length=494' Tc=7.2 min CN=71 Runoff=14.05 cfs 0.718 af Runoff Area=174,318 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 1C: SC 1C Flow Length=517' Tc=8.0 min CN=72 Runoff=7.15 cfs 0.374 af Runoff Area=122,518 sf 0.00% Impervious Runoff Depth=1.06"Subcatchment 1D: SC 1D Flow Length=561' Tc=10.1 min CN=71 Runoff=4.40 cfs 0.249 af Runoff Area=5.751 ac 0.00% Impervious Runoff Depth=1.06"Subcatchment 1E: SC 1E Flow Length=965' Tc=12.1 min CN=71 Runoff=8.26 cfs 0.510 af Runoff Area=5.661 ac 0.00% Impervious Runoff Depth=1.06"Subcatchment 1F: SC 1F Flow Length=952' Tc=11.0 min CN=71 Runoff=8.53 cfs 0.502 af Runoff Area=184,958 sf 0.00% Impervious Runoff Depth=1.12"Subcatchment 1G: SC-G Flow Length=605' Tc=9.8 min CN=72 Runoff=7.13 cfs 0.397 af Runoff Area=190,886 sf 0.00% Impervious Runoff Depth=1.06"Subcatchment 1H: SC 1H Flow Length=893' Tc=12.0 min CN=71 Runoff=6.33 cfs 0.388 af Runoff Area=112,472 sf 0.00% Impervious Runoff Depth=0.62"Subcatchment 1I: SC 1I Flow Length=238' Tc=8.3 min CN=62 Runoff=2.19 cfs 0.132 af Runoff Area=6.315 ac 0.00% Impervious Runoff Depth=0.57"Subcatchment 2A: SC 2A Flow Length=957' Tc=6.1 min CN=61 Runoff=5.32 cfs 0.301 af Runoff Area=243,425 sf 0.00% Impervious Runoff Depth=0.71"Subcatchment 2B(1): SC 2B (1) Flow Length=759' Tc=15.3 min CN=64 Runoff=4.22 cfs 0.328 af Runoff Area=181,578 sf 0.00% Impervious Runoff Depth=0.49"Subcatchment 2B(2): SC 2B (2) Flow Length=682' Tc=13.9 min CN=59 Runoff=1.92 cfs 0.171 af Runoff Area=1.650 ac 0.00% Impervious Runoff Depth=0.35"Subcatchment 2C: SC 2C Flow Length=230' Tc=10.0 min CN=55 Runoff=0.48 cfs 0.048 af Runoff Area=138,521 sf 23.90% Impervious Runoff Depth=0.85"Subcatchment 2D: SC 2D Flow Length=848' Tc=17.8 min CN=67 Runoff=2.83 cfs 0.225 af Runoff Area=155,074 sf 0.00% Impervious Runoff Depth=0.42"Subcatchment 3: SC 3 Flow Length=370' Tc=12.1 min CN=57 Runoff=1.34 cfs 0.123 af Runoff Area=258,311 sf 0.00% Impervious Runoff Depth=0.49"Subcatchment 4: SC 4 Flow Length=622' Tc=16.2 min CN=59 Runoff=2.48 cfs 0.243 af AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 4HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Runoff Area=238,537 sf 15.16% Impervious Runoff Depth=0.62"Subcatchment 5: SC 5 Flow Length=740' Tc=16.7 min CN=62 Runoff=3.21 cfs 0.281 af Runoff Area=8.100 ac 17.93% Impervious Runoff Depth=0.71"Subcatchment OS: OFFSITE Flow Length=1,234' Tc=12.6 min CN=64 Runoff=6.81 cfs 0.476 af Avg. Flow Depth=0.95' Max Vel=2.27 fps Inflow=21.31 cfs 3.445 afReach R1: AP-1 TO RIVER n=0.190 L=370.0' S=0.1568 '/' Capacity=462.43 cfs Outflow=21.14 cfs 3.445 af Avg. Flow Depth=0.41' Max Vel=3.92 fps Inflow=16.63 cfs 0.906 afReach R1A: Northend 6DN ditch n=0.035 L=950.0' S=0.0342 '/' Capacity=2,767.35 cfs Outflow=14.17 cfs 0.906 af Avg. Flow Depth=0.52' Max Vel=13.91 fps Inflow=11.43 cfs 0.623 afReach R1B: 36" SD 36.0" Round Pipe n=0.013 L=960.0' S=0.0688 '/' Capacity=174.88 cfs Outflow=10.79 cfs 0.623 af Avg. Flow Depth=0.54' Max Vel=12.08 fps Inflow=8.52 cfs 0.502 afReach R1F: 24" SD 24.0" Round Pipe n=0.013 L=857.0' S=0.0525 '/' Capacity=51.84 cfs Outflow=8.16 cfs 0.502 af Avg. Flow Depth=0.78' Max Vel=1.78 fps Inflow=19.76 cfs 1.549 afReach R2: AP-2 TO RIVER n=0.100 L=2,900.0' S=0.0352 '/' Capacity=268.52 cfs Outflow=8.20 cfs 1.549 af Avg. Flow Depth=0.18' Max Vel=0.99 fps Inflow=1.34 cfs 0.123 afReach R3: AP-3 TO RIVER n=0.100 L=1,700.0' S=0.0765 '/' Capacity=395.93 cfs Outflow=0.48 cfs 0.123 af Avg. Flow Depth=0.34' Max Vel=1.75 fps Inflow=2.48 cfs 0.243 afReach R4: AP-4 TO RIVER n=0.100 L=350.0' S=0.1000 '/' Capacity=452.76 cfs Outflow=2.31 cfs 0.243 af Avg. Flow Depth=0.30' Max Vel=0.90 fps Inflow=3.21 cfs 0.281 afReach R5: AP-5 TO RIVER n=0.100 L=2,600.0' S=0.0315 '/' Capacity=254.27 cfs Outflow=1.00 cfs 0.281 af Peak Elev=2,717.49' Inflow=11.43 cfs 0.623 afPond CBCD: #1 36.0" Round Culvert n=0.013 L=4.0' S=0.1250 '/' Outflow=11.43 cfs 0.623 af Peak Elev=2,651.45' Inflow=25.98 cfs 1.530 afPond CBEG: #2 36.0" Round Culvert n=0.013 L=200.0' S=0.2550 '/' Outflow=25.98 cfs 1.530 af Peak Elev=2,699.52' Inflow=8.52 cfs 0.502 afPond CBF: #3 24.0" Round Culvert n=0.013 L=857.0' S=0.0525 '/' Outflow=8.52 cfs 0.502 af Peak Elev=2,653.48' Inflow=14.39 cfs 0.889 afPond CBH: #4 36.0" Round Culvert n=0.013 L=200.0' S=0.2700 '/' Outflow=14.39 cfs 0.889 af Peak Elev=2,590.55' Storage=23,673 cf Inflow=43.45 cfs 3.445 afPond P1: DETENTION POND 1 Primary=21.31 cfs 3.445 af Secondary=0.00 cfs 0.000 af Outflow=21.31 cfs 3.445 af Peak Elev=2,727.41' Storage=106 cf Inflow=7.15 cfs 0.374 afPond P1C: CB 24.0" Round Culvert n=0.013 L=130.0' S=0.0038 '/' Outflow=7.16 cfs 0.374 af Peak Elev=2,719.51' Storage=81 cf Inflow=4.40 cfs 0.249 afPond P1D: CB 18.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=4.36 cfs 0.249 af AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 5HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev=2,655.29' Storage=76 cf Inflow=8.26 cfs 0.510 afPond P1E: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=8.28 cfs 0.510 af Peak Elev=2,707.31' Storage=67 cf Inflow=8.53 cfs 0.502 afPond P1F: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=8.52 cfs 0.502 af Peak Elev=2,655.18' Storage=96 cf Inflow=7.13 cfs 0.397 afPond P1G: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=7.11 cfs 0.397 af Peak Elev=2,665.10' Storage=128 cf Inflow=6.33 cfs 0.388 afPond P1H: CB 24.0" Round Culvert n=0.013 L=12.0' S=0.0417 '/' Outflow=6.32 cfs 0.388 af Peak Elev=2,692.48' Storage=12,180 cf Inflow=14.17 cfs 0.906 afPond P3: DETENTION BASIN 3 Outflow=2.30 cfs 0.894 af Peak Elev=2,690.21' Storage=1,167 cf Inflow=5.32 cfs 0.301 afPond P4: DETENTION BASIN 4 Outflow=4.06 cfs 0.301 af Peak Elev=2,653.42' Storage=186 cf Inflow=13.61 cfs 1.030 afPond P6: Pooling Area, Catch Basin, 36-in Outflow=13.63 cfs 1.030 af Inflow=21.31 cfs 3.445 afLink AP-1: Analysis Point 1 Primary=21.31 cfs 3.445 af Inflow=19.76 cfs 1.549 afLink AP-2: Analysis Point 2 Primary=19.76 cfs 1.549 af Inflow=1.34 cfs 0.123 afLink AP-3: Analysis Point 3 Primary=1.34 cfs 0.123 af Inflow=2.48 cfs 0.243 afLink AP-4: Analysis Point 4 Primary=2.48 cfs 0.243 af Inflow=3.21 cfs 0.281 afLink AP-5: Analysis Point 5 Primary=3.21 cfs 0.281 af Inflow=23.83 cfs 5.642 afLink AP-6: PIGEON RIVER CONTRIBUTION Primary=23.83 cfs 5.642 af Total Runoff Area = 85.760 ac Runoff Volume = 5.655 af Average Runoff Depth = 0.79" 96.45% Pervious = 82.717 ac 3.55% Impervious = 3.043 ac AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 6HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1A: SC 1A Runoff = 2.86 cfs @ 12.00 hrs, Volume= 0.188 af, Depth= 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 16,982 85 Gravel roads, HSG B 168,380 58 Meadow, non-grazed, HSG B 185,362 60 Weighted Average 185,362 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 64 0.0470 10.53 4,718.88 Trap/Vee/Rect Channel Flow, C-D Bot.W=40.00' D=8.00' Z= 2.0 '/' Top.W=72.00' n= 0.100 Earth, dense brush, high stage 0.3 75 0.3600 4.20 Shallow Concentrated Flow, D-E Short Grass Pasture Kv= 7.0 fps 8.7 377 Total Summary for Subcatchment 1B: SC 1B Runoff = 14.05 cfs @ 11.97 hrs, Volume= 0.718 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 4,792 85 Gravel roads, HSG B 348,044 71 Meadow, non-grazed, HSG C 352,836 71 Weighted Average 352,836 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.9 100 0.1600 0.28 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 216 0.3300 4.02 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 178 0.0100 7.62 609.28 Trap/Vee/Rect Channel Flow, D-E Bot.W=8.00' D=4.00' Z= 3.0 '/' Top.W=32.00' n= 0.035 Earth, dense weeds 7.2 494 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 7HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1C: SC 1C Runoff = 7.15 cfs @ 11.98 hrs, Volume= 0.374 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 11,326 85 Gravel roads, HSG B 162,992 71 Meadow, non-grazed, HSG C 174,318 72 Weighted Average 174,318 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.5 122 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 157 0.3300 19.38 116.27 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 2.0 '/' Top.W=8.00' n= 0.035 0.2 138 0.0800 12.41 74.44 Channel Flow, D-E Area= 6.0 sf Perim= 7.2' r= 0.83' n= 0.030 Earth, grassed & winding 8.0 517 Total Summary for Subcatchment 1D: SC 1D Runoff = 4.40 cfs @ 12.00 hrs, Volume= 0.249 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 120,471 71 Meadow, non-grazed, HSG C 2,047 85 Gravel roads, HSG B 122,518 71 Weighted Average 122,518 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.8 371 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 90 0.3300 28.16 450.49 Channel Flow, C-DArea= 16.0 sf Perim= 12.9' r= 1.24' n= 0.035 10.1 561 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 8HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1E: SC 1E Runoff = 8.26 cfs @ 12.03 hrs, Volume= 0.510 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 5.690 71 Meadow, non-grazed, HSG C * 0.061 85 gravel road 5.751 71 Weighted Average 5.751 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 202 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.0 50 0.0300 21.73 391.23 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.013 12.1 965 Total Summary for Subcatchment 1F: SC 1F Runoff = 8.53 cfs @ 12.01 hrs, Volume= 0.502 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 5.537 71 Meadow, non-grazed, HSG C * 0.124 85 gravel road 5.661 71 Weighted Average 5.661 100.00% Pervious Area AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 9HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.9 380 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 104 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.8 368 0.0300 8.07 145.31 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.035 11.0 952 Total Summary for Subcatchment 1G: SC-G Runoff = 7.13 cfs @ 12.00 hrs, Volume= 0.397 af, Depth= 1.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 171,906 71 Meadow, non-grazed, HSG C * 13,052 85 gravel road 184,958 72 Weighted Average 184,958 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.3 306 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 199 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 9.8 605 Total Summary for Subcatchment 1H: SC 1H Runoff = 6.33 cfs @ 12.02 hrs, Volume= 0.388 af, Depth= 1.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 10HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (sf) CN Description 188,150 71 Meadow, non-grazed, HSG C 2,736 96 Gravel surface, HSG B 190,886 71 Weighted Average 190,886 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.2 180 0.3333 13.33 33.32 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 12.0 893 Total Summary for Subcatchment 1I: SC 1I Runoff = 2.19 cfs @ 12.00 hrs, Volume= 0.132 af, Depth= 0.62" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 16,117 85 Gravel roads, HSG B 96,355 58 Meadow, non-grazed, HSG B 112,472 62 Weighted Average 112,472 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 8.3 238 Total Summary for Subcatchment 2A: SC 2A Runoff = 5.32 cfs @ 11.97 hrs, Volume= 0.301 af, Depth= 0.57" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 11HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (ac) CN Description 0.818 56 Brush, Fair, HSG B 4.709 58 Meadow, non-grazed, HSG B 0.788 85 Gravel roads, HSG B 6.315 61 Weighted Average 6.315 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.9 63 0.1800 0.27 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 1.1 500 0.0280 7.41 44.48 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 3.0 '/' Top.W=9.00' n= 0.025 1.1 394 0.0810 6.17 13.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=0.50' Z= 3.0 '/' Top.W=6.00' n= 0.035 Earth, dense weeds 6.1 957 Total Summary for Subcatchment 2B(1): SC 2B (1) Runoff = 4.22 cfs @ 12.07 hrs, Volume= 0.328 af, Depth= 0.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 28,750 55 Woods, Good, HSG B 153,255 58 Meadow, non-grazed, HSG B 61,420 85 Gravel roads, HSG B 243,425 64 Weighted Average 243,425 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 89 0.1800 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.9 250 0.0400 4.49 24.68 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Riprap D50 = 8-12" 0.9 420 0.1100 7.44 40.93 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Rirap D50 (8-12") 15.3 759 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 12HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2B(2): SC 2B (2) Runoff = 1.92 cfs @ 12.07 hrs, Volume= 0.171 af, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 54,014 55 Woods, Good, HSG B 10,019 85 Gravel roads, HSG B 117,545 58 Meadow, non-grazed, HSG B 181,578 59 Weighted Average 181,578 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 100 0.0250 0.13 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 540 0.1700 9.59 62.35 Trap/Vee/Rect Channel Flow, B-C Bot.W=4.00' D=1.00' Z= 2.5 '/' Top.W=9.00' n= 0.050 0.5 42 0.0400 1.40 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 13.9 682 Total Summary for Subcatchment 2C: SC 2C Runoff = 0.48 cfs @ 12.04 hrs, Volume= 0.048 af, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 1.490 55 Woods, Good, HSG B 0.160 58 Meadow, non-grazed, HSG B 1.650 55 Weighted Average 1.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 130 0.1500 1.94 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 10.0 230 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 13HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2D: SC 2D Runoff = 2.83 cfs @ 12.10 hrs, Volume= 0.225 af, Depth= 0.85" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 63,162 55 Woods, Good, HSG B 33,106 98 Paved parking, HSG B 3,049 85 Gravel roads, HSG B 39,204 58 Meadow, non-grazed, HSG B 138,521 67 Weighted Average 105,415 76.10% Pervious Area 33,106 23.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.3 90 0.1600 0.10 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 1.0 428 0.0600 7.38 22.14 Trap/Vee/Rect Channel Flow, B-C Bot.W=0.00' D=1.00' Z= 3.0 '/' Top.W=6.00' n= 0.030 Earth, grassed & winding 2.5 330 0.1000 2.21 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 17.8 848 Total Summary for Subcatchment 3: SC 3 Runoff = 1.34 cfs @ 12.06 hrs, Volume= 0.123 af, Depth= 0.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 97,139 55 Woods, Good, HSG B 7,841 85 Gravel roads, HSG B 50,094 58 Meadow, non-grazed, HSG B 155,074 57 Weighted Average 155,074 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1300 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 270 0.1400 1.87 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 12.1 370 Total AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 14HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 2.48 cfs @ 12.10 hrs, Volume= 0.243 af, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 121,097 55 Woods, Good, HSG B 21,780 85 Gravel roads, HSG B 115,434 58 Meadow, non-grazed, HSG B 258,311 59 Weighted Average 258,311 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 3.21 cfs @ 12.10 hrs, Volume= 0.281 af, Depth= 0.62" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (sf) CN Description 192,799 55 Woods, Good, HSG B 35,284 98 Paved parking, HSG B 9,583 58 Meadow, non-grazed, HSG B 871 98 Roofs, HSG B 238,537 62 Weighted Average 202,382 84.84% Pervious Area 36,155 15.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 100 0.1600 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.6 470 0.1400 12.61 122.92 Trap/Vee/Rect Channel Flow, B-C Bot.W=6.00' D=1.00' Z= 2.5 & 5.0 '/' Top.W=13.50' n= 0.035 0.5 170 0.0300 5.54 44.29 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 15HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.035 16.7 740 Total Summary for Subcatchment OS: OFFSITE Runoff = 6.81 cfs @ 12.04 hrs, Volume= 0.476 af, Depth= 0.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Yr Storm Rainfall=3.50" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.4 308 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 0.3 91 0.0200 5.76 161.26 Trap/Vee/Rect Channel Flow, E-FBot.W=4.00' D=2.00' Z= 5.0 '/' Top.W=24.00' n= 0.040 12.6 1,234 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 0.99" for 2-Yr Storm event Inflow = 21.31 cfs @ 12.17 hrs, Volume= 3.445 af Outflow = 21.14 cfs @ 12.26 hrs, Volume= 3.445 af, Atten= 1%, Lag= 5.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 2.27 fps, Min. Travel Time= 2.7 min Avg. Velocity = 0.60 fps, Avg. Travel Time= 10.3 min Peak Storage= 3,445 cf @ 12.21 hrs Average Depth at Peak Storage= 0.95' Bank-Full Depth= 4.00' Flow Area= 80.0 sf, Capacity= 462.43 cfs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 16HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 30.00' x 4.00' deep Parabolic Channel, n= 0.190 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' ‡ Summary for Reach R1A: Northend 6DN ditch Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 0.88" for 2-Yr Storm event Inflow = 16.63 cfs @ 11.98 hrs, Volume= 0.906 af Outflow = 14.17 cfs @ 12.09 hrs, Volume= 0.906 af, Atten= 15%, Lag= 6.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 3.92 fps, Min. Travel Time= 4.0 min Avg. Velocity = 1.32 fps, Avg. Travel Time= 12.0 min Peak Storage= 3,559 cf @ 12.02 hrs Average Depth at Peak Storage= 0.41' Bank-Full Depth= 6.00' Flow Area= 156.0 sf, Capacity= 2,767.35 cfs 8.00' x 6.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 '/' Top Width= 44.00' Length= 950.0' Slope= 0.0342 '/' Inlet Invert= 2,726.50', Outlet Invert= 2,694.00' ‡ Summary for Reach R1B: 36" SD Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 1.10" for 2-Yr Storm event Inflow = 11.43 cfs @ 11.99 hrs, Volume= 0.623 af Outflow = 10.79 cfs @ 12.02 hrs, Volume= 0.623 af, Atten= 6%, Lag= 1.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 13.91 fps, Min. Travel Time= 1.2 min Avg. Velocity = 4.77 fps, Avg. Travel Time= 3.4 min Peak Storage= 779 cf @ 12.00 hrs Average Depth at Peak Storage= 0.52' Bank-Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 174.88 cfs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 17HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 36.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 960.0' Slope= 0.0688 '/' Inlet Invert= 2,715.00', Outlet Invert= 2,649.00' Summary for Reach R1F: 24" SD Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af Outflow = 8.16 cfs @ 12.05 hrs, Volume= 0.502 af, Atten= 4%, Lag= 2.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 12.08 fps, Min. Travel Time= 1.2 min Avg. Velocity = 4.27 fps, Avg. Travel Time= 3.3 min Peak Storage= 593 cf @ 12.03 hrs Average Depth at Peak Storage= 0.54' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 51.84 cfs 24.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 857.0' Slope= 0.0525 '/' Inlet Invert= 2,698.00', Outlet Invert= 2,653.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 0.64" for 2-Yr Storm event Inflow = 19.76 cfs @ 12.05 hrs, Volume= 1.549 af Outflow = 8.20 cfs @ 12.75 hrs, Volume= 1.549 af, Atten= 58%, Lag= 41.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.78 fps, Min. Travel Time= 27.1 min Avg. Velocity = 0.52 fps, Avg. Travel Time= 92.7 min Peak Storage= 13,362 cf @ 12.29 hrs Average Depth at Peak Storage= 0.78' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 268.52 cfs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 18HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,900.0' Slope= 0.0352 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,530.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 0.42" for 2-Yr Storm event Inflow = 1.34 cfs @ 12.06 hrs, Volume= 0.123 af Outflow = 0.48 cfs @ 12.80 hrs, Volume= 0.123 af, Atten= 64%, Lag= 44.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 0.99 fps, Min. Travel Time= 28.7 min Avg. Velocity = 0.52 fps, Avg. Travel Time= 54.9 min Peak Storage= 834 cf @ 12.32 hrs Average Depth at Peak Storage= 0.18' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' Summary for Reach R4: AP-4 TO RIVER Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 0.49" for 2-Yr Storm event Inflow = 2.48 cfs @ 12.10 hrs, Volume= 0.243 af Outflow = 2.31 cfs @ 12.21 hrs, Volume= 0.243 af, Atten= 7%, Lag= 6.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.75 fps, Min. Travel Time= 3.3 min Avg. Velocity = 0.76 fps, Avg. Travel Time= 7.7 min Peak Storage= 467 cf @ 12.15 hrs Average Depth at Peak Storage= 0.34' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 19HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 0.62" for 2-Yr Storm event Inflow = 3.21 cfs @ 12.10 hrs, Volume= 0.281 af Outflow = 1.00 cfs @ 13.27 hrs, Volume= 0.281 af, Atten= 69%, Lag= 70.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 0.90 fps, Min. Travel Time= 48.0 min Avg. Velocity = 0.36 fps, Avg. Travel Time= 119.5 min Peak Storage= 2,872 cf @ 12.47 hrs Average Depth at Peak Storage= 0.30' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' Summary for Pond CBCD: #1 Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 1.10" for 2-Yr Storm event Inflow = 11.43 cfs @ 11.99 hrs, Volume= 0.623 af Outflow = 11.43 cfs @ 11.99 hrs, Volume= 0.623 af, Atten= 0%, Lag= 0.0 min Primary = 11.43 cfs @ 11.99 hrs, Volume= 0.623 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,717.49' @ 11.99 hrs Flood Elev= 2,722.00' Device Routing Invert Outlet Devices #1 Primary 2,716.00'36.0" Round Culvert L= 4.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,716.00' / 2,715.50' S= 0.1250 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 20HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=11.15 cfs @ 11.99 hrs HW=2,717.46' (Free Discharge) 1=Culvert (Inlet Controls 11.15 cfs @ 3.25 fps) Summary for Pond CBEG: #2 Inflow Area = 16.811 ac, 0.00% Impervious, Inflow Depth = 1.09" for 2-Yr Storm event Inflow = 25.98 cfs @ 12.02 hrs, Volume= 1.530 af Outflow = 25.98 cfs @ 12.02 hrs, Volume= 1.530 af, Atten= 0%, Lag= 0.0 min Primary = 25.98 cfs @ 12.02 hrs, Volume= 1.530 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,651.45' @ 12.02 hrs Device Routing Invert Outlet Devices #1 Primary 2,649.00'36.0" Round Culvert L= 200.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,649.00' / 2,598.00' S= 0.2550 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=25.28 cfs @ 12.02 hrs HW=2,651.40' (Free Discharge) 1=Culvert (Inlet Controls 25.28 cfs @ 4.17 fps) Summary for Pond CBF: #3 Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af Outflow = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af, Atten= 0%, Lag= 0.0 min Primary = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,699.52' @ 12.01 hrs Flood Elev= 2,708.00' Device Routing Invert Outlet Devices #1 Primary 2,698.00'24.0" Round Culvert L= 857.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,698.00' / 2,653.00' S= 0.0525 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=8.30 cfs @ 12.01 hrs HW=2,699.50' (Free Discharge) 1=Culvert (Inlet Controls 8.30 cfs @ 3.29 fps) AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 21HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond CBH: #4 Inflow Area = 10.043 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 14.39 cfs @ 12.04 hrs, Volume= 0.889 af Outflow = 14.39 cfs @ 12.04 hrs, Volume= 0.889 af, Atten= 0%, Lag= 0.0 min Primary = 14.39 cfs @ 12.04 hrs, Volume= 0.889 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,653.48' @ 12.04 hrs Flood Elev= 2,664.00' Device Routing Invert Outlet Devices #1 Primary 2,652.00'36.0" Round Culvert L= 200.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,652.00' / 2,598.00' S= 0.2700 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=14.15 cfs @ 12.04 hrs HW=2,653.47' (Free Discharge) 1=Culvert (Inlet Controls 14.15 cfs @ 4.12 fps) Summary for Pond P1: DETENTION POND 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 0.99" for 2-Yr Storm event Inflow = 43.45 cfs @ 12.03 hrs, Volume= 3.445 af Outflow = 21.31 cfs @ 12.17 hrs, Volume= 3.445 af, Atten= 51%, Lag= 9.0 min Primary = 21.31 cfs @ 12.17 hrs, Volume= 3.445 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,590.55' @ 12.17 hrs Surf.Area= 8,229 sf Storage= 23,673 cf Plug-Flow detention time= 23.4 min calculated for 3.442 af (100% of inflow) Center-of-Mass det. time= 23.8 min ( 909.5 - 885.6 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 83,876 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 5,223 0 0 2,588.00 5,997 5,610 5,610 2,590.00 7,703 13,700 19,310 2,592.00 9,623 17,326 36,636 2,594.00 11,757 21,380 58,016 2,596.00 14,103 25,860 83,876 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 22HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013, Flow Area= 3.14 sf #2 Secondary 2,594.00'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=21.21 cfs @ 12.17 hrs HW=2,590.52' (Free Discharge) 1=Culvert (Inlet Controls 21.21 cfs @ 6.75 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=2,587.00' (Free Discharge) 2=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond P1C: CB Inflow Area = 4.002 ac, 0.00% Impervious, Inflow Depth = 1.12" for 2-Yr Storm event Inflow = 7.15 cfs @ 11.98 hrs, Volume= 0.374 af Outflow = 7.16 cfs @ 11.98 hrs, Volume= 0.374 af, Atten= 0%, Lag= 0.2 min Primary = 7.16 cfs @ 11.98 hrs, Volume= 0.374 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,727.41' @ 11.98 hrs Surf.Area= 0 sf Storage= 106 cf Flood Elev= 2,730.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.9 min calculated for 0.373 af (100% of inflow) Center-of-Mass det. time= 0.9 min ( 860.7 - 859.8 ) Volume Invert Avail.Storage Storage Description #1 2,726.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,726.00 0 2,728.00 150 2,730.00 521 Device Routing Invert Outlet Devices #1 Primary 2,726.00'24.0" Round Culvert L= 130.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,726.00' / 2,725.50' S= 0.0038 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=6.90 cfs @ 11.98 hrs HW=2,727.38' (Free Discharge) 1=Culvert (Barrel Controls 6.90 cfs @ 4.21 fps) Summary for Pond P1D: CB Inflow Area = 2.813 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 4.40 cfs @ 12.00 hrs, Volume= 0.249 af Outflow = 4.36 cfs @ 12.01 hrs, Volume= 0.249 af, Atten= 1%, Lag= 0.2 min Primary = 4.36 cfs @ 12.01 hrs, Volume= 0.249 af AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 23HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,719.51' @ 12.01 hrs Surf.Area= 0 sf Storage= 81 cf Flood Elev= 2,722.00' Surf.Area= 0 sf Storage= 500 cf Plug-Flow detention time= 0.6 min calculated for 0.249 af (100% of inflow) Center-of-Mass det. time= 0.9 min ( 866.0 - 865.0 ) Volume Invert Avail.Storage Storage Description #1 2,718.50'500 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,718.50 0 2,720.00 120 2,722.00 500 Device Routing Invert Outlet Devices #1 Primary 2,718.50'18.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,718.50' / 2,718.00' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf Primary OutFlow Max=4.31 cfs @ 12.01 hrs HW=2,719.51' (Free Discharge) 1=Culvert (Inlet Controls 4.31 cfs @ 3.42 fps) Summary for Pond P1E: CB Inflow Area = 5.751 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 8.26 cfs @ 12.03 hrs, Volume= 0.510 af Outflow = 8.28 cfs @ 12.03 hrs, Volume= 0.510 af, Atten= 0%, Lag= 0.3 min Primary = 8.28 cfs @ 12.03 hrs, Volume= 0.510 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,655.29' @ 12.03 hrs Surf.Area= 0 sf Storage= 76 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 686 cf Plug-Flow detention time= 0.3 min calculated for 0.509 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 867.2 - 866.9 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'686 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 40 40 2,656.00 125 165 2,660.00 521 686 AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 24HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=8.07 cfs @ 12.03 hrs HW=2,655.27' (Free Discharge) 1=Culvert (Inlet Controls 8.07 cfs @ 3.84 fps) Summary for Pond P1F: CB Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 8.53 cfs @ 12.01 hrs, Volume= 0.502 af Outflow = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af, Atten= 0%, Lag= 0.1 min Primary = 8.52 cfs @ 12.01 hrs, Volume= 0.502 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,707.31' @ 12.01 hrs Surf.Area= 0 sf Storage= 67 cf Flood Elev= 2,710.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.4 min calculated for 0.502 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 866.2 - 865.9 ) Volume Invert Avail.Storage Storage Description #1 2,706.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,706.00 0 2,707.00 40 2,708.00 125 2,710.00 521 Device Routing Invert Outlet Devices #1 Primary 2,706.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,706.00' / 2,705.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=8.30 cfs @ 12.01 hrs HW=2,707.29' (Free Discharge) 1=Culvert (Inlet Controls 8.30 cfs @ 3.87 fps) Summary for Pond P1G: CB Inflow Area = 4.246 ac, 0.00% Impervious, Inflow Depth = 1.12" for 2-Yr Storm event Inflow = 7.13 cfs @ 12.00 hrs, Volume= 0.397 af Outflow = 7.11 cfs @ 12.00 hrs, Volume= 0.397 af, Atten= 0%, Lag= 0.2 min Primary = 7.11 cfs @ 12.00 hrs, Volume= 0.397 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 25HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,655.18' @ 12.00 hrs Surf.Area= 0 sf Storage= 96 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 716 cf Plug-Flow detention time= 0.7 min calculated for 0.397 af (100% of inflow) Center-of-Mass det. time= 0.7 min ( 862.2 - 861.5 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'716 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 75 75 2,656.00 120 195 2,660.00 521 716 Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=7.07 cfs @ 12.00 hrs HW=2,655.17' (Free Discharge) 1=Culvert (Inlet Controls 7.07 cfs @ 3.69 fps) Summary for Pond P1H: CB Inflow Area = 4.382 ac, 0.00% Impervious, Inflow Depth = 1.06" for 2-Yr Storm event Inflow = 6.33 cfs @ 12.02 hrs, Volume= 0.388 af Outflow = 6.32 cfs @ 12.03 hrs, Volume= 0.388 af, Atten= 0%, Lag= 0.2 min Primary = 6.32 cfs @ 12.03 hrs, Volume= 0.388 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,665.10' @ 12.03 hrs Surf.Area= 0 sf Storage= 128 cf Flood Elev= 2,667.00' Surf.Area= 0 sf Storage= 550 cf Plug-Flow detention time= 2.5 min calculated for 0.387 af (100% of inflow) Center-of-Mass det. time= 1.2 min ( 868.0 - 866.8 ) Volume Invert Avail.Storage Storage Description #1 2,663.00'550 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,663.00 0 2,664.00 40 2,666.00 200 2,667.00 550 AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 26HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,664.00'24.0" Round Culvert L= 12.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,664.00' / 2,663.50' S= 0.0417 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=6.16 cfs @ 12.03 hrs HW=2,665.08' (Free Discharge) 1=Culvert (Inlet Controls 6.16 cfs @ 3.54 fps) Summary for Pond P3: DETENTION BASIN 3 Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 0.88" for 2-Yr Storm event Inflow = 14.17 cfs @ 12.09 hrs, Volume= 0.906 af Outflow = 2.30 cfs @ 12.58 hrs, Volume= 0.894 af, Atten= 84%, Lag= 29.6 min Primary = 2.30 cfs @ 12.58 hrs, Volume= 0.894 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 2,692.48' @ 12.58 hrs Surf.Area= 5,782 sf Storage= 12,180 cf Flood Elev= 2,710.00' Surf.Area= 49,803 sf Storage= 427,793 cf Plug-Flow detention time= 58.3 min calculated for 0.894 af (99% of inflow) Center-of-Mass det. time= 49.7 min ( 934.7 - 885.0 ) Volume Invert Avail.Storage Storage Description #1 2,688.00' 427,793 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,688.00 0 0 0 2,690.00 2,243 2,243 2,243 2,700.00 16,532 93,875 96,118 2,710.00 49,803 331,675 427,793 Device Routing Invert Outlet Devices #1 Primary 2,689.00'12.0" Round Culvert L= 806.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,689.00' / 2,655.00' S= 0.0422 '/' Cc= 0.900 n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 2,688.00'1.0" Vert. Pool Drain Holes X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,694.00'24.0" Horiz. Top Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.30 cfs @ 12.58 hrs HW=2,692.48' (Free Discharge) 1=Culvert (Passes 2.30 cfs of 6.52 cfs potential flow) 2=Pool Drain Holes (Orifice Controls 2.30 cfs @ 8.78 fps) 3=Top Overflow ( Controls 0.00 cfs) AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 27HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond P4: DETENTION BASIN 4 Inflow Area = 6.315 ac, 0.00% Impervious, Inflow Depth = 0.57" for 2-Yr Storm event Inflow = 5.32 cfs @ 11.97 hrs, Volume= 0.301 af Outflow = 4.06 cfs @ 12.03 hrs, Volume= 0.301 af, Atten= 24%, Lag= 3.5 min Primary = 4.06 cfs @ 12.03 hrs, Volume= 0.301 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,690.21' @ 12.03 hrs Surf.Area= 524 sf Storage= 1,167 cf Plug-Flow detention time= 2.6 min calculated for 0.301 af (100% of inflow) Center-of-Mass det. time= 2.6 min ( 903.2 - 900.6 ) Volume Invert Avail.Storage Storage Description #1 2,686.00' 1,553,058 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,686.00 0 0 0 2,688.00 279 279 279 2,694.00 944 3,669 3,948 2,696.00 3,604 4,548 8,496 2,700.00 24,897 57,002 65,498 2,710.00 68,989 469,430 534,928 2,720.00 134,637 1,018,130 1,553,058 Device Routing Invert Outlet Devices #1 Primary 2,685.00'12.0" Round Culvert L= 425.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,685.00' / 2,634.00' S= 0.1200 '/' Cc= 0.900 n= 0.012, Flow Area= 0.79 sf #2 Device 1 2,686.00'1.0" Vert. Orifice/Grate X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,690.00'24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=3.84 cfs @ 12.03 hrs HW=2,690.18' (Free Discharge) 1=Culvert (Passes 3.84 cfs of 6.46 cfs potential flow) 2=Orifice/Grate (Orifice Controls 2.31 cfs @ 8.83 fps) 3=Orifice/Grate (Weir Controls 1.53 cfs @ 1.38 fps) Summary for Pond P6: Pooling Area, Catch Basin, 36-in Culvert Inflow Area = 16.868 ac, 13.12% Impervious, Inflow Depth = 0.73" for 2-Yr Storm event Inflow = 13.61 cfs @ 12.06 hrs, Volume= 1.030 af Outflow = 13.63 cfs @ 12.06 hrs, Volume= 1.030 af, Atten= 0%, Lag= 0.1 min Primary = 13.63 cfs @ 12.06 hrs, Volume= 1.030 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 28HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,653.42' @ 12.06 hrs Surf.Area= 494 sf Storage= 186 cf Flood Elev= 2,673.00' Surf.Area= 6,110 sf Storage= 19,106 cf Plug-Flow detention time= 0.3 min calculated for 1.028 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 892.5 - 892.2 ) Volume Invert Avail.Storage Storage Description #1 2,653.00' 19,106 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,653.00 386 0 0 2,654.00 640 513 513 2,656.00 1,911 2,551 3,064 2,660.00 6,110 16,042 19,106 Device Routing Invert Outlet Devices #1 Primary 2,649.00'29.1" Round Culvert L= 536.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,649.00' / 2,633.50' S= 0.0289 '/' Cc= 0.900 n= 0.010, Flow Area= 4.62 sf #2 Device 1 2,653.00'1.5" x 4.5" Horiz. Orifice/Grate X 8.00 columns X 16 rows C= 0.600 in 45.0" x 45.5" Grate Limited to weir flow at low heads Primary OutFlow Max=13.31 cfs @ 12.06 hrs HW=2,653.42' (Free Discharge) 1=Culvert (Passes 13.31 cfs of 39.81 cfs potential flow) 2=Orifice/Grate (Weir Controls 13.31 cfs @ 2.11 fps) Summary for Link AP-1: Analysis Point 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 0.99" for 2-Yr Storm event Inflow = 21.31 cfs @ 12.17 hrs, Volume= 3.445 af Primary = 21.31 cfs @ 12.17 hrs, Volume= 3.445 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-2: Analysis Point 2 Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 0.64" for 2-Yr Storm event Inflow = 19.76 cfs @ 12.05 hrs, Volume= 1.549 af Primary = 19.76 cfs @ 12.05 hrs, Volume= 1.549 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 2-Yr Storm Rainfall=3.50"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 29HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 0.42" for 2-Yr Storm event Inflow = 1.34 cfs @ 12.06 hrs, Volume= 0.123 af Primary = 1.34 cfs @ 12.06 hrs, Volume= 0.123 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 0.49" for 2-Yr Storm event Inflow = 2.48 cfs @ 12.10 hrs, Volume= 0.243 af Primary = 2.48 cfs @ 12.10 hrs, Volume= 0.243 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 0.62" for 2-Yr Storm event Inflow = 3.21 cfs @ 12.10 hrs, Volume= 0.281 af Primary = 3.21 cfs @ 12.10 hrs, Volume= 0.281 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.760 ac, 3.55% Impervious, Inflow Depth = 0.79" for 2-Yr Storm event Inflow = 23.83 cfs @ 12.61 hrs, Volume= 5.642 af Primary = 23.83 cfs @ 12.61 hrs, Volume= 5.642 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 30HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=185,362 sf 0.00% Impervious Runoff Depth=1.42"Subcatchment 1A: SC 1A Flow Length=377' Tc=8.7 min CN=60 Runoff=9.21 cfs 0.503 af Runoff Area=352,836 sf 0.00% Impervious Runoff Depth=2.27"Subcatchment 1B: SC 1B Flow Length=494' Tc=7.2 min CN=71 Runoff=30.75 cfs 1.531 af Runoff Area=174,318 sf 0.00% Impervious Runoff Depth=2.35"Subcatchment 1C: SC 1C Flow Length=517' Tc=8.0 min CN=72 Runoff=15.24 cfs 0.785 af Runoff Area=122,518 sf 0.00% Impervious Runoff Depth=2.27"Subcatchment 1D: SC 1D Flow Length=561' Tc=10.1 min CN=71 Runoff=9.68 cfs 0.532 af Runoff Area=5.751 ac 0.00% Impervious Runoff Depth=2.27"Subcatchment 1E: SC 1E Flow Length=965' Tc=12.1 min CN=71 Runoff=18.37 cfs 1.087 af Runoff Area=5.661 ac 0.00% Impervious Runoff Depth=2.27"Subcatchment 1F: SC 1F Flow Length=952' Tc=11.0 min CN=71 Runoff=18.85 cfs 1.070 af Runoff Area=184,958 sf 0.00% Impervious Runoff Depth=2.35"Subcatchment 1G: SC-G Flow Length=605' Tc=9.8 min CN=72 Runoff=15.33 cfs 0.833 af Runoff Area=190,886 sf 0.00% Impervious Runoff Depth=2.27"Subcatchment 1H: SC 1H Flow Length=893' Tc=12.0 min CN=71 Runoff=14.05 cfs 0.829 af Runoff Area=112,472 sf 0.00% Impervious Runoff Depth=1.56"Subcatchment 1I: SC 1I Flow Length=238' Tc=8.3 min CN=62 Runoff=6.33 cfs 0.336 af Runoff Area=6.315 ac 0.00% Impervious Runoff Depth=1.49"Subcatchment 2A: SC 2A Flow Length=957' Tc=6.1 min CN=61 Runoff=16.06 cfs 0.785 af Runoff Area=243,425 sf 0.00% Impervious Runoff Depth=1.71"Subcatchment 2B(1): SC 2B (1) Flow Length=759' Tc=15.3 min CN=64 Runoff=11.74 cfs 0.797 af Runoff Area=181,578 sf 0.00% Impervious Runoff Depth=1.35"Subcatchment 2B(2): SC 2B (2) Flow Length=682' Tc=13.9 min CN=59 Runoff=6.91 cfs 0.469 af Runoff Area=1.650 ac 0.00% Impervious Runoff Depth=1.08"Subcatchment 2C: SC 2C Flow Length=230' Tc=10.0 min CN=55 Runoff=2.41 cfs 0.149 af Runoff Area=138,521 sf 23.90% Impervious Runoff Depth=1.94"Subcatchment 2D: SC 2D Flow Length=848' Tc=17.8 min CN=67 Runoff=7.10 cfs 0.515 af Runoff Area=155,074 sf 0.00% Impervious Runoff Depth=1.21"Subcatchment 3: SC 3 Flow Length=370' Tc=12.1 min CN=57 Runoff=5.50 cfs 0.360 af Runoff Area=258,311 sf 0.00% Impervious Runoff Depth=1.35"Subcatchment 4: SC 4 Flow Length=622' Tc=16.2 min CN=59 Runoff=8.99 cfs 0.667 af AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 31HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Runoff Area=238,537 sf 15.16% Impervious Runoff Depth=1.56"Subcatchment 5: SC 5 Flow Length=740' Tc=16.7 min CN=62 Runoff=9.80 cfs 0.713 af Runoff Area=8.100 ac 17.93% Impervious Runoff Depth=1.71"Subcatchment OS: OFFSITE Flow Length=1,234' Tc=12.6 min CN=64 Runoff=18.64 cfs 1.156 af Avg. Flow Depth=1.43' Max Vel=2.97 fps Inflow=54.73 cfs 7.485 afReach R1: AP-1 TO RIVER n=0.190 L=370.0' S=0.1568 '/' Capacity=462.43 cfs Outflow=49.04 cfs 7.485 af Avg. Flow Depth=0.69' Max Vel=5.34 fps Inflow=39.48 cfs 2.035 afReach R1A: Northend 6DN ditch n=0.035 L=950.0' S=0.0342 '/' Capacity=2,767.35 cfs Outflow=36.91 cfs 2.035 af Avg. Flow Depth=0.75' Max Vel=17.38 fps Inflow=24.49 cfs 1.315 afReach R1B: 36" SD 36.0" Round Pipe n=0.013 L=960.0' S=0.0688 '/' Capacity=174.88 cfs Outflow=23.43 cfs 1.315 af Avg. Flow Depth=0.83' Max Vel=15.03 fps Inflow=18.50 cfs 1.070 afReach R1F: 24" SD 24.0" Round Pipe n=0.013 L=857.0' S=0.0525 '/' Capacity=51.84 cfs Outflow=18.08 cfs 1.070 af Avg. Flow Depth=1.49' Max Vel=2.71 fps Inflow=53.93 cfs 3.870 afReach R2: AP-2 TO RIVER n=0.100 L=2,900.0' S=0.0352 '/' Capacity=268.52 cfs Outflow=32.76 cfs 3.870 af Avg. Flow Depth=0.41' Max Vel=1.71 fps Inflow=5.50 cfs 0.360 afReach R3: AP-3 TO RIVER n=0.100 L=1,700.0' S=0.0765 '/' Capacity=395.93 cfs Outflow=2.94 cfs 0.360 af Avg. Flow Depth=0.63' Max Vel=2.62 fps Inflow=8.99 cfs 0.667 afReach R4: AP-4 TO RIVER n=0.100 L=350.0' S=0.1000 '/' Capacity=452.76 cfs Outflow=8.68 cfs 0.667 af Avg. Flow Depth=0.59' Max Vel=1.41 fps Inflow=9.80 cfs 0.713 afReach R5: AP-5 TO RIVER n=0.100 L=2,600.0' S=0.0315 '/' Capacity=254.27 cfs Outflow=4.27 cfs 0.713 af Peak Elev=2,718.35' Inflow=24.49 cfs 1.315 afPond CBCD: #1 36.0" Round Culvert n=0.013 L=4.0' S=0.1250 '/' Outflow=24.49 cfs 1.315 af Peak Elev=2,654.93' Inflow=56.61 cfs 3.235 afPond CBEG: #2 36.0" Round Culvert n=0.013 L=200.0' S=0.2550 '/' Outflow=56.61 cfs 3.235 af Peak Elev=2,701.40' Inflow=18.50 cfs 1.070 afPond CBF: #3 24.0" Round Culvert n=0.013 L=857.0' S=0.0525 '/' Outflow=18.50 cfs 1.070 af Peak Elev=2,654.40' Inflow=31.93 cfs 1.898 afPond CBH: #4 36.0" Round Culvert n=0.013 L=200.0' S=0.2700 '/' Outflow=31.93 cfs 1.898 af Peak Elev=2,594.33' Storage=61,930 cf Inflow=96.35 cfs 7.489 afPond P1: DETENTION POND 1 Primary=33.57 cfs 7.293 af Secondary=21.16 cfs 0.192 af Outflow=54.73 cfs 7.485 af Peak Elev=2,728.42' Storage=229 cf Inflow=15.24 cfs 0.785 afPond P1C: CB 24.0" Round Culvert n=0.013 L=130.0' S=0.0038 '/' Outflow=15.28 cfs 0.785 af Peak Elev=2,720.47' Storage=209 cf Inflow=9.68 cfs 0.532 afPond P1D: CB 18.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=9.40 cfs 0.530 af AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 32HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev=2,656.46' Storage=225 cf Inflow=18.37 cfs 1.087 afPond P1E: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=18.31 cfs 1.087 af Peak Elev=2,708.49' Storage=223 cf Inflow=18.85 cfs 1.070 afPond P1F: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=18.50 cfs 1.070 af Peak Elev=2,656.02' Storage=197 cf Inflow=15.33 cfs 0.833 afPond P1G: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=15.25 cfs 0.833 af Peak Elev=2,665.84' Storage=187 cf Inflow=14.05 cfs 0.829 afPond P1H: CB 24.0" Round Culvert n=0.013 L=12.0' S=0.0417 '/' Outflow=14.02 cfs 0.828 af Peak Elev=2,694.89' Storage=30,279 cf Inflow=36.91 cfs 2.035 afPond P3: DETENTION BASIN 3 Outflow=8.18 cfs 2.020 af Peak Elev=2,694.45' Storage=4,503 cf Inflow=16.06 cfs 0.785 afPond P4: DETENTION BASIN 4 Outflow=8.93 cfs 0.785 af Peak Elev=2,654.56' Storage=972 cf Inflow=36.89 cfs 2.468 afPond P6: Pooling Area, Catch Basin, 36-in Outflow=36.11 cfs 2.468 af Inflow=54.73 cfs 7.485 afLink AP-1: Analysis Point 1 Primary=54.73 cfs 7.485 af Inflow=53.93 cfs 3.870 afLink AP-2: Analysis Point 2 Primary=53.93 cfs 3.870 af Inflow=5.50 cfs 0.360 afLink AP-3: Analysis Point 3 Primary=5.50 cfs 0.360 af Inflow=8.99 cfs 0.667 afLink AP-4: Analysis Point 4 Primary=8.99 cfs 0.667 af Inflow=9.80 cfs 0.713 afLink AP-5: Analysis Point 5 Primary=9.80 cfs 0.713 af Inflow=71.00 cfs 13.094 afLink AP-6: PIGEON RIVER CONTRIBUTION Primary=71.00 cfs 13.094 af Total Runoff Area = 85.760 ac Runoff Volume = 13.116 af Average Runoff Depth = 1.84" 96.45% Pervious = 82.717 ac 3.55% Impervious = 3.043 ac AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 33HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1A: SC 1A Runoff = 9.21 cfs @ 11.99 hrs, Volume= 0.503 af, Depth= 1.42" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 16,982 85 Gravel roads, HSG B 168,380 58 Meadow, non-grazed, HSG B 185,362 60 Weighted Average 185,362 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 64 0.0470 10.53 4,718.88 Trap/Vee/Rect Channel Flow, C-D Bot.W=40.00' D=8.00' Z= 2.0 '/' Top.W=72.00' n= 0.100 Earth, dense brush, high stage 0.3 75 0.3600 4.20 Shallow Concentrated Flow, D-E Short Grass Pasture Kv= 7.0 fps 8.7 377 Total Summary for Subcatchment 1B: SC 1B Runoff = 30.75 cfs @ 11.96 hrs, Volume= 1.531 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 4,792 85 Gravel roads, HSG B 348,044 71 Meadow, non-grazed, HSG C 352,836 71 Weighted Average 352,836 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.9 100 0.1600 0.28 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 216 0.3300 4.02 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 178 0.0100 7.62 609.28 Trap/Vee/Rect Channel Flow, D-E Bot.W=8.00' D=4.00' Z= 3.0 '/' Top.W=32.00' n= 0.035 Earth, dense weeds 7.2 494 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 34HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1C: SC 1C Runoff = 15.24 cfs @ 11.97 hrs, Volume= 0.785 af, Depth= 2.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 11,326 85 Gravel roads, HSG B 162,992 71 Meadow, non-grazed, HSG C 174,318 72 Weighted Average 174,318 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.5 122 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 157 0.3300 19.38 116.27 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 2.0 '/' Top.W=8.00' n= 0.035 0.2 138 0.0800 12.41 74.44 Channel Flow, D-E Area= 6.0 sf Perim= 7.2' r= 0.83' n= 0.030 Earth, grassed & winding 8.0 517 Total Summary for Subcatchment 1D: SC 1D Runoff = 9.68 cfs @ 12.00 hrs, Volume= 0.532 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 120,471 71 Meadow, non-grazed, HSG C 2,047 85 Gravel roads, HSG B 122,518 71 Weighted Average 122,518 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.8 371 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 90 0.3300 28.16 450.49 Channel Flow, C-DArea= 16.0 sf Perim= 12.9' r= 1.24' n= 0.035 10.1 561 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 35HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1E: SC 1E Runoff = 18.37 cfs @ 12.02 hrs, Volume= 1.087 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 5.690 71 Meadow, non-grazed, HSG C * 0.061 85 gravel road 5.751 71 Weighted Average 5.751 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 202 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.0 50 0.0300 21.73 391.23 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.013 12.1 965 Total Summary for Subcatchment 1F: SC 1F Runoff = 18.85 cfs @ 12.01 hrs, Volume= 1.070 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 5.537 71 Meadow, non-grazed, HSG C * 0.124 85 gravel road 5.661 71 Weighted Average 5.661 100.00% Pervious Area AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 36HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.9 380 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 104 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.8 368 0.0300 8.07 145.31 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.035 11.0 952 Total Summary for Subcatchment 1G: SC-G Runoff = 15.33 cfs @ 11.99 hrs, Volume= 0.833 af, Depth= 2.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 171,906 71 Meadow, non-grazed, HSG C * 13,052 85 gravel road 184,958 72 Weighted Average 184,958 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.3 306 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 199 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 9.8 605 Total Summary for Subcatchment 1H: SC 1H Runoff = 14.05 cfs @ 12.02 hrs, Volume= 0.829 af, Depth= 2.27" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 37HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (sf) CN Description 188,150 71 Meadow, non-grazed, HSG C 2,736 96 Gravel surface, HSG B 190,886 71 Weighted Average 190,886 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.2 180 0.3333 13.33 33.32 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 12.0 893 Total Summary for Subcatchment 1I: SC 1I Runoff = 6.33 cfs @ 11.98 hrs, Volume= 0.336 af, Depth= 1.56" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 16,117 85 Gravel roads, HSG B 96,355 58 Meadow, non-grazed, HSG B 112,472 62 Weighted Average 112,472 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 8.3 238 Total Summary for Subcatchment 2A: SC 2A Runoff = 16.06 cfs @ 11.96 hrs, Volume= 0.785 af, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 38HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (ac) CN Description 0.818 56 Brush, Fair, HSG B 4.709 58 Meadow, non-grazed, HSG B 0.788 85 Gravel roads, HSG B 6.315 61 Weighted Average 6.315 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.9 63 0.1800 0.27 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 1.1 500 0.0280 7.41 44.48 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 3.0 '/' Top.W=9.00' n= 0.025 1.1 394 0.0810 6.17 13.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=0.50' Z= 3.0 '/' Top.W=6.00' n= 0.035 Earth, dense weeds 6.1 957 Total Summary for Subcatchment 2B(1): SC 2B (1) Runoff = 11.74 cfs @ 12.06 hrs, Volume= 0.797 af, Depth= 1.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 28,750 55 Woods, Good, HSG B 153,255 58 Meadow, non-grazed, HSG B 61,420 85 Gravel roads, HSG B 243,425 64 Weighted Average 243,425 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 89 0.1800 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.9 250 0.0400 4.49 24.68 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Riprap D50 = 8-12" 0.9 420 0.1100 7.44 40.93 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Rirap D50 (8-12") 15.3 759 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 39HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2B(2): SC 2B (2) Runoff = 6.91 cfs @ 12.05 hrs, Volume= 0.469 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 54,014 55 Woods, Good, HSG B 10,019 85 Gravel roads, HSG B 117,545 58 Meadow, non-grazed, HSG B 181,578 59 Weighted Average 181,578 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 100 0.0250 0.13 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 540 0.1700 9.59 62.35 Trap/Vee/Rect Channel Flow, B-C Bot.W=4.00' D=1.00' Z= 2.5 '/' Top.W=9.00' n= 0.050 0.5 42 0.0400 1.40 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 13.9 682 Total Summary for Subcatchment 2C: SC 2C Runoff = 2.41 cfs @ 12.01 hrs, Volume= 0.149 af, Depth= 1.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 1.490 55 Woods, Good, HSG B 0.160 58 Meadow, non-grazed, HSG B 1.650 55 Weighted Average 1.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 130 0.1500 1.94 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 10.0 230 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 40HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2D: SC 2D Runoff = 7.10 cfs @ 12.09 hrs, Volume= 0.515 af, Depth= 1.94" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 63,162 55 Woods, Good, HSG B 33,106 98 Paved parking, HSG B 3,049 85 Gravel roads, HSG B 39,204 58 Meadow, non-grazed, HSG B 138,521 67 Weighted Average 105,415 76.10% Pervious Area 33,106 23.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.3 90 0.1600 0.10 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 1.0 428 0.0600 7.38 22.14 Trap/Vee/Rect Channel Flow, B-C Bot.W=0.00' D=1.00' Z= 3.0 '/' Top.W=6.00' n= 0.030 Earth, grassed & winding 2.5 330 0.1000 2.21 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 17.8 848 Total Summary for Subcatchment 3: SC 3 Runoff = 5.50 cfs @ 12.03 hrs, Volume= 0.360 af, Depth= 1.21" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 97,139 55 Woods, Good, HSG B 7,841 85 Gravel roads, HSG B 50,094 58 Meadow, non-grazed, HSG B 155,074 57 Weighted Average 155,074 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1300 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 270 0.1400 1.87 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 12.1 370 Total AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 41HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 8.99 cfs @ 12.08 hrs, Volume= 0.667 af, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 121,097 55 Woods, Good, HSG B 21,780 85 Gravel roads, HSG B 115,434 58 Meadow, non-grazed, HSG B 258,311 59 Weighted Average 258,311 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 9.80 cfs @ 12.08 hrs, Volume= 0.713 af, Depth= 1.56" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (sf) CN Description 192,799 55 Woods, Good, HSG B 35,284 98 Paved parking, HSG B 9,583 58 Meadow, non-grazed, HSG B 871 98 Roofs, HSG B 238,537 62 Weighted Average 202,382 84.84% Pervious Area 36,155 15.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 100 0.1600 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.6 470 0.1400 12.61 122.92 Trap/Vee/Rect Channel Flow, B-C Bot.W=6.00' D=1.00' Z= 2.5 & 5.0 '/' Top.W=13.50' n= 0.035 0.5 170 0.0300 5.54 44.29 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 42HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.035 16.7 740 Total Summary for Subcatchment OS: OFFSITE Runoff = 18.64 cfs @ 12.03 hrs, Volume= 1.156 af, Depth= 1.71" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Storm Rainfall=5.20" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.4 308 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 0.3 91 0.0200 5.76 161.26 Trap/Vee/Rect Channel Flow, E-FBot.W=4.00' D=2.00' Z= 5.0 '/' Top.W=24.00' n= 0.040 12.6 1,234 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.15" for 10-yr Storm event Inflow = 54.73 cfs @ 12.16 hrs, Volume= 7.485 af Outflow = 49.04 cfs @ 12.23 hrs, Volume= 7.485 af, Atten= 10%, Lag= 4.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 2.97 fps, Min. Travel Time= 2.1 min Avg. Velocity = 0.71 fps, Avg. Travel Time= 8.7 min Peak Storage= 6,345 cf @ 12.20 hrs Average Depth at Peak Storage= 1.43' Bank-Full Depth= 4.00' Flow Area= 80.0 sf, Capacity= 462.43 cfs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 43HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 30.00' x 4.00' deep Parabolic Channel, n= 0.190 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' ‡ Summary for Reach R1A: Northend 6DN ditch Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 1.98" for 10-yr Storm event Inflow = 39.48 cfs @ 11.97 hrs, Volume= 2.035 af Outflow = 36.91 cfs @ 12.05 hrs, Volume= 2.035 af, Atten= 7%, Lag= 5.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 5.34 fps, Min. Travel Time= 3.0 min Avg. Velocity = 1.50 fps, Avg. Travel Time= 10.5 min Peak Storage= 6,574 cf @ 12.00 hrs Average Depth at Peak Storage= 0.69' Bank-Full Depth= 6.00' Flow Area= 156.0 sf, Capacity= 2,767.35 cfs 8.00' x 6.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 '/' Top Width= 44.00' Length= 950.0' Slope= 0.0342 '/' Inlet Invert= 2,726.50', Outlet Invert= 2,694.00' ‡ Summary for Reach R1B: 36" SD Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 2.32" for 10-yr Storm event Inflow = 24.49 cfs @ 11.99 hrs, Volume= 1.315 af Outflow = 23.43 cfs @ 12.01 hrs, Volume= 1.315 af, Atten= 4%, Lag= 1.4 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 17.38 fps, Min. Travel Time= 0.9 min Avg. Velocity = 5.56 fps, Avg. Travel Time= 2.9 min Peak Storage= 1,335 cf @ 12.00 hrs Average Depth at Peak Storage= 0.75' Bank-Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 174.88 cfs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 44HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 36.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 960.0' Slope= 0.0688 '/' Inlet Invert= 2,715.00', Outlet Invert= 2,649.00' Summary for Reach R1F: 24" SD Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af Outflow = 18.08 cfs @ 12.04 hrs, Volume= 1.070 af, Atten= 2%, Lag= 1.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 15.03 fps, Min. Travel Time= 1.0 min Avg. Velocity = 5.01 fps, Avg. Travel Time= 2.9 min Peak Storage= 1,049 cf @ 12.03 hrs Average Depth at Peak Storage= 0.83' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 51.84 cfs 24.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 857.0' Slope= 0.0525 '/' Inlet Invert= 2,698.00', Outlet Invert= 2,653.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 1.60" for 10-yr Storm event Inflow = 53.93 cfs @ 12.06 hrs, Volume= 3.870 af Outflow = 32.76 cfs @ 12.50 hrs, Volume= 3.870 af, Atten= 39%, Lag= 26.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 2.71 fps, Min. Travel Time= 17.9 min Avg. Velocity = 0.61 fps, Avg. Travel Time= 78.7 min Peak Storage= 35,163 cf @ 12.21 hrs Average Depth at Peak Storage= 1.49' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 268.52 cfs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 45HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,900.0' Slope= 0.0352 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,530.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 1.21" for 10-yr Storm event Inflow = 5.50 cfs @ 12.03 hrs, Volume= 0.360 af Outflow = 2.94 cfs @ 12.45 hrs, Volume= 0.360 af, Atten= 47%, Lag= 24.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.71 fps, Min. Travel Time= 16.6 min Avg. Velocity = 0.63 fps, Avg. Travel Time= 45.2 min Peak Storage= 2,954 cf @ 12.17 hrs Average Depth at Peak Storage= 0.41' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' Summary for Reach R4: AP-4 TO RIVER Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 1.35" for 10-yr Storm event Inflow = 8.99 cfs @ 12.08 hrs, Volume= 0.667 af Outflow = 8.68 cfs @ 12.15 hrs, Volume= 0.667 af, Atten= 4%, Lag= 4.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 2.62 fps, Min. Travel Time= 2.2 min Avg. Velocity = 0.96 fps, Avg. Travel Time= 6.0 min Peak Storage= 1,179 cf @ 12.11 hrs Average Depth at Peak Storage= 0.63' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 46HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 1.56" for 10-yr Storm event Inflow = 9.80 cfs @ 12.08 hrs, Volume= 0.713 af Outflow = 4.27 cfs @ 12.82 hrs, Volume= 0.713 af, Atten= 56%, Lag= 44.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.41 fps, Min. Travel Time= 30.8 min Avg. Velocity = 0.42 fps, Avg. Travel Time= 103.4 min Peak Storage= 7,909 cf @ 12.30 hrs Average Depth at Peak Storage= 0.59' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' Summary for Pond CBCD: #1 Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 2.32" for 10-yr Storm event Inflow = 24.49 cfs @ 11.99 hrs, Volume= 1.315 af Outflow = 24.49 cfs @ 11.99 hrs, Volume= 1.315 af, Atten= 0%, Lag= 0.0 min Primary = 24.49 cfs @ 11.99 hrs, Volume= 1.315 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,718.35' @ 11.99 hrs Flood Elev= 2,722.00' Device Routing Invert Outlet Devices #1 Primary 2,716.00'36.0" Round Culvert L= 4.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,716.00' / 2,715.50' S= 0.1250 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 47HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=23.90 cfs @ 11.99 hrs HW=2,718.31' (Free Discharge) 1=Culvert (Inlet Controls 23.90 cfs @ 4.09 fps) Summary for Pond CBEG: #2 Inflow Area = 16.811 ac, 0.00% Impervious, Inflow Depth = 2.31" for 10-yr Storm event Inflow = 56.61 cfs @ 12.01 hrs, Volume= 3.235 af Outflow = 56.61 cfs @ 12.01 hrs, Volume= 3.235 af, Atten= 0%, Lag= 0.0 min Primary = 56.61 cfs @ 12.01 hrs, Volume= 3.235 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,654.93' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 2,649.00'36.0" Round Culvert L= 200.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,649.00' / 2,598.00' S= 0.2550 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=55.59 cfs @ 12.01 hrs HW=2,654.78' (Free Discharge) 1=Culvert (Inlet Controls 55.59 cfs @ 7.86 fps) Summary for Pond CBF: #3 Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af Outflow = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af, Atten= 0%, Lag= 0.0 min Primary = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,701.40' @ 12.02 hrs Flood Elev= 2,708.00' Device Routing Invert Outlet Devices #1 Primary 2,698.00'24.0" Round Culvert L= 857.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,698.00' / 2,653.00' S= 0.0525 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=18.15 cfs @ 12.02 hrs HW=2,701.31' (Free Discharge) 1=Culvert (Inlet Controls 18.15 cfs @ 5.78 fps) AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 48HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond CBH: #4 Inflow Area = 10.043 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 31.93 cfs @ 12.03 hrs, Volume= 1.898 af Outflow = 31.93 cfs @ 12.03 hrs, Volume= 1.898 af, Atten= 0%, Lag= 0.0 min Primary = 31.93 cfs @ 12.03 hrs, Volume= 1.898 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,654.40' @ 12.03 hrs Flood Elev= 2,664.00' Device Routing Invert Outlet Devices #1 Primary 2,652.00'36.0" Round Culvert L= 200.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,652.00' / 2,598.00' S= 0.2700 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=31.20 cfs @ 12.03 hrs HW=2,654.36' (Free Discharge) 1=Culvert (Inlet Controls 31.20 cfs @ 5.23 fps) Summary for Pond P1: DETENTION POND 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.15" for 10-yr Storm event Inflow = 96.35 cfs @ 12.02 hrs, Volume= 7.489 af Outflow = 54.73 cfs @ 12.16 hrs, Volume= 7.485 af, Atten= 43%, Lag= 8.8 min Primary = 33.57 cfs @ 12.16 hrs, Volume= 7.293 af Secondary = 21.16 cfs @ 12.16 hrs, Volume= 0.192 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,594.33' @ 12.16 hrs Surf.Area= 12,141 sf Storage= 61,930 cf Plug-Flow detention time= 22.9 min calculated for 7.477 af (100% of inflow) Center-of-Mass det. time= 22.9 min ( 890.7 - 867.7 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 83,876 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 5,223 0 0 2,588.00 5,997 5,610 5,610 2,590.00 7,703 13,700 19,310 2,592.00 9,623 17,326 36,636 2,594.00 11,757 21,380 58,016 2,596.00 14,103 25,860 83,876 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 49HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013, Flow Area= 3.14 sf #2 Secondary 2,594.00'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=33.50 cfs @ 12.16 hrs HW=2,594.30' (Free Discharge) 1=Culvert (Inlet Controls 33.50 cfs @ 10.66 fps) Secondary OutFlow Max=18.87 cfs @ 12.16 hrs HW=2,594.30' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 18.87 cfs @ 1.39 fps) Summary for Pond P1C: CB Inflow Area = 4.002 ac, 0.00% Impervious, Inflow Depth = 2.35" for 10-yr Storm event Inflow = 15.24 cfs @ 11.97 hrs, Volume= 0.785 af Outflow = 15.28 cfs @ 11.98 hrs, Volume= 0.785 af, Atten= 0%, Lag= 0.6 min Primary = 15.28 cfs @ 11.98 hrs, Volume= 0.785 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,728.42' @ 11.98 hrs Surf.Area= 0 sf Storage= 229 cf Flood Elev= 2,730.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.7 min calculated for 0.785 af (100% of inflow) Center-of-Mass det. time= 0.6 min ( 838.3 - 837.6 ) Volume Invert Avail.Storage Storage Description #1 2,726.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,726.00 0 2,728.00 150 2,730.00 521 Device Routing Invert Outlet Devices #1 Primary 2,726.00'24.0" Round Culvert L= 130.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,726.00' / 2,725.50' S= 0.0038 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=14.73 cfs @ 11.98 hrs HW=2,728.35' (Free Discharge) 1=Culvert (Barrel Controls 14.73 cfs @ 5.03 fps) Summary for Pond P1D: CB Inflow Area = 2.813 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 9.68 cfs @ 12.00 hrs, Volume= 0.532 af Outflow = 9.40 cfs @ 12.01 hrs, Volume= 0.530 af, Atten= 3%, Lag= 0.6 min Primary = 9.40 cfs @ 12.01 hrs, Volume= 0.530 af AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 50HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,720.47' @ 12.01 hrs Surf.Area= 0 sf Storage= 209 cf Flood Elev= 2,722.00' Surf.Area= 0 sf Storage= 500 cf Plug-Flow detention time= 2.8 min calculated for 0.530 af (100% of inflow) Center-of-Mass det. time= 1.1 min ( 843.2 - 842.1 ) Volume Invert Avail.Storage Storage Description #1 2,718.50'500 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,718.50 0 2,720.00 120 2,722.00 500 Device Routing Invert Outlet Devices #1 Primary 2,718.50'18.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,718.50' / 2,718.00' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf Primary OutFlow Max=9.29 cfs @ 12.01 hrs HW=2,720.44' (Free Discharge) 1=Culvert (Inlet Controls 9.29 cfs @ 5.25 fps) Summary for Pond P1E: CB Inflow Area = 5.751 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 18.37 cfs @ 12.02 hrs, Volume= 1.087 af Outflow = 18.31 cfs @ 12.03 hrs, Volume= 1.087 af, Atten= 0%, Lag= 0.5 min Primary = 18.31 cfs @ 12.03 hrs, Volume= 1.087 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,656.46' @ 12.03 hrs Surf.Area= 0 sf Storage= 225 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 686 cf Plug-Flow detention time= 0.3 min calculated for 1.086 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 844.2 - 843.9 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'686 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 40 40 2,656.00 125 165 2,660.00 521 686 AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 51HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=17.84 cfs @ 12.03 hrs HW=2,656.39' (Free Discharge) 1=Culvert (Inlet Controls 17.84 cfs @ 5.68 fps) Summary for Pond P1F: CB Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 18.85 cfs @ 12.01 hrs, Volume= 1.070 af Outflow = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af, Atten= 2%, Lag= 0.6 min Primary = 18.50 cfs @ 12.02 hrs, Volume= 1.070 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,708.49' @ 12.02 hrs Surf.Area= 0 sf Storage= 223 cf Flood Elev= 2,710.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.3 min calculated for 1.069 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 843.2 - 842.9 ) Volume Invert Avail.Storage Storage Description #1 2,706.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,706.00 0 2,707.00 40 2,708.00 125 2,710.00 521 Device Routing Invert Outlet Devices #1 Primary 2,706.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,706.00' / 2,705.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=18.15 cfs @ 12.02 hrs HW=2,708.44' (Free Discharge) 1=Culvert (Inlet Controls 18.15 cfs @ 5.78 fps) Summary for Pond P1G: CB Inflow Area = 4.246 ac, 0.00% Impervious, Inflow Depth = 2.35" for 10-yr Storm event Inflow = 15.33 cfs @ 11.99 hrs, Volume= 0.833 af Outflow = 15.25 cfs @ 12.00 hrs, Volume= 0.833 af, Atten= 1%, Lag= 0.2 min Primary = 15.25 cfs @ 12.00 hrs, Volume= 0.833 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 52HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,656.02' @ 12.00 hrs Surf.Area= 0 sf Storage= 197 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 716 cf Plug-Flow detention time= 0.5 min calculated for 0.832 af (100% of inflow) Center-of-Mass det. time= 0.5 min ( 839.8 - 839.3 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'716 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 75 75 2,656.00 120 195 2,660.00 521 716 Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=15.13 cfs @ 12.00 hrs HW=2,656.00' (Free Discharge) 1=Culvert (Inlet Controls 15.13 cfs @ 4.82 fps) Summary for Pond P1H: CB Inflow Area = 4.382 ac, 0.00% Impervious, Inflow Depth = 2.27" for 10-yr Storm event Inflow = 14.05 cfs @ 12.02 hrs, Volume= 0.829 af Outflow = 14.02 cfs @ 12.02 hrs, Volume= 0.828 af, Atten= 0%, Lag= 0.2 min Primary = 14.02 cfs @ 12.02 hrs, Volume= 0.828 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,665.84' @ 12.02 hrs Surf.Area= 0 sf Storage= 187 cf Flood Elev= 2,667.00' Surf.Area= 0 sf Storage= 550 cf Plug-Flow detention time= 1.5 min calculated for 0.827 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 844.6 - 843.8 ) Volume Invert Avail.Storage Storage Description #1 2,663.00'550 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,663.00 0 2,664.00 40 2,666.00 200 2,667.00 550 AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 53HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,664.00'24.0" Round Culvert L= 12.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,664.00' / 2,663.50' S= 0.0417 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=13.69 cfs @ 12.02 hrs HW=2,665.81' (Free Discharge) 1=Culvert (Inlet Controls 13.69 cfs @ 4.58 fps) Summary for Pond P3: DETENTION BASIN 3 Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 1.98" for 10-yr Storm event Inflow = 36.91 cfs @ 12.05 hrs, Volume= 2.035 af Outflow = 8.18 cfs @ 12.31 hrs, Volume= 2.020 af, Atten= 78%, Lag= 15.4 min Primary = 8.18 cfs @ 12.31 hrs, Volume= 2.020 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 2,694.89' @ 12.31 hrs Surf.Area= 9,228 sf Storage= 30,279 cf Flood Elev= 2,710.00' Surf.Area= 49,803 sf Storage= 427,793 cf Plug-Flow detention time= 77.5 min calculated for 2.020 af (99% of inflow) Center-of-Mass det. time= 72.5 min ( 929.6 - 857.1 ) Volume Invert Avail.Storage Storage Description #1 2,688.00' 427,793 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,688.00 0 0 0 2,690.00 2,243 2,243 2,243 2,700.00 16,532 93,875 96,118 2,710.00 49,803 331,675 427,793 Device Routing Invert Outlet Devices #1 Primary 2,689.00'12.0" Round Culvert L= 806.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,689.00' / 2,655.00' S= 0.0422 '/' Cc= 0.900 n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 2,688.00'1.0" Vert. Pool Drain Holes X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,694.00'24.0" Horiz. Top Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=8.18 cfs @ 12.31 hrs HW=2,694.89' (Free Discharge) 1=Culvert (Barrel Controls 8.18 cfs @ 10.42 fps) 2=Pool Drain Holes (Passes < 3.02 cfs potential flow) 3=Top Overflow (Passes < 14.24 cfs potential flow) AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 54HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond P4: DETENTION BASIN 4 Inflow Area = 6.315 ac, 0.00% Impervious, Inflow Depth = 1.49" for 10-yr Storm event Inflow = 16.06 cfs @ 11.96 hrs, Volume= 0.785 af Outflow = 8.93 cfs @ 12.04 hrs, Volume= 0.785 af, Atten= 44%, Lag= 5.3 min Primary = 8.93 cfs @ 12.04 hrs, Volume= 0.785 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,694.45' @ 12.04 hrs Surf.Area= 1,539 sf Storage= 4,503 cf Plug-Flow detention time= 4.1 min calculated for 0.784 af (100% of inflow) Center-of-Mass det. time= 4.1 min ( 869.0 - 864.9 ) Volume Invert Avail.Storage Storage Description #1 2,686.00' 1,553,058 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,686.00 0 0 0 2,688.00 279 279 279 2,694.00 944 3,669 3,948 2,696.00 3,604 4,548 8,496 2,700.00 24,897 57,002 65,498 2,710.00 68,989 469,430 534,928 2,720.00 134,637 1,018,130 1,553,058 Device Routing Invert Outlet Devices #1 Primary 2,685.00'12.0" Round Culvert L= 425.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,685.00' / 2,634.00' S= 0.1200 '/' Cc= 0.900 n= 0.012, Flow Area= 0.79 sf #2 Device 1 2,686.00'1.0" Vert. Orifice/Grate X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,690.00'24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=8.91 cfs @ 12.04 hrs HW=2,694.41' (Free Discharge) 1=Culvert (Inlet Controls 8.91 cfs @ 11.35 fps) 2=Orifice/Grate (Passes < 3.48 cfs potential flow) 3=Orifice/Grate (Passes < 31.77 cfs potential flow) Summary for Pond P6: Pooling Area, Catch Basin, 36-in Culvert Inflow Area = 16.868 ac, 13.12% Impervious, Inflow Depth = 1.76" for 10-yr Storm event Inflow = 36.89 cfs @ 12.05 hrs, Volume= 2.468 af Outflow = 36.11 cfs @ 12.07 hrs, Volume= 2.468 af, Atten= 2%, Lag= 1.2 min Primary = 36.11 cfs @ 12.07 hrs, Volume= 2.468 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 55HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,654.56' @ 12.07 hrs Surf.Area= 997 sf Storage= 972 cf Flood Elev= 2,673.00' Surf.Area= 6,110 sf Storage= 19,106 cf Plug-Flow detention time= 0.3 min calculated for 2.465 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 862.9 - 862.6 ) Volume Invert Avail.Storage Storage Description #1 2,653.00' 19,106 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,653.00 386 0 0 2,654.00 640 513 513 2,656.00 1,911 2,551 3,064 2,660.00 6,110 16,042 19,106 Device Routing Invert Outlet Devices #1 Primary 2,649.00'29.1" Round Culvert L= 536.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,649.00' / 2,633.50' S= 0.0289 '/' Cc= 0.900 n= 0.010, Flow Area= 4.62 sf #2 Device 1 2,653.00'1.5" x 4.5" Horiz. Orifice/Grate X 8.00 columns X 16 rows C= 0.600 in 45.0" x 45.5" Grate Limited to weir flow at low heads Primary OutFlow Max=35.55 cfs @ 12.07 hrs HW=2,654.51' (Free Discharge) 1=Culvert (Passes 35.55 cfs of 46.12 cfs potential flow) 2=Orifice/Grate (Orifice Controls 35.55 cfs @ 5.92 fps) Summary for Link AP-1: Analysis Point 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.15" for 10-yr Storm event Inflow = 54.73 cfs @ 12.16 hrs, Volume= 7.485 af Primary = 54.73 cfs @ 12.16 hrs, Volume= 7.485 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-2: Analysis Point 2 Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 1.60" for 10-yr Storm event Inflow = 53.93 cfs @ 12.06 hrs, Volume= 3.870 af Primary = 53.93 cfs @ 12.06 hrs, Volume= 3.870 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 10-yr Storm Rainfall=5.20"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 56HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 1.21" for 10-yr Storm event Inflow = 5.50 cfs @ 12.03 hrs, Volume= 0.360 af Primary = 5.50 cfs @ 12.03 hrs, Volume= 0.360 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 1.35" for 10-yr Storm event Inflow = 8.99 cfs @ 12.08 hrs, Volume= 0.667 af Primary = 8.99 cfs @ 12.08 hrs, Volume= 0.667 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 1.56" for 10-yr Storm event Inflow = 9.80 cfs @ 12.08 hrs, Volume= 0.713 af Primary = 9.80 cfs @ 12.08 hrs, Volume= 0.713 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.760 ac, 3.55% Impervious, Inflow Depth = 1.83" for 10-yr Storm event Inflow = 71.00 cfs @ 12.49 hrs, Volume= 13.094 af Primary = 71.00 cfs @ 12.49 hrs, Volume= 13.094 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 57HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=185,362 sf 0.00% Impervious Runoff Depth=1.92"Subcatchment 1A: SC 1A Flow Length=377' Tc=8.7 min CN=60 Runoff=12.74 cfs 0.681 af Runoff Area=352,836 sf 0.00% Impervious Runoff Depth=2.90"Subcatchment 1B: SC 1B Flow Length=494' Tc=7.2 min CN=71 Runoff=39.29 cfs 1.957 af Runoff Area=174,318 sf 0.00% Impervious Runoff Depth=2.99"Subcatchment 1C: SC 1C Flow Length=517' Tc=8.0 min CN=72 Runoff=19.37 cfs 0.998 af Runoff Area=122,518 sf 0.00% Impervious Runoff Depth=2.90"Subcatchment 1D: SC 1D Flow Length=561' Tc=10.1 min CN=71 Runoff=12.38 cfs 0.679 af Runoff Area=5.751 ac 0.00% Impervious Runoff Depth=2.90"Subcatchment 1E: SC 1E Flow Length=965' Tc=12.1 min CN=71 Runoff=23.55 cfs 1.389 af Runoff Area=5.661 ac 0.00% Impervious Runoff Depth=2.90"Subcatchment 1F: SC 1F Flow Length=952' Tc=11.0 min CN=71 Runoff=24.14 cfs 1.367 af Runoff Area=184,958 sf 0.00% Impervious Runoff Depth=2.99"Subcatchment 1G: SC-G Flow Length=605' Tc=9.8 min CN=72 Runoff=19.50 cfs 1.059 af Runoff Area=190,886 sf 0.00% Impervious Runoff Depth=2.90"Subcatchment 1H: SC 1H Flow Length=893' Tc=12.0 min CN=71 Runoff=18.01 cfs 1.059 af Runoff Area=112,472 sf 0.00% Impervious Runoff Depth=2.09"Subcatchment 1I: SC 1I Flow Length=238' Tc=8.3 min CN=62 Runoff=8.59 cfs 0.450 af Runoff Area=6.315 ac 0.00% Impervious Runoff Depth=2.01"Subcatchment 2A: SC 2A Flow Length=957' Tc=6.1 min CN=61 Runoff=21.96 cfs 1.055 af Runoff Area=243,425 sf 0.00% Impervious Runoff Depth=2.26"Subcatchment 2B(1): SC 2B (1) Flow Length=759' Tc=15.3 min CN=64 Runoff=15.81 cfs 1.054 af Runoff Area=181,578 sf 0.00% Impervious Runoff Depth=1.84"Subcatchment 2B(2): SC 2B (2) Flow Length=682' Tc=13.9 min CN=59 Runoff=9.76 cfs 0.639 af Runoff Area=1.650 ac 0.00% Impervious Runoff Depth=1.52"Subcatchment 2C: SC 2C Flow Length=230' Tc=10.0 min CN=55 Runoff=3.57 cfs 0.209 af Runoff Area=138,521 sf 23.90% Impervious Runoff Depth=2.53"Subcatchment 2D: SC 2D Flow Length=848' Tc=17.8 min CN=67 Runoff=9.36 cfs 0.670 af Runoff Area=155,074 sf 0.00% Impervious Runoff Depth=1.68"Subcatchment 3: SC 3 Flow Length=370' Tc=12.1 min CN=57 Runoff=7.94 cfs 0.497 af Runoff Area=258,311 sf 0.00% Impervious Runoff Depth=1.84"Subcatchment 4: SC 4 Flow Length=622' Tc=16.2 min CN=59 Runoff=12.79 cfs 0.909 af AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 58HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Runoff Area=238,537 sf 15.16% Impervious Runoff Depth=2.09"Subcatchment 5: SC 5 Flow Length=740' Tc=16.7 min CN=62 Runoff=13.46 cfs 0.954 af Runoff Area=8.100 ac 17.93% Impervious Runoff Depth=2.26"Subcatchment OS: OFFSITE Flow Length=1,234' Tc=12.6 min CN=64 Runoff=25.04 cfs 1.528 af Avg. Flow Depth=1.99' Max Vel=3.65 fps Inflow=103.79 cfs 9.653 afReach R1: AP-1 TO RIVER n=0.190 L=370.0' S=0.1568 '/' Capacity=462.43 cfs Outflow=95.89 cfs 9.653 af Avg. Flow Depth=0.80' Max Vel=5.83 fps Inflow=51.48 cfs 2.638 afReach R1A: Northend 6DN ditch n=0.035 L=950.0' S=0.0342 '/' Capacity=2,767.35 cfs Outflow=48.03 cfs 2.638 af Avg. Flow Depth=0.85' Max Vel=18.62 fps Inflow=31.18 cfs 1.677 afReach R1B: 36" SD 36.0" Round Pipe n=0.013 L=960.0' S=0.0688 '/' Capacity=174.88 cfs Outflow=29.83 cfs 1.677 af Avg. Flow Depth=0.95' Max Vel=16.06 fps Inflow=23.88 cfs 1.367 afReach R1F: 24" SD 24.0" Round Pipe n=0.013 L=857.0' S=0.0525 '/' Capacity=51.84 cfs Outflow=23.20 cfs 1.367 af Avg. Flow Depth=1.75' Max Vel=3.00 fps Inflow=68.70 cfs 5.155 afReach R2: AP-2 TO RIVER n=0.100 L=2,900.0' S=0.0352 '/' Capacity=268.52 cfs Outflow=46.06 cfs 5.155 af Avg. Flow Depth=0.51' Max Vel=1.98 fps Inflow=7.94 cfs 0.497 afReach R3: AP-3 TO RIVER n=0.100 L=1,700.0' S=0.0765 '/' Capacity=395.93 cfs Outflow=4.73 cfs 0.497 af Avg. Flow Depth=0.75' Max Vel=2.92 fps Inflow=12.79 cfs 0.909 afReach R4: AP-4 TO RIVER n=0.100 L=350.0' S=0.1000 '/' Capacity=452.76 cfs Outflow=12.30 cfs 0.909 af Avg. Flow Depth=0.72' Max Vel=1.60 fps Inflow=13.46 cfs 0.954 afReach R5: AP-5 TO RIVER n=0.100 L=2,600.0' S=0.0315 '/' Capacity=254.27 cfs Outflow=6.50 cfs 0.954 af Peak Elev=2,718.82' Inflow=31.18 cfs 1.677 afPond CBCD: #1 36.0" Round Culvert n=0.013 L=4.0' S=0.1250 '/' Outflow=31.18 cfs 1.677 af Peak Elev=2,657.73' Inflow=72.29 cfs 4.126 afPond CBEG: #2 36.0" Round Culvert n=0.013 L=200.0' S=0.2550 '/' Outflow=72.29 cfs 4.126 af Peak Elev=2,702.99' Inflow=23.88 cfs 1.367 afPond CBF: #3 24.0" Round Culvert n=0.013 L=857.0' S=0.0525 '/' Outflow=23.88 cfs 1.367 af Peak Elev=2,654.93' Inflow=40.99 cfs 2.425 afPond CBH: #4 36.0" Round Culvert n=0.013 L=200.0' S=0.2700 '/' Outflow=40.99 cfs 2.425 af Peak Elev=2,594.69' Storage=66,381 cf Inflow=125.37 cfs 9.630 afPond P1: DETENTION POND 1 Primary=34.52 cfs 8.757 af Secondary=69.27 cfs 0.896 af Outflow=103.79 cfs 9.653 af Peak Elev=2,729.36' Storage=403 cf Inflow=19.37 cfs 0.998 afPond P1C: CB 24.0" Round Culvert n=0.013 L=130.0' S=0.0038 '/' Outflow=19.41 cfs 0.998 af Peak Elev=2,721.22' Storage=352 cf Inflow=12.38 cfs 0.679 afPond P1D: CB 18.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=11.95 cfs 0.679 af AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 59HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev=2,657.38' Storage=345 cf Inflow=23.55 cfs 1.389 afPond P1E: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=23.40 cfs 1.389 af Peak Elev=2,709.49' Storage=419 cf Inflow=24.14 cfs 1.367 afPond P1F: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=23.88 cfs 1.367 af Peak Elev=2,656.65' Storage=280 cf Inflow=19.50 cfs 1.059 afPond P1G: CB 24.0" Round Culvert n=0.013 L=15.0' S=0.0333 '/' Outflow=19.43 cfs 1.059 af Peak Elev=2,666.38' Storage=335 cf Inflow=18.01 cfs 1.059 afPond P1H: CB 24.0" Round Culvert n=0.013 L=12.0' S=0.0417 '/' Outflow=17.83 cfs 1.058 af Peak Elev=2,696.05' Storage=41,982 cf Inflow=48.03 cfs 2.638 afPond P3: DETENTION BASIN 3 Outflow=8.31 cfs 2.630 af Peak Elev=2,695.79' Storage=7,758 cf Inflow=21.96 cfs 1.055 afPond P4: DETENTION BASIN 4 Outflow=9.58 cfs 1.055 af Peak Elev=2,655.64' Storage=2,412 cf Inflow=49.44 cfs 3.252 afPond P6: Pooling Area, Catch Basin, Outflow=46.94 cfs 3.252 af Inflow=103.79 cfs 9.653 afLink AP-1: Analysis Point 1 Primary=103.79 cfs 9.653 af Inflow=68.70 cfs 5.155 afLink AP-2: Analysis Point 2 Primary=68.70 cfs 5.155 af Inflow=7.94 cfs 0.497 afLink AP-3: Analysis Point 3 Primary=7.94 cfs 0.497 af Inflow=12.79 cfs 0.909 afLink AP-4: Analysis Point 4 Primary=12.79 cfs 0.909 af Inflow=13.46 cfs 0.954 afLink AP-5: Analysis Point 5 Primary=13.46 cfs 0.954 af Inflow=117.61 cfs 17.168 afLink AP-6: PIGEON RIVER CONTRIBUTION Primary=117.61 cfs 17.168 af Total Runoff Area = 85.760 ac Runoff Volume = 17.155 af Average Runoff Depth = 2.40" 96.45% Pervious = 82.717 ac 3.55% Impervious = 3.043 ac AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 60HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1A: SC 1A Runoff = 12.74 cfs @ 11.99 hrs, Volume= 0.681 af, Depth= 1.92" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 16,982 85 Gravel roads, HSG B 168,380 58 Meadow, non-grazed, HSG B 185,362 60 Weighted Average 185,362 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 64 0.0470 10.53 4,718.88 Trap/Vee/Rect Channel Flow, C-D Bot.W=40.00' D=8.00' Z= 2.0 '/' Top.W=72.00' n= 0.100 Earth, dense brush, high stage 0.3 75 0.3600 4.20 Shallow Concentrated Flow, D-E Short Grass Pasture Kv= 7.0 fps 8.7 377 Total Summary for Subcatchment 1B: SC 1B Runoff = 39.29 cfs @ 11.96 hrs, Volume= 1.957 af, Depth= 2.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 4,792 85 Gravel roads, HSG B 348,044 71 Meadow, non-grazed, HSG C 352,836 71 Weighted Average 352,836 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.9 100 0.1600 0.28 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 216 0.3300 4.02 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 178 0.0100 7.62 609.28 Trap/Vee/Rect Channel Flow, D-E Bot.W=8.00' D=4.00' Z= 3.0 '/' Top.W=32.00' n= 0.035 Earth, dense weeds 7.2 494 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 61HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1C: SC 1C Runoff = 19.37 cfs @ 11.97 hrs, Volume= 0.998 af, Depth= 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 11,326 85 Gravel roads, HSG B 162,992 71 Meadow, non-grazed, HSG C 174,318 72 Weighted Average 174,318 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.5 122 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 157 0.3300 19.38 116.27 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 2.0 '/' Top.W=8.00' n= 0.035 0.2 138 0.0800 12.41 74.44 Channel Flow, D-E Area= 6.0 sf Perim= 7.2' r= 0.83' n= 0.030 Earth, grassed & winding 8.0 517 Total Summary for Subcatchment 1D: SC 1D Runoff = 12.38 cfs @ 11.99 hrs, Volume= 0.679 af, Depth= 2.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 120,471 71 Meadow, non-grazed, HSG C 2,047 85 Gravel roads, HSG B 122,518 71 Weighted Average 122,518 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.8 371 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 90 0.3300 28.16 450.49 Channel Flow, C-DArea= 16.0 sf Perim= 12.9' r= 1.24' n= 0.035 10.1 561 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 62HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 1E: SC 1E Runoff = 23.55 cfs @ 12.02 hrs, Volume= 1.389 af, Depth= 2.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 5.690 71 Meadow, non-grazed, HSG C * 0.061 85 gravel road 5.751 71 Weighted Average 5.751 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 202 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.0 50 0.0300 21.73 391.23 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.013 12.1 965 Total Summary for Subcatchment 1F: SC 1F Runoff = 24.14 cfs @ 12.00 hrs, Volume= 1.367 af, Depth= 2.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 5.537 71 Meadow, non-grazed, HSG C * 0.124 85 gravel road 5.661 71 Weighted Average 5.661 100.00% Pervious Area AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 63HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.9 380 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.1 104 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 0.8 368 0.0300 8.07 145.31 Trap/Vee/Rect Channel Flow, D-E Bot.W=3.00' D=2.00' Z= 3.0 '/' Top.W=15.00' n= 0.035 11.0 952 Total Summary for Subcatchment 1G: SC-G Runoff = 19.50 cfs @ 11.99 hrs, Volume= 1.059 af, Depth= 2.99" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 171,906 71 Meadow, non-grazed, HSG C * 13,052 85 gravel road 184,958 72 Weighted Average 184,958 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 2.3 306 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.3 199 0.3300 13.26 33.15 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 9.8 605 Total Summary for Subcatchment 1H: SC 1H Runoff = 18.01 cfs @ 12.01 hrs, Volume= 1.059 af, Depth= 2.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 64HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (sf) CN Description 188,150 71 Meadow, non-grazed, HSG C 2,736 96 Gravel surface, HSG B 190,886 71 Weighted Average 190,886 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 100 0.1000 0.23 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 4.6 613 0.1000 2.21 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.2 180 0.3333 13.33 33.32 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=0.50' Z= 2.0 '/' Top.W=6.00' n= 0.035 12.0 893 Total Summary for Subcatchment 1I: SC 1I Runoff = 8.59 cfs @ 11.98 hrs, Volume= 0.450 af, Depth= 2.09" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 16,117 85 Gravel roads, HSG B 96,355 58 Meadow, non-grazed, HSG B 112,472 62 Weighted Average 112,472 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 92 0.1960 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 0.6 146 0.3150 3.93 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 8.3 238 Total Summary for Subcatchment 2A: SC 2A Runoff = 21.96 cfs @ 11.95 hrs, Volume= 1.055 af, Depth= 2.01" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 65HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Area (ac) CN Description 0.818 56 Brush, Fair, HSG B 4.709 58 Meadow, non-grazed, HSG B 0.788 85 Gravel roads, HSG B 6.315 61 Weighted Average 6.315 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.9 63 0.1800 0.27 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 1.1 500 0.0280 7.41 44.48 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 3.0 '/' Top.W=9.00' n= 0.025 1.1 394 0.0810 6.17 13.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=0.50' Z= 3.0 '/' Top.W=6.00' n= 0.035 Earth, dense weeds 6.1 957 Total Summary for Subcatchment 2B(1): SC 2B (1) Runoff = 15.81 cfs @ 12.06 hrs, Volume= 1.054 af, Depth= 2.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 28,750 55 Woods, Good, HSG B 153,255 58 Meadow, non-grazed, HSG B 61,420 85 Gravel roads, HSG B 243,425 64 Weighted Average 243,425 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 89 0.1800 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.9 250 0.0400 4.49 24.68 Trap/Vee/Rect Channel Flow, B-C Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Riprap D50 = 8-12" 0.9 420 0.1100 7.44 40.93 Trap/Vee/Rect Channel Flow, C-D Bot.W=3.00' D=1.00' Z= 2.5 '/' Top.W=8.00' n= 0.050 Rirap D50 (8-12") 15.3 759 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 66HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2B(2): SC 2B (2) Runoff = 9.76 cfs @ 12.05 hrs, Volume= 0.639 af, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 54,014 55 Woods, Good, HSG B 10,019 85 Gravel roads, HSG B 117,545 58 Meadow, non-grazed, HSG B 181,578 59 Weighted Average 181,578 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.5 100 0.0250 0.13 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.9 540 0.1700 9.59 62.35 Trap/Vee/Rect Channel Flow, B-C Bot.W=4.00' D=1.00' Z= 2.5 '/' Top.W=9.00' n= 0.050 0.5 42 0.0400 1.40 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 13.9 682 Total Summary for Subcatchment 2C: SC 2C Runoff = 3.57 cfs @ 12.00 hrs, Volume= 0.209 af, Depth= 1.52" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 1.490 55 Woods, Good, HSG B 0.160 58 Meadow, non-grazed, HSG B 1.650 55 Weighted Average 1.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.1600 0.19 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 1.1 130 0.1500 1.94 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 10.0 230 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 67HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 2D: SC 2D Runoff = 9.36 cfs @ 12.08 hrs, Volume= 0.670 af, Depth= 2.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 63,162 55 Woods, Good, HSG B 33,106 98 Paved parking, HSG B 3,049 85 Gravel roads, HSG B 39,204 58 Meadow, non-grazed, HSG B 138,521 67 Weighted Average 105,415 76.10% Pervious Area 33,106 23.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.3 90 0.1600 0.10 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 1.0 428 0.0600 7.38 22.14 Trap/Vee/Rect Channel Flow, B-C Bot.W=0.00' D=1.00' Z= 3.0 '/' Top.W=6.00' n= 0.030 Earth, grassed & winding 2.5 330 0.1000 2.21 Shallow Concentrated Flow, C-D Short Grass Pasture Kv= 7.0 fps 17.8 848 Total Summary for Subcatchment 3: SC 3 Runoff = 7.94 cfs @ 12.03 hrs, Volume= 0.497 af, Depth= 1.68" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 97,139 55 Woods, Good, HSG B 7,841 85 Gravel roads, HSG B 50,094 58 Meadow, non-grazed, HSG B 155,074 57 Weighted Average 155,074 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 100 0.1300 0.17 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.4 270 0.1400 1.87 Shallow Concentrated Flow, B-C Woodland Kv= 5.0 fps 12.1 370 Total AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 68HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Subcatchment 4: SC 4 Runoff = 12.79 cfs @ 12.07 hrs, Volume= 0.909 af, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 121,097 55 Woods, Good, HSG B 21,780 85 Gravel roads, HSG B 115,434 58 Meadow, non-grazed, HSG B 258,311 59 Weighted Average 258,311 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.8 162 0.1420 0.20 Sheet Flow, A-B Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 280 0.1070 2.29 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 0.4 180 0.1390 6.70 535.86 Parabolic Channel, C-D W=60.00' D=2.00' Area=80.0 sf Perim=60.2' n= 0.100 Earth, dense brush, high stage 16.2 622 Total Summary for Subcatchment 5: SC 5 Runoff = 13.46 cfs @ 12.08 hrs, Volume= 0.954 af, Depth= 2.09" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (sf) CN Description 192,799 55 Woods, Good, HSG B 35,284 98 Paved parking, HSG B 9,583 58 Meadow, non-grazed, HSG B 871 98 Roofs, HSG B 238,537 62 Weighted Average 202,382 84.84% Pervious Area 36,155 15.16% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 100 0.1600 0.11 Sheet Flow, A-B Woods: Dense underbrush n= 0.800 P2= 3.50" 0.6 470 0.1400 12.61 122.92 Trap/Vee/Rect Channel Flow, B-C Bot.W=6.00' D=1.00' Z= 2.5 & 5.0 '/' Top.W=13.50' n= 0.035 0.5 170 0.0300 5.54 44.29 Trap/Vee/Rect Channel Flow, C-D Bot.W=4.00' D=1.00' Z= 4.0 '/' Top.W=12.00' AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 69HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.035 16.7 740 Total Summary for Subcatchment OS: OFFSITE Runoff = 25.04 cfs @ 12.03 hrs, Volume= 1.528 af, Depth= 2.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Yr Storm Rainfall=6.00" Area (ac) CN Description 5.200 55 Woods, Good, HSG B 0.970 98 Paved parking, HSG B 1.930 70 1/2 acre lots, 25% imp, HSG B 8.100 64 Weighted Average 6.647 82.07% Pervious Area 1.452 17.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.3 100 0.0400 0.16 Sheet Flow, A-B Grass: Dense n= 0.240 P2= 3.50" 0.6 70 0.0900 2.10 Shallow Concentrated Flow, B-C Short Grass Pasture Kv= 7.0 fps 1.0 665 0.0900 10.58 52.89 Trap/Vee/Rect Channel Flow, C-D Bot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00' n= 0.030 Earth, grassed & winding 0.4 308 0.0730 13.26 93.71 Pipe Channel, D-E 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.025 Corrugated metal 0.3 91 0.0200 5.76 161.26 Trap/Vee/Rect Channel Flow, E-FBot.W=4.00' D=2.00' Z= 5.0 '/' Top.W=24.00' n= 0.040 12.6 1,234 Total Summary for Reach R1: AP-1 TO RIVER Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.77" for 25-Yr Storm event Inflow = 103.79 cfs @ 12.09 hrs, Volume= 9.653 af Outflow = 95.89 cfs @ 12.15 hrs, Volume= 9.653 af, Atten= 8%, Lag= 3.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 3.65 fps, Min. Travel Time= 1.7 min Avg. Velocity = 0.75 fps, Avg. Travel Time= 8.3 min Peak Storage= 10,347 cf @ 12.11 hrs Average Depth at Peak Storage= 1.99' Bank-Full Depth= 4.00' Flow Area= 80.0 sf, Capacity= 462.43 cfs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 70HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 30.00' x 4.00' deep Parabolic Channel, n= 0.190 Length= 370.0' Slope= 0.1568 '/' Inlet Invert= 2,590.00', Outlet Invert= 2,532.00' ‡ Summary for Reach R1A: Northend 6DN ditch Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 2.56" for 25-Yr Storm event Inflow = 51.48 cfs @ 11.97 hrs, Volume= 2.638 af Outflow = 48.03 cfs @ 12.04 hrs, Volume= 2.638 af, Atten= 7%, Lag= 4.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 5.83 fps, Min. Travel Time= 2.7 min Avg. Velocity = 1.60 fps, Avg. Travel Time= 9.9 min Peak Storage= 7,932 cf @ 12.00 hrs Average Depth at Peak Storage= 0.80' Bank-Full Depth= 6.00' Flow Area= 156.0 sf, Capacity= 2,767.35 cfs 8.00' x 6.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 '/' Top Width= 44.00' Length= 950.0' Slope= 0.0342 '/' Inlet Invert= 2,726.50', Outlet Invert= 2,694.00' ‡ Summary for Reach R1B: 36" SD Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 2.95" for 25-Yr Storm event Inflow = 31.18 cfs @ 11.99 hrs, Volume= 1.677 af Outflow = 29.83 cfs @ 12.01 hrs, Volume= 1.677 af, Atten= 4%, Lag= 1.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 18.62 fps, Min. Travel Time= 0.9 min Avg. Velocity = 5.86 fps, Avg. Travel Time= 2.7 min Peak Storage= 1,585 cf @ 12.00 hrs Average Depth at Peak Storage= 0.85' Bank-Full Depth= 3.00' Flow Area= 7.1 sf, Capacity= 174.88 cfs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 71HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 36.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 960.0' Slope= 0.0688 '/' Inlet Invert= 2,715.00', Outlet Invert= 2,649.00' Summary for Reach R1F: 24" SD Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af Outflow = 23.20 cfs @ 12.04 hrs, Volume= 1.367 af, Atten= 3%, Lag= 1.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 16.06 fps, Min. Travel Time= 0.9 min Avg. Velocity = 5.28 fps, Avg. Travel Time= 2.7 min Peak Storage= 1,260 cf @ 12.03 hrs Average Depth at Peak Storage= 0.95' Bank-Full Depth= 2.00' Flow Area= 3.1 sf, Capacity= 51.84 cfs 24.0" Round Pipe n= 0.013 Corrugated PE, smooth interior Length= 857.0' Slope= 0.0525 '/' Inlet Invert= 2,698.00', Outlet Invert= 2,653.00' Summary for Reach R2: AP-2 TO RIVER Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 2.13" for 25-Yr Storm event Inflow = 68.70 cfs @ 12.06 hrs, Volume= 5.155 af Outflow = 46.06 cfs @ 12.47 hrs, Volume= 5.155 af, Atten= 33%, Lag= 24.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 3.00 fps, Min. Travel Time= 16.1 min Avg. Velocity = 0.65 fps, Avg. Travel Time= 74.4 min Peak Storage= 44,858 cf @ 12.20 hrs Average Depth at Peak Storage= 1.75' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 268.52 cfs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 72HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,900.0' Slope= 0.0352 '/' Inlet Invert= 2,632.00', Outlet Invert= 2,530.00' Summary for Reach R3: AP-3 TO RIVER Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 1.68" for 25-Yr Storm event Inflow = 7.94 cfs @ 12.03 hrs, Volume= 0.497 af Outflow = 4.73 cfs @ 12.39 hrs, Volume= 0.497 af, Atten= 40%, Lag= 21.6 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.98 fps, Min. Travel Time= 14.3 min Avg. Velocity = 0.66 fps, Avg. Travel Time= 42.7 min Peak Storage= 4,097 cf @ 12.15 hrs Average Depth at Peak Storage= 0.51' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 395.93 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 1,700.0' Slope= 0.0765 '/' Inlet Invert= 2,664.00', Outlet Invert= 2,534.00' Summary for Reach R4: AP-4 TO RIVER Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 1.84" for 25-Yr Storm event Inflow = 12.79 cfs @ 12.07 hrs, Volume= 0.909 af Outflow = 12.30 cfs @ 12.13 hrs, Volume= 0.909 af, Atten= 4%, Lag= 3.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 2.92 fps, Min. Travel Time= 2.0 min Avg. Velocity = 1.03 fps, Avg. Travel Time= 5.7 min Peak Storage= 1,507 cf @ 12.10 hrs Average Depth at Peak Storage= 0.75' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 452.76 cfs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 73HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 350.0' Slope= 0.1000 '/' Inlet Invert= 2,568.00', Outlet Invert= 2,533.00' Summary for Reach R5: AP-5 TO RIVER Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 2.09" for 25-Yr Storm event Inflow = 13.46 cfs @ 12.08 hrs, Volume= 0.954 af Outflow = 6.50 cfs @ 12.72 hrs, Volume= 0.954 af, Atten= 52%, Lag= 38.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Max. Velocity= 1.60 fps, Min. Travel Time= 27.1 min Avg. Velocity = 0.44 fps, Avg. Travel Time= 98.7 min Peak Storage= 10,591 cf @ 12.27 hrs Average Depth at Peak Storage= 0.72' Bank-Full Depth= 4.00' Flow Area= 53.3 sf, Capacity= 254.27 cfs 20.00' x 4.00' deep Parabolic Channel, n= 0.100 Earth, dense brush, high stage Length= 2,600.0' Slope= 0.0315 '/' Inlet Invert= 2,612.00', Outlet Invert= 2,530.00' Summary for Pond CBCD: #1 Inflow Area = 6.814 ac, 0.00% Impervious, Inflow Depth = 2.95" for 25-Yr Storm event Inflow = 31.18 cfs @ 11.99 hrs, Volume= 1.677 af Outflow = 31.18 cfs @ 11.99 hrs, Volume= 1.677 af, Atten= 0%, Lag= 0.0 min Primary = 31.18 cfs @ 11.99 hrs, Volume= 1.677 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,718.82' @ 11.99 hrs Flood Elev= 2,722.00' Device Routing Invert Outlet Devices #1 Primary 2,716.00'36.0" Round Culvert L= 4.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,716.00' / 2,715.50' S= 0.1250 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 74HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=30.63 cfs @ 11.99 hrs HW=2,718.78' (Free Discharge) 1=Culvert (Inlet Controls 30.63 cfs @ 4.48 fps) Summary for Pond CBEG: #2 Inflow Area = 16.811 ac, 0.00% Impervious, Inflow Depth = 2.94" for 25-Yr Storm event Inflow = 72.29 cfs @ 12.01 hrs, Volume= 4.126 af Outflow = 72.29 cfs @ 12.01 hrs, Volume= 4.126 af, Atten= 0%, Lag= 0.0 min Primary = 72.29 cfs @ 12.01 hrs, Volume= 4.126 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,657.73' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 2,649.00'36.0" Round Culvert L= 200.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,649.00' / 2,598.00' S= 0.2550 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=70.98 cfs @ 12.01 hrs HW=2,657.48' (Free Discharge) 1=Culvert (Inlet Controls 70.98 cfs @ 10.04 fps) Summary for Pond CBF: #3 Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af Outflow = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af, Atten= 0%, Lag= 0.0 min Primary = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,702.99' @ 12.01 hrs Flood Elev= 2,708.00' Device Routing Invert Outlet Devices #1 Primary 2,698.00'24.0" Round Culvert L= 857.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,698.00' / 2,653.00' S= 0.0525 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=23.35 cfs @ 12.01 hrs HW=2,702.82' (Free Discharge) 1=Culvert (Inlet Controls 23.35 cfs @ 7.43 fps) AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 75HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond CBH: #4 Inflow Area = 10.043 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 40.99 cfs @ 12.04 hrs, Volume= 2.425 af Outflow = 40.99 cfs @ 12.04 hrs, Volume= 2.425 af, Atten= 0%, Lag= 0.0 min Primary = 40.99 cfs @ 12.04 hrs, Volume= 2.425 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,654.93' @ 12.04 hrs Flood Elev= 2,664.00' Device Routing Invert Outlet Devices #1 Primary 2,652.00'36.0" Round Culvert L= 200.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,652.00' / 2,598.00' S= 0.2700 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf Primary OutFlow Max=40.25 cfs @ 12.04 hrs HW=2,654.88' (Free Discharge) 1=Culvert (Inlet Controls 40.25 cfs @ 5.77 fps) Summary for Pond P1: DETENTION POND 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.77" for 25-Yr Storm event Inflow = 125.37 cfs @ 12.03 hrs, Volume= 9.630 af Outflow = 103.79 cfs @ 12.09 hrs, Volume= 9.653 af, Atten= 17%, Lag= 3.9 min Primary = 34.52 cfs @ 12.09 hrs, Volume= 8.757 af Secondary = 69.27 cfs @ 12.09 hrs, Volume= 0.896 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,594.69' @ 12.09 hrs Surf.Area= 12,564 sf Storage= 66,381 cf Plug-Flow detention time= 18.8 min calculated for 9.623 af (100% of inflow) Center-of-Mass det. time= 20.7 min ( 881.5 - 860.8 ) Volume Invert Avail.Storage Storage Description #1 2,587.00' 83,876 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,587.00 5,223 0 0 2,588.00 5,997 5,610 5,610 2,590.00 7,703 13,700 19,310 2,592.00 9,623 17,326 36,636 2,594.00 11,757 21,380 58,016 2,596.00 14,103 25,860 83,876 Device Routing Invert Outlet Devices #1 Primary 2,587.00'24.0" Round Culvert L= 30.0' CPP, mitered to conform to fill, Ke= 0.700 Inlet / Outlet Invert= 2,587.00' / 2,586.00' S= 0.0333 '/' Cc= 0.900 AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 76HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC n= 0.013, Flow Area= 3.14 sf #2 Secondary 2,594.00'45.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=34.47 cfs @ 12.09 hrs HW=2,594.67' (Free Discharge) 1=Culvert (Inlet Controls 34.47 cfs @ 10.97 fps) Secondary OutFlow Max=66.61 cfs @ 12.09 hrs HW=2,594.67' (Free Discharge) 2=Broad-Crested Rectangular Weir (Weir Controls 66.61 cfs @ 2.21 fps) Summary for Pond P1C: CB Inflow Area = 4.002 ac, 0.00% Impervious, Inflow Depth = 2.99" for 25-Yr Storm event Inflow = 19.37 cfs @ 11.97 hrs, Volume= 0.998 af Outflow = 19.41 cfs @ 11.99 hrs, Volume= 0.998 af, Atten= 0%, Lag= 0.9 min Primary = 19.41 cfs @ 11.99 hrs, Volume= 0.998 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,729.36' @ 11.98 hrs Surf.Area= 0 sf Storage= 403 cf Flood Elev= 2,730.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.6 min calculated for 0.997 af (100% of inflow) Center-of-Mass det. time= 0.6 min ( 831.3 - 830.7 ) Volume Invert Avail.Storage Storage Description #1 2,726.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,726.00 0 2,728.00 150 2,730.00 521 Device Routing Invert Outlet Devices #1 Primary 2,726.00'24.0" Round Culvert L= 130.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,726.00' / 2,725.50' S= 0.0038 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=18.78 cfs @ 11.99 hrs HW=2,729.23' (Free Discharge) 1=Culvert (Barrel Controls 18.78 cfs @ 5.98 fps) Summary for Pond P1D: CB Inflow Area = 2.813 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 12.38 cfs @ 11.99 hrs, Volume= 0.679 af Outflow = 11.95 cfs @ 12.01 hrs, Volume= 0.679 af, Atten= 3%, Lag= 0.8 min Primary = 11.95 cfs @ 12.01 hrs, Volume= 0.679 af AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 77HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 3 Peak Elev= 2,721.22' @ 12.01 hrs Surf.Area= 0 sf Storage= 352 cf Flood Elev= 2,722.00' Surf.Area= 0 sf Storage= 500 cf Plug-Flow detention time= 1.2 min calculated for 0.678 af (100% of inflow) Center-of-Mass det. time= 0.8 min ( 835.8 - 835.0 ) Volume Invert Avail.Storage Storage Description #1 2,718.50'500 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,718.50 0 2,720.00 120 2,722.00 500 Device Routing Invert Outlet Devices #1 Primary 2,718.50'18.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,718.50' / 2,718.00' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf Primary OutFlow Max=11.79 cfs @ 12.01 hrs HW=2,721.17' (Free Discharge) 1=Culvert (Inlet Controls 11.79 cfs @ 6.67 fps) Summary for Pond P1E: CB Inflow Area = 5.751 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 23.55 cfs @ 12.02 hrs, Volume= 1.389 af Outflow = 23.40 cfs @ 12.02 hrs, Volume= 1.389 af, Atten= 1%, Lag= 0.5 min Primary = 23.40 cfs @ 12.02 hrs, Volume= 1.389 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,657.38' @ 12.02 hrs Surf.Area= 0 sf Storage= 345 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 686 cf Plug-Flow detention time= 0.3 min calculated for 1.389 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 837.1 - 836.8 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'686 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 40 40 2,656.00 125 165 2,660.00 521 686 AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 78HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=22.86 cfs @ 12.02 hrs HW=2,657.28' (Free Discharge) 1=Culvert (Inlet Controls 22.86 cfs @ 7.28 fps) Summary for Pond P1F: CB Inflow Area = 5.661 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 24.14 cfs @ 12.00 hrs, Volume= 1.367 af Outflow = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af, Atten= 1%, Lag= 0.7 min Primary = 23.88 cfs @ 12.01 hrs, Volume= 1.367 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,709.49' @ 12.01 hrs Surf.Area= 0 sf Storage= 419 cf Flood Elev= 2,710.00' Surf.Area= 0 sf Storage= 521 cf Plug-Flow detention time= 0.3 min calculated for 1.366 af (100% of inflow) Center-of-Mass det. time= 0.3 min ( 836.1 - 835.8 ) Volume Invert Avail.Storage Storage Description #1 2,706.00'521 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,706.00 0 2,707.00 40 2,708.00 125 2,710.00 521 Device Routing Invert Outlet Devices #1 Primary 2,706.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,706.00' / 2,705.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=23.35 cfs @ 12.01 hrs HW=2,709.38' (Free Discharge) 1=Culvert (Inlet Controls 23.35 cfs @ 7.43 fps) Summary for Pond P1G: CB Inflow Area = 4.246 ac, 0.00% Impervious, Inflow Depth = 2.99" for 25-Yr Storm event Inflow = 19.50 cfs @ 11.99 hrs, Volume= 1.059 af Outflow = 19.43 cfs @ 12.00 hrs, Volume= 1.059 af, Atten= 0%, Lag= 0.3 min Primary = 19.43 cfs @ 12.00 hrs, Volume= 1.059 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 79HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,656.65' @ 12.00 hrs Surf.Area= 0 sf Storage= 280 cf Flood Elev= 2,660.00' Surf.Area= 0 sf Storage= 716 cf Plug-Flow detention time= 0.5 min calculated for 1.058 af (100% of inflow) Center-of-Mass det. time= 0.5 min ( 832.8 - 832.4 ) Volume Invert Avail.Storage Storage Description #1 2,654.00'716 cf Custom Stage Data Listed below Elevation Inc.Store Cum.Store (feet) (cubic-feet) (cubic-feet) 2,654.00 0 0 2,655.00 75 75 2,656.00 120 195 2,660.00 521 716 Device Routing Invert Outlet Devices #1 Primary 2,654.00'24.0" Round Culvert L= 15.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,654.00' / 2,653.50' S= 0.0333 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=19.29 cfs @ 12.00 hrs HW=2,656.63' (Free Discharge) 1=Culvert (Inlet Controls 19.29 cfs @ 6.14 fps) Summary for Pond P1H: CB Inflow Area = 4.382 ac, 0.00% Impervious, Inflow Depth = 2.90" for 25-Yr Storm event Inflow = 18.01 cfs @ 12.01 hrs, Volume= 1.059 af Outflow = 17.83 cfs @ 12.03 hrs, Volume= 1.058 af, Atten= 1%, Lag= 1.1 min Primary = 17.83 cfs @ 12.03 hrs, Volume= 1.058 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,666.38' @ 12.03 hrs Surf.Area= 0 sf Storage= 335 cf Flood Elev= 2,667.00' Surf.Area= 0 sf Storage= 550 cf Plug-Flow detention time= 1.3 min calculated for 1.057 af (100% of inflow) Center-of-Mass det. time= 0.7 min ( 837.5 - 836.7 ) Volume Invert Avail.Storage Storage Description #1 2,663.00'550 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic-feet) 2,663.00 0 2,664.00 40 2,666.00 200 2,667.00 550 AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 80HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Device Routing Invert Outlet Devices #1 Primary 2,664.00'24.0" Round Culvert L= 12.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,664.00' / 2,663.50' S= 0.0417 '/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 3.14 sf Primary OutFlow Max=17.37 cfs @ 12.03 hrs HW=2,666.32' (Free Discharge) 1=Culvert (Inlet Controls 17.37 cfs @ 5.53 fps) Summary for Pond P3: DETENTION BASIN 3 Inflow Area = 12.355 ac, 0.00% Impervious, Inflow Depth = 2.56" for 25-Yr Storm event Inflow = 48.03 cfs @ 12.04 hrs, Volume= 2.638 af Outflow = 8.31 cfs @ 12.37 hrs, Volume= 2.630 af, Atten= 83%, Lag= 19.4 min Primary = 8.31 cfs @ 12.37 hrs, Volume= 2.630 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 2,696.05' @ 12.37 hrs Surf.Area= 10,890 sf Storage= 41,982 cf Flood Elev= 2,710.00' Surf.Area= 49,803 sf Storage= 427,793 cf Plug-Flow detention time= 75.4 min calculated for 2.627 af (100% of inflow) Center-of-Mass det. time= 73.5 min ( 922.3 - 848.8 ) Volume Invert Avail.Storage Storage Description #1 2,688.00' 427,793 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,688.00 0 0 0 2,690.00 2,243 2,243 2,243 2,700.00 16,532 93,875 96,118 2,710.00 49,803 331,675 427,793 Device Routing Invert Outlet Devices #1 Primary 2,689.00'12.0" Round Culvert L= 806.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,689.00' / 2,655.00' S= 0.0422 '/' Cc= 0.900 n= 0.012 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 2,688.00'1.0" Vert. Pool Drain Holes X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,694.00'24.0" Horiz. Top Overflow C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=8.31 cfs @ 12.37 hrs HW=2,696.05' (Free Discharge) 1=Culvert (Barrel Controls 8.31 cfs @ 10.58 fps) 2=Pool Drain Holes (Passes < 3.31 cfs potential flow) 3=Top Overflow (Passes < 21.66 cfs potential flow) AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 81HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Pond P4: DETENTION BASIN 4 Inflow Area = 6.315 ac, 0.00% Impervious, Inflow Depth = 2.01" for 25-Yr Storm event Inflow = 21.96 cfs @ 11.95 hrs, Volume= 1.055 af Outflow = 9.58 cfs @ 12.06 hrs, Volume= 1.055 af, Atten= 56%, Lag= 6.6 min Primary = 9.58 cfs @ 12.06 hrs, Volume= 1.055 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 2,695.79' @ 12.06 hrs Surf.Area= 3,320 sf Storage= 7,758 cf Plug-Flow detention time= 5.5 min calculated for 1.054 af (100% of inflow) Center-of-Mass det. time= 5.5 min ( 860.9 - 855.4 ) Volume Invert Avail.Storage Storage Description #1 2,686.00' 1,553,058 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,686.00 0 0 0 2,688.00 279 279 279 2,694.00 944 3,669 3,948 2,696.00 3,604 4,548 8,496 2,700.00 24,897 57,002 65,498 2,710.00 68,989 469,430 534,928 2,720.00 134,637 1,018,130 1,553,058 Device Routing Invert Outlet Devices #1 Primary 2,685.00'12.0" Round Culvert L= 425.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 2,685.00' / 2,634.00' S= 0.1200 '/' Cc= 0.900 n= 0.012, Flow Area= 0.79 sf #2 Device 1 2,686.00'1.0" Vert. Orifice/Grate X 12.00 columns X 4 rows with 6.0" cc spacing C= 0.600 #3 Device 1 2,690.00'24.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=9.56 cfs @ 12.06 hrs HW=2,695.75' (Free Discharge) 1=Culvert (Inlet Controls 9.56 cfs @ 12.17 fps) 2=Orifice/Grate (Passes < 3.77 cfs potential flow) 3=Orifice/Grate (Passes < 36.28 cfs potential flow) Summary for Pond P6: Pooling Area, Catch Basin, 36-in Culvert Inflow Area = 16.868 ac, 13.12% Impervious, Inflow Depth = 2.31" for 25-Yr Storm event Inflow = 49.44 cfs @ 12.04 hrs, Volume= 3.252 af Outflow = 46.94 cfs @ 12.08 hrs, Volume= 3.252 af, Atten= 5%, Lag= 2.1 min Primary = 46.94 cfs @ 12.08 hrs, Volume= 3.252 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 82HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Peak Elev= 2,655.64' @ 12.08 hrs Surf.Area= 1,680 sf Storage= 2,412 cf Flood Elev= 2,673.00' Surf.Area= 6,110 sf Storage= 19,106 cf Plug-Flow detention time= 0.4 min calculated for 3.249 af (100% of inflow) Center-of-Mass det. time= 0.4 min ( 854.6 - 854.2 ) Volume Invert Avail.Storage Storage Description #1 2,653.00' 19,106 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,653.00 386 0 0 2,654.00 640 513 513 2,656.00 1,911 2,551 3,064 2,660.00 6,110 16,042 19,106 Device Routing Invert Outlet Devices #1 Primary 2,649.00'29.1" Round Culvert L= 536.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 2,649.00' / 2,633.50' S= 0.0289 '/' Cc= 0.900 n= 0.010, Flow Area= 4.62 sf #2 Device 1 2,653.00'1.5" x 4.5" Horiz. Orifice/Grate X 8.00 columns X 16 rows C= 0.600 in 45.0" x 45.5" Grate Limited to weir flow at low heads Primary OutFlow Max=46.26 cfs @ 12.08 hrs HW=2,655.56' (Free Discharge) 1=Culvert (Passes 46.26 cfs of 51.44 cfs potential flow) 2=Orifice/Grate (Orifice Controls 46.26 cfs @ 7.71 fps) Summary for Link AP-1: Analysis Point 1 Inflow Area = 41.792 ac, 0.00% Impervious, Inflow Depth = 2.77" for 25-Yr Storm event Inflow = 103.79 cfs @ 12.09 hrs, Volume= 9.653 af Primary = 103.79 cfs @ 12.09 hrs, Volume= 9.653 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-2: Analysis Point 2 Inflow Area = 29.002 ac, 7.63% Impervious, Inflow Depth = 2.13" for 25-Yr Storm event Inflow = 68.70 cfs @ 12.06 hrs, Volume= 5.155 af Primary = 68.70 cfs @ 12.06 hrs, Volume= 5.155 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs AREA D VERTICAL EXPANSION Type II 24-hr 25-Yr Storm Rainfall=6.00"POST-6D- veritcal expansion11.29 Printed 11/29/2016Prepared by {enter your company name here} Page 83HydroCAD® 10.00 s/n 01260 © 2012 HydroCAD Software Solutions LLC Summary for Link AP-3: Analysis Point 3 Inflow Area = 3.560 ac, 0.00% Impervious, Inflow Depth = 1.68" for 25-Yr Storm event Inflow = 7.94 cfs @ 12.03 hrs, Volume= 0.497 af Primary = 7.94 cfs @ 12.03 hrs, Volume= 0.497 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-4: Analysis Point 4 Inflow Area = 5.930 ac, 0.00% Impervious, Inflow Depth = 1.84" for 25-Yr Storm event Inflow = 12.79 cfs @ 12.07 hrs, Volume= 0.909 af Primary = 12.79 cfs @ 12.07 hrs, Volume= 0.909 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-5: Analysis Point 5 Inflow Area = 5.476 ac, 15.16% Impervious, Inflow Depth = 2.09" for 25-Yr Storm event Inflow = 13.46 cfs @ 12.08 hrs, Volume= 0.954 af Primary = 13.46 cfs @ 12.08 hrs, Volume= 0.954 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Summary for Link AP-6: PIGEON RIVER CONTRIBUTION Inflow Area = 85.760 ac, 3.55% Impervious, Inflow Depth = 2.40" for 25-Yr Storm event Inflow = 117.61 cfs @ 12.16 hrs, Volume= 17.168 af Primary = 117.61 cfs @ 12.16 hrs, Volume= 17.168 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs