Loading...
HomeMy WebLinkAbout4116_WIHighPointCDLF_AssessmentWells_DIN27261_20170116 Golder Associates NC, Inc. 5B Oak Branch Drive Greensboro, North Carolina, 27407 Tel: (336) 852-4903 Fax: (336) 852-4904 www.golder.com Engineering Lic. No. C-2862/Geology Lic. No. C-399 Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America January 16, 2017 1239651616.400 Ms. Jackie Drummond, Hydrogeologist North Carolina Department of Environmental Quality Division of Waste Management - Solid Waste Section 2090 US Highway 70 Swannanoa, North Carolina 28778 jaclynne.drummond@ncdenr.gov RE: SUMMARY OF ASSESSMENT WELL INSTALLATIONS WASTE INDUSTRIES OF HIGH POINT CONSTRUCTION AND DEMOLITION LANDFILL, PERMIT NO. 41-16 GUILFORD COUNTY, NORTH CAROLINA Dear Jackie: On behalf of Waste Industries of High Point, LLC (Waste Industries), Golder Associates NC, Inc. (Golder) is submitting the enclosed letter report summarizing the installation groundwater assessment wells AMW-1 and AMW-2 at the active Waste Industries of High Point Construction and Demolition (C&D) Landfill in Guilford County, North Carolina (NC). The assessment wells were installed in accordance with the Assessment Monitoring Notification and Work Plan Addendum (AMNWPA), dated October 21, 2016, which was approved by the NC Department of Environmental Quality (DEQ) in a letter dated October 31, 2016. Landfill gas monitoring well LFG-1 was not installed, as proposed in the AMNWPA, due to shallow groundwater (approximately 3.5 feet below ground surface [bgs]). The NC DEQ was notified by telephone the day of the well installations of this change to the AMNWPA. On December 5, 2016, a Golder licensed geologist provided oversight for the installation of assessment wells AMW-1 and AMW-2 in accordance with Title 15A of the North Carolina Administrative Code (NCAC), Subchapter 2C .0100, the approved AMNWPA, and Draft North Carolina Water Quality Monitoring Guidance Document for Solid Waste Facilities; Solid Waste Section, Division of Solid Waste Management; Department of Environment, Health and Natural Resources (March 1995). The well was installed by South Atlantic Environmental Drilling and Construction Company, Inc. (SAEDACCO) of Fort Mill, South Carolina using a Geoprobe 3230DT drilling rig utilizing 4.25-inch inner diameter (ID) hollow stem augers (HSAs) and a 4-inch downhole hammer. The borings were advanced with HSAs to the approximate saprolite / bedrock interface at 9 feet bgs at AMW-1, and at 3.5 feet bgs at AMW-2. Afterwards, the borings were advanced utilizing air drilling methods with a downhole hammer to the target depth of 15 feet bgs based on static groundwater levels. The assessment wells were constructed with 2-inch schedule 40 polyvinyl-chloride (PVC) screen and riser pipe. The 0.010-inch slotted screens were both installed from 5 to 15 feet bgs. The filter pack consisted of Driller Service Inc. (DSI) #2 sand from 4 to 15 feet bgs. A filter pack seal was installed from 2 to 4 feet bgs and consisted of 3/8-inch bentonite chips. The remaining annular spaces were filled with Type I Portland cement. The surface completions consisted of locking 4-inch aluminum protective casings and a 3-foot by 3-foot by 0.5-foot concrete apron. A summary of well construction information is provided on Table 1. The boring / well construction log and Form GW-1 Rev. 8/13 for each well are provided as Attachment A. The wells were developed on December 16, 2016, utilizing a Waterra inertial pump. AMW-1 was developed for 4 hours and approximately 57 gallons of water was removed. AMW-2 was developed for 3.25 hours and approximately 52 gallons of water were removed. The well development forms are provided as Attachment B. Though turbidity values remained high during development, during sampling of the wells on January 12, 2017, turbidity values for each well were under 10 Nephelometric Turbidity Units. The wells were surveyed by Regional Land Surveyors, Inc. of Greensboro, NC on December 16, ATTACHMENT A BORING AND WELL CONSTRUCTION LOGS AND WELL CONSTRUCTION RECORDS Rich Lemire 2593A SAEDACCO Inc X 12-5-2016 AMW-1 HIGH POINT C&D LANDFILL AMW-1 5830 Riverdale Drive Jamestown, NC 27282 Guilford , JAMESTOWN, NC, 27282 GUILFORD 35.9521218 79.952118 X X 1 15' 4' 4" AUGER/AIR 0 5' 2"SCH40 PVC 5' 15' 2" .010 SCH40 PVC 0 2' PORTLAND POURED 4' 15' SAND #2 0 9 RIVER SAND 9' 15' ROCK BENTONITE FROM 2'TO4'. 12/5/2016 Rich Lemire 2593A SAEDACCO Inc X 12-5-2016 AMW-2 HIGH POINT C&D LANDFILL AMW-2 5830 Riverdale Drive Jamestown, NC 27282 Guilford , JAMESTOWN, NC, 27282 GUILFORD 35.9521218 79.952118 X X 1 15' 4' 4" AUGER/AIR 0 5' 2"SCH40 PVC 5' 15' 2" .010 SCH40 PVC 0 2' PORTLAND POURED 4' 15' SAND #2 0 4' RIVER SAND 4' 15' ROCK BENTONITE FROM 2'TO4'. 12/5/2016 ATTACHMENT B WELL DEVELOPMENT FORMS ATTACHMENT C SURVEY LETTER TABLE January 2017 1 of 1 1239651616.400 Tables - Well Inst Report.xlsx from to from to AMW-1 12/05/16 2 802,509.487 1,726,046.318 750.82 753.28 15.00 735.82 3.51 749.77 9.00 741.82 5.00 15.00 745.82 735.82 PWR / Bedrock AMW-2 12/05/16 2 801,580.594 1,725,717.371 728.19 730.57 15.00 713.19 3.59 726.98 3.50 724.69 5.00 15.00 723.19 713.19 Bedrock Notes: 1. ft AMSL = feet above mean sea level 2. ft bgs = feet below ground surface 3. TOC = top of casing 4. PWR = partially weathered rock Lithology of Screened Interval Ground Surface TOC Depth (ft bgs) Elevation (ft AMSL) Depth (ft bgs)Elevation (ft AMSL) Depth (ft bgs)Elevation (ft AMSL) Groundwater Surface Depth (ft bgs) Elevation (ft AMSL) Northing Easting TABLE 1 Summary of Assessment Monitoring Well Construction Information Waste Industries of High Point C&D Landfill, Permit No. 41-16 Landfill Assessment Monitoring Well Identification Date Installed Casing Diameter (inches) Elevations Total Depth Drilled Top of Bedrock Screened Interval ft AMSL DRAWING ENON-MECKLENBURG-CECIL (NC083)MW-4D 770 780760770780790790800810820830840780760750 8 0 0 7 9 0 8 0 0 8 1 0 820830840 8 1 0 810 8 1 0 8 1 0 810 8 1 0 8 2 0 8 1 0 8 0 0 800810820840830 8 2 0 8 3 0 820 8 1 0 7 9 0 8 0 0 79 0 7 9 0 8 0 0 790 8 0 0 8 0 0 8 0 0 7 8 0 7 9 0 7 8 0 8 0 0 8 0 0 8 0 0 790800 810 820 830 7 7 0 7 8 0 760 7 7 0 7 8 0 78 0 820 800 810 850 850790800810820830840780 770760750740750740750730730740730730740750750740760770780830840800790810820750760730740770780790780740750770760 740 760 7 5 0 77 0 780 7 8 0 790 7 8 0 7 7 0 790 7 9 0 78 0 79 0 8 0 0 8 0 0 8 1 0 8 1 0 8 0 0 8 0 0 800 800 7 8 0 7 9 0 7 7 0 7 6 0 7 4 0 7 5 0 7 6 0 750 7 3 0 740 73 0 730 730 760750740720720720720730740720720740730750740730750760770780760770760750 8 1 3 . 6 8 1 1 . 4 8 2 3 . 3 8 1 1 . 0 7 9 9 . 2 8 1 7 . 6 8 2 0 . 4 8 2 3 . 5 8 1 0 . 9 8 1 0 . 3 8 1 0 . 2 8 1 1 . 8 8 3 1 . 1 8 3 2 . 8 8 2 0 . 0 8 2 1 . 1 8 1 6 . 6 WE 792.9'795. 3 795.1 795.5 8 0 1 . 7 8 0 4 . 2 8 1 0 . 4 849.0849.3 8 1 1 . 4 8 0 9 . 4 8 0 9 . 7 8 1 7 . 1 8 1 1 . 1 8 0 9 . 6 8 1 0 . 7 826.8 7 9 8 . 3 8 1 1 . 0 8 2 0 . 6 8 0 4 . 3 7 9 8 . 9 8 1 0 . 2 7 9 7 . 9 7 9 5 . 4 8 1 0 . 5 8 0 4 . 6 7 9 9 . 3 7 9 5 . 8 8 0 1 . 7 8 0 2 . 9 8 0 2 . 9 8 0 0 . 9 8 0 2 . 1 7 9 9 . 1 7 8 4 . 1 7 8 4 . 9 7 8 8 . 8 8 0 3 . 2 8 0 1 . 8 7 8 5 . 4 7 8 4 . 1 850.6850.4 833.0 830.8 849.5 777.0753.0743.3752.5744.5 781.3770.3779.7 785.7 7 6 8 . 0 7 7 2 . 3 7 9 8 . 3 7 8 9 . 3 7 8 4 . 3 8 0 5 . 0 8 1 3 . 6 8 0 9 . 3 8 0 0 . 1 803.4802.0 783.0792.4744.2 743.7 WE 741.6'745.1743.9740.3 724.1723.2 8 0 1 . 1 8 0 9 . 1 RIP-RAP RI P - R A P S C A L E S END UNKNOW 601763.88 B H - 4 B H - 3 B H - 2 BH-1EXISTING OVERHEAD POWER LINES M A P P I N G L I M I T S . R E C L A M A T I O N F A C I L I T Y M A I N T E N A N C E B U I L D I N G F A C I L I T Y P R O P E R T Y B O U N D A R Y SW-2 SW-1SW-3SB-3 MW-5 MW-4S MW-3 M W - 1 MW-2 MW-8MW-7S MW-6 MW-4D S C A L E H O U S E MW-7D S W - 4 C R E E K OP-3 F U T U R E D I S P O S A L A R E A S PHASE 2 DISPOS A L AREAPHASE IDISPOSALAREA B H - 4 AMW-2 AMW-1 B H - 5 C O N S U L T A N T D E S I G N P R E P A R E D R E V I E W A P P R O V E D Y Y Y Y - M M - D D T I T L E P R O J E C T N o . R e v . P R O J E C T C L I E N T Path: \\greensboro\CAD\_2012\12396516 - WI - High Point\PRODUCTION\_F - 2016 GW\ | File Name: 1239651615F003.dwg IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI D01 in 1 2 3 9 6 5 1 6 1 6 P H A S E 4 0 0 D R A W I N G 1 0 2 0 1 7 - 0 1 - 0 6 A L B D Y R D Y R R P K W A S T E I N D U S T R I E S O F H I G H P O I N T C O N S T R U C T I O N A N D D E M O L I T I O N D E B R I S L A N D F I L L A N D R E C L A M A T I O N F A C I L I T Y G U I L F O R D C O U N T Y , N O R T H C A R O L I N A S I T E L O C A T I O N M A P 0 F E E T 2 0 0 4 0 0 S C A L E L E G E N D E X I S T I N G 1 0 ' C O N T O U R S E X I S T I N G 2 ' C O N T O U R S P R O P E R T Y L I N E S T R E A M T R E E L I N E E X I S T I N G R O A D P R O P O S E D O R E X I S T I N G L I M I T S O F W A S T E M O N I T O R I N G W E L L L O C A T I O N S U R F A C E W A T E R M O N I T O R I N G P O I N T B A R H O L E P R O B E M E T H A N E M O N I T O R I N G L O C A T I O N B E N C H M A R K S E D I M E N T B A S I N M W - 3 S W - 1 B M - 1 S B - 1 1 . T O P O G R A P H I C C O N T O U R I N T E R V A L = 2 F E E T 2 . D R A W I N G B A S E D O N S I T E P L A N P L A N P R E P A R E D B Y J O Y C E E N G I N E E R I N G , I N C D A T E D J U L Y 7 , 2 0 0 4 . 3 . U P D A T E D T O P O G R A P H Y P R O V I D E D F R O M A E R I A L S U R V E Y P R E P A R E D B Y S U R V E Y I N G S O L U T I O N S , P . C . , P H O T O G R A P H Y D A T E J A N U A R Y 1 3 , 2 0 1 6 . S I T E S I T E L O C A T I O N M A P N O T E S G O L D E R A S S O C I A T E S N C , I N C . P G C - 3 9 9 W A S T E I N D U S T R I E S U S A , I N C . B H - 1