HomeMy WebLinkAbout7607_GreatOakMSWLF_PTOCell1A_CoverLtr_DIN27189_20161229
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
MICHAEL SCOTT
Director
Solid Waste Section
December 29, 2016
Mr. John Workman/Operator
Waste Management of Carolinas, Inc.
1850 Parkway Place, Suite 600
Marietta, GA 30067
Mr. Paxton Arthurs/Owner
Director of Public Works
Randolph County
Randolph County Office Building
725 McDowell Road
Asheboro, NC 27205
Re: Issuance of Permit Approval to Operate for Great Oak Landfill - Phases 1, Cell A
Randolph County, North Carolina
Permit No. 7607-MSWLF-2015, Document ID No. (DIN) 27189
Dear Gentlemen:
The Division Waste Management (DWM), Solid Waste Section (SWS) has completed reviews of
the certified Construction Quality Assurance Report (CQA Report) for the constructed Great Oak
Landfill – Phase 1, Cell A. The referenced CQA Report is titled as:
Construction Certification Report, Cell 1A, Great Oak Landfill (Permit No. 7607-
MSWLF-2015). Dated December 2016. Prepared by SCS Engineers, PC in North
Carolina. (DIN 27190).
Based on the reviews, the SWS determines that the constructed Great Oak Landfill – Phase 1,
Cell A has met the pre-operative conditions stated in the Permit to Construct of the landfill dated
January 19, 2016 (DIN 25142), the approved CQA Plan, the amendments, and technical
specifications and hereby, issues Randolph County (Owner) and Waste Management of
Carolinas, Inc. (Operator) the Permit Approval to Operate – Phase 1, Cell A of the Great Oak
Landfill (DIN 27188). Enclose please find a copy of the permit and a copy of the cover pages of
the CQA Report with an approval seal. Please place the approved document and this permit to
the landfill facility operating record.
Please review the permit. If you have any questions on the permit, please contact me at 919-707-
8251 or ming.chao@ncdenr.gov or Mr. John Patrone who is the SWS Senior Environmental
Specialist for your area and can be reached at 336-776-9673 or john.patrone@ncdenr.gov.
Mr. John Workman/Operator
Mr. Paxton Arthurs/Owner
December 29, 2016
DIN 27189
Page 2 of 2
Sincerely,
Ming-Tai Chao, P.E.
Division of Waste Management, NCDEQ
cc:
Steve Lamb, P.E., SCS Engineers Ed Mussler, P.E, Permitting Branch Supervisor
John Murray, P.E., DWM John Patrone, DWM
Deb Aja, DWM Central Files
Enclosures:
Permit Approval to Operate – Phase 1, Cell A of the Great Oak Landfill (one copy)
The cover page of the CQA Report with an approval seal (one copy)