Loading...
HomeMy WebLinkAbout7607_GreatOakMSWLF_PTOCell1A_CoverLtr_DIN27189_20161229 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director Solid Waste Section December 29, 2016 Mr. John Workman/Operator Waste Management of Carolinas, Inc. 1850 Parkway Place, Suite 600 Marietta, GA 30067 Mr. Paxton Arthurs/Owner Director of Public Works Randolph County Randolph County Office Building 725 McDowell Road Asheboro, NC 27205 Re: Issuance of Permit Approval to Operate for Great Oak Landfill - Phases 1, Cell A Randolph County, North Carolina Permit No. 7607-MSWLF-2015, Document ID No. (DIN) 27189 Dear Gentlemen: The Division Waste Management (DWM), Solid Waste Section (SWS) has completed reviews of the certified Construction Quality Assurance Report (CQA Report) for the constructed Great Oak Landfill – Phase 1, Cell A. The referenced CQA Report is titled as:  Construction Certification Report, Cell 1A, Great Oak Landfill (Permit No. 7607- MSWLF-2015). Dated December 2016. Prepared by SCS Engineers, PC in North Carolina. (DIN 27190). Based on the reviews, the SWS determines that the constructed Great Oak Landfill – Phase 1, Cell A has met the pre-operative conditions stated in the Permit to Construct of the landfill dated January 19, 2016 (DIN 25142), the approved CQA Plan, the amendments, and technical specifications and hereby, issues Randolph County (Owner) and Waste Management of Carolinas, Inc. (Operator) the Permit Approval to Operate – Phase 1, Cell A of the Great Oak Landfill (DIN 27188). Enclose please find a copy of the permit and a copy of the cover pages of the CQA Report with an approval seal. Please place the approved document and this permit to the landfill facility operating record. Please review the permit. If you have any questions on the permit, please contact me at 919-707- 8251 or ming.chao@ncdenr.gov or Mr. John Patrone who is the SWS Senior Environmental Specialist for your area and can be reached at 336-776-9673 or john.patrone@ncdenr.gov. Mr. John Workman/Operator Mr. Paxton Arthurs/Owner December 29, 2016 DIN 27189 Page 2 of 2 Sincerely, Ming-Tai Chao, P.E. Division of Waste Management, NCDEQ cc: Steve Lamb, P.E., SCS Engineers Ed Mussler, P.E, Permitting Branch Supervisor John Murray, P.E., DWM John Patrone, DWM Deb Aja, DWM Central Files Enclosures: Permit Approval to Operate – Phase 1, Cell A of the Great Oak Landfill (one copy) The cover page of the CQA Report with an approval seal (one copy)