HomeMy WebLinkAboutYWN74002_INSP_20170106FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW X Transfer Compost SLAS COUNTY: Pitt
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: YWN 74-002
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 6 January 2017 Date of Previous Inspection: 2 March 2016
FACILITY NAME AND ADDRESS:
Pitt County Ayden-Grifton Yard Waste
5171 Weyerhaeuser Road
Ayden, NC 28516
GPS COORDINATES: N: 35.43913 E: -077.40688
FACILITY CONTACT NAME AND PHONE NUMBER:
John Demary
252.902.3355
FACILITY CONTACT ADDRESS:
Pitt County Solid Waste Department
3025 Landfill Road
Greenville, NC 27834
Attn: John W Demary
E-mail: john.demary@pittcountync.gov.
PARTICIPANTS:
Ray Williams; NCDENR-Solid Waste
STATUS OF PERMIT:
Active; Annual Yard Waste Facility Notification issued 15 June 2016; expires 31 May 2017. A completed Yard
Waste Facility Annual Notification Form must be submitted to the Solid Waste Section Compost and Land
Application Branch on or before 1 June 2017.
PURPOSE OF SITE VISIT:
Comprehensive Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a Yard Waste Facility Notification under two acres in size.
2) This Facility is permitted to receive:
a. Untreated and unpainted wood waste.
b. Silvicultural Waste as defined in 15A NCAC 13B .0101(41): Waste materials produced from the care
and cultivation of forest trees, including bark and woodchips.
c. Yard Trash as defined in 15A NCAC 13B .0101(55): Solid waste resulting from landscaping and yard
maintenance such as brush, grass, tree limbs, and similar vegetative material.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
YWN74002_INSP_20170106
Page 2 of 3
d. Yard Waste as defined in 15A NCAC 13B .0101(56): Yard trash and landclearing debris to include
stumps, limbs, leaves, grass.
3) This Facility can receive the aforementioned wastes for processing and storage in volumes not greater than
6,000 cubic yards per quarter.
4) The land on which this Facility is located is described in the deed recorded with the Pitt County Register of
deeds at: Book #48; Page #337.
5) The hours of operation for this Facility are Monday through Saturday, 7:30 AM to 4:30 PM.
6) The access road to the Facility is being managed properly at this time.
7) Signage is posted at the entrance to the Facility stating the Facility contact information, hours of operation,
and types of waste received.
8) This site is secured by a chain-link fence with a locked gate at the Facility entrance and has controlled access
for security. The Facility access gate was unlocked and open upon my arrival at the Facility and the Facility
operator was on-site during this Facility Compliance Inspection.
9) A roll-off container is maintained on site for the removal of any unpermitted wastes found on site. This
container is removed from the site for proper disposal as needed.
10) A John Deere 605C Crawler and a New Holland 3930 Tractor are maintained on-site and used for Facility
maintenance operations.
11) Landclearing waste and yard trash have been brought on site for processing with a tub or horizontal grinder.
All ground wood chips are removed from the site and used for boiler fuel.
12) Less than six thousand cubic yards of unprocessed vegetative waste was observed on-site during this Facility
Compliance Inspection.
13) The waste type was reviewed. No unpermitted wastes or unacceptable waste streams were noted during this
Facility Compliance Inspection.
14) All waste setbacks and buffers being maintained as required.
15) Portions of the site have recently been graded to promote positive sheet flow of all surface waters from the
site.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
YWN74002_INSP_20170106
Page 3 of 3
16) No off site erosion was observed during this Facility Compliance Inspection.
17) Windblown debris is being well managed at this time.
18) No violations were observed during this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 10 January 2017 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; FOB Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov
Martin A (Tony) Gallagher; Compost and Land Application Branch Head: tony.gallagher@ncdenr.gov
C: \2017\Pitt\Notifications\YWN 74-002\Inspections\YWN74002_INSP_20170106
NCDENR CARA Portal: https://edm.nc.gov/DENR-Portal/
Go Green! Thank you for helping NCDEQ be environmentally responsible.