Loading...
HomeMy WebLinkAbout6512_DukeSutton_APPROVAL_UpdatedWQMP_DIN27204_20170104 State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, 27699-1646 919 707 8200 ROY COOPER Governor January 4, 2017 Sent via email - John.Toepfer@duke-energy.com Mr. John Toepfer Lead Engineer Duke Energy 410 South Wilmington Street/NC 14 Raleigh, North Carolina 27601 Re: Approval of Updated Water Quality Monitoring Plan Duke Energy Progress, Inc. – L.V. Sutton Energy Complex Coal Combustion Residuals (CCR) Landfill New Hanover County DIN 27204 Dear Mr. Toepfer: The North Carolina Division of Waste Management, Solid Waste Section (Section) has reviewed the Updated Water Quality Monitoring Plan (DIN 27113) submitted on your behalf by Geosyntec on November 15, 2016 for the CCR Landfill at the L.V. Sutton Energy Complex. The Section approves the updated Water Quality Monitoring Plan (WQMP). This WQMP supersedes the original Plan submitted with the Permit to Construct Application (DIN 25549). The updated Water Quality Monitoring Plan includes eight (8) monitoring wells associated with Phase 1 (Cells 3-8), three (3) monitoring wells associated with Phase 2 (Cells 1-2) and three (3) monitoring wells associated with Phase 3 (Cells 9-11). This water quality monitoring network shall be sampled semi-annually. It is the Section’s understanding that the monitoring wells will be installed on a per Phase basis. Upon completion of well installations, submit the boring logs and well construction records (Form GW-1b) to the Section. Groundwater monitoring wells associated with Phase 1 must be sampled for the Appendix I constituent list prior to waste placement. In addition to a hard copy, provide the Section with an electronic copy of the groundwater monitoring data collected at the landfill facility. Guidelines for sampling groundwater and submitting data electronically can be located on the Section’s website: http://deq.nc.gov/about/divisions/waste-management/waste-management- permit-guidance/solid-waste-section/environmental-monitoring Approval-Updated WQMP Duke Energy Progress L.V. Sutton Energy Complex January 4, 2017 Page 2 If you have any questions or concerns, please contact me via email elizabeth.werner@ncdenr.gov or phone (919) 707-8253. Sincerely, Elizabeth S. Werner Permitting Hydrogeologist Solid Waste Section Cc: Victor Damasceno, Ph.D., P.E. – Geosyntec Donald Gibbs, P.E. – Duke Energy Ed Mussler, P.E. – SWS, Permitting Branch Head Drew Hammonds – SWS, Eastern District Supervisor Larry Frost – SWS, Permitting Engineer Shannon Aufman – SWS, Permitting Engineer Shawn McKee – SWS, Environmental Specialist