Loading...
HomeMy WebLinkAbout1117_Charah_AVLArea2_PermitDenialLetter_DIN27183_20161221 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, North Carolina 27699-1646 919 707 8200 T December 21, 2016 Mr. Norman Divers, Environmental Manager Charah, Inc., Regional Headquarters 435 South Tryon Street, Suite 180 Charlotte, North Carolina 28202 Subject: Permit to Construct Application – Denial Greater Asheville Regional Airport, Area 2 Engineered Structural Fill Project Buncombe County, DIN 27183 Dear Mr. Divers: On May 29, 2015 the Division of Waste Management, Solid Waste Section (Section) received your application for the Permit to Construct, Greater Asheville Regional Airport, Area 2 Engineered Structural Fill Project, located in Buncombe County, entitled: Project Manual, Greater Asheville Regional Airport – Area 2 Engineered Structural Fill Project, Asheville, North Carolina. Prepared for Duke Energy. Assembled for Charah, Inc. Prepared by FSC Consulting. May 2015. DIN 24408. On June 18, 2015 the Section performed a review of the application for a determination of completeness and determined the application complete in accordance with North Carolina General Statute NCGS 130A-309.203(b). The determination of completeness meant that the application included all required components in accordance with North Carolina General Statute NCGS 130A-309.215, but did not mean that the required components provided all of the information that is required for the Division to make a decision on the application. Therefore, the determination of completeness included a technical review of the application, entitled: Permit to Construct Application – Determination of Completeness and Technical Review, Greater Asheville Regional Airport, Area 2 Engineered Structural Fill Project, Buncombe County. Prepared by NC Solid Waste Section. June 2015. DIN 24514. Since June 2015 there has been no written response to the information requested in the technical review and the application has been on hold per conversations with you. On December 20, 2016 in a telephone conversation, you informed me that the project has been cancelled and I informed you that this denial letter was forth coming. As a result, your application for a permit to construct and operate a structural fill facility is hereby cancelled. Asheville Regional Airport, Area 2 Structural Fill Page 2 of 2 DIN 27183 Should you have any questions regarding this matter please contact me at (828) 296-4704 larry.frost@ncdenr.gov. Sincerely, Larry Frost, Engineering Project Manager Permitting Branch, Solid Waste Section Division of Waste Management, NCDEQ ec: Ed Mussler – SWS/RCO Elizabeth Werner – SWS/RCO Shawn Mckee – SWS/RCO Shannon Aufman – SWS/RCO Sarah Rice – SWS/RCO