HomeMy WebLinkAbout9226_INSP_20161115FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: WAKE
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 9226-CDLF-2001
CDLF X Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: November 15, 2016 Date of Last Inspection: June 9, 2016
FACILITY NAME AND ADDRESS:
Shotwell C&D Landfill, Inc.
4714 Smithfield Road
Wendell, NC 27591-8651
919-556-1182
919-217-0045
GPS COORDINATES: N: 35.72417 E: -78.4349
FACILITY CONTACT NAME AND PHONE NUMBER:
David King
919-427-4104
dking@debrisrp.com
FACILITY CONTACT ADDRESS:
Mr. David W. King, President
Shotwell Landfill, Inc.
3209 Gresham Lake Road, Suite 120
Raleigh, NC 27615
PARTICIPANTS:
Liz Patterson, NCDEQ-Solid Waste Section
Drew Hammonds, NCDEQ-Solid Waste Section
David King, Shotwell Landfill, Inc.
STATUS OF PERMIT:
PTC, Original Issue, Phase I - January 10, 2001
PTO, Phase I, Cell 1 - April 30, 2001
PTO, Modification - April 12, 2004
PTO, Phase I, additional 1 acre - March 30, 2006
PTC, Phase II - October 16, 2006
PTO, Phase II, Cell 1, 2 acre subcell - November 8, 2006
PTO, Phase II, Cell 1, remaining area - June 19, 2007
PTO, Phase II, Cell 2 - July 18, 2008
PTO, Phase II, Cell 3 - June 12, 2009
PTC, Phase III and PTO (all prior phases/cells) - October 26, 2010
PTC, Phase 3 amended and PTO (Phase 1-3A) - July 25, 2011
PTO, Phase 3, Cell B - June 15, 2012
PTO, Phase 3, Cell C – April 1, 2013
PTC, Phase 4, PTO Phases 1,2,3 - June 12, 2014
PTC – Phase 4B, PTO – Phases 1,2, and 3and 4A – April 24, 2015
PTO, Phases 1,2,3, and 4 – July 9, 2015
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
ADDITIONAL COMMENTS
The facility is a construction and demolition (C&D) debris landfill. The Permit to Operate Phases 1, 2, 3 and 4 was issued
July 9, 2015 and shall expire July 25, 2021. Construction of Phase 4A is complete. Per Condition #13 in Part III of
Attachment 3 of the Permit a permit amendment should be submitted to the SWS no later than January 25, 2021.
1. The facility is permitted to receive C&D waste generated within Wake and Johnston counties.
2. The facility is approved to accept 91,250 tons per year or approximately 250 tons per day, based on 365 operating
days per year, in accordance with the approved franchise granted by Wake County.
3. The facility is fenced and is secured by a locking gate when it is not open for operation. The correct signage is at
the entrance of the facility listing the facility name, permit number and emergency contact information as well as
materials accepted at the facility. The facility accepts waste Monday through Friday from 7:30 am until 4:00 pm.
4. Liz Patterson, Environmental Senior Specialist, and Drew Hammonds, Eastern District Supervisor, with the
Division of Waste Management were at the facility to investigate an odor complaint from Betty Brandt
Williamson that was emailed to Liz Patterson, Environmental Senior Specialist, with the Division of Waste
Management; John Roberson, Solid Waste Director for Wake County; and Sig Hutchinson, Wake County
Commissioner, on Monday, November 14, 2016 at 12:18 AM.
5. The smell of landfill gas consistent with a construction and demolition debris landfill was detected onsite. No
odors were detected outside the facility boundary.
6. David King, Liz Patterson, Drew Hammonds drove from Shotwell Landfill down Smithfield Road to Mial
Plantation Road and no odors were detected at neighboring properties outside of the landfill boundary.
7. Liz Patterson and Drew Hammonds took an additional drive down Mial Plantation Road and Smithfield Rd which
becomes Pritchard Road as you come to Falls of Norwood and then Riverwood neighborhoods to try and detect
odors.
8. Records were not reviewed at this inspection.
9. A perimeter road has been established around the entire footprint of the landfill. The perimeter road is being
well maintained.
10. Edge-of-waste markers have been installed and are being maintained around the landfill as required.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
11. At the time of inspection it appeared the working face was approaching one-half acre in size. Per 15A NCAC
13B .0542(f)(1), states “(f) Cover material requirements. (1) Except as provided in Subparagraph (3) of
this Paragraph, the owners and operators of all C&DLF units must cover the solid waste with six inches
of earthen material when the waste disposal area exceeds one-half acre and at least once weekly. Cover
must be placed at more frequent intervals if necessary to control disease vectors, fires, odors, blowing
litter, and scavenging. A notation of the date and time of the cover placement must be recorded in the
operating record as specified in Paragraph (n) of this Rule.”
Working face of landfill
12. Digital photos were taken during the inspection
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 919-707-8286(O) 919-805-6499 (C)
Liz Patterson
Environmental Senior Specialist
Regional Representative
Sent on: 12-19-2016 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor – Solid Waste Section
Donna Wilson, Permitting Engineer – Solid Waste Section
Jaclynne Drummond, Compliance Hydrogeologist – Solid Waste Section
Jessica Montie, Compliance Officer – Solid Waste Section
John Roberson, Wake County Solid Waste Management Director