HomeMy WebLinkAbout3608_INSP_20161205FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 12 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: Gaston Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 36-08-Transfer-1993 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 12-5-16 Date of Last Inspection: 10-12-16 FACILITY NAME AND ADDRESS: Waste Management Transfer Station, Ranlo Facility 2712 Lowell Road Gastonia, NC 28054 GPS COORDINATES: N: 35.27943 W: -81.12120 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Jeffrey Edwards, District Manager Telephone: (704) 869-7663 Email address: jedwards3@wm.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Jeffrey Edwards, District Manager Steven Edwards, Commercial RM Daniel Moore, P.G., Environmental Protection Manager Kim Sue, NCDEQ - Environmental Senior Specialist - Solid Waste Section STATUS OF PERMIT: Current – Approved May 12, 2016 (DIN 26093) expires May 10, 2021 Operations Plan – Approved May 12, 2016 (DIN 25637) PURPOSE OF SITE VISIT: Operational Inspection STATUS OF PAST NOTED VIOLATIONS: 1. RESOLVED: 15A NCAC 13B .0203(d): cited for failure to perform the required random inspections for waste screening as required by General Permit Condition Number 19. The facility provided waste screening records for random inspections on December 2, 2016. A review of these records showed that:  October - 15 random inspection were performed from October 13, 2016 to October 13, 2016.  November - 17 random inspection were performed from November 1, 2016 to November 30, 2016. Therefore, this violation is considered resolved. 2. RESOLVED: 15A NCAC 13B .0402(1) cited for failure to perform the required random inspections for waste screening in accordance with the operations plan. The facility provided waste screening records for random inspections on December 2, 2016. A review of these records showed that:  October - 15 random inspection were performed from October 13, 2016 to October 13, 2016. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 12  November - 17 random inspection were performed from November 1, 2016 to November 30, 2016. Therefore, this violation is considered resolved. 3. RESOLVED: 15A NCAC 13B .0203(d) cited for failure to comply with General Permit Condition Number 20(c). An inspection of all loaded trailers being used at Waste Management Transfer Facility revealed the measures Waste Management had implemented to ensure leachate would not leak out of the loaded trailers. All leaking trailers from the prior inspection on October 12, 2016 have been replaced and/or repaired. All trailers are staged with the open/doored ends facing up-gradient, so that potential leakage will be minimized in the event of faulty containment. Lateral cross-door chains are being used on all trailers to ratchet tight, drawing the doors tightly together. This action tightens the door seals. Troughs were placed underneath the back end of all trailers as a protective measure. During the inspection leachate was observed actively leaking from loaded trailer #3856. The leak was pointed out to staff and immediately a trough was moved under the leak. Facility staff had identified a leak towards the front end of the trailer and moved a trough underneath. Facility staff noted the leak and stated the trailer will be taken out of service to make all necessary repairs. No leachate was observed flowing across the gravel parking lot and no objectionable odors were detected in the vegetated area to the south of the facility. Therefore, this violation is considered resolved. Lateral cross-door chain. Photo taken by: Kim Sue 12-5-16. Trough underneath back end of trailer. Photo taken by: Kim Sue 12-5-16. Troughs underneath back end of trailers. Photo taken by: Kim Sue 12-5-16. Trailer identified with several leaks. Photo taken by: Kim Sue 12-5-16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 12 4. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .0402(1) cited for failure to comply with the Facility Operations Plan. The approved Facility Operations Plan Waste Management of Carolina, Inc., dated May 12, 2016 (DIN 25637, Page 4) “Waste Acceptance & Storage” states: “If the waste is to remain on site for more than seven days after collection from the generator, a refrigerated type trailer will be utilized. The loaded or partially loaded trailers will primarily be staged on a concrete pad outside the facility. If necessary, the trailers may be staged on the yard as identified on the facility diagram. The staged trailers will be inspected during loading, prior to staging outside, and prior to transfer to identify leaks or spills. If leaks or spill are identified, clean up and decontamination procedures will be implemented as outlined in the transportation vehicle’s contingency plan”. An inspection of all loaded trailers being used at Waste Management Transfer Facility revealed the measures Waste Management had implemented to ensure leachate would not leak out of the loaded trailers. All leaking trailers from the prior inspection on October 12, 2016 have been replaced and/or repaired. All trailers are staged with the open/doored ends facing up-gradient, so that potential leakage will be minimized in the event of faulty containment. Lateral cross-door chains are being used on all trailers to ratchet tight, drawing the doors tightly together. This action tightens the door seals. Troughs were placed underneath the back end of all trailers as a protective measure. During the inspection leachate was observed actively leaking from loaded trailer #3856. The leak was pointed out to staff and immediately a trough was moved under the leak. Facility staff had identified a leak towards the front end of the trailer and moved a trough underneath. Facility staff noted the leak and stated the trailer will be taken out of service to make all necessary repairs. Facility staff contacted Ervin Lane, Compliance Hydrogeologist, and the required soil sampling plan was prepared by Golder Associates NC, Inc. and submitted to DEQ on November 17, 2016. The plan was approved by Mr. Lane on November 21, 2016 and implemented by Golder on November 22, 2016. Waste Management’s consultant is awaiting the soil sampling analytical results, necessary for completion of the assessment report. Waste Management is waiting to gravel the staging area till after the completion of the assessment report in case further actions to remediate leachate releases is required. The standing water is the result of recent rain events. Leachate leaking below trailer #3856. Photo taken by: Kim Sue 12-5-16. Trough moved immediately to capture leachate. Photo taken by: Kim Sue 12-5-16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 12 5. RESOLVED: SL2013-413, Section 59.2(c), in amending 15A NCAC 13B .0105 cited for failing to maintain vehicles used for the collection and transportation of solid waste to be leak-resistant in accordance with industry standards. Documentation was provided on December 2, 2016 confirming that Waste Management’s contracted facility operator and waste transfer company had replaced and/or repaired all of the identified transfer trailers that were on site during the October 12, 2016 inspection. An inspection of all loaded trailers being used at Waste Management Transfer Facility revealed the measures Waste Management had implemented to ensure leachate would not leak out of the loaded trailers. All trailers are staged with the open/doored ends facing up-gradient, so that potential leakage will be minimized in the event of faulty containment. Lateral cross-door chains are being used on all trailers to ratchet tight, drawing the doors tightly together. This action tightens the door seals. Troughs were placed underneath the back end of all trailers as a protective measure. Therefore, this violation is considered resolved. 6. RESOLVED: 15A NCAC 13B .0203(d) cited for failing to properly capture leachate in the collection system in accordance with General Permit Condition Number 21(a) and (b). During the inspection no leachate was leaving the confines of the transfer building and flowing north across the paved parking lot. The straw bales located along the edge of the parking lot up against the guard rail have been permanently removed. The facility’s wash-down water faucet has been repaired reducing the amount of leachate generated. The trench drain across the entrance to the transfer station was clean and free of waste. Tipping floor and loading bay floor drains are, on a daily basis, being removed and accumulated trash is being removed. The drainage ways are washed down to assure free flow of wastewater/leachate to the oil-water separator. Therefore, this violation is considered resolved. 7. RESOLVED: 15A NCAC 13B .0402(3) cited for leachate leaving the confines of the transfer building and flowing across the parking lot. During the inspection all leachate was being collected in the leachate collection system. The straw bales located along the edge of the parking lot up against the guard rail have been permanently removed. The facility’s wash-down water faucet has been repaired reducing the amount of leachate generated. The trench drain across the entrance to the transfer station was clean and free of waste. Tipping floor and loading bay floor drains are, on a daily basis, being removed and BEFORE Leachate release in the loaded trailer parking lot. Photo taken by: Kim Sue 10/12/16. AFTER No leachate observed flowing to the vegetated area from the loaded trailer parking lot. Photo taken by: Kim Sue 12-5-16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 5 of 12 accumulated trash is being removed. The drainage ways are washed down to assure free flow of wastewater/leachate to the oil-water separator. Therefore, this violation is considered resolved. BEFORE Leachate flowing across parking lot. Photo taken by: Kim Sue 10/12/16 BEFORE Leachate flowing across parking lot to straw bales. Photo taken by: Kim Sue 10/12/16 AFTER No leachate flowing across parking lot. Photo taken by: Kim Sue 12/5/16 AFTER No leachate flowing across parking lot and straw bales removed. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 6 of 12 8. RESOLVED: 15A NCAC 13B .0203(d) cited to maintain the tipping floor in a clean and sanitary condition in accordance with General Permit Condition Number 20(a). The trench drain across the entrance to the transfer station was clean and free of waste. Tipping floor and loading bay floor drains are, on a daily basis, being removed and accumulated trash is being removed. The drainage ways are washed down to assure free flow of wastewater/leachate to the oil-water separator. Therefore, this violation is considered resolved. 9. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .0402(1) cited for failure to follow the Facility Operations Plan. The approved Facility Operations Plan Waste Management of Carolina, Inc., dated May 12, 2016 (DIN 25637, Page 4) “Housekeeping & Vector Control” states: “The operator is responsible for the operations, maintenance, and general housekeeping of the facility. All extraneous solid waste will be swept and removed by broom and/or shovel during the operations day. Any extremely wet material will be removed by washing the area down with water. This wastewater will be routed to the sanitary sewer”. During the inspection minimal waste was observed deposited on the I beams in the trailer loading bays. The missing deflector sections are to be replaced by a contractor in the next few months. Additional deflectors across the I beams are to be installed allowing waste to fall more freely into the trailers. Facility staff perform daily removal of waste which can be reached in a safe manner from the I beams. Daily housekeeping checklist forms were reviewed. The section where the deflector was missing is clogged with waste and will be removed safely by the contractor and a new deflector installed. All waste was removed behind the east push wall and this area is checked on a daily basis. The insulation on the rear wall of the transfer station will be removed by the contractor. A complete wash down of the walls will be conducted after all repairs are completed by the contractor. BEFORE Residue in trench drain. Photo taken by: Kim Sue 10/12/16 AFTER Trench drain free of residue and debris. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 7 of 12 BEFORE Waste build-up on I beams in trailer loading bay. Photo taken by: Kim Sue 10/12/16 Solid waste and missing section in deflector to be replaced by contractor. Photo taken by: Kim Sue 12/5/16 AFTER Waste is picked up by facility staff during daily housekeeping duties. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 8 of 12 9. RESOLVED: 15A NCAC 13B .0203(d) cited for failure to pick up windblown litter at the end of each day in accordance with General Permit Condition Number 20 (e) (ii). During the inspection no windblown material was observed. Windblown material is picked up throughout the day and documented on daily housekeeping checklists. Therefore, this violation is considered resolved. 10. RESOLVED: 15A NCAC 13B .0402(7) cited for failure to pick up windblown litter at the conclusion of each day. During the inspection no windblown material was observed. Windblown material is picked up throughout the day and documented on daily housekeeping checklists. Therefore, this violation is considered resolved. 10. RESOLVED: 15A NCAC 13B .0402(1) cited for failure to follow the Facility Operations Plan. The approved Facility Operations Plan Waste Management of Carolina, Inc., dated May 12, 2016 (DIN 25637, Page 4) states: “Windblown litter is controlled at the transfer station by using covered transfer and collection vehicles, confining waste transfer activities to the inside of the building, and controlling vehicle access to the transfer building. Litter that escapes the transfer building will be picked up daily and managed to minimize contact with stormwater”. During the inspection no windblown material was observed. Windblown material is picked up throughout the day and documented on daily housekeeping checklists. The stormwater trench drains and wastewater trench drains are monitored, cleaned several times a day and documented on the daily housekeeping checklists. No waste was observed washing to the open ditch and retention pond. Therefore, this violation is considered resolved. BEFORE Waste behind east push wall. Photo taken by: Kim Sue 10/12/16 AFTER Waste removed daily behind east push wall. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 9 of 12 BEFORE Windblown litter around scaffolding. Photo taken by: Kim Sue 10/12/16 BEFORE Windblown litter along access road to trailer loading bays. Photo taken by: Deb Aja 10/12/16 AFTER No windblown material observed. Staff placed a roll out waste container at this location. Photo taken by: Kim Sue 12/5/16. AFTER No windblown material observed. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 10 of 12 BEFORE Windblown litter against retaining wall along access road to trailer loading bays. Photo taken by: Kim Sue 10/12/16 BEFORE Trash washing down trench drain in front of loading bays to storm drainage ditch. Photo taken by: Kim Sue 10/12/16 AFTER No windblown litter against retaining wall along access road to trailer loading bays. Photo taken by: Kim Sue 12/5/16. AFTER No trash washing down trench drain in front of loading bays to storm drainage ditch. Photo taken by: Kim Sue 12/5/16. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 11 of 12 ADDITIONAL COMMENTS 1. All cracked sewer clean-outs have been repaired. 2. The severed vent for the oil-water separator has been repaired. 3. During the inspection facility staff was actively picking up windblown waste. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 12 of 12 Please contact me if you have any questions or concerns regarding this inspection report. __________ ___________________________ Phone: (704) 235-2163 _ Kim Sue Environmental Senior Specialist Regional Representative E-mailed to: Jeffrey Edwards on 12/20/2016 X Email Hand delivery US Mail Certified No. Copies: Jason Watkins, Field Operations Branch Head Deb Aja, Western District Supervisor - Solid Waste Section Jessica Montie, Compliance Officer - Solid Waste Section Ervin Lane, Compliance Hydrogeologists – Solid Waste Section Shawn Carroll, Waste Management, scarrol3@wm.com Dan Moore, Waste Management, dmoore36@wm.com