Loading...
HomeMy WebLinkAbout7601_RandolphCounty_DIN25845_20160318 Golder Associates NC, Inc. 5B Oak Branch Drive Greensboro, NC. 27407 USA Tel: (336) 852-4903 Fax: (336) 852-4904 www.golder.com Engineering Lic. No. C-2862/Geology Lic. No. C-399 Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation March 18, 2016 0739-612715.300 Mr. Ervin Lane, Hydrogeologist Department of Environmental Quality Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina 27699 ervin.lane@ncdenr.gov RE: LEACHATE SEEP REPAIR PLAN FOR PRE-REGULATORY LANDFILL CLOSED RANDOLPH COUNTY LANDFILL, PERMIT NO. 76-01 RANDOLPH COUNTY, NORTH CAROLINA Dear Ervin: On behalf of Randolph County, Golder Associates NC, Inc. (Golder) is presenting a plan to repair leachate seeps at the pre-regulatory landfill at the Closed Randolph County facility. In a letter dated February 1, 2016, the North Carolina Department of Environmental Quality (NC DEQ) requested that a plan to prevent future seeps be certified by a North Carolina Professional Engineer and submitted prior to implementation. Leachate seeps were identified on the slope of a pre-regulatory landfill located at the Closed Randolph County Landfill facility by Randolph County (County) staff late in the day on January 12, 2016. The location of the seeps are shown on the attached Drawing 2. At the request of the County, a representative of Golder visited the facility the morning of January 13, 2016, to examine and locate the leachate seeps and determine if leachate may have entered drainages or left the landfill property. It was discovered that the seeps combine into a single drainage that flowed down the landfill slope and eventually exited the site via an unnamed tributary of the Deep River. Upon discovery that leachate had left the waste boundary, the County notified the NC DEQ. On January 14, 2016, Golder collected surface water samples and determined that the impact was minimal. No volatile organic compounds were detected in any of the samples, including the seep itself, which may be indicative of the age of the landfill and advanced decomposition of the waste. A lined containment area was constructed at the base of the slope just below the main seep breakout area to collect the discharged leachate. The leachate collected in this berm is pumped out twice a week by an environmental contractor and is disposed of by approved means. A request for bids to repair the seeps and to make repairs to prevent future seeps was submitted to selected contractors on March 18, 2016. Details of the plan are provided on Drawing 3. To repair the existing seeps, cover soil will be removed at the seep locations and approximately six (6) feet of waste will be excavated and backfilled with stone. Then a geotextile will be installed and covered with two (2) feet of soil. During installation, a Schedule 80 polyvinyl chloride (PVC) standpipe will be installed from the bottom of the excavation to the surface, so that if leachate is not re-directed into the waste mass, it can be pumped out before causing future seeps. Waste and soils will be stockpiled until representative Toxicity Characteristic Leaching Procedure (TCLP) samples can be collected and data received to determine the disposal location for the excavated material. Other measures to prevent future seeps are to regrade a bench on the slope to prevent standing water on the slope and decrease infiltration into the waste mass. Also, repairs will be made to the cover soil caused < < < < < G:\Plan Production Data Files\Drawing Data Files\073-9612715\A - Leachate Seep\Active Drawings\0739612715A-01.dwg COVER SHEET D R A W I N G 1 D E S I G N P R O J E C T N o . C A D D C H E C K R E V I E W F I L E N o . S C A L E R E V . REVISION DESCRIPTION CADD CHK RVWDESDATEREV TITLE PROJECT 0 7 3 - 9 6 1 2 7 1 5 0 7 3 9 6 1 2 7 1 5 A - 0 1 0 A S S H O W N M A K 0 3 / 0 7 / 2 0 1 6 K L L 0 3 / 1 0 / 2 0 1 6 PREPARED BY: C O N T A C T I N F O R M A T I O N E N G I N E E R : G O L D E R A S S O C I A T E S N C , I N C . MAI N C O N T A C T : M I C H A E L K I R C H E R 5 B O A K B R A N C H D R I V E GREEN S B O R O , N O R T H C A R O L I N A 2 7 4 0 7 P H O N E : ( 3 3 6 ) 8 5 2 - 4 9 0 3 EMA I L : m i c h a e l _ k i r c h e r @ g o l d e r . c o m O W N E R : R A N D O L P H C O U N T Y M A I N C O N T A C T : P A X T O N A R T H U R S , P E P U B L I C W O R K S D I R E C T O R 7 2 5 M c D O W E L L R O A D A S H E B O R O , N O R T H C A R O L I N A 2 7 2 0 5 P H O N E : ( 3 3 6 ) 3 1 8 - 6 6 5 3 E M A I L : p a x t o n . a r t h u r s @ r a n d o l p h c o u n t y n c . g o v CLOSED RANDOL P H C O U N T Y L A N D F I L L ( P E R M I T # 7 6 - 0 1 ) P R O J E C T A R E A LEAC H A T E S E E P R E P A I R RAN D O L P H C O U N T Y , N O R T H C A R O L I N A M A R C H 2 0 1 6 AT PR E - R E G U L A T O R Y L A N D F I L L RANDOLPH COUNTY, NC Asheboro Randleman Liberty7373 85642416474SCALE: 1" = 150' N O T T O S C A L E RANDOLPH COUNTY LANDFILL SEEP RANDOLPH COUNTY, NC SITE S I T E L O C A T I O N S H E E T L I S T T A B L E S H E E T N U M B E R S H E E T T I T L E 1 C O V E R S H E E T 2 E X I S T I N G C O N D I T I O N S 3 P R O P O S E D R E M E D I A T I O N B O R R O W S I T E L O C A T I O N REVISED AS PER COUNTY COMMENTS KLL MAKMAK3/16/20161 T R A N S F E R S T A T I O N < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < E X I S T I N G C U L V E R T A P P R O X I M A T E L I M I T S O F T E M P O R A R Y L I N E R E X I S T I N G T E M P O R A R Y L E A C H A T E C O N T A I N M E N T A R E A E X I S T I N G S E E P G U L L Y TOP OF EXISTINGBENCH APPROXIMATE LIMITS OFEXISTING SEEP AREA APPROXIMATE LIMITS OF PONDED STORMWATER AND LEACHATE EXISTING CATTAILS EXISTING PIPE INTAKE RANDOLPHCOUNTYANIMAL CONTROL COU N T Y L A N D R O A D < < < < < < < < < < < E X I S T I N G C U L V E R T T O S E D I M E N T B A S I N E X I S T I N G R O A D S I D E D I T C H < < < < TO B O R R O W A R E A (APP R O X I M A T E L Y 0 . 5 M I L E S ) E X I S T I N G U T I L I T Y P O L E TO TRANS F E R S T A T I O N A P P R O X I M A T E L I M I T S O F E X I S T I N G S E E P A R E A G:\Plan Production Data Files\Drawing Data Files\073-9612715\A - Leachate Seep\Active Drawings\0739612715A-02.dwg 0 2 0 2 0 4 0 S C A L E F E E T EXISTING CONDITIONS RANDOLPH COUNTY LANDFILL SEEP RANDOLPH COUNTY, NC D R A W I N G 2 D E S I G N P R O J E C T N o . C A D D C H E C K R E V I E W F I L E N o . S C A L E R E V . REVISION DESCRIPTION CADD CHK RVWDESDATEREV TITLE PROJECT N O T E S : L O C A T I O N S D E P I C T E D O N T H I S F I G U R E A R E A P P R O X I M A T E A N D W E R E R E C O R D E D U S I N G A G P S D E V I C E D U R I N G A S I T E V I S I T P E R F O R M E D B Y G O L D E R A S S O C I A T E S O N F E B R U A R Y 2 9 , 2 0 1 6 . 0 7 3 - 9 6 1 2 7 1 5 0 7 3 9 6 1 2 7 1 5 A - 0 2 0 A S S H O W N M A K 0 3 / 0 7 / 2 0 1 6 K L L 0 3 / 1 0 / 2 0 1 6 REVISED AS PER COUNTY COMMENTS KLL MAKMAK3/16/20161 < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < < E X I S T I N G C U L V E R T A P P R O X I M A T E L I M I T S O F T E M P O R A R Y L I N E R E X I S T I N G T E M P O R A R Y L E A C H A T E C O N T A I N M E N T A R E A EXI S T I N G S E E P G U L L Y TOP OF EXISTINGBENCH APPROXIMATE LIMITS OFEXISTING SEEP AREA APPROXIMATE LIMITS OF PONDED STORMWATER AND LEACHATE EXISTING CATTAILS EXISTING PIPE INTAKE RANDOLPHCOUNTYANIMAL CONTROL COU N T Y L A N D R O A D C O N T E N T S A N D C O N T A I N M E N T A R E A T O B E R E M O V E D U P O N C O M P L E T I O N O F E X C A V A T I O N A N D B A C K F I L L I N G A C T I V I T I E S . SEG R E G A T E L E A C H A T E IMPA C T E D S O I L S F O R DISP O S A L O R P L A C E M E N T UND E R C O V E R S O I L . GRADE TOP OF BENCH TODRAIN TO EXISTING PIPEINVERT.<<<<<<<< < < < < < < < < < < < E X I S T I N G C U L V E R T T O S E D I M E N T B A S I N DEWATER TO THE TEMPORARYLEACHATE CONTAINMENT AREA.BACKFILL THE AREA WITH COVERSOIL FROM THE ON-SITE BORROWAREA TO PROMOTE DRAINAGE TOEXISTING OUTLET PIPE.REPAIR DAMAGE TO COVER SOILCAUSED BY FALLEN TREES.PROPOSED 6' x 6' EXCAVATION AREA.REMOVE COVER SOIL TO EXPOSETHE WASTE MASS AND REMOVE AMINIMUM OF 6 FEET OF WASTE TO BEPLACED IN A TEMPORARY STOCKPILELOCATION. BACKFILL EXCAVATIONAREA WITH STONE AND 24" OFCOVER SOIL. INSTALL 8" DIA.SCHEDULE 80 PVC STANDPIPE.13 1 2 f t P R O P O S E D 1 8 " C M P . PLA C E I N E X I S T I N G D I T C H I N V E R T PRO P O S E D S T A N D P I P E A C C E S S R O A D ( S E E N O T E 2 A N D N O T E 5 . ) TEMPORARY CULVERTINLET PROTECTION T E M P O R A R Y C U L V E R T I N L E T P R O T E C T I O N T E M P O R A R Y C U L V E R T I N L E T P R O T E C T I O N E X I S T I N G R O A D S I D E D I T C H < < < < TO B O R R O W A R E A (APPR O X I M A T E L Y 0 . 5 M I L E S ) 2 3 E X I S T I N G U T I L I T Y P O L E TO TRAN S F E R S T A T I O N P R O P O S E D 6 ' x 6 ' E X C A V A T I O N A R E A . R E M O V E C O V E R S O I L T O E X P O S E T H E W A S T E M A S S A N D R E M O V E A M I N I M U M O F 6 F E E T O F W A S T E T O B E P L A C E D I N A T E M P O R A R Y S T O C K P I L E L O C A T I O N . B A C K F I L L E X C A V A T I O N A R E A W I T H S T O N E A N D 2 4 " O F C O V E R S O I L . I N S T A L L 8 " D I A . S C H E D U L E 8 0 P V C S T A N D P I P E . 1 3 T E M P O R A R Y S T O C K P I L E L O C A T I O N 3 3 A P P R O X I M A T E L I M I T S O F E X I S T I N G S E E P A R E A 8 " S C H E D U L E 8 0 P V C S T A N D P I P E W I T H C A P 4 ' 1 ' 2' 6 ' 6' E X I S T I N G 2 ' O F C O V E R S O I L E X I S T I N G W A S T E M A T E R I A L R E P L A C E 2 ' O F C O V E R S O I L R E P L A C E W I T H A A S H T O # 1 S T O N E REMOVE AND DISPOSE OF EXISTING WASTE MATERIAL P E R F O R A T E D P I P E 8 o z . N O N - W O V E N G E O T E X T I L E 1 2 ' 6" A G G R E G A T E B A S E C O U R S E ( A B C ) S T O N E ( 6 " D E P T H ) T O P R O V I D E A N A L L - W E A T H E R T R A V E L S U R F A C E 8 o z . W O V E N G E O T E X T I L E ( M I R A F I 6 0 0 X O R A P P R O V E D E Q U A L ) K E Y I N G E O T E X T I L E A T P E R I M E T E R 2 % W A S T E S T O C K P I L E 6 m i l T H I C K S H E E T I N G S A N D B A G S 15' MAX. G:\Plan Production Data Files\Drawing Data Files\073-9612715\A - Leachate Seep\Active Drawings\0739612715A-02.dwg 0 2 0 2 0 4 0 S C A L E F E E T PROPOSED REMEDIATION RANDOLPH COUNTY LANDFILL SEEP RANDOLPH COUNTY, NC D R A W I N G 3 D E S I G N P R O J E C T N o . C A D D C H E C K R E V I E W F I L E N o . S C A L E R E V . REVISION DESCRIPTION CADD CHK RVWDESDATEREV TITLE PROJECT N O T E S : E X C A V A T I O N A R E A D E T A I L N O T T O S C A L E 1 3 1 . L O C A T I O N S D E P I C T E D O N T H I S F I G U R E A R E A P P R O X I M A T E A N D W E R E R E C O R D E D U S I N G A G P S D E V I C E D U R I N G A S I T E V I S I T P E R F O R M E D B Y G O L D E R A S S O C I A T E S O N F E B R U A R Y 2 9 , 2 0 1 6 . 2 . O R I E N T A T I O N O F A C C E S S R O A D M A Y B E A D J U S T E D O N S I T E T O L I M I T T H E A M O U N T O F N E C C E S S A R Y C L E A R I N G . 3 . E R O S I O N C O N T R O L D E V I C E S S H A L L B E I N S T A L L E D I N A C C O R D A N C E W I T H T H E N O R T H C A R O L I N A D E Q E R O S I O N A N D S E D I M E N T C O N T R O L P L A N N I N G & D E S I G N M A N U A L . 4 . R E M O V E E R O S I O N C O N T R O L D E V I C E S W H E N A L L D I S T U R B E D A R E A S H A V E B E E N S T A B I L I Z E D . 5 . T H E S T A N D P I P E A C C E S S R O A D , 1 8 " C M P A N D T H E A S S O C I A T E D C U L V E R T I N L E T P R O T E C T I O N A R E S H O W N F O R T H E P U P O S E O F P R O V I D I N G A N A L T E R N A T E B I D I T E M . S T A N D P I P E A C C E S S R O A D N O T T O S C A L E 2 3 0 7 3 - 9 6 1 2 7 1 5 0 7 3 9 6 1 2 7 1 5 A - 0 2 0 A S S H O W N M A K 0 3 / 0 7 / 2 0 1 6 K L L 0 3 / 1 0 / 2 0 1 6 REVISED AS PER COUNTY COMMENTS KLL MAKMAK3/16/20161 T E M P O R A R Y S T O C K P I L E N O T T O S C A L E 3 3