HomeMy WebLinkAbout9226_ShotwellCDLF_Phase5WPApproval_DIN26087_20160511.pdf
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
MICHAEL SCOTT
Director
State of North Carolina | Environmental Quality | Waste Management
1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646
919 707 8200 T
May 11, 2016
Submitted via email ‐ dking@debrisrp.com
Mr. David W. King, President
Shotwell Landfill, Inc.
3209 Gresham Lake Road, Suite 120
Raleigh, North Carolina 27615
Re: Design Hydrogeologic Study Work Plan Approval
Shotwell C&D Landfill ‐ Phase 5 Expansion
Wake County
9226‐CDLF‐2001
DIN 26087
Dear Mr. King,
The Solid Waste Section (Section) has reviewed the Phase 5 Expansion Design Hydrogeologic Study Work
Plan (DIN 26079) submitted on your behalf by Garrett & Moore on April 25, 2016. The Section approves
this work plan.
The work plan proposes the installation of ten (10) new Type II piezometers (B‐22, B‐23/‐23D, B‐24, B‐
25, B‐26, B‐27, B‐28/‐28D, B‐29) to further understand the hydrogeological conditions in the Phase 5
expansion area. These piezometers shall be installed in accordance with 15A NCAC Subchapter 2C.
Piezometer B‐24 and existing piezometer PZ‐2S will be converted to monitoring wells MW‐9 and MW‐
10, respectively. Submit well construction records (Form GW‐1b) and boring logs for each piezometer
after the installation process is complete.
If you have any questions or concerns, please don’t hesitate to contact me via email
elizbeth.werner@ncdenr.gov or phone 919‐707‐8253.
Sincerely,
Elizabeth S. Werner
Permitting Hydrogeologist
Solid Waste Section
Cc: Craig Fortner, P.E. – Garrett & Moore
Ed Mussler – SWS, Permitting Branch Head
Pat Backus – SWS, Permitting Engineer
Liz Patterson – SWS, Environmental Specialist
Drew Hammonds – SWS, Field Operations Eastern Supervisor