Loading...
HomeMy WebLinkAbout9226_ShotwellCDLF_Phase5WPApproval_DIN26087_20160511.pdf    PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T May 11, 2016    Submitted via email ‐ dking@debrisrp.com    Mr. David W. King, President  Shotwell Landfill, Inc.  3209 Gresham Lake Road, Suite 120  Raleigh, North Carolina 27615    Re: Design Hydrogeologic Study Work Plan Approval   Shotwell C&D Landfill ‐ Phase 5 Expansion    Wake County   9226‐CDLF‐2001   DIN 26087     Dear Mr. King,    The Solid Waste Section (Section) has reviewed the Phase 5 Expansion Design Hydrogeologic Study Work  Plan (DIN 26079) submitted on your behalf by Garrett & Moore on April 25, 2016.  The Section approves  this work plan.      The work plan proposes the installation of ten (10) new Type II piezometers (B‐22, B‐23/‐23D, B‐24, B‐ 25, B‐26, B‐27, B‐28/‐28D, B‐29) to further understand the hydrogeological conditions in the Phase 5  expansion area.  These piezometers shall be installed in accordance with 15A NCAC Subchapter 2C.   Piezometer B‐24 and existing piezometer PZ‐2S will be converted to monitoring wells MW‐9 and MW‐ 10, respectively.  Submit well construction records (Form GW‐1b) and boring logs for each piezometer  after the installation process is complete.    If you have any questions or concerns, please don’t hesitate to contact me via email  elizbeth.werner@ncdenr.gov or phone 919‐707‐8253.      Sincerely,      Elizabeth S. Werner  Permitting Hydrogeologist  Solid Waste Section    Cc: Craig Fortner, P.E. – Garrett & Moore   Ed Mussler – SWS, Permitting Branch Head   Pat Backus – SWS, Permitting Engineer   Liz Patterson – SWS, Environmental Specialist   Drew Hammonds – SWS, Field Operations Eastern Supervisor