Loading...
HomeMy WebLinkAbout7803_RobesonMSW_Phase5AddendumApproval_DIN25725_20160308.pdf    PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Acting Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T March 8, 2016    Sent Via Email ‐ steve.edge@co.robeson.nc.us    Mr. Steve Edge  Solid Waste Director  Robeson County Solid Waste Department   246 Landfill Road  St. Pauls, North Carolina 28384    Re: Design Hydrogeologic Approval     Robeson County MSW    Phase 5 Expansion    7803‐MSWLF‐1997   DIN 25725    Dear Mr. Edge,    The Solid Waste Section (Section) has reviewed the Addendum to Phase 5 Design Hydrogeologic Report  (DIN 24961) submitted on your behalf by Joyce Engineering on September 1, 2015 and the Revised  Addendum to Phase 5 (DIN 25733) submitted via email on January 11, 2016.  In the revised Addendum,  the footprint of Phase 5 was expanded to the northern property line as well as the western border  creating a total footprint of 19 acres.  After numerous conversations with Joyce Engineering, the Section  approves the Phase 5 Addendum.      If you have any questions or concerns, please do not hesitate to contact me via email  elizabeth.werner@ncdenr.gov or phone (919) 707‐8253.      Sincerely,        Elizabeth S. Werner       Permitting Hydrogeologist  Solid Waste Section        Cc: Van Burbach, Ph.D., P.G. – Joyce Engineering   Ed Mussler, P.E. – SWS, Permitting Brand Head   John Murray – SWS, Permitting Engineer  Drew Hammonds – SWS, Environmental Senior Specialist