HomeMy WebLinkAbout2301_ClevelandCo_SelfMcNeilly_EmailPhase3LFG_DIN26080_20160506.pdf1
Werner, Elizabeth
From:Jonathan Pfohl <jpfohl@mesco.com>
Sent:Friday, May 06, 2016 4:23 PM
To:Werner, Elizabeth
Subject:Cleveland Co MSWLF Proposed Ph 3 LFG Plan Guidance Request
Attachments:Cleveland LFG Aerial.pdf
Hi Elizabeth,
We are currently drafting the Design Hydrogeologic Study and Water Quality Monitoring Plan for a horizontal
expansion (proposed Ph. 3) at the Cleveland Co. Subtitle D Lined Landfill.
However, we are uncertain if Landfill Gas (LFG) migration monitoring probes are necessary since the vast
majority of the property is surrounded by water bodies which the SWS LFG Guidance Document correctly
indicates serve as effective hydraulic barriers to off-site migration. We propose the LFG Plan for Ph. 1,2 & 3
to include only quarterly monitoring of the 6 on-site structures. I've attached a site map showing the pertinent
information including streams that have recently been delineated and approved by the US corps of
Engineers. Please let us know if the SWS would consider approval of a LFG Plan without any probes/wells
and if not what specific areas would probes be required. Simply ask if you need any additional information.
Thank You and have a great weekend,
Jonathan
--
Jonathan Pfohl
Municipal Engineering Services, Co. PA
PO Box 97 Garner NC 27529
68 Shipwash Dr. Garner NC 27529
Office: (919) 696-1383
Mobile: (919) 696-1383
Fax: (919) 772-1176