HomeMy WebLinkAbout92V_INSP_20161026FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID X YW Transfer Compost SLAS COUNTY: WAKE
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 92V-LCID-
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: October 26, 2016 Date of Last Inspection:
FACILITY NAME AND ADDRESS:
Carolina Tree Debris
1417 Old Watkins Road
Raleigh, NC 27616
GPS COORDINATES: N: 35.8640 W: -78.5060
FACILITY CONTACT NAME AND PHONE NUMBER:
Thomas Butler
Phone: 919-880-2852
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Liz Patterson - NCDEQ – Solid Waste Section
Sammy Blackwell – Carolina Tree Debris
STATUS OF PERMIT:
Permit to Operate (original issue by Wake County): August 19, 1999
Permit Modification (PTO#2) issued by NCDENR on December 8, 2011
Permit expiration date is December 8, 2016
Permit renewal received November 3, 2016 and under review
PURPOSE OF SITE VISIT:
Partial audit
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS
The facility is a LCID landfill that was originally permitted by Wake County under a memorandum of understanding. The
current permitting authority is the DEQ -Solid Waste Section (SWS). A permit modification was issued by NCDENR
(now DEQ) on December 8, 2011. This Permit to Operate expires December 8, 2016. The facility permit renewal
application was submitted to the SWS on November 3, 201 and is currently under review.
1. As an LCID landfill the facility is allowed to receive land clearing waste; yard trash; untreated and unpainted
wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt
in accordance with NCGS 130-294(m).
2. The facility is secured with a gate during hours of non-operation. The posted operating hours are 8am-5pm,
Monday through Friday. The facility has proper signage.
3. Operations were discussed with Mr. Blackwell.
4. The facility currently segregates different materials for treatment and processing. Land clearing waste consisting
of stumps and logs was the primary material observed on-site.
5. The facility tracks incoming loads on individual tickets. Each load ticket lists the company of the hauler, the
driver name, date, and the signature of the driver.
6. No unpermitted waste was noted during inspection. Unpermitted material such as treated wood and other
miscellaneous construction debris are removed from the incoming waste for proper disposal at a permitted
facility.
7. The facility pad/landfill cap appeared to be in good condition. No holes, ruts, or areas of ponding were
observed. No erosion or runoff was observed.
8. Ensure that ground cover sufficient to restrain erosion is established within 30 working days or 120 calendar days
upon completion of any phase of landfill development. Eastern slopes had been recently mowed. Mr. Blackwell
indicated that reseeding of any bare spots and side slopes would occur when the weather becomes favorable for
new groundcover.
9. Edge of waste markers need to be installed and maintained while the landfill is in operation.
10. The haul road is being well maintained
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 919-707-8286
Elizabeth.Patterson@ncdenr.gov
Liz Patterson
Environmental Senior Specialist
Regional Representative
Sent on: 12-01-2016 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern/Western District Supervisor - Solid Waste Section
Jessica Montie, Compliance Officer - Solid Waste Section
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
Digital pictures taken by Liz Patterson on October 26, 2016
Facility sign viewable from main road Land clearing debris on cap for treatment & processing
Land clearing debris and logs Stockpiled concrete to be crushed and used on haul roads