Loading...
HomeMy WebLinkAbout76-05T_CityAsheboroTS_LOS_PTO_DIN27060_20161130 Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 1 of 9 North Carolina Department of Environmental Quality Division of Waste Management Pat McCrory Donald R. van der Vaart Governor Secretary 1646 Mail Service Center, Raleigh, North Carolina 27699-1646 Phone: 919-707-8200 Internet: http://deq.nc.gov/about/divisions/waste-management/solid-waste-section An Equal Opportunity \ Affirmative Action Employer STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION SOLID WASTE MANAGEMENT FACILITY PERMIT NO. 7605T-TRANSFER-2002 CITY OF ASHEBORO is hereby issued a PERMIT APPROVAL TO CONSTRUCT NOT APPLICABLE PERMIT APPROVAL TO OPERATE CITY OF ASHEBORO RECYCLING & SOLID WASTE TRANSFER STATION PERMIT FOR CLOSURE NOT APPLICABLE located at 630 Transfer Station Place in the City of Asheboro, Randolph County, North Carolina, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deeds recorded for this property listed in Attachment No. 1 of this permit. Edward F. Mussler, III, P.E. Permitting Branch Supervisor Solid Waste Section Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 2 of 9 ATTACHMENT 1 GENERAL PERMIT CONDITIONS INFORMATION Permit Status Issuance Expiration 7605T-TRANSFER-2002 Active November 30, 2016 Life of Site Part I General Facility 1. This permit is issued by the North Carolina Department of Environmental Quality, Division of Waste Management, Solid Waste Section (Section). In accordance with North Carolina Solid Waste Management Rule (Rule) 15A NCAC 13B .0201(d), a solid waste management facility permit shall have two parts: a permit approval to construct and a permit approval to operate. The permit approval to construct must be implemented in accordance with Attachment 2 of this permit. The permit approval to operate must be implemented in accordance with Attachment 3 of this permit. 2. The persons to whom this permit is issued (“permittee”) are the owners and operators of the solid waste management facility. 3. This permit shall not be effective until the certified copy of this permit which references legal descriptions for all land within the solid waste management facility boundary is recorded in the Register of Deeds office and indexed in the grantor index under the name of the owner of the land in the county or counties in which the land is located. The certified copy of the permit affixed with the Register's seal and the date, book, and page number of recording must be returned to the Solid Waste Section within thirty (30) calendar days of issuance of this permit. If the Solid Waste Section does not receive the certified copy of the recorded permit within 30 calendar days of issuance of the permit, then and in that event, the permit is suspended and of no effect until the date the Solid Waste Section receives the certified copy of the recorded permit. 4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other instrument of transfer must contain in the deed description section, in no smaller type than that used in the body of the deed or instrument, a statement that the property has been used as a solid waste management facility and a reference by book and page to the recordation of the permit. 5. By initiating construction or receiving waste at this facility the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Operation of this solid waste management facility shall be in accordance with the North Carolina Solid Waste Management Rules, 15A NCAC 13B; Article 9 of the Chapter 130A of the North Carolina General Statutes (N.C.G.S. 130A-290, et seq.); the conditions contained in this permit; and the approved plan. Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 3 of 9 addressed by permit condition. Failure to comply may result in compliance action or permit revocation. 7. This permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, “List of Documents for Approved Plan,” and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the conditions of permit shall govern. 8. This permit may be transferred only with the approval of the Section, through the issuance of a new or substantially amended permit in accordance with applicable statutes and rules. 9. In accordance with N.C.G.S. 130A-295.2(g) the permittee shall notify the Section thirty (30) days prior to any significant change in the identity or business structure of either the owner or the operator, including but not limited to a proposed transfer of ownership of the facility or a change in the parent company of the owner or a change in the operator of the facility or parent company of the operator. 10. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for a General or Individual National Pollutant Discharge Elimination System Stormwater Discharge Permit. Issuance of this permit does not remove the permittee’s responsibilities for compliance with any other local, state, or federal rule, regulation, or statute. PROPERTIES APPROVED FOR THE SOLID WASTE MANAGEMENT FACILITIES Randolph County, N.C. Register of Deeds Book Page Grantor Grantee Acres 1190 967 - 969 G. Porter Pritchard and wife, Exie G. Pritchard City of Asheboro 34.80 Note: The property Parcel Identification Number is 7761378624. Part II Municipal Solid Waste Landfill Unit(s) Not Applicable Part III Construction and Demolition Landfill Unit(s) Not Applicable Part IV Industrial Landfill Unit(s) Not Applicable Part V Land Clearing and Inert Debris Landfill Unit(s) Not Applicable Part VI Transfer Station/Treatment & Processing Unit(s) Permitting History Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 4 of 9 Permit Type Date Issued Document Identification Number (DIN) Permit to Construct December 28, 2000 - Permit to Operate (PTO), Original February 13, 2002 - PTO, 5-yr Permit Amendment June 28, 2007 2594 PTO, 5-yr Permit Amendment June 8, 2011 14009 PTO – Life of Site November 30, 2016 27060 List of Documents for the Approved Plan Part VII Miscellaneous Solid Waste Management Unit(s) Not Applicable - End of Section - ATTACHMENT 2 CONDITIONS OF PERMIT APPROVAL TO CONSTRUCT Not Applicable -End of Section- ATTACHMENT 3 CONDITIONS OF PERMIT APPROVAL TO OPERATE Part I: General Facility 1. The facility must be adequately secured by means of gates, chains, berms, fences, or other security measures approved by the Section to prevent unauthorized entry. 2. Signs must be posted at the entrance to the facility that state that no hazardous waste or liquid waste can be received at the facility; and provide information on dumping procedures, the hours of operation, the permit number, contact name, telephone number, DIN DOCUMENT DESCRIPTION 2595 Operational Plans, City of Asheboro Recycle & Solid Waste Transfer Station. Prepared by: The City of Asheboro, Asheboro, North Carolina. January 2007. 13677 & 14015 Revised Operational Plans, City of Asheboro Recycle & Solid Waste Transfer Station. Prepared by: The City of Asheboro, Asheboro, North Carolina. May 2011 and revised May 25, 2011. 27062 Operational Plans, City of Asheboro Recycle & Solid Waste Transfer Station. Permit Number 76-05-T. Prepared by: The City of Asheboro, Asheboro, North Carolina. May 2016 and revised through June 08, 2016. Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 5 of 9 and other pertinent information. Traffic signs or markers must be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. 3. Interior roadway must be of all-weather construction and maintained in good condition. 4. A responsible individual trained and certified in facility operations must be on-site at all times during all operating hours of the facility in accordance with N.C.G.S. 130A-309.25. An attendant must be present to oversee the loading and unloading of waste. 5. Copies of this permit, the approved plans, and all records required to be maintained by the permittee must be maintained at the facility and made available to the Section upon request during normal business hours. 6. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act, N.C.G.S. 113A-50 et seq., and rules promulgated under 15A NCAC 4. The Section must be notified of any approved modifications to the sedimentation and erosion control plan. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 4040 or the Clean Water Act, as amended. 8. Fire lanes must be established and maintained at all times. The dimensions of the fire lanes must be coordinated with the Fire Marshall having jurisdiction over the site. 9. Open burning of solid waste is prohibited. Fires must be reported to the regional waste management specialist with 24 hours or the occurrence, followed by a written notification within 15 calendar days of the occurrence. Part II: Municipal Solid Waste Landfill Unit(s) Not Applicable Part III: Construction and Demolition Debris Landfill Unit(s) Not Applicable Part IV: Industrial Landfill Unit(s) Not Applicable Part V: Land Clearing and Inert Debris Landfill Unit(s) Not Applicable Part VI: Transfer Station / Treatment and Processing Unit 1. This permit approval is for the life-of-site as defined in N.C.G.S. 130A-294(a2). Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 6 of 9 2. The facility is permitted to receive non-hazardous solid waste as defined in N.C.G.S. 130A -290(a)(35) which is generated within Randolph County and in consistent with the Operational Plan (DIN 27062), except where prohibited by North Carolina General Statutes Article 9 of Chapter 130A and the 15A NCAC 13B rules. 3. The following, at a minimum, must not be accepted for disposal at the facility: hazardous waste, yard trash, liquid wastes, regulated medical waste, sharps not properly packaged, regulated-asbestos containing material as defined in 40 CFR 61, PCB waste as defined in 40 CFR 761, and wastes banned from disposal in North Carolina by N.C.G.S. 130A- 309.10(f). 4. The waste collected at this transfer facility must be transported to a sanitary landfill facility that is a. permitted to receive the type of waste specified, and b. whose service area includes the origin of the waste. 5. The permittee must not knowingly dispose of, or accept for transfer for subsequent disposal, municipal solid waste that is generated within the boundaries of a unit of local government that by ordinance: a. Prohibits generators or collectors of municipal solid waste from disposing of that type or form of municipal solid waste. b. Requires generators or collectors of municipal solid waste to recycle that type or form of municipal solid waste. 6. The permittee must develop, and implement a training and screening program at the facility for detecting and preventing unauthorized wastes from being accepted at the facility according to the approved Operational Plan (DIN 27062). At a minimum, the program must include: a. Random inspections of incoming loads or other comparable procedures. b. Records of all inspections c. Training of personnel to recognize hazardous, liquid and other excluded waste types. d. Development of a contingency plan to properly manage any identified hazardous, liquid, or other excluded or unauthorized wastes. The plan must address identification, removal, storage and final disposition of these wastes. 7. The facility must not cause nuisance conditions according to Rule 15A NCAC 13B .0402 and the approved Operational Plan (DIN 27062). Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 7 of 9 a. The tipping floor and transfer trailer loading area must be maintained in a clean, sanitary condition at all times and must be cleaned at least daily. b. Waste must only be deposited on a “tipping floor” or directly into a transfer container. Waste must not be stored on the “tipping floor” after operating hours. c. Waste may be stored on-site, in vehicles or containers that are constructed, operated, and maintained to be leak resistant in order to prevent the creation a nuisance to the public health from the escape of solid, semi-solid, or liquid waste a maximum of 72 hours when the facility is closed during a weekend or holiday. Storage of the waste must not cause any nuisance, such as odor or attraction of vectors. d. Effective vector control measures must be applied at all times to control any potential vectors including flies, rodents, insects, and other vermin. e. Control measures must be utilized to minimize and eliminate visible dust emissions and blowing litter. i) Fugitive dust emissions are prohibited. ii) Windblown materials must be collected by the end of the day and no windblown material may be allowed to leave the facility boundary. 8. All water that comes in contact with solid waste, including vehicle wash-down water, is leachate and must be captured and properly treated before release to the environment in accordance with the approved Operational Plan (DIN 27062) and Rule 15A NCAC 13B .0402(3). a. The leachate control system, such as floor drains, leachate collection devices, sanitary sewer connections and leachate storage tanks, must be operational during facility operations. b. The tipping floor must drain away from the building entrance and into the leachate collection system. 9. The permittee must maintain a record of the amount of solid waste received at the facility, including daily records of waste received and origins of the loads. Scales must be used to weigh waste. The daily records are to be summarized into a monthly report for use in the required annual reports. 10. On or before August 1 annually, the Permittee must submit an annual facility report to the Solid Waste Section, on forms prescribed by the Section. a. The reporting period shall be for the previous year beginning July 1 and ending June 30. Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 8 of 9 b. The annual facility report must list the amount of waste received in tons and be compiled: i) On a monthly basis. ii) By county, city or transfer station of origin. iii) By specific waste type. iv) By receiving disposal facility. v) By diversion to alternative management facilities. c. The completed report must be forwarded to the Regional Environmental Specialist for the facility by the date due on the prescribed annual facility report form. d. A copy of the completed report must be forwarded to each county manager for each county from which waste was received at the facility. Documentation that a copy of the report has been forwarded to the county managers must be sent to the Regional Environmental Specialist by the date due on the prescribed annual facility report form. Part VII: Miscellaneous Solid Waste Management 1. The facility may accept “recovered material” or “recyclable material” as defined in N.C.G.S. 130A-294(a)(24) and (26), respectively that are generated within Randolph County must be transferred to the facilities described in the approved Operational Plan (DIN 27062). The Section must be notified of proposed changes to the service area and/or the receiving facility. 2. Recyclable or recovered materials may be received and processed as described in the approved Operational Plan (DIN 27062). The received materials shall be cleared from the tipping floor at the end of each day and placed in a transfer trailer or at the designated locations as shown on the Sheet No. 1 of 1 -Site Layout Drawing of the Operational Plan (DIN 27062). 3. Recovered or recyclable material must be managed as a valuable commodity in a manner consistent with the desired use or end use. The permittee must operate and manage received recyclables or recovered material at this facility according to the requirements set forth in N.C.G.S. 130A-309.05(c)(1), (2), and (3) and the approved Operational Plan (DIN 27062). 4. Seventy-five present (75%), by weight, of the recovered material stored at the facility at the beginning of a calendar year commencing January 1, must be removed from the facility through sale, use, or reuse by December 31 of the same year. Facility Permit No: 7605T-Transfer-2002 City of Asheboro Transfer Station Date:November 30, 2016 DIN:27060 Page 9 of 9 5. This facility is permitted to receive and temporarily store Freon-containing white goods as defined in N.C.G.S. 130A-290.(a)(44), non-Freon-containing white goods, and scrap metal. a. White goods collection areas shall provide for the proper removal of chlorofluorocarbon refrigerants (Freon) according to the approved plan (DIN 27062). b. Freon-containing and non-Freon-containing white goods must be stored separated initially; however, after properly removing Freon from the white goods, the white goods can be comingled altogether. 6. This facility is permitted to receive and temporarily store the discarded electronics including televisions, computer, or computer equipment as defined in N.C.G.S. 130A- 309.131 must be properly stored on pallet or other equivalent material. 7. This facility is permitted to receive and temporarily store used tires scrap tires as defined in N.C.G.S. 130A-309.53(6) & (7) only from non-commercial sources. The permittee must operate the scrap tire collection areas in accordance with the requirements of Rule 15A NCAC 13B. 1107 and the approved plan (DIN 27062). -End of Section- ATTACHMENT 4 CONDITIONS OF PERMIT FOR CLOSURE Not Applicable -End of Section- - End of Permit Conditions -