HomeMy WebLinkAbout25I_CieszkoApplComplete_DIN25832_20160329.pdf
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
MICHAEL SCOTT
Acting Director
March 29, 2016
Mr. Martin Cieszko
President
Cieszko Construction Company, Inc.
PO Box 690
Havelock, NC 28532
Subject: Permit Application Complete
Cieszko LCID
Permit No. 25I-LCID-, Craven County, Document ID No. 25832
Dear Mr. Cieszko:
The Division of Waste Management, Solid Waste Section, has received your permit amendment
application for the Cieszko LCID (Permit No. 25-I). This letter is to notify you that the application is
considered complete within the context of North Carolina General Statues (NCGS) §130A-295.8(e).
A determination of completeness means that the application includes all required components but does
not mean that the required components provide all of the information that is required for the Section to
make a decision on the application. A technical review of your application is in progress.
Under NCGS §150B-3, when an applicant makes a timely and sufficient application for issuance or
renewal of a permit, the existing permit does not expire until a final decision on the application is made.
Therefore, until the final decision is made, you are authorized to continue operation of the Cieszko LCID
in accordance with your most recent Solid Waste Permit and the Solid Waste Management Rules (15A
NCAC 13B).
If you have any questions regarding this matter, please contact me at (919) 707-8257 or by email at
pat.backus@ncdenr.gov.
Sincerely,
Patricia Backus, P.E., Environmental Engineer
Division of Waste Management, NCDEQ
cc: C. Tyrus Clayton, Jr., PE, Draper Aden Associates
Ed Mussler, P.E., Permitting Branch Head
Jason Watkins, Field Operations Branch Head
Ray Williams, Environmental Senior Specialist
Scanned By Date DOC ID Permit
Backus
03/29/2016 25832 25I-LCID-
Digitally signed by Patricia M. Backus,
P.E.
DN: cn=Patricia M. Backus, P.E.,
o=Solid Waste Section, ou=DWM,
email=pat.backus@ncdenr.gov, c=US
Date: 2016.03.29 13:06:31 -04'00'