Loading...
HomeMy WebLinkAbout4303_AndersoncreekCDLF_CQARpt_Phase3AII_DIN26986_20161104 Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina Prepared for: Harnett County Solid Waste Department Lillington, North Carolina November 2016 Prepared by: © 2016 Smith Gardner, Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner, Inc. November 4, 2016 Mr. Ming-Tai Chao, P.E. Environmental Engineer NC DEQ - Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699 RE: Harnett County Anderson Creek C&DLF - Phase IIIA-2 (Permit No. 43-03) Construction Quality Assurance (CQA) Report Dear Mr. Chao: On behalf of Harnett County, Smith Gardner, Inc. (S+G) would like to submit the enclosed construction quality assurance (CQA) report for the Phase IIIA-2 construction and demolition debris (C&D) landfill unit at the County’s Anderson Creek Landfill facility. Phase IIIA-2 (1.8 acres) is the final portion of the approved Phase IIIA landfill unit. Please contact me at your earliest convenience if you should have any questions or comments on this submittal. Sincerely, SMITH GARDNER, INC. Pieter K. Scheer, P.E. Vice President, Senior Engineer pieter@smithgardnerinc.com Enclosure: CQA Report cc: Amanda Bader, P.E., Harnett County Randy Smith, Harnett County Andrew Holland, Harnett County This page intentionally left blank. Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina Prepared For: Harnett County Solid Waste Department Lillington, North Carolina S+G Project No. HARNETT-AC-15-2 Based on the observations and results of the CQA program documented herein, it is my professional opinion that the construction of Phase IIIA-2 of the Anderson Creek C&D Landfill was completed in accordance with the following: i. The Project CQA Manual; ii. The conditions of the Permit; iii. The requirements of 15A NCAC 13B.0541; and iv. Acceptable engineering practices. Pieter K. Scheer, P.E. Project Manager 11/2/16 November 2015 This page intentionally left blank. Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Table of Contents Page i Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina Construction Quality Assurance Report Table of Contents Page 1.0 OVERVIEW ........................................................................................................................... 1  2.0 PROJECT DESCRIPTION ..................................................................................................... 1  2.1 General ...................................................................................................................... 1  2.2 Reference Documents ............................................................................................... 1  2.3 Project Participants ................................................................................................... 1  2.3.1 Owner ............................................................................................................ 1  2.3.2 Engineer/CQA Engineer ................................................................................ 2  2.3.3 CQA Testing - Earthwork & Construction Monitoring ................................. 2  2.3.4 Surveyor ......................................................................................................... 2  3.0 SUMMARY OF CONSTRUCTION ACTIVITIES ....................................................................... 2  3.1 Site Preparation......................................................................................................... 3  3.2 Earthwork .................................................................................................................. 3  4.0 CQA PROGRAM ................................................................................................................... 3  4.1 Scope of Services ...................................................................................................... 3  5.0 EARTHWORK CQA ............................................................................................................... 4  5.1 Soil Types in Upper Two Feet of Landfill Subgrade ................................................. 4  6.0 RECORD DRAWING ............................................................................................................. 5  TABLE Table 1 Summary of Material Control and Record Tests - Structural Fill APPENDICES Appendix A Photographic Log Appendix B CQA Meeting Documentation Appendix C Earthwork CQA Data Appendix D Record Drawing Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Table of Contents Page ii This page intentionally left blank. Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 1 1.0 OVERVIEW This Construction Quality Assurance (CQA) Report has been prepared to document the CQA activities performed during the construction of Phase IIIA-2 of the Anderson Creek Construction and Demolition Debris (C&D) Landfill. The landfill facility is located at 1086 Poplar Drive in Spring Lake, North Carolina and is owned and operated by Harnett County under State Solid Waste Permit No. 43-03. A Permit to Construct for the Phase IIIA landfill unit was issued by the North Carolina Department of Environmental Quality Division of Waste Management (NCDWM) on June 5, 2015. 2.0 PROJECT DESCRIPTION 2.1 General Phase IIIA-2 is an unlined C&D landfill unit designed by Smith Gardner, Inc. (S+G). This unit, which is part of the larger Phase IIIA landfill unit, is approximately 1.8 acres (limits of certification) and is located to the northeast of the existing Phases I, II, and IIIA-1 units. Construction activities included of subgrade preparation activities, and construction of a small berm. 2.2 Reference Documents Phase IIIA-2 was constructed in accordance with the following documents. Permit to Construct Application - Harnett County Anderson Creek Landfill Facility C&D Landfill - Phase IIIA: Includes technical specifications, CQA manual, and permit drawings prepared by S+G as revised through May 2015 (Permit to Construct issued by NCDWM on June 5, 2015). 2.3 Project Participants The following parties were involved in the construction and CQA of Phase IIIA-2: 2.3.1 Owner Harnett County Solid Waste Department (County) P.O. Box 2773 102 East Front Street Lillington, NC 27546 Phone: (910) 814-6156 Contacts: Amanda Bader, P.E., County Engineer Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 2 Al Truelove, Construction Project Manager Randy Smith, Solid Waste Operations Manager Andrew Holland, Solid Waste Operations Crew Leader Note: For this project, the County performed as the Contractor. 2.3.2 Engineer/CQA Engineer Smith Gardner, Inc. (S+G) 14 N. Boylan Ave. Raleigh, NC 27603 Phone: (919) 828-0577 Fax: (919) 828-3899 Contacts: Pieter Scheer, P.E., Project Manager 2.3.3 CQA Testing - Earthwork & Construction Monitoring GeoTechnologies,Inc., P.A. 3200 Wellington Ct., Suite 108 Raleigh, NC 27615 Phone: (919) 954-1514 Contacts: Mike Morton, Construction Services Manager Mike Norton, Field Technician 2.3.4 Surveyor 4D Site Solutions, Inc. 409 Chicago Drive, Suite 112 Fayetteville, NC 28306 Phone: (910) 426-6777 Contacts: Jimmy Holland, PLS 3.0 SUMMARY OF CONSTRUCTION ACTIVITIES Major elements of the project are discussed below. Photos documenting the construction of Phase IIIA-2 can be found in Appendix A. Prior to beginning the project, a CQA meeting was held on July 7, 2015 (and repeated on August 23, 2016). Documentation of this meeting can be found in Appendix B. Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 3 3.1 Site Preparation Construction of Phase IIIA-2 began in August 2016 with the surveying/staking of the limits of construction by 4D Site Solutions and the initiation of earthwork activities by County forces. 3.2 Earthwork The site, which lies within a portion of the site designated for borrow, was previously cleared and grubbed. Additionally, an existing French drain running northeast of and adjacent to the Phases I & II Extension was previously removed to the extent practical and the remainder abandoned (References: NC DWM DIN 21375 (Revised Report with Documentation) and DIN 21384 (Acknowledgement of French Drain Removal)). Once the site was staked, excavation and stockpiling activities were performed. Suitable soils identified for use as structural fill were excavated and placed and compacted or were temporarily stockpiled. A portion of the structural fill came from the County’s nearby active borrow area. During construction of the subgrade for Phase IIIA-2, Mr. Pieter Scheer, P.E. visited the site and examined the subgrade in accordance with the requirements of 15A NCAC 13B.0540. As anticipated based on the site investigations performed in this area, no evidence of bedrock or groundwater was observed in excavations made to reach subgrade elevations. An as-built drawing showing completed subgrade elevations is provided in Appendix D. Permitted seasonal high groundwater contours are also shown on this drawing to illustrate the separation to groundwater. It is noted that much of the southwestern portion of Phase IIIA-2 was constructed higher than design grades to stay sufficiently above wet areas encountered during placement of structural fill. 4.0 CQA PROGRAM 4.1 Scope of Services In satisfying the requirements of the Project CQA Manual for Phase IIIA-2, the following activities were performed:  Observation and documentation of construction of prepared subgrade and structural fill.  Field and laboratory testing of structural fill.  Verification of the soil types in the upper two (2) feet of the subgrade.  Review/preparation of record drawing. Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 4  Preparation of the final CQA report. 5.0 EARTHWORK CQA The criteria for construction of structural fill per the project specifications included the following: Materials: SP*, SW*, SM, SM-SC, SC, ML, MH, ML-CL, CL, or CH (ASTM D 2488) with no topsoil or other deleterious material and no stones or rocks in excess of one half the lift thickness as compacted; Density: Minimum 95% Maximum Standard Proctor Dry Density (ASTM D 698); Moisture Content: As necessary for compaction; and Lift Thickness: 8-inch max. (compacted). *Within the limits of the landfill, SP (poorly-graded sand) and SW (well-graded sand) soils are not allowed in the upper two (2) feet of the subgrade (see Section 5.1). The number and results of material control and record tests performed on the structural fill are summarized in Table 1. Other tests performed on an on-going basis during construction included a visual classification of soils (ASTM D 2488) and monitoring of loose lift thickness. Note that the number of tests required was based on an approximate quantity of 10,000 CY of material placed (in-place measure). The results of field and laboratory testing of structural fill can be found in Appendix C. An as-built drawing showing completed subgrade elevations is provided in Appendix D. 5.1 Soil Types in Upper Two Feet of Landfill Subgrade For this site, no SP, SW, or coarser soil types (as defined using ASTM D 2488) were found to be present within the limits of Phase IIIA-2 based on visual inspection and testing performed as part of construction. Additionally, the County generally excavated to two feet below design subgrade in cut areas such that materials could be monitored during placement. Five tests performed on actual materials placed in the upper two feet of the landfill subgrade show that the soils used were classified as SM of SC. These soil types meet the requirements of 15A NCAC 13B.0540 for the upper two feet of the landfill subgrade. Given that the materials tested appeared to be representative of all materials placed as structural fill during construction, the five material classification tests were deemed to be sufficient. Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 5 6.0 RECORD DRAWING The following record (as-built) drawing depicting the construction of Phase IIIA-2 can be found in Appendix D:  Subgrade (prepared by S+G using surveyed elevations by 4D Site Solutions, Inc., Jimmy Holland, PLS). Harnett County AC C&DLF - Phase IIIA-2 Construction Quality Assurance Report November 2016 Page 6 This page intentionally left blank. Anderson Creek C&D Landfill Phase IIIA-2 TABLE 1 SUMMARY OF MATERIAL CONTROL AND RECORD TESTS STRUCTURAL FILL Control Tests Units ----- % Std. Proctor % Test Method ASTM D 698 ASTM D 2937 ASTM D 4959 Required Test Frequency 5,000 CY per each soil 20,000 ft2 per lift & 1 per 500 LF of Berms (<200 ft. base width) (+/- 1 Per 500 CY) 20,000 ft2 per lift & 1 per 500 LF of Berms (<200 ft. base width) (+/- 1 Per 500 CY) No. of Tests Required 22020 No. of Tests Performed 23434 Specified Value ----- > 95% Std. Proctor As Required for Density Minimum Value ----- 95 -7 % Opt. Maximum Value ----- 103 -0 % Opt. Average Value ----- 97 -3 % Opt. Quantity of Structural Fill (In-Place):10,000 CY (Approx) Record Tests Property Moisture-Density Relationship (Proctor)In-Place Density In-Place Moisture Content SMITH GARDNER, INC.Table 1 - Structural Fill HC ACLF CQA Report Table 1.xls This page intentionally left blank. Appendix A Photographic Log Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina This page intentionally left blank. PHOTOGRAPHIC LOG Client Name: Harnett County, North Carolina Site Location: Anderson Creek C&DLF – Phase IIIA-2 Project No. HARNETT-AC-15-2 Photo No. 1 Date 7/28/15 Direction Photo Taken: East Description: Initial Earthwork Activities for Phase IIIA Photo No. 2 Date 3/17/16 Direction Photo Taken: East Description: Earthwork in Phase IIIA-2 PHOTOGRAPHIC LOG Client Name: Harnett County, North Carolina Site Location: Anderson Creek C&DLF – Phase IIIA-2 Project No. HARNETT-AC-15-2 Photo No. 3 Date 10/24/16 Direction Photo Taken: East Description: View from Northern Berm (Prior to Storm Repairs) Photo No. 4 Date 10/27/16 Direction Photo Taken: Southwest Description: Low End of Phase IIIA-2 (After Storm Repairs) PHOTOGRAPHIC LOG Client Name: Harnett County, North Carolina Site Location: Anderson Creek C&DLF – Phase IIIA-2 Project No. HARNETT-AC-15-2 Photo No. 5 Date: 10/27/16 Direction Photo Taken: South Description: Berm at Low End of Phase IIIA-2 (Temporary Pipe to be Removed Prior to Waste Placement in this Area) Photo No. 6 Date: 10/27/16 Direction Photo Taken: East Description: East End of Phase IIIA- 2 This page intentionally left blank. Appendix B CQA Meeting Documentation Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina This page intentionally left blank. MEMORANDUM Date: August 19, 2015 To: CQA Report From: Pieter K. Scheer, P.E. Smith Gardner, Inc. RE: Harnett County C&DLF - Phase IIIA CQA Meeting Documentation Attendees: Amanda Bader, Harnett County Al Truelove, Harnett County Randy Smith, Harnett County Andrew Holland, Harnett County Mike Morton, GeoTechnologies Pieter Scheer, Smith Gardner (S+G) Meeting Summary: A construction quality assurance (CQA) meeting was held Tuesday July 7th at the site to discuss the plans for the placement of structural fill for construction of the Phase IIIA of the Harnett County Anderson Creek Construction and Demolition Debris (C&D) Landfill. The meeting began at approximately 2:00 p.m. and lasted approximately 30 minutes. The County will contact Streamline Land Surveying (Robert Godwin, PLS) for staking of the site. Streamline will also prepare an as-built survey at the completion of the work. The County will contact S+G/GeoTechnologies to perform moisture/density testing of structural fill placed. Earthwork testing and subgrade verification will follow the attached specification and CQA requirements (anticipated earthwork quantities are identified also). S+G will prepare the certification report which will include the as-built survey and information from tests performed by GeoTechnologies. Attachment: Phase IIIA CQA Meeting Agenda Harnett County C&DLF - Phase IIIA Construction July 7, 2015 Page 1 PHASE IIIA CQA MEETING AGENDA 1. Quantities: A. Area = 2.1 Acres (91,500 SF) B. Excavation = 38,600 CY C. Structural Fill = 4,100 CY 2. Review of Specification Requirements: Earthwork (Perimeter Berms and Subgrade): $ Compaction Requirements: > 95% Std. Proctor; moisture content as required to obtain density $ Surveying: Verify elevation and slope of completed subgrade $ Upper 2 Feet of Subgrade Must be SM, SC, ML, MH, CL, or CH 3. Review of CQA Requirements: A. Control Tests on Subgrade Material  Visual Classification  Moisture-Density Relationship: 1 per 5,000 CY (per Each Soil) B. Approval of Subgrade (visual (by P.G. or P.E. (S+G) and review of survey information) C. CQA Testing: $ In-Place Moisture/Density Testing: 20,000 SF/Lift & 1 per 500/LF/Lift of Berms $ Verification of Subgrade Soil Type (Upper 2 Feet): o Visual Classification: 1 per 5,000 SF (Throughout) o Atterberg Limits: 1 per 10,000 SF (10 Tests Min.) o Grain Size Analysis: 1 per 10,000 SF (10 Tests Min.) Appendix C Earthwork CQA Data Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina This page intentionally left blank. Pr o j e c t N a m e : Ha r n e t t C o u n t y - A n d e r s o n C r e e k C & D L F - P h a s e I I I A - 2 Pr o j e c t N u m b e r : HA R N E T T - A C - 1 5 - 2 Co n t r a c t o r : Ha r n e t t C o u n t y In - P l a c e M o i s t u r e - D e n s i t y T e s t R e s u l t s : Di f f e r e n c e Op t i m u m F r o m Mo i s t u r e M a x i m u m M o i s t u r e O p t i m u m Te s t T e s t D r y D e n s i t y Co n t e n t D r y D e n s i t y Co n t e n t C o m p a c t i o n M o i s t u r e Nu m b e r Da t e M e t h o d * ( p c f ) ( % ) ( p c f) ( % ) ( % ) ( % ) P a s s / F a i l 6 3 / 1 0 / 1 6 D C 1 1 5 . 5 1 4 . 4 1 1 5 . 0 1 4 . 0 1 0 0 0 P A S S 7 3 / 1 4 / 1 6 D C 1 0 9 . 0 1 1 . 6 1 1 4 . 0 1 2 . 0 9 6 0 P A S S 8 3 / 1 7 / 1 6 D C 1 1 3 . 9 8 . 2 1 1 8 . 0 1 2 . 5 9 7 - 4 P A S S 9 3 / 2 2 / 1 6 D C 1 1 4 . 2 1 3 . 4 1 1 5 . 8 1 4 . 0 9 9 - 1 P A S S 10 3 / 3 0 / 1 6 D C 1 2 3 . 6 1 0 . 0 1 2 2 . 0 1 2 . 0 1 0 1 - 2 P A S S 11 3 / 3 1 / 1 6 D C 1 1 4 . 1 1 0 . 3 1 1 9 . 0 1 3 . 0 9 6 - 3 P A S S 12 8 / 2 5 / 1 6 D C 1 1 5 . 0 7 . 2 1 1 9 . 4 1 1 . 5 9 6 - 4 P A S S 13 8 / 2 5 / 1 6 D C 1 1 7 . 1 8 . 1 1 1 9 . 4 1 1 . 5 9 8 - 3 P A S S 14 8 / 2 6 / 1 6 D C 1 1 5 . 7 9 . 2 1 1 6 . 8 1 3 . 1 9 9 - 4 P A S S 15 8 / 2 6 / 1 6 D C 1 1 3 . 4 7 . 1 1 1 6 . 8 1 3 . 1 9 7 - 6 P A S S 16 8 / 2 9 / 1 6 D C 1 1 1 . 8 1 5 . 7 1 0 9 . 9 1 6 . 5 1 0 2 - 1 P A S S 17 8 / 2 9 / 1 6 D C 1 1 1 . 4 1 5 . 3 1 0 9 . 9 1 6 . 5 1 0 1 - 1 P A S S 18 8 / 3 0 / 1 6 D C 1 1 6 . 3 9 . 5 1 2 1 . 4 1 1 . 4 9 6 - 2 P A S S 19 8 / 3 0 / 1 6 D C 1 1 5 . 5 9 . 8 1 2 1 . 4 1 1 . 4 9 5 - 2 P A S S 20 8 / 3 1 / 1 6 D C 1 1 3 . 6 1 0 . 1 1 1 7 . 5 1 2 . 5 9 7 - 2 P A S S 21 9 / 1 / 1 6 D C 1 1 7 . 0 9 . 2 1 1 8 . 5 1 2 . 3 9 9 - 3 P A S S 22 9 / 1 / 1 6 D C 1 1 6 . 7 6 . 9 1 1 8 . 5 1 2 . 3 9 8 - 5 P A S S 23 9 / 7 / 1 6 D C 1 2 3 . 7 9 . 3 1 1 9 . 8 1 2 . 5 1 0 3 - 3 P A S S 24 9 / 7 / 1 6 D C 1 1 4 . 1 7 . 8 1 1 9 . 8 1 2 . 5 9 5 - 5 P A S S 25 9 / 1 0 / 1 6 D C 1 1 3 . 0 8 . 9 1 1 8 . 5 1 2 . 3 9 5 - 3 P A S S 26 9 / 1 0 / 1 6 D C 1 1 2 . 1 9 . 5 1 1 8 . 5 1 2 . 3 9 5 - 3 F A I L 27 9 / 1 0 / 1 6 D C 1 1 4 . 2 7 . 3 1 1 8 . 5 1 2 . 3 9 6 - 5 P A S S 28 9 / 9 / 1 6 D C 1 1 5 . 3 4 . 1 1 2 1 . 0 1 1 . 0 9 5 - 7 P A S S 29 9 / 9 / 1 6 D C 1 1 5 . 2 5 . 6 1 2 1 . 0 1 1 . 0 9 5 - 5 P A S S 30 9 / 9 / 1 6 D C 1 1 7 . 3 5 . 8 1 2 1 . 0 1 1 . 0 9 7 - 5 P A S S 31 9 / 1 2 / 1 6 D C 1 1 3 . 8 7 . 6 1 2 1 . 0 1 1 . 2 9 4 - 4 F A I L 31 a 9 / 1 2 / 1 6 D C 1 1 3 . 2 8 . 4 1 2 1 . 0 1 1 . 2 9 4 - 3 F A I L 31 b 9 / 1 2 / 1 6 D C 1 1 4 . 9 7 . 3 1 2 1 . 0 1 1 . 2 9 5 - 4 P A S S 32 9 / 1 2 / 1 6 D C 1 1 4 . 7 8 . 5 1 2 1 . 0 1 1 . 2 9 5 - 3 P A S S See Field Report See Field ReportSee Field Report See Field ReportSee Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field ReportSee Field Report See Field Report See Field Report See Field Report See Field Report See Field ReportSee Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field Report See Field ReportSee Field Report ST R U C T U R A L F I L L RE C O R D T E S T S U M M A R Y In - S i t u V a l u e s R e f e r e n c e V a l u e s (A S T M D 6 9 8 ) Location/Comment SM I T H G A R D N E R , I N C . Re c o r d T e s t s 1 o f 2 H C A C L F S t r u c t u r a l F i l l S u m m a r y 2 0 1 6 - 1 1 - 0 2 . x l s Di f f e r e n c e Op t i m u m F r o m Mo i s t u r e M a x i m u m M o i s t u r e O p t i m u m Te s t T e s t D r y D e n s i t y Co n t e n t D r y D e n s i t y Co n t e n t C o m p a c t i o n M o i s t u r e Nu m b e r Da t e M e t h o d * ( p c f ) ( % ) ( p c f) ( % ) ( % ) ( % ) P a s s / F a i l In - S i t u V a l u e s R e f e r e n c e V a l u e s (A S T M D 6 9 8 ) Location/Comment 33 9 / 1 2 / 1 6 D C 1 1 2 . 7 8 . 1 1 2 1 . 0 1 1 . 2 9 3 - 3 F A I L 34 9 / 1 2 / 1 6 D C 1 1 4 . 7 7 . 5 1 2 1 . 0 1 1 . 2 9 5 - 4 P A S S 33 a 9 / 1 3 / 1 6 D C 1 1 6 . 7 8 . 0 1 2 1 . 0 1 1 . 2 9 6 - 3 P A S S 35 9 / 1 3 / 1 6 D C 1 1 8 . 2 7 . 4 1 2 1 . 0 1 1 . 2 9 8 - 4 P A S S 36 9 / 1 3 / 1 6 D C 1 1 8 . 4 6 . 2 1 2 1 . 0 1 1 . 2 9 8 - 5 P A S S 37 9 / 1 3 / 1 6 D C 1 1 8 . 0 8 . 6 1 2 1 . 0 1 1 . 2 9 8 - 3 P A S S 38 9 / 1 3 / 1 6 D C 1 1 5 . 1 7 . 9 1 2 1 . 0 1 1 . 2 9 5 - 3 P A S S 39 9 / 1 3 / 1 6 D C 1 1 8 . 4 7 . 9 1 2 1 . 0 1 1 . 2 9 8 - 3 P A S S 40 9 / 1 3 / 1 6 D C 1 1 7 . 6 6 . 1 1 2 1 . 0 1 1 . 2 9 7 - 5 P A S S *N o t e : N = N u c l e a r ; S C = S a n d C o n e ; D C = D r i v e C y l i n d e r ; R B = R u b b e r B a l l o o n To t a l s * : Nu m b e r o f T e s t s = 3 4 *O n l y P a s s i n g R e s u l t s I n c l u d e d i n T o t a l s Mi n . P e r c e n t C o m p a c t i o n = 9 5 M i n . M o i s t u r e ( % o f O p t . ) = - 7 Ma x . P e r c e n t C o m p a c t i o n = 1 0 3 M a x . M o i s t u r e ( % o f O p t . ) = 0 Av g . P e r c e n t C o m p a c t i o n = 9 7 A v g . M o i s t u r e ( % o f O p t . ) = - 3 See Field ReportSee Field Report See Field Report See Field Report See Field Report See Field Report See Field ReportSee Field Report See Field Report SM I T H G A R D N E R , I N C . Re c o r d T e s t s 2 o f 2 H C A C L F S t r u c t u r a l F i l l S u m m a r y 2 0 1 6 - 1 1 - 0 2 . x l s (Clear, 70°F)March 10, 2016 GeoTechnologies representative was onsite to perform density testing. Density testing was performed on cell A - clay liner. A total of 1 density test was performed today. All density tests met compaction and moisture requirements. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 100.4 0.4 P -2' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 10, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Kristopher Gonzalez Al TruelovePRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 10, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 6†03/10/2016 D-2937 132.1 115.5 14.4 D-698 115.0 14.0 95 100+Cell A - clay liner -2' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA March 15, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton (CLOUDY, 66°F)March 14, 2016 GeoTechnologies representative was onsite to perform in-place density testing. A total of one soil density test was performed today. The density test met compaction and moisture requirements. Density testing was performed on lower section of the landfill as shown on the attachment. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 95.6 -0.4 P -3' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 14, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 15, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 14, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 15, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 7†03/14/2016 D-2937 121.6 109.0 11.6 D-698 114.0 12.0 95 95.6 Lower slope, as shown on the attachment -3' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA March 17, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Clear, 75°F)March 17, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed on fill placed in cell A. Test Results passed compaction requirements. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 96.5 -4.3 P SG CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 17, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allan Beam PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 17, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 17, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allan Beam PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 17, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 8†03/17/2016 D-2937 123.2 113.9 8.2 D-698 118.0 12.5 95 96.5 Cell A SG * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA March 21, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Cool, 55°F)March 22, 2016 GeoTechnologies representative was onsite to perform in-place density testing on the area highlighted on attached site plan. One drive tube test was taken in this area, and this test met requirements for compaction and moisture. The contractor was informed of the results. No other tests were needed, so the technician departed the site. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 98.6 -0.6 P SG CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 22, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Dale Morton PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 22, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 22, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Dale Morton PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 22, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 9†03/22/2016 D-2937 129.5 114.2 13.4 D-698 115.8 14.0 95 98.6 See attached site plan for exact location.SG * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA March 28, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Clear, 50°F)March 30, 2016 Technician performed drive tube density test and check plug on fill placed adjacent to marker #245 at elevation 309.77. Test passed with 100.1% compaction and +2.1% moisture. Reported test results to Al Truelove with Harnett County Services. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 101.3 -2.0 P 309.77 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 30, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allen Henry Al Truelove- Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton March 31, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 10†03/30/2016 D-2937 136.0 123.6 10.0 D-698 122.0 12.0 95 100+Adjacent to marker #245 309.77 * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA April 04, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton (CLOUDY, 72°F)March 31, 2016 GeoTechnologies representative was onsite to perform in-place density testing. Density testing was performed on lower north side of the work area as shown on the attachment. The density tests met compaction and moisture requirements. A total of 1 soil density tests were performed today. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 95.9 -2.7 P -1' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 31, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton April 01, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: March 31, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton April 01, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 11†03/31/2016 D-2937 125.8 114.1 10.3 D-698 119.0 13.0 95 95.9 As shown on the attachment -1' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA April 04, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Sunny, 75°F)August 25, 2016 GeoTechnologies reported to the above referenced site to observe bottom prior to new fill and to perform density tests on fill placed as landfill phase 3A. See sketch attached to field report for locations. A total of two density tests were conducted using drive tube method. Both density tests passed to meet specification of 95% standard proctor maximum dry density. The contractor was informed of the results. Technician evaluated utilizing a 1/2'' diameter steel probe rod to check bottom prior to new fill and noticed soft and wet material with groundwater. Technician recommends 3' bridgelift over wet areas and compact the top of the bridgelift. The contractor requested that density tests be conducted on 8-26-16, Friday, in the morning. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 96.3 -4.3 P -2' 2 Drive Tube 98.1 -3.4 P -8'' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 25, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Andrew w/Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 25, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 25, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Andrew w/Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 25, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 12†08/25/2016 D-2937 123.3 115.0 7.2 D-698 119.4 11.5 95 96.3 Landfill area phase 3A. See sketch for locations.-2' 13†08/25/2016 D-2937 126.6 117.1 8.1 D-698 119.4 11.5 95 98.1 Landfill phase 3A. See sketch for locations -8'' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA August 30, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Sunny, 86°F)August 26, 2016 GeoTechnologies reported to the above referenced site to perform density tests on fill placed as landfill area Phase 3A. A total of two density tests were conducted using drive tube method. Both density tests passed to meet specification of 95% standard proctor maximum dry density. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 99.1 -3.9 P -6" 2 Drive Tube 97.1 -6.0 P -1' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 26, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 29, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 14†08/26/2016 D-2937 126.3 115.7 9.2 D-698 116.8 13.1 95 99.1 Landfill area phase 3A -6" 15†08/26/2016 D-2937 121.5 113.4 7.1 D-698 116.8 13.1 95 97.1 Landfill area phase 3A -1' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA August 30, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton (Cloudy, 73°F)August 29, 2016 GeoTechnologies reported to the above referenced site to perform density tests on fill placed as Landfill phase 3A. See sketch attached to field report for locations. A total of 2 density tests were conducted using drive tube method. Both density tests passed to meet specification of 95% standard proctor maximum dry density. Technician also collected a small bag sample where density was tested and to transport to Raleigh soils lab for a Grain Size and Atterberg test. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 101.7 -0.8 P -4" 2 Drive Tube 101.4 -1.2 P -1' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 29, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Andrew with Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 29, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 29, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Andrew with Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 29, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 16†08/29/2016 D-2937 129.3 111.8 15.7 D-698 109.9 16.5 95 100+Landfill area phase 3A. See sketch for locations -4" 17†08/29/2016 D-2937 128.4 111.4 15.3 D-698 109.9 16.5 95 100+Landfill area phase 3A. See sketch for locations -1' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 01, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Cloudy, 83°F)August 30, 2016 GeoTechnologies representative was onsite to perform density testing. A total of 2 density tests were performed today. Density testing was performed on phase A. All density tests met compaction and moisture requirements. Attached is picture of test area. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 96.0 -1.9 P SG 2 Drive Tube 95.4 -1.6 P SG CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 30, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 30, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 30, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Jackson Langat PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 30, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 18†08/30/2016 D-2937 127.4 116.3 9.5 D-698 121.1 11.4 95 96.0 Upper end of Phase A SG 19†08/30/2016 D-2937 126.8 115.5 9.8 D-698 121.1 11.4 95 95.4 Lower end of Phase A SG * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 01, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Sunny, 75°F)August 31, 2016 GeoTechnologies reported to the above referenced site to perform density test on fill placed as Landfill phase 3A. See sketch attached to field report for locations. One density test was conducted using drive tube method. One density test passed to meet specification of 95% standard proctor maximum dry density. The contractor was informed of the results. Contractor requested that density tests be conducted on Thursday, 9-1-16, at 8:00 am. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 96.7 -2.4 P -16" CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 31, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 31, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: August 31, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:John Berger Harnett CountyPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton August 31, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 20†08/31/2016 D-2937 125.1 113.6 10.1 D-698 117.5 12.5 95 96.7 Phase 3A -16" * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 02, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Sunny, 84°F)September 01, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed on Phase IIIA of the landfill expansion, see attached photo for location of samples taken. A total of 2 soil density tests were performed today. All density tests met compaction and moisture requirements. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 98.7 -3.1 P -2' 2 Drive Tube 98.5 -5.4 P -1' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 01, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss Randy SmithPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 02, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 01, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss Randy SmithPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 02, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 21†09/01/2016 D-2937 127.8 117.0 9.2 D-698 118.5 12.3 95 98.7 Phase III A, (Sample A-see photo)-2' 22†09/01/2016 D-2937 124.8 116.7 6.9 D-698 118.5 12.3 95 98.5 Phase III A, (Sample B-see photo)-1' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 06, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Clear, 95°F)September 07, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed on fill placed in Phase 3 Section A. Two density tests were performed. See attached diagram for test locations. Both density tests met compaction and moisture requirements. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 103.3 -3.2 P SG 2 Drive Tube 95.2 -4.7 P -8" CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 07, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allan Beam PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 08, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 07, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allan Beam PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 08, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 23†09/07/2016 D-2937 135.2 123.7 9.3 D-698 119.8 12.5 95 100+Phase 3 Section A SG 24†09/07/2016 D-2937 123.0 114.1 7.8 D-698 119.8 12.5 95 95.2 Phase 3 section A -8" * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 09, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Clear, 90°F)September 09, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed at 3 locations indicated by contractor. All tests passed compaction requirement. The contractor was informed of the results. Representative departed the site once testing/inspections were completed. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 95.3 -6.9 P SG 2 Drive Tube 95.2 -5.4 P -3' 3 Drive Tube 96.9 -5.2 P -3' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 09, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allan Beam PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 12, 2016 (Clear, 85°F)September 10, 2016 Technician performed three drive tube density tests and a one point proctor determination on berm in phase 3A. All tests passed for compaction, but test #3 was 5% dry of optimum. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 95.4 -3.4 P 314 2 Drive Tube 94.6 -2.8 P 314.47 3 Drive Tube 96.4 -5.0 P 314 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 10, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allen Henry PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 12, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 10, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Allen Henry PRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 12, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 25†09/10/2016 D-2937 123.1 113.0 8.9 D-698 118.5 12.3 95 95.4 Sta 239 314 26†09/10/2016 D-2937 122.8 112.1 9.5 D-698 118.5 12.3 95 95.0 Sta 240 314.47 27†09/10/2016 D-2937 122.5 114.2 7.3 D-698 118.5 12.3 95 96.4 Sta 238 314 28†09/09/2016 D-2937 120.0 115.3 4.1 D-698 121.0 11.0 95 95.3 Phase 3 section A SG 29†09/09/2016 D-2937 121.7 115.2 5.6 D-698 121.0 11.0 95 95.2 Phase 3 Section A berm -3' 30†09/09/2016 D-2937 124.1 117.3 5.8 D-698 121.0 11.0 95 96.9 Phase 3 Section A berm -3' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 14, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton (Sunny, 86°F)September 12, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed on the berm along the northern rim of Phase IIIA of the landfill expansion. For sample points and specific location refer to attached photo. A total of 6 soil density tests were performed today. Tests taken from points A1 and C1 at the -2' elevation did not meet specification for compaction. Grading contractor was notified of results. A retest was taken at point B2 and did meet specified compaction of 95%. GeoTechnologies representative also collected bag samples of material for further processing at GeoTechnologies' lab. Bag samples were labeled with their corresponding point on the photo provided. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 94.0 -3.6 F -2' 2 Drive Tube 94.8 -2.7 P -2' 3 Drive Tube 93.6 -2.8 F -2' 4 Drive Tube 93.1 -3.1 F -3' 5 Drive Tube 95.0 -3.9 P -2' 6 Drive Tube 94.8 -3.7 P -1' CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 12, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss AndrewPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 13, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 12, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss AndrewPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 13, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 31†09/12/2016 D-2937 122.4 113.8 7.6*D-698 121.0 11.2 95 94.0*Point A1 (on provided photo)-2' 31a†09/12/2016 D-2937 122.7 113.2 8.4 D-698 121.0 11.2 95 93.6*Point C1 (on provided photo)-2' 31b†09/12/2016 D-2937 123.3 114.9 7.3 D-698 121.0 11.2 95 95.0 Point B2 (on provided photo)-2' 32†09/12/2016 D-2937 124.5 114.7 8.5 D-698 121.0 11.2 95 95.0 Point B1 (on provided photo)-2' 33†09/12/2016 D-2937 121.8 112.7 8.1*D-698 121.0 11.2 95 93.1*Point A2 (on provided photo)-3' 34†09/12/2016 D-2937 123.3 114.7 7.5 D-698 121.0 11.2 95 95.0 Point C2 (on provided photo)-1' * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 15, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. (Sunny, 87°F)September 13, 2016 GeoTechnologies representative was onsite to perform soil density testing. Density testing was performed on the berm along the northern rim of Phase IIIA of the landfill expansion. For sample points and specific location refer to attached photo. A total of 7 soil density tests were performed today. A follow up re-test was taken at Point B1 on provided photo. All tests of material met required specification for compaction. The contractor was informed of the results. FIELD INSPECTION AND OBSERVATION: Stone Depth (in.)Type of Test ElevationPass/FailCompactionWc +/- Opt.# DENSITY TEST RESULTS 1 Drive Tube 97.7 -3.8 P -1' 2 Drive Tube 96.4 -3.2 P -3' 3 Drive Tube 97.9 -5.0 P SG 4 Drive Tube 97.5 -2.6 P -1' 5 Drive Tube 95.1 -3.3 P -1' 6 Drive Tube 97.9 -3.3 P SG 7 Drive Tube 97.2 -5.1 P SG CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 13, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss AndrewPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 14, 2016 CONCRETE STRUCTURAL STEEL SOILS FOOTING CHECK OTHER (SPECIFY): Anderson Creek C & D Landfill Expansion Harnett County 3200 Wellington Court, Suite 108 Raleigh, NC 27615 (919) 954-1514 LOCATION: PROJECT: FIELD REPORTDATE OF VISIT: September 13, 2016 License No. C-0894 RE:1150502CAPROJECT NO: GEOTECHNOLOGIES REP:Lee Hotchkiss AndrewPRESENT AT SITE: REVIEWED BY: APPROVED: Michael Morton September 14, 2016 Location Elevation or Stone Depth Test Percent Specified Percent In-Place CompactionReference Standard Optimum Moisture ContentMDDType Moisture Content In-Place Density Test Dry Density Wet DensityTypeDate# 32a†09/13/2016 D-2937 126.0 116.7 8.0 D-698 121.0 11.2 95 96.4 Point B1 (refer to provided photo)-3' 35†09/13/2016 D-2937 126.9 118.2 7.4 D-698 121.0 11.2 95 97.7 Point A1 (refer to provided photo)-1' 36†09/13/2016 D-2937 125.7 118.4 6.2 D-698 121.0 11.2 95 97.9 Point C1 (see provided photo)SG 37†09/13/2016 D-2937 128.1 118.0 8.6 D-698 121.0 11.2 95 97.5 Point A2 (refer to provided photo)-1' 38†09/13/2016 D-2937 124.2 115.1 7.9 D-698 121.0 11.2 95 95.1 Point B2 (refer to provided photo)-1' 39†09/13/2016 D-2937 127.8 118.4 7.9 D-698 121.0 11.2 95 97.9 Point C2 (refer to provided photo)SG 40†09/13/2016 D-2937 124.8 117.6 6.1 D-698 121.0 11.2 95 97.2 Point A3 (refer to provided photo)SG * = Failed Specified Compaction and/or Moisture Content All Test Locations and Elevations are approximate D-1556: Test Method for Density and Unit Weight of Soil In Place by Sand Cone Method, D-1557: Laboratory Compaction Characteristics of Soil Using Modified Effort, D-2167: 08 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber, D-2937: Test Method for Density of Soil In Place by Drive Cylinder Method, D-4959: Test Method for Determination of Soil by Direct Heating, D-558: Moisture - Density Relations of Soil-Cement Mixtures, D-6938: Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Method, D-698: Laboratory Compaction Characteristics of Soil Using Standard Effort References: Distribution:Pieter K. Scheer, P.E., Amanda Bader, Al Truelove † Note: A field technician was not present during the actual fill placement; therefore, field tests are only indicative of location and elevation. In-Place Density Test Results Project Info: Client: Report Date: Project No: Client Job No: Anderson Creek C & D Landfill Expansion / Harnett County, NC Harnett County Engineering & Fac. Maintenance 1150502CA September 16, 2016 GeoTechnologies, Inc., P.A. -- 3200 Wellington Court, Suite 108 -- Raleigh, NC 27615 -- License No. C-0894 Page:1 Name (Technical Responsibility)Signature Michael K. Morton This page intentionally left blank. 0 10 20 30 40 50 60 70 80 90 100 680.00124680.0124680.1246812468102468100 Anderson Creek Landfill 1" P.L. P.I. Project: Job No.: Date: Soil Description or Classification Harnett Co., NC 1-15-0502-CA NP Brown Silty Fine to Medium Sand 10/5/16 3/ 8 " GRAVEL SAND NP FINES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES NP Pe r c e n t F i n e r B y W e i g h t U.S. Standard Sieve Sizes Grain Size In Millimeters GRAIN SIZE DISTRIBUTION 3/ 4 " 1/ 2 " S-3 #4 #10 #20 #40 #60 #100 #200 Boring No.Elev./Depth Nat. W.C. L.L. 3200 Wellington Court, Ste 108Raleigh, NC 27615 Date Recieved: Dates Tested: 0 10 20 30 40 50 60 70 80 90 100 680.00124680.0124680.1246812468102468100 Anderson Creek Landfill 1" P.L. P.I. Project: Job No.: Date: Soil Description or Classification Harnett Co., NC 1-15-0502-CA NP Brown Silty Fine to Medium Sand 10/5/16 3/ 8 " GRAVEL SAND NP FINES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES NP Pe r c e n t F i n e r B y W e i g h t U.S. Standard Sieve Sizes Grain Size In Millimeters GRAIN SIZE DISTRIBUTION 3/ 4 " 1/ 2 " S-4 #4 #10 #20 #40 #60 #100 #200 Boring No.Elev./Depth Nat. W.C. L.L. 3200 Wellington Court, Ste 108Raleigh, NC 27615 Date Recieved: Dates Tested: 0 10 20 30 40 50 60 70 80 90 100 680.00124680.0124680.1246812468102468100 Anderson Creek Landfill 1" P.L. P.I. Project: Job No.: Date: Soil Description or Classification Harnett Co., NC 1-15-0502-CA 30.0 Orange Brown Clayey Silty Fine to Medium Sand 9/22/16 3/ 8 " GRAVEL SAND 31.0 FINES COARSE FINE COARSE MEDIUM FINE SILT SIZES CLAY SIZES 61.0 Pe r c e n t F i n e r B y W e i g h t U.S. Standard Sieve Sizes Grain Size In Millimeters GRAIN SIZE DISTRIBUTION 3/ 4 " 1/ 2 " CL-1 #4 #10 #20 #40 #60 #100 #200 Boring No.Elev./Depth Nat. W.C. L.L. 3200 Wellington Court, Ste 108Raleigh, NC 27615 Date Recieved: Dates Tested: 8/29-9/9/2016 8/29/2016 0 10 20 30 40 50 60 70 80 0 20 40 60 80 100 CL-1 S-1 S-2 S-3 S-4 Specimen Identification LL PL PI Fines Classification P LAS TI CIT Y I NDE X CL ML CH MH LIQUID LIMIT (LL) ATTERBERG LIMITS' RESULTS 61 34 31 NP NP 31 27 24 NP NP CL-ML ASTM D-4318 30 7 7 NP NP 39.9 35.2 31.1 13.2 15.8 Orange Brown Clayey Silty Fine to Medium Sand Orange Brown Clayey Silty Medium to Fine Sand Orange Brown Clayey Silty Medium to Fine Sand Brown Silty Fine to Medium Sand Brown Silty Fine to Medium Sand PROJECT JOB NO.DATEAnderson Creek Landfill - Harnett Co., NC 1-15-0502-CA 10/5/16 3200 Wellington Court, Ste 108 Raleigh, NC 27615 Date Recieved: Dates Tested: Appendix D Record Drawing Construction Quality Assurance Report Harnett County Anderson Creek C&D Landfill - Phase IIIA-2 Spring Lake, North Carolina This page intentionally left blank. G: \ C A D \ H a r n e t t C o u n t y \ H a r n e t t - A C 1 5 - 2 \ s h e e t s \ H A R N E T T - B 0 1 1 0 . d w g - 10 / 1 0 / 2 0 1 6 2 : 2 7 P M DR A W N : AP P R O V E D : PR O J E C T N O : SC A L E : FIL E N A M E : DA T E : FIG U R E N O . PR E P A R E D B Y : PR E P A R E D F O R : SM I T H 14 N . B o y l a n A v e n u e , R a l e i g h N C 2 7 6 0 3 NC L I C . N O . C - 0 8 2 8 ( E N G I N E E R I N G ) 91 9 . 8 2 8 . 0 5 7 7 GA R D N E R + © 2016 Smith Gardner, Inc. AN D E R S O N C R E E K C & D L F PH A S E I I I A - 2 A S - B U I L T C. T . J . P. K . S . AS S H O W N AB - 1 Oc t 2 0 1 6 HA R N E T T - A C 1 5 - 2 HA R N E T T - B 0 1 1 0           Th i s P a g e I n t e n t i o n a l l y L e f t B l a n k