Loading...
HomeMy WebLinkAbout42A_RoanokeValley_LCID_AFR13-14LCID 2014 Page 1 42-A-LCID- Facility Name:Roanoke Valley LCID Landfill Permit: 42-A-LCID- Physical Address Street 1: 2055 Hwy 301 Street 2: City: Weldon State:North Carolina Zip: 27890 County: Halifax Mailing Address Street 1: 497 Hwy 48 Street 2: City: Roanoke Rapids State:North Carolina Zip: 27870 Primary Facility Contact Person Name: Walt Gibbs Phone: (252) 537-3223 Fax: (252) 537-4645 Email: wgibbs@rightmyer.com Billing Contact Person Name: Linda Hawkins Phone: (252) 537-3223 Fax: (252) 537-4645 Email: lhawkins@rightmyer.com 1. Tipping Fee: $per Tipping Fee: $per Tipping Fee: $per 2. Estimate the amount of waste taken in an average week at this facility?50 3. How many weeks did you operate this year? 51 4. What are the hours/days of operation for this facility? Private as needed 5. What is the acreage of the footprint of the waste on site as of June 30? 4.20 Acre(s) CERTIFICATION: I certify that the information provided is an accurate representation of the activity at this facility. Signature:Date: 07/09/2014 Name: Walter R. Gibbs Title: Facility Manager Phone Number: (252) 537-3223 Email: wgibbs@rightmyer.com REMINDER: According to (G.S. 130A-309.09D(b)), this report must be sent to the Regional Environmental Senior Specialist for your area and a copy of this report must be sent to the County Manager of each county from which waste was received. Please return your completed report to: Mary Whaley PO Box 59 Oxford, NC 27565 phone: 919.693.5023 email: Mary.Whaley@ncdenr.gov 6. Did your facility stop receiving waste during this past Fiscal Year? Yes No If so, please report the date this occurred: tons cubic yards LCID State of North Carolina Department of Environment and Natural Resources Division of Waste Management LAND CLEARING & INERT DEBRIS LANDFILL Facility Annual Report For the period of July 1, 2013-June 30, 2014 According to (G.S. 130A-309.09D(b)) completed forms must be returned by August 1, 2014 and a copy of this report must be sent to the County Manager of each county from which waste was received. If you have questions or require assistance in completing this report, contact your Regional Environmental Senior Specialist. Walter R. Gibbs Digitally signed by Walter R. Gibbs DN: cn=Walter R. Gibbs, o=Rightmyer Machine Rentals, Inc., ou, email=wgibbs@rightmyer.com, c=US Date: 2014.07.09 10:40:54 -04'00' LCID 2014 Page 2 42-A-LCID- Instructions: NC DENR Division of Waste Management - Solid Waste Section Risk Assessment Form Facility Name: Roanoke Valley LCID Landfill Permit: 42-A-LCID- Address: 2055 Hwy 301 City: Weldon State: North Carolina Zip: 27890 Date: 07/09/2014Person completing Assessment: Walt Gibbs Phone Number: (252) 537-3223 Fax: (252) 537-4645 Email: wgibbs@rightmyer.com Please indicate either Yes or No for each Receptor and Post Closure Maintenance question. Then please determine the distance or distances for each Receptor from the Edge of Waste (using range finders and/or GIS maps) and type that information into the form. Please attach additional information including GIS maps, lists of potable well locations, etc. Receptors 1. Are there Residential Dwellings Within 1,500 feet of the Edge of Waste?Yes No If Yes, how many? 3 What are the three closest distances from the Edge of Waste?Feet650 Feet675 Feet900 2. Are there Potable Wells Within 1,500 feet of the Edge of Waste?Yes No If Yes, how many? What are the three closest distances from the Edge of Waste?Feet Feet Feet 3. Are there Community/Municipal Wells Within 1,500 feet of the Edge of Waste?Yes No If Yes, how many? What are the three closest distances from the Edge of Waste?Feet Feet Feet 4. Are there Surface Water Bodies Within 1,500 feet of the Edge of Waste?Yes No If Yes, how many? What are the three closest distances from the Edge of Waste?Feet Feet Feet Please list the names of the water bodies: 5. Is Public Water Available Within 1,500 feet of the Edge of Waste?Yes No If Yes, how many of the Residential Dwellings noted above are connected? Corrective Measures 6. Is there an active methane extraction system (blower, flare, etc.)?Yes No 7. Is there a passive methane extraction system (trench, vents in cap, flare, etc.)?Yes No 8. Is there groundwater remediation taking place on site?Yes No If Yes, what is the specific remedial technology used? Comments