Loading...
HomeMy WebLinkAbout9210_DukeShearonHarris_APPROVAL_AssessmentWorkPlan_DIN26959_20161101 State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, 27699-1646 919 707 8200 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director November 1, 2016 Sent via email - John.Toepfer@duke-energy.com Mr. John Toepfer, P.E. Lead Engineer Duke Energy 410 South Wilmington Street Raleigh, North Carolina 27601 Re: Approval of Assessment Work Plan Duke Energy Progress, LLC Harris Nuclear Plant Industrial Landfill 9210-INDUS-1986 Wake County DIN 26959 Dear Mr. Toepfer, The Division of Waste Management, Solid Waste Section (Section) has reviewed the Assessment Work Plan (DIN 26954) for the Harris Nuclear Plant Industrial Landfill submitted on your behalf by S&ME on October 28, 2016. The Section approves the Assessment Work Plan. The Work Plan proposes to install two new monitoring wells (MW-8 and MW-9) to investigate the extent of potential contamination in the fracture zones. The Work Plan is organized into the following tasks: • Soil borings and monitoring well installations • Groundwater sampling and analyses • Slug testing • Reporting Approval – Assessment Work Plan Harris Nuclear Plant Industrial Landfill 9210-INUDS-1986 DIN 26959 November 1, 2016 Page 2 of 2 If you have any questions, please do not hesitate to contact me via email Elizabeth.werner@ncdenr.gov or phone (919) 707-8253. Sincerely, Elizabeth S. Werner Permitting Hydrogeologist Solid Waste Section ec: Ed Sullivan, P.E. – Duke Energy Progress Ed Henriques, L.G. – S&ME Liz Patterson – Environmental Senior Specialist, SWS Drew Hammonds – Eastern District Supervisor, SWS Jason Watkins – Field Operations Branch Head, SWS