Loading...
HomeMy WebLinkAbout4116_WIHighPoint_CDLF_PH2B2OpsApprove_DIN26876_20161031    PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T October 31, 2016 Sent Via Email – seth.heath@wasteindustries.com Mr. Seth Heath General Manager 58300 Riverdale Road Jamestown, North Carolina 27282 Subject: Phase 2B-2 Operation Authorization High Point C&D Debris Landfill Guilford County, Permit # 4116-CDLF-2012, Document ID 26876 Mr. Heath, The Division of Waste Management, Solid Waste Section (Section) has received and reviewed the Construction Quality Assurance Report (DIN 26831) for Phase 2B-2 at the above referenced facility. The report was submitted on your behalf by Smith Gardner, Inc. and was received in the Central Office on September 28, 2016. The report was forwarded to the Asheville Regional Office on October 10, 2016. Based on our review, it appears the pre-operative conditions have been met so operation of Phase 2B-2 is authorized. Additionally, the Closure, Post-closure and Potential Assessment and Corrective Action cost estimates, totaling $3,294,910, are approved. The financial assurance mechanism for the facility must be updated to include these new costs and submitted to the Section as soon as possible. Operation of Phase 2B-2 must be managed in accordance with currently approved operations plan. The Permit will be updated to include Phase 2B-2, and any associated documents, once the Phase 3 Permit to Construct Application review is complete. If you should have any questions regarding this matter please contact me at (828) 296-4703, or by email at allen.gaither@ncdenr.gov . Sincerely, Allen Gaither Environmental Engineer CC: Mr. Stacey Smith – Smith Gardner, Inc. Mr. John Patrone – SWS/WSO