Loading...
HomeMy WebLinkAbout1910_Brickhaven_INSP_20161011FACILITY COMPLIANCE INSPECTION REPORT Department of Environmental Quality Division of Waste Management - Solid Waste Section UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Chatham Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 1910-STRUC-2015 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: October 11, 2016 Date of Last Inspection: April 18, 2016 FACILITY NAME AND ADDRESS: Brickhaven No. 2 1473 Moncure-Flatwood Road Moncure, NC GPS COORDINATES: N: 35.596 W: -79.010 FACILITY CONTACT NAME AND PHONE NUMBER: Glenn Amey, PG, Engineering Manager, Direct: 704-731-2202, gamey@charah.com FACILITY CONTACT ADDRESS: Green Meadow, LLC 352 Brickyard Road Sanford, NC 27330 (877) 314-7724 PARTICIPANTS: Shawn McKee, NCDEQ, Solid Waste Section Elizabeth Werner, NCDEQ, Solid Waste Section Shannon Aufman, NCDEQ, Solid Waste Section Jacob Buda, Charah, Inc. Kyle Hoover, Charah, Inc. STATUS OF PERMIT: Permit to Construct and Operate issued June 5, 2015 This permit shall expire June 5, 2025 PURPOSE OF SITE VISIT: Comprehensive inspection. STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS None. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 5 ADDITIONAL COMMENTS The site is a lined coal combustion products structural fill permitted for mine reclamation in conjunction with NCDEQ DEMLR Mine Permit 19-25. 1. The structural fill permit, site plan, and operations plan were discussed during the inspection. The Permit to Construct and Operate was issued on June 5, 2015 and approves the operation of Cells 1 through Cell 5. The permit is subject to review by June 5, 2020. 2. Approval to commence structural fill operations in Subcell 2C and 2D was issued by the Solid Waste Section on September 20, 2016. 3. According to the approved site operations plan, operations can occur 24 hours a day, 7 days per week. Solid Waste Section approval is needed if there is a change in operating hours. 4. A sign providing the facility name, permit number, operating hours, and emergency contact numbers is posted at the site entrance. 5. A responsible individual trained in operations must be on-site at all times during all operating hours. 6. Training records were reviewed during the inspection. Spill Prevention Control and Countermeasure (SPCC) Plan training and Waste Management training are required for all staff both initially as new staff start and annually thereafter. The most recent training was conducted on May 5, 2016. 7. Financial assurance must be continuously maintained for the duration of the site operations and post closure care in accordance with §130A-309.221. The owner and operator must annually adjust cost estimates for inflation. Financial assurance documentation for the structural fill was reviewed during the inspection. The approved financial assurance includes $5,992,590 for closure, $2,208,000 for post-closure care, $2,000,000 for potential assessment and corrective action, and $65,000 for Departmental Costs to Respond to an Incident. 8. The structural fill began placing coal combustion products on October 23, 2015. At the time of the inspection, trains were not being received at the structural fill because of disruptions caused by Hurricane Matthew. During normal operations, approximately one train per day of coal combustion products (CCPs) arrive per day; approximately half coming each from the Duke Energy facilities of Sutton Steam Plant and Riverbend Steam Station (approximately 13 per month from Sutton and approximately 14 per month from Riverbend). 9. As of the date of the inspection, 1,966,960.89 tons of CCPs have been placed within the structural fill. Of that total tonnage, 1,940,560.80 tons were received by rail and 26,300.09 tons were received by truck. Since March 9, 2016, all ash arriving at the site has been by rail. Each train has up to 85 cars; each train has the capacity to carry up to 8,500 tons of CCPs. Ash is conditioned to 18-20% moisture content prior to transport. 10. Annually by August 1, the Permittee must submit an annual facility report to the Section. During the time period between July 1, 2015 and June 30, 2016, the facility reported that 1,105,401.45 tons of ash were placed in the structural fill. Scales are being used routinely to weigh the amount of coal combustion products received. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 5 11. The structural fill has an approved dust control plan. Water trucks are utilized to control road dust, as needed. Water trucks were operating at the time of the inspection. Dust control checks occur daily at 9am and 2pm and are recorded. Records from 1/1/16 to 3/31/16 were reviewed during the inspection. 12. Independent background samples from each of the compliance groundwater monitoring wells and surface water sampling locations have been obtained and analyzed for constituents listed in Appendix III and IV in accordance with 40 CFR 257.94(b). Additionally, during the first year of operation eight (8) independent samples from each of the compliance groundwater monitoring wells and surface water sampling locations were sampled and analyzed for the Appendix III and IV constituents. Results have been submitted to the Solid Waste Section. 13. Compliance groundwater monitoring wells, surface water locations and leachate monitoring ports are sampled semi-annually and analyzed for constituents listed in the approved Water Quality Monitoring Plan. Results are submitted to the Solid Waste Section. 14. A readily accessible unobstructed path shall be cleared and maintained so that four-wheel drive vehicles may access monitoring locations, at all times. Groundwater monitoring wells are well marked and protected from vehicular traffic by yellow bollards and flags. All groundwater monitoring wells must be secured with locks and have permanent well tags. 15. The following monitoring wells were observed during this inspection: 1910-STRUC-2015 Monitoring Well ID Well Tag Concrete Pad Comments Groundwater Monitoring Wells BG-1 Yes Yes MW-1 Yes Yes MW-2 Yes unknown well buried under gravel, facility needs to unbury it to check integrity of concrete pad MW-3 Yes unknown well buried under gravel, facility needs to unbury it to check integrity of concrete pad MW-4 No Yes needs permanent well tag MW-5 No Yes needs permanent well tag MW-6 Yes Yes major erosion under concrete pad, pad needs replacing MW-7 No Yes heavy vegetation surrounding well, vegetation needs to be removed & needs permanent tag MW-8 Yes Yes Note: All wells should be labeled with reflective mailbox numbers/letters allowing proper identification from a distance. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 5 Monitoring well has been buried under gravel, facility needs to unbury it to check integrity of concrete pad 16. At the time of the inspection, ash was being place in Subcells 2C and 2D. Interim soil cover has been place on Subcells 1A & 1B and has been seeded. Ash being placed in Cell 2C and 2D FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 5 of 5 17. Roadways are of all-weather construction. Where practicable, roadways are one-way to reduce vehicular conflicts. A wheel washing station has been installed to reduce migration of coal combustion products from truck traffic. 18. No windblown dust from operations or roadways was noted during the inspection. 19. Coal combustion products must not be placed in standing water. Surface water must be diverted away from the operational area and must not be impounded over or in coal combustion products. Water that comes into contact with coal combustion products shall be handled as leachate. No standing water was observed on or adjacent to coal combustion products even though significant rainfall had occurred a few days prior due to Hurricane Matthew. Preparations done onsite by the site operators prior to the storm clearly helped minimize storm impacts at the site. 20. Two 500,000 gallon tanks have been installed onsite to hold leachate prior to offsite treatment. The leachate tanks were observed during the inspection. Tank levels are checked by onsite staff on a daily basis. During September 2016, a total of 1,810,859 gallons were pumped from the tanks. During October 1 to October 10, a total of 640,239 gallons of leachate were pumped from the tanks. Leachate is taken offsite for treatment or used within the footprint of the lined cells for dust control. 21. Storm water from the rail unloading yard is sloped to drain into an approximately 400,000-gallon underground storage tank. The tank has the capacity to hold the run-off from a 25 year/24 hour storm event. This water can be used for dust control on the lined area of the structural fill. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 919-707-8284 Environmental Senior Specialist Regional Representative Sent on: October 20, 2016 Email: X Hand delivery US Mail Certified No. [ _] Copies: Ellen Lorscheider, Section Chief, Solid Waste Section Ed Mussler, Permitting Branch Head, Solid Waste Section Jason Watkins, Field Operations Branch Head, Solid Waste Section Elizabeth Werner, Permitting Hydrogeologist, Solid Waste Section Shannon Aufman, Permitting Engineer, Solid Waste Section