HomeMy WebLinkAbout7906_Duke_DanRiver_LeachateTanks_DIN26123_20161026 Amec Foster Wheeler Environment & Infrastructure Inc. 2801 Yorkmont Road, Suite 100 Charlotte, North Carolina 28208 704-357-8600 amecfw.com Registered in North Carolina Engineering and Land Surveying License No. F-1253 Geology License No. C-247 May 17, 2016 Duke Energy 526 South Church Street Charlotte, North Carolina 28202 Attention: Ms. Kimberlee Witt, P.E. Subject: Leachate Tank and Secondary Containment Plan Proposed Dan River Landfill Duke Energy – Dan River Steam Station Eden, North Carolina Amec Foster Wheeler Project No. 7810140065 Dear Ms. Witt: Amec Foster Wheeler is pleased to provide this Leachate Tank and Secondary Containment Plan to Duke Energy (Duke) for the proposed Dan River Landfill at Duke’s Dan River Steam Station. Amec Foster Wheeler is also attaching the Dan River Steam Station legal property description which was prepared for Duke by ESP Associates, P.A. We understand that Duke will provide these documents to the North Carolina Department of Environmental Quality (NCDEQ) Solid Waste Section (SWS). The Leachate Tank and Secondary Containment Plan drawings included with this submittal address the design of the leachate storage tank, secondary containment facility, leachate force main piping, and tie-in into the City of Eden sanitary sewer system. Development of a leachate discharge agreement between Duke and the City of Eden is in progress. Additional information regarding the proposed leachate tank and secondary containment is provided as follows. Leachate Tank The proposed leachate tank will consist of a ModuTank MS110-17 modular-style galvanized steel uncovered tank, or equivalent as approved by the Engineer. Containment will be provided by a geomembrane within the tank. The geomembrane will be anchored at the top of the tank and ballasted at the bottom of the tank; therefore, there is no minimum required depth of water needed to maintain the tank. The tank will have a capacity of 1,000,000 gallons at the service elevation, with an additional two feet of freeboard in accordance with North Carolina solid waste rules for uncovered storage tanks at municipal landfills generally referred to as the .1600 rules. Leachate Tank and Secondary Containment Plan Dan River Landfill Duke Energy – Dan River Steam Station Eden, North Carolina Amec Foster Wheeler Project No. 7810140065 May 17, 2016 2 Modular Tank Anticipated Service A typical landfill is designed, permitted, and constructed to serve as a facility to contain a consistently generated waste stream; therefore, a typical landfill may have an active lifespan on the order of several decades. The proposed Dan River Landfill modular tank is anticipated to have a relatively short service life on the order of ten years due to the following factors:  The Dan River Landfill will not accept waste materials from other steam stations or other off-site sources.  The Dan River Landfill will contain waste materials due to closure of the existing inactive on-site coal combustion residual (CCR) units.  The Dan River Station no longer produces energy by burning coal; therefore, the waste stream is of a finite quantity and no new CCR waste is being generated.  North Carolina’s Coal Ash Management Act (CAMA) requires closure and remediation of the Dan River Station CCR surface impoundments by August 1, 2019.  The Dan River Landfill will be closed upon closure and remediation of on-site CCR units.  Leachate generation is anticipated to decrease following closure of the Dan River Landfill as shown in the “Leachate Generation Calculation” provided in the “Engineering and Facility Plan – Dan River Landfill”, Amec Foster Wheeler, December 24, 2015.  The proposed modular storage tank will be replaced by a smaller storage device with secondary containment upon a demonstration of a sustained decrease in leachate generation and approval by the NCDEQ-SWS. The proposed modular storage tank will be disassembled upon incorporation of the smaller storage device. Modular Tank Liner The proposed ModuTank MS110-17 modular tank will incorporate a 45-mil reinforced polypropylene geomembrane liner, or as proposed by the tank Manufacturer and approved by the Engineer. As previously discussed, the modular tank and tank liner is anticipated to be in service on the order of ten years. During service, the proposed geomembrane tank liner will be inspected, repaired, and replaced in accordance with the Manufacturer’s recommendations. Modular Tank Performance History ModuTank Inc. has been manufacturing above-ground modular storage tanks since 1970 for a variety of applications, and has sold more than 30 modular storage tanks in North Carolina since 1987. Modular storage tanks have been successfully used at the following municipal solid waste (MSW) landfill facilities:  CSS Landfill, Republic Services, Avalon, TX, installed December 2010.  Arlington Landfill, Republic Services, Evless, TX, installed December 2010.  Galveston Landfill, Republic Services, Santa Fe, TX, installed March 2012.  Ellis County Landfill, Republic Services, Ennis, TX, installed May 2013.  Itaska Landfill, Republic Services, Taska, TX, installed May 2013.  McCarty Road Landfill, Republic Services, Houston, TX, installed September 2014. Leachate Tank and Secondary Containment Plan Dan River Landfill Duke Energy – Dan River Steam Station Eden, North Carolina Amec Foster Wheeler Project No. 7810140065 May 17, 2016 3 Secondary Containment A soil berm will provide storage capacity for the leachate tank secondary containment area. The secondary containment area storage volume was designed to be in excess of 1,100,000 gallons, or 110 percent of the leachate tank storage volume as required by the .1600 rules. Containment will be provided by a 60-mil high density polyethylene (HDPE) geomembrane with an anchor trench at the top of the soil berm. The geomembrane will be overlain by an 8 oz/sy non- woven geotextile and at least 12 inches of aggregate to protect the geomembrane. The secondary containment area will be graded to drain to a sump in the southern portion of the containment area. Liquids collected in the sump will either drain to the landfill perimeter channel by gravity via an HDPE pipe if leachate is not present or will be pumped back to the storage tank if leachate is present. Gravity flow through the HDPE pipe will be controlled by a butterfly valve which will be maintained in the closed condition until it can be determined via visual observation that leachate is not present in liquids collected in the secondary containment area sump. Force Main The proposed leachate force main will be located on Duke property and will consist of approximately 2,269 linear feet of dual-contained solid-walled HDPE pipe. The force main will begin at the pump pad on the northeast side of the secondary containment facility. Approximate Stations 0+00 to 2+00 will be located along the outside edge of the proposed landfill perimeter access road. Approximate Stations 2+00 to 5+00 will be located through a wooded area west of the proposed Dan River Landfill. Approximate Stations 5+00 to 20+00 will be located along an existing dirt road near the northern boundary of the Dan River Station property. The proposed leachate force main will cross Edgewood Road between approximate stations 20+00 to 20+50. The force main will cross Edgewood Road on Duke property beyond the limits of the North Carolina Department of Transportation (NCDOT) right-of-way (ROW). Approximate Stations 20+50 to 22+69 will be located along the western side of Edgewood Road on Duke property outside of the NCDOT ROW. The proposed tie-in to the City of Eden sanitary sewer system will be at approximate station 22+69. The force main will include at least one air release valve at a high point along the alignment and one witness manhole at a low point along the alignment. Tie-In to City of Eden Sanitary Sewer System The proposed leachate force main will tie in to the City of Eden sanitary sewer system on Duke property near an existing air release valve on the west side of Edgewood Road approximately 375 feet north of the gated entrance to the Dan River Station. A check valve, gate valve, and flanged outlet tapping sleeve will be utilized at the tie-in between the proposed leachate pipe and the existing City of Eden sanitary sewer force main. The location and configuration of the tie-in was discussed with the City of Eden and their consultants. A manhole will facilitate access, inspection, and maintenance of the tie-in. Leachate Tank and Secondary Containment Plan Dan River Landfill Duke Energy – Dan River Steam Station Eden, North Carolina Amec Foster Wheeler Project No. 7810140065 May 17, 2016 4 Closing Amec Foster Wheeler appreciates the opportunity to provide these reports to Duke. Please contact us at your convenience with questions. Sincerely, Amec Foster Wheeler Cedric H. Ruhl Chris Jordan Senior Engineer Technical Professional Attachments: Technical Specification Section 221363 – Leachate Storage Tank Leachate Tank and Secondary Containment Plan drawings Legal Property Description TECHNICAL SPECIFICATION Dan River Landfill Issued for Permit Amec Foster Wheeler Project No. 7810140065 May 17, 2016 Leachate Storage Tank 22 13 63 - 1 SECTION 221363 – LEACHATE STORAGE TANK PART 1 - GENERAL 1.1 SUMMARY A. Section includes leachate storage tank and sight tube. 1. Leachate storage tank shall be Modutank MS110-17 or approved equivalent. 2. Leachate storage tank shall have a minimum operating capacity of 1,000,000 gallons as measured at the High elevation. 3. The top of the leachate storage tank shall be a minimum of two feet above the High elevation. 4. Sight tube shall be Varec 6700 liquid level indicator or approved equivalent. B. Related Sections. 1. Section 033000 “Cast-in-Place Concrete.” 2. Section 334110 “HDPE Pipe and Pipe Fittings.” 1.2 REFERENCES A. American Welding Society (AWS): 1. AWS D1.1 – Structural Welding Code – Steel. 2. AWS D1.3 – Structural Welding Code – Sheet Steel. 3. AWS D1.4 – Structural Welding Code – Reinforced Steel. B. American Water Works Association (AWWA): 1. AWWA D100 – Welded Carbon Steel Tanks for Water Storage. 1.3 SUBMITTALS A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for storage tanks and sight tubes. 2. Include rated capacities, operating characteristics, and furnished specialties and accessories. B. Shop Drawings: 1. Include plans, elevations, sections, and mounting details. 2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection. Dan River Landfill Issued for Permit Amec Foster Wheeler Project No. 7810140065 May 17, 2016 Leachate Storage Tank 22 13 63 - 2 3. Detail fabrication and assembly of tank and components. C. Welding certificates. D. Maintenance Data: For storage tanks to include in maintenance manuals. E. Manufacturer’s tank warranty to be free from defects and material workmanship. Warranty shall be valid for a minimum one year from date of shipment. 1.4 QUALITY ASSURANCE A. Fabricator Qualifications: Employ a qualified structural engineer to prepare calculations, Shop Drawings, and other structural data for fabrication and erection of surface water-storage tanks. 1. Engineering Responsibility: Preparation of data for surface water-storage tanks, accessories, specified appurtenances, and concrete supports and foundations, including Shop Drawings, based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project. B. Welding Qualifications: Qualify procedures and personnel according to the following: 1. AWS D1.1/D1.1M, "Structural Welding Code - Steel." 2. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel." 3. AWS D1.4/D1.4M, "Structural Welding Code - Reinforced Steel." PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Structural Performance: Surface water-storage tank, including structural reinforcement and foundation, shall be capable of withstanding the effects of dead and live gravity loads and winds of 100 mph. 2.2 MODULAR, NONPRESSURE, STORAGE TANKS A. Description: Modular, vertical, nonpressure-rated tank with cylindrical sidewalls. B. Construction: Steel or as otherwise approved by the Engineer, constructed with nontoxic welded joints. C. Liners 1. 45 mil reinforced polypropylene liner, shop fabricated in one piece for drop in installation 2. As specified by the Manufacturer and approved by the Engineer. D. Inlet and Outlet connections: Factory-fabricated, as indicated on the Drawings. E. Vertical Tank Supports: Factory-fabricated steel legs or steel skirt, welded to tank. Dan River Landfill Issued for Permit Amec Foster Wheeler Project No. 7810140065 May 17, 2016 Leachate Storage Tank 22 13 63 - 3 F. Exterior Coating: As specified by the Manufacturer and approved by the Engineer. PART 3 - EXECUTION 3.1 INSTALLATION A. Install water storage tanks on concrete bases, level and plumb, firmly anchored. Arrange so devices needing servicing are accessible. B. Vertical Water Storage Tanks: 1. Install on cast-in-place concrete equipment base(s). C. Install the following devices on tanks: 1. Inlet and outlet connections to appurtenances and for over-the-wall and through-wall piping. 2. OSHA approved galvanized steel or aluminum ladder with cage D. After installing tanks with factory finish, inspect finishes and repair damages to finishes. 3.2 FIELD QUALITY CONTROL A. Perform the following tests and inspections: 1. Tank Weld Test: Use radiographic method according to AWWA D100. Repair failures and retest. 2. Leak Test: Comply with AWWA D100 or as approved by the Engineer. Fill tanks with water and test for leaks after installation. Repair leaks and retest until no leaks exist. a. Water will be furnished by Owner. 3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. B. Water storage tanks will be considered defective if they do not pass test and inspections. C. Prepare test and inspection reports. D. Obtain and submit tank manufacturer warranty to Owner. END OF SECTION 221363 LEGAL PROPERTY DESCRIPTION DRAWINGS N PREPARED FOR: DUKE ENERGY CAROLINAS, LLC LEACHATE TANK AND SECONDARY CONTAINMENT DAN RIVER LANDFILL DUKE ENERGY - DAN RIVER STEAM STATION ROCKINGHAM COUNTY, NORTH CAROLINA DAN RIVER STEAM STATION ROCKINGHAM COUNTY LANDFILL LIMIT OF WASTE ASH FILL 2 PRIMARY ASH BASIN SECONDARY ASH BASIN LANDFILL LIMIT OF WASTE ASH FILL 2 PRIMARY ASH BASIN SECONDARY ASH BASIN ASH FILL 1 ASH FILL 1 SITE AERIAL IMAGE 1"=1000' SITE VICINITY MAP NOT TO SCALE  NC GEOLOGY: C-247 NC ENG: F-1253 LICENSURE: FAX: (704) 357-8638 TEL: (704) 357-8600 CHARLOTTE, NC 28208 SUITE 100 2801 YORKMONT ROAD 5/17/2016 7810-14-0065 DWG AS SHOWN CHR CHR AAJ CSJ CSJ C-0.0 COVER SHEET.dwg 0 0 0 C-0.0 C - 0 . 0 C-0.0 ISSUED FOR PERMITTING - NOT RELEASED FOR CONSTRUCTION COVER SHEET DAN RIVER STEAM STATION LEACHATE TANK AND SECONDARY CONTAINMENT Sheet List Table Sheet Number Sheet Title C-0.0 COVER SHEET C-1.1 LEACHATE FORCE MAIN ALIGNMENT C-1.2 LEACHATE STORAGE AREA GRADING PLAN C-1.3 LEACHATE STORAGE TANK LAYOUT C-1.4 LEACHATE FORCE MAIN PROFILE D-1.1 LCRS DETAILS D-2.1 LEACHATE STORAGE FACILITY DETAILS 1 D-2.2 LEACHATE STORAGE FACILITY DETAILS 2 D-2.3 LEACHATE STORAGE FACILITY DETAILS 3 D-2.4 LEACHATE STORAGE FACILITY DETAILS 4 D-2.5 LEACHATE STORAGE FACILITY DETAILS 5 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR DRAWING NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 86 4 5 7 8 9 106 A F C B 22"x34" ANSI D Environment & Infrastructure SEAL REV DATE JOB NO.PROJECT TYPE DES DFTR CHKD ENGR APPD DESCRIPTIONABSAT ISSUE #DATE DESIGN 5/17/20160 LEACHATE TANK AND SECONDARY CONTAINMENTCHRCHRAAJCSJCSJLANDFILL7810-14-0065 N REFERENCES1.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM PHOTOGRAMMETRICMETHODS FROM AERIAL PHOTOGRAPHY OBTAINED ON FEBRUARY 7, 2014 BY LDSI, INC.2.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM LIGHT DETECTION ANDRANGING (LIDAR) OBTAINED FROM NCDOT WEBSITE ON AUGUST 7, 2015.  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J C - 1 . 1 L E A C H A T E F O R C E M A I N A L I G N M E N T . d w g 0 0 0 C - 1 . 1 C - 1 . 1 C - 1 . 1 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E F O R C E M A I N A L I G N M E N T D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 N REFERENCES1.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM PHOTOGRAMMETRICMETHODS FROM AERIAL PHOTOGRAPHY OBTAINED ON FEBRUARY 7, 2014 BY LDSI, INC.  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J C - 1 . 2 L E A C H A T E S T O R A G E A R E A G R A D I N G P L A N . d w g 0 0 0 C - 1 . 2 C - 1 . 2 C - 1 . 2 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E A R E A G R A D I N G P L A N D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 E X I S T I N G P I P E T O B E R E M O V E D B Y O T H E R S DURI N G A S H E X C A V A T I O N 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 N REFERENCES1.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM PHOTOGRAMMETRICMETHODS FROM AERIAL PHOTOGRAPHY OBTAINED ON FEBRUARY 7, 2014 BY LDSI, INC.  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J C - 1 . 3 L E A C H A T E S T O R A G E T A N K L A Y O U T . d w g 0 0 0 C - 1 . 3 C - 1 . 3 C - 1 . 3 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E T A N K L A Y O U T D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 SECONDARYCONTAINMENT DRAIN D I R T R O A D E X T E N T S H I G H P O I N T A R V M A N H O L E 2 D - 1 . 1 560 570 580 590 600 610 620 5 6 0 5 7 0 5 8 0 5 9 0 6 0 0 6 1 0 6 2 0 0+000+501+001+50 2 + 0 0 2 + 5 0 3 + 0 0 3 + 5 0 4 + 0 0 4 + 5 0 5 + 0 0 5 + 5 0 5 + 7 0 560 570 580 590 600 610 620 5 6 0 5 7 0 5 8 0 5 9 0 6 0 0 6 1 0 6 2 0 5+706+006+507+007+50 8 + 0 0 8 + 5 0 9 + 0 0 9 + 5 0 1 0 + 0 0 1 0 + 5 0 1 1 + 0 0 1 1 + 5 0 1 1 + 6 0 LOW POINT MANHOLE3D-1.1560570580590600610620 5 6 0 5 7 0 5 8 0 5 9 0 6 0 0 6 1 0 6 2 0 11+6012+0012+5013+00 1 3 + 5 0 1 4 + 0 0 1 4 + 5 0 1 5 + 0 0 1 5 + 5 0 1 6 + 0 0 1 6 + 5 0 1 7 + 0 0 1 7 + 4 0 560 570 580 590 600 610 620 5 6 0 5 7 0 5 8 0 5 9 0 6 0 0 6 1 0 6 2 0 17+4017+5018+0018+5019+00 1 9 + 5 0 2 0 + 0 0 2 0 + 5 0 2 1 + 0 0 2 1 + 5 0 2 2 + 0 0 2 2 + 5 0 2 3 + 0 0 1 0 " F O R C E M A I N ( E L . = 5 9 5 ' ) ( R E F . 3 ) E X I S T I N G 2 4 " F O R C E M A I N ( E L . 5 9 0 ' ) ( R E F . 3 ) U T I L I T Y T R E N C H R E P A I R H I G H P O I N T A R V 2 D - 1 . 1 E D G E W O O D R O A D P R O F I L E ( S T A . 0 + 0 0 T O 5 + 7 0 ) P R O F I L E ( S T A . 5 + 7 0 T O 1 1 + 6 0 ) P R O F I L E ( S T A . 1 1 + 6 0 T O 1 7 + 4 0 ) P R O F I L E ( S T A . 1 7 + 4 0 T O 2 3 + 0 0 ) L E G E N D L E A C H A T E F O R C E M A I N P R O P O S E D G R A D E S E X I S T I N G G R A D E S [ R E F . 1 ] E X I S T I N G G R A D E S [ R E F . 2 ] REFERENCES1.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM PHOTOGRAMMETRICMETHODS FROM AERIAL PHOTOGRAPHY OBTAINED ON FEBRUARY 7, 2014 BY LDSI, INC.2.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM LIGHT DETECTION ANDRANGING (LIDAR) OBTAINED FROM NCDOT WEBSITE ON AUGUST 7, 2015.3.FORCE MAIN SIZE AND LOCATION PROVIDED BY CITY OF EDEN.  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J C - 1 . 4 L E A C H A T E F O R C E M A I N P R O F I L E . d w g 0 0 0 C - 1 . 4 C - 1 . 4 C - 1 . 4 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E F O R C E M A I N P R O F I L E D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 F O R C E M A I N T I E I N 4 D - 1 . 1 5 D - 1 . 1 LEACHATE FORCE MAIN TIE IN TO PROPOSEDLEACHATE STORAGE TANK PUMP PAD(SAMPLE PORT LOCATED AT TANK PUMP PAD)102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 END TERMINATION6" BUTTERFLY VALVEPVC BODY AND DISCEPDM SEATS END TERMINATION WITHLOW POINT DRAIN2.0'(MIN.)5.0'UP-GRADIENTDIRECTION DETECTABLE TRACER TAPE6-IN. DIA. HDPE SDR-17 CARRIER PIPE10-IN. DIA. HDPE SDR-17 CONTAINMENT PIPE 1.0'4.0'5-FT. X 3-FT. X 4-FT. HDPEMANHOLE WITH COVER UP-GRADIENTDIRECTION 5.0'6-IN. DIA. HDPE SDR-17 CARRIER PIPE10-IN. DIA. HDPE SDR-17 CONTAINMENT PIPE 5-FT. X 3-FT. X 4-FT. HDPEMANHOLE WITH COVEREND TERMINATION WITHLOW POINT DRAINEND TERMINATION 6" BUTTERFLY VALVEPVC BODY AND DISCEPDM SEATS3.0'A2A2A1A1 3 . 0 ' 2 . 0 ' ( M I N . ) 4 . 0 ' END TERMINATION WIT H LOW POINT DRAI N 5-FT. X 3-FT. X 4-FT. HDP E MANHOLE WITH COVE R UNISTRUTS PLACED AS NEEDED EXTRUSION WELD TO UNISTRUT (TYP.) N O T E S : 1 . I N S T A L L S P A C E R S T O M A N U F A C T U R E R ' S S P E C I F I E D D I S T A N C E . 2 . C O N F I G U R A T I O N A N D F I T T I N G S S U B J E C T T O C H A N G E B A S E D O N M A N U F A C T U R E R ' S R E C O M M E N D A T I O N S A N D D I M E N S I O N S O F S E L E C T E D P R O D U C T S . PLANSECTION A1 S E C T I O N A 2 UP-GRADIENTDIRECTIONUP-GRADIENTDIRECTION 9-IN. COMPACTED ABC STONEMIRAFI RS580I WOVENGEOTEXTILE OR ENGINEERAPPROVED EQUIVALENT MANHOLE LID9-IN. COMPACTED ABC STONEMIRAFI RS580I WOVENGEOTEXTILE OR ENGINEERAPPROVED EQUIVALENT MANHOLE LID L O C A L L Y I N C R E A S E A G G R E G A T E D E P T H A N D G R A D E T O D R A I N A W A Y F R O M M A N H O L E LOCALLY INCREASEAGGREGATE DEPTHAND GRADE TO DRAINAWAY FROM MANHOLE EXTRUSION WELD THE CONTAINMENTPIPE TO THE INSIDE AND OUTSIDE OFTHE VAULTEXTRUSION WELD THE CONTAINMENTPIPE TO THE INSIDE AND OUTSIDE OFTHE VAULT6.5'UP-GRADIENTDIRECTION DETECTABLE TRACER TAPE6-IN. DIA. HDPE SDR-17 CARRIER PIPE10-IN. DIA. HDPE SDR-17 CONTAINMENT PIPE 4.0'9-FT. X 3-FT. X 4-FT. HDPEMANHOLE WITH COVER UP-GRADIENTDIRECTION 6.5'6-IN. DIA. HDPE SDR-17 CARRIER PIPE10-IN. DIA. HDPE SDR-17 CONTAINMENT PIPE EXTRUSION WELD THE CONTAINMENTPIPE TO THE INSIDE AND OUTSIDE OFTHE VAULT 6.5-FT. X 3-FT. X 4-FT.HDPE MANHOLE WITHCOVEREND TERMINATION WITHLOW POINT DRAIN6" BUTTERFLY VALVEPVC BODY AND DISCEPDM SEATS 3.0'B1 3 . 0 ' 2 ' ( M I N . ) 4 . 0 ' END TER M I N A T I O N W I T H LO W P O I N T D R A I N 9-FT. X 3-F T . X 4 - F T . H D P E MANHOL E W I T H C O V E R N O T E S : 1 . I N S T A L L S P A C E R S T O M A N U F A C T U R E R ' S S P E C I F I E D D I S T A N C E . 2 . C O N F I G U R A T I O N A N D F I T T I N G S S U B J E C T T O C H A N G E B A S E D O N M A N U F A C T U R E R ' S R E C O M M E N D A T I O N S A N D D I M E N S I O N S O F S E L E C T E D P R O D U C T S . PLANSECTION B1 S E C T I O N B 2 B1UP-GRADIENTDIRECTION B2B2UP-GRADIENTDIRECTION 2'(MIN.)1.0'6" BUTTERFLY VALVEPVC BODY AND DISCEPDM SEATSUNISTRUTS PLACED AS NEEDED EXTRUSION WELD TO UNISTRUT (TYP.)END TERMINATION WITHLOW POINT DRAIN END TERMINATION WITHLOW POINT DRAIN9-IN. COMPACTED A B C S T O N E MIRAFI RS58 0 I W O V E N GEOTEXTILE OR E N G I N E E R APPROVED EQ U I V A L E N T MA N H O L E L I D 9-IN. COMPACTED ABC STONEMIRAFI RS580I WOVENGEOTEXTILE OR ENGINEERAPPROVED EQUIVALENT MANHOLE LID L O C A L L Y I N C R E A S E A G G R E G A T E D E P T H A N D G R A D E T O D R A I N A W A Y F R O M M A N H O L E LOCALLY INCREASEAGGREGATE DEPTHAND GRADE TO DRAINAWAY FROM MANHOLE EXTRUSION WELD THE CONTAINMENTPIPE TO THE INSIDE AND OUTSIDE OFTHE VAULTEXTRUSION WELD THE CONTAINMENTPIPE TO THE INSIDE AND OUTSIDE OFTHE VAULT 6 . 0 ' D E T E C T A B L E T R A C E R T A P E 9 - I N . C O M P A C T E D A B C S T O N E M I R A F I R S 5 8 0 I W O V E N G E O T E X T I L E O R E N G I N E E R A P P R O V E D E Q U I V A L E N T 6 - I N . D I A . H D P E S D R - 1 7 C A R R I E R P I P E 1 0 - I N . D I A . H D P E S D R - 1 7 C O N T A I N M E N T P I P E 4 . 0 ' 6 - F T . X 3 - F T . X 4 - F T . H D P E M A N H O L E W I T H C O V E R 6 . 0 ' N O T E S : 1 . I N S T A L L S P A C E R S T O M A N U F A C T U R E R ' S S P E C I F I E D D I S T A N C E . 2 . C O N F I G U R A T I O N A N D F I T T I N G S S U B J E C T T O C H A N G E B A S E D O N M A N U F A C T U R E R ' S R E C O M M E N D A T I O N S A N D D I M E N S I O N S O F S E L E C T E D P R O D U C T S . P L A N S E C T I O N C 1 2 ' ( M I N . ) 1 . 0 ' 6 - I N . D I A . H D P E S D R - 1 7 C A R R I E R P I P E 1 0 - I N . D I A . H D P E S D R - 1 7 C O N T A I N M E N T P I P E 6 - F T . X 3 - F T . X 4 - F T . H D P E M A N H O L E W I T H C O V E R C 1 C 1 E N D T E R M I N A T I O N 6 " B U T T E R F L Y V A L V E P V C B O D Y A N D D I S C E P D M S E A T S A I R / V A C U U M V A L V E 3 . 0 ' U P - G R A D I E N T D I R E C T I O N U P - G R A D I E N T D I R E C T I O N U N I S T R U T S P L A C E D A S N E E D E D E X T R U S I O N W E L D T O U N I S T R U T U P - G R A D I E N T D I R E C T I O N U P - G R A D I E N T D I R E C T I O N A I R / V A C U U M V A L V E E N D T E R M I N A T I O N 6 " B U T T E R F L Y V A L V E P V C B O D Y A N D D I S C E P D M S E A T S M A N H O L E L I D L O C A L L Y I N C R E A S E A G G R E G A T E D E P T H A N D G R A D E T O D R A I N A W A Y F R O M M A N H O L E E X T R U S I O N W E L D T H E C O N T A I N M E N T P I P E T O T H E I N S I D E A N D O U T S I D E O F T H E V A U L T E X T R U S I O N W E L D T H E C O N T A I N M E N T P I P E T O T H E I N S I D E A N D O U T S I D E O F T H E V A U L T D E T A I L L E G E N D S O I L S U B G R A D E C O M P A C T E D S O I L L I N E R R E - C O M P A C T E D S O I L L I N E R ( N O P E R M E A B I L I T Y R E Q U I R E M E N T ) P R O T E C T I V E C O V E R - C C R O R S O I L P R O T E C T I V E C O V E R - S O I L O N L Y W A S T E I N T E R I M S O I L C O V E R F I N A L S O I L C O V E R V E G E T A T I V E S O I L C O V E R N C D O T 7 8 M D R A I N A G E A G G R E G A T E A S T M C - 3 3 C O N C R E T E S A N D R I P R A P C O N C R E T E C O M P A C T E D A B C S T O N E G E O S Y N T H E T I C C L A Y L I N E R ( G C L ) 6 0 - M I L D O U B L E - S I D E D T E X T U R E D H D P E G E O M E M B R A N E G E O C O M P O S I T E D R A I N A G E L A Y E R G E O T E X T I L E L I N E R S Y S T E M P I P E ( H I D D E N ) P I P E ( E X P O S E D ) 6 " F L A N G E D E N D S W I N G C H E C K V A L V E H I - P V C B O D Y A N D D I S C S E P D M S E A T S 6 " S S G A T E V A L V E J C M # 4 1 2 F L A N G E D O U T L E T T A P P I N G S L E E V E C I T Y O F E D E N 2 4 " D U C T I L E I R O N F O R C E M A I N E X T R U S I O N W E L D T H E C A R R I E R P I P E T O T H E I N S I D E A N D O U T S I D E O F T H E V A U L T L A D D E R A C C E S S ( N C D O T 8 4 0 . 6 6 ) 1 ' 0 . 5 ' C I T Y O F E D E N 1 0 - I N . D I A . F O R C E M A I N ( A P P R O X I M A T E L O C A T I O N ) 1 0 ' 1 0 ' X 6 ' C A S T I N P L A C E C O N C R E T E M A N H O L E U N I S T R U T S P L A C E D A S N E E D E D T O S U P P O R T P I P E S A N D V A L V E S 6 " D R - 1 7 L E A C H A T E F O R C E M A I N 0 . 5 ' 1 0 ' N O T E S : 1 . C O N T R A C T O R T O P R O V I D E S U P P O R T S F O R P I P E S D U R I N G C O N S T R U C T I O N . 2 . T I E I N C O N F I G U R A T I O N M A Y C H A N G E P E N D I N G C I T Y O F E D E N A P P R O V A L . W + 2 W W = ( M I N . 2 ' - M A X . 5 ' ) 2 ' - 0 " M I N . E X I S T I N G R O A D W A Y S U R F A C E 9 5 % S T A N D A R D P R O C T O R C O M P A C T I O N S T O N E B E D D I N G R E P A I R R O A D W A Y T O O R I G I N A L S E C T I O N T H I C K N E S S A N D M A T E R I A L S N O T E : D E T A I L S U B J E C T T O C H A N G E B A S E D O N R I G H T O F W A Y O W N E R R E Q U I R E M E N T LOW POINT MANHOLESCALE: 1" = 2'3D-1.1 BUTTERFLY VALVE MANHOLESCALE: 1" = 2'1D-1.1 H I G H P O I N T A R V M A N H O L E S C A L E : 1 " = 2 ' 2 D - 1 . 1 F O R C E M A I N T I E I N T O C I T Y F O R C E M A I N N T S 4 D - 1 . 1 U T I L I T Y T R E N C H R E P A I R D E T A I L N T S 5 D - 1 . 1  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 1 . 1 L C R S D E T A I L S . d w g 0 0 0 D - 1 . 1 D - 1 . 1 D - 1 . 1 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L C R S D E T A I L S D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 VARIESNOTES:1.GEOSYNTHETIC COMPONENTS SHOWN AT EXAGGERATED SCALE.SOIL SUBGRADE 8OZ/SY NON-WOVENGEOTEXTILE60-MIL DOUBLE-SIDED TEXTUREDHDPE GEOMEMBRANE NCDOT 78M DRAINAGEAGGREGATE1' 1 2 L E A C H A T E S T O R A G E L I N E R S Y S T E M 2 1 NCDOT 78 M D R A I N A G E A G G R E G A T E 2 . 0 0 ' 1 . 5 0 ' 5 ' 1 D - 2 . 1 18-IN. CLASS B RIPRAP L I M I T O F L I N E R M A R K E R ( S E E N O T E 1 ) 1 . 5 ' N O T E 1 : C O N T R A C T O R T O I N S T A L L T R I V I E W M A R K E R S E V E R Y 1 0 0 F E E T A N D A T C H A N G E S I N A L I G N M E N T . 2 . 5 ' 3 F T . - 7 - I N . ( M I N . ) 1 - F T . - 1 1 - I N . 9 - I N . C O M P A C T E D A B C S T O N E M I R A F I R S 5 8 0 I W O V E N G E O T E X T I L E O R E N G I N E E R A P P R O V E D E Q U I V A L E N T L A N D F I L L P E R I M E T E R B E R M 2 % 2 % S E E I N S E T A 3 1 1 . 5 ' I N S E T A 2 % L E A C H A T E L O A D O U T A R E A 4 D - 2 . 1 N O T E S : 1 . I N S T A L L G U A R D R A I L I N A C C O R D A N C E W I T H N C D O T S T A N D A R D D E T A I L S 8 6 2 . 0 1 A N D 8 6 2 . 0 2 . 2 . C O N T R A C T O R S H A L L I N S T A L L T R I V I E W M A R K E R S E V E R Y 1 0 0 F E E T A N D A T C H A N G E S I N A L I G N M E N T . L I N E R S Y S T E M L I M I T S ( S E E N O T E 2 ) 0.50'LEACHATE LOADOUT GUARDRAIL10' 5 5 ' 1 0 ' 5% 5 % LEACHATE STORAGE LINER SYSTEM1D-2.19-IN. COMPACTED ABC STONE 3D-2.1 D E T A I L L E G E N D S O I L S U B G R A D E C O M P A C T E D S O I L L I N E R R E - C O M P A C T E D S O I L L I N E R ( N O P E R M E A B I L I T Y R E Q U I R E M E N T ) P R O T E C T I V E C O V E R - C C R O R S O I L P R O T E C T I V E C O V E R - S O I L O N L Y W A S T E I N T E R I M S O I L C O V E R F I N A L S O I L C O V E R V E G E T A T I V E S O I L C O V E R N C D O T 7 8 M D R A I N A G E A G G R E G A T E A S T M C - 3 3 C O N C R E T E S A N D R I P R A P C O N C R E T E C O M P A C T E D A B C S T O N E G E O S Y N T H E T I C C L A Y L I N E R ( G C L ) 6 0 - M I L D O U B L E - S I D E D T E X T U R E D H D P E G E O M E M B R A N E G E O C O M P O S I T E D R A I N A G E L A Y E R G E O T E X T I L E L I N E R S Y S T E M P I P E ( H I D D E N ) P I P E ( E X P O S E D ) NCDOT 78M DRAINAGE AGGREGATE F O U N D A T I O N S E C T I O N 1D-2.1 LEACHATE STORAGE LINER SYSTEM 51  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 2 . 1 L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 1 . d w g 0 0 0 D - 2 . 1 D - 2 . 1 D - 2 . 1 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 1 D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 LEACHATE STORAGE LINER SYSTEMSCALE: 1" = 1'1D-2.1 L E A C H A T E S T O R A G E A N C H O R T R E N C H S C A L E : 1 " = 2 ' 2 D - 2 . 1 L E A C H A T E L O A D O U T G U A R D R A I L S C A L E : 1 " = 4 ' 3 D - 2 . 1 L E A C H A T E L O A D O U T A R E A S C A L E : 1 " = 4 ' 4 D - 2 . 1 LEACHATE LINER SYSTEM T R A N S I T I O N SCALE: 1" = 1'5D-2.1102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 NCDOT 78MDRAINAGEAGGREGATE C O M P A C T E D A B C S T O N E L E G E N D P R O P O S E D M A J O R C O N T O U R ( 1 0 ' ) P R O P O S E D M I N O R C O N T O U R ( 2 ' ) L I M I T O F L I N E R ( S E E N O T E 1 ) L I M I T O F L I N E R ( S E E N O T E 2 ) N C D O T 7 8 M D R A I N A G E A G G R E G A T E R I P R A P C O M P A C T E D A B C S T O N E C O N C R E T E N O T E S : 1 : S E E D E T A I L 2 O N S H E E T D - 5 . 1 F O R A N C H O R T R E N C H 2 : S E E D E T A I L 3 O N S H E E T D - 5 . 1 F O R L I N E R L A Y O U T  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 2 . 2 L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 2 . d w g 0 0 0 D - 2 . 2 D - 2 . 2 D - 2 . 2 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 2 D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 LEACHATE STORAGE FACILITY SURFACING DETAILSCALE: 1: = 10'1D-2.2 L E A C H A T E S U M P P L A N L A Y O U T S C A L E : 1 " = 1 0 ' 2 D - 2 . 2 CONCRETE E Q U I P M E N T P A D CONCRETE SUMP CONTRACTOR TO INSTALLTRIVIEW MARKERS EVERY 100 FEETAND AT TRANSITIONS IN ALIGNMENT102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 2 1 1 1 1 1 2 1 31 2 % 2 % B U T T E R F L Y V A L V E ( S E E N O T E 1 & 2 ) 12 IN. DIA. SDR-17 HDPE PI P E (SEE NOTE 3)CONCRETE SUMP LEACHATE STORAGE LINER SYSTEM1D-2.1 8 O Z / S Y N O N W O V E N G E O T E X T I L E 9 - I N . G R O U T E D C L A S S A R I P R A P 9 - I N . C O M P A C T E D A B C S T O N E M I R A F I R S 5 8 0 I W O V E N G E O T E X T I L E O R E N G I N E E R A P P R O V E D E Q U I V A L E N T 6 ' 5 ' 2 4 ' 5 ' 10'6'12-IN. NCDOT 78MDRAINAGE AGGREGATE L E A C H A T E S T O R A G E A N C H O R T R E N C H 2 D - 2 . 1 BOOT LINER TO PIPE T O P O F R O C K A T E L . 5 9 3 . 5 ' T O P O F S O I L A T E L . 5 9 2 ' N O T E S : 1 : C O N T R A C T O R S H A L L I N S T A L L S I G N A G E I N A C C O R D A N C E W I T H N C D O T D E T A I L 9 0 4 . 5 0 . 2 : C O N T R A C T O R S H A L L I N S T A L L 4 - F T . D I A . T R A F F I C L O A D R A T E D M A N H O L E . 3 : C O N T R A C T O R S H A L L I N S T A L L M E T A L P I P E D E B R I S S C R E E N . 4 . C O N T R A C T O R T O I N S T A L L T R I V I E W M A R K E R E V E R Y 1 0 0 F E E T A N D A T C H A N G E S I N A L I G N M E N T . L I M I T O F L I N E R M A R K E R ( S E E N O T E 4 ) 1 . 5 ' 2 % 2 % 21 3 1 3 1 L E A D L A G P U M P S 6 ' 1 0 ' 6 ' 1 2 - I N . N C D O T 7 8 M D R A I N A G E A G G R E G A T E 6 - I N . C A S T I N P L A C E C O N C R E T E L E A C H A T E S T O R A G E L I N E R S Y S T E M 1 D- 2 . 1 D E T A I L L E G E N D S O I L S U B G R A D E C O M P A C T E D S O I L L I N E R R E - C O M P A C T E D S O I L L I N E R ( N O P E R M E A B I L I T Y R E Q U I R E M E N T ) P R O T E C T I V E C O V E R - C C R O R S O I L P R O T E C T I V E C O V E R - S O I L O N L Y W A S T E I N T E R I M S O I L C O V E R F I N A L S O I L C O V E R V E G E T A T I V E S O I L C O V E R N C D O T 7 8 M D R A I N A G E A G G R E G A T E A S T M C - 3 3 C O N C R E T E S A N D R I P R A P C O N C R E T E C O M P A C T E D A B C S T O N E G E O S Y N T H E T I C C L A Y L I N E R ( G C L ) 6 0 - M I L D O U B L E - S I D E D T E X T U R E D H D P E G E O M E M B R A N E G E O C O M P O S I T E D R A I N A G E L A Y E R G E O T E X T I L E L I N E R S Y S T E M P I P E ( H I D D E N ) P I P E ( E X P O S E D )  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 2 . 3 L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 3 . d w g 0 0 0 D - 2 . 3 D - 2 . 3 D - 2 . 3 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 3 D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 S U M P S E C T I O N 1 S C A L E : 1 " = 4 ' 1 D - 2 . 3 S U M P S E C T I O N 2 S C A L E : 1 " = 4 ' 2 D - 2 . 3 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 S E C T I O N A - A 575 580 590 600 610 6200+000+ 5 0 1 + 0 0 1 + 5 0 2 + 0 0 2 + 5 0 3 + 0 0 3 + 0 0 L E A C H A T E S T O R A G E A N C H O R T R E N C H 2D-2 . 1 M O D U T A N K M S 1 1 0 - 1 7 1 0 9 ' 1 0 " D I A . X 1 7 ' H T S T E E L T A N K ( T A N K E L . 5 8 8 ' A S S U M I N G 1 ' A G G R E G A T E O N T O P O F B A S E G R A D E ) L E A C H A T E S T O R A G E L I N E R S Y S T E M 1 D - 2 . 1 F O U N D A T I O N S E C T I O N L E A C H A T E L I N E R S Y S T E M T R A N S I T I O N 5 D - 2 . 1 LEACHATE LINER SYSTEM TRANSIT I O N S E C T I O N B - B 555 560 570 580 590 600 610 6200+000+501+ 0 0 1 + 5 0 2 + 0 0 2 + 5 0 3 + 0 0 3 + 5 0 4 + 0 0 LEACHATE STORAGE ANCHOR TRENCH2D-2.1 L E A C H A T E S T O R A G E L I N E R S Y S T E M 1 D - 2 . 1 F O U N D A T I O N S E C T I O N L E A C H A T E L I N E R S Y S T E M T R A N S I T I O N 5 D - 2 . 1 LEACHATE LINER SYSTEM TRANSITION M O D U T A N K M S 1 1 0 - 1 7 1 0 9 ' 1 0 " D I A . X 1 7 ' H T S T E E L T A N K ( T A N K E L . 5 8 8 ' A S S U M I N G 1 ' A G G R E G A T E O N T O P O F B A S E G R A D E ) S E C T I O N C - C ' 565 570 580 590 6000 + 0 0 0 + 5 0 1 + 0 0 1 + 3 0 L E A C H A T E S T O R A G E A N C H O R T R E N C H 2 D - 2 . 1 L E A C H A T E S T O R A G E L I N E R S Y S T E M 1 D - 2 . 1 L E G E N D : E X I S T I N G G R A D E [ R E F . 1 ] P R O P O S E D L A N D F I L L G R A D E S O I L F I L L N C D O T 7 8 M S T O N E R I P - R A P C O M P A C T E D A B C S T O N E REFERENCES1.EXISTING TOPOGRAPHIC INFORMATION WAS PRODUCED FROM PHOTOGRAMMETRICMETHODS FROM AERIAL PHOTOGRAPHY OBTAINED ON FEBRUARY 7, 2014 BY LDSI, INC.  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 2 . 4 L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 4 . d w g 0 0 0 D - 2 . 4 D - 2 . 4 D - 2 . 4 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 4 D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 C O M P A C T E D F I L L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5 LEACHATE PUMP TANK INTAKE NOT TO SCALE 1D-2.5 16" DIAMETER T A N K A N T I - VORTEX PUM P I N T A K E AQUATIC TEC H N O L O G Y AVPLATE6PV C K I T 6"6" LONG RADIUS SS E L B O W TANK INTERIOR150 LB FLANGED TANKCONNECTION 6" FLANGEDVIBRATION ISOLATOR TANK WALL L E A C H A T E T A N K F I L L S U P P O R T F R O M T A N K C O N F I R M S U P P O R T A T T A C H M E N T W I T H T A N K M A N U F A C T U R E R L E A C H A T E T A N K 5'-0"6'-0"6'-0" P I P E A N C H O R 6 " P R O V I D E P I P E G U I D E R I N G T O A L L O W E X P A N S I O N U P W A R D P R O V I D E P I P E G U I D E R I N G T O A L L O W E X P A N S I O N U P W A R D  N C G E O L O G Y : C - 2 4 7 N C E N G : F - 1 2 5 3 L I C E N S U R E : F A X : ( 7 0 4 ) 3 5 7 - 8 6 3 8 T E L : ( 7 0 4 ) 3 5 7 - 8 6 0 0 C H A R L O T T E , N C 2 8 2 0 8 S U I T E 1 0 0 2 8 0 1 Y O R K M O N T R O A D 5 / 1 7 / 2 0 1 6 7 8 1 0 - 1 4 - 0 0 6 5 D W G A S S H O W N C H R C H R A A J C S J C S J D - 2 . 5 L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 5 . d w g 0 0 0 D - 2 . 5 D - 2 . 5 D - 2 . 5 I S S U E D F O R P E R M I T T I N G - N O T R E L E A S E D F O R C O N S T R U C T I O N L E A C H A T E S T O R A G E F A C I L I T Y D E T A I L S 5 D A N R I V E R S T E A M S T A T I O N L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T 0 T Y P I C A L L E A C H A T E T A N K F I L L P I P E N O T T O S C A L E 2 D - 2 . 5 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 6 4 5 7 8 9 1 0 6 A F C B 2 2 " x 3 4 " A N S I D E n v i r o n m e n t & I n f r a s t r u c t u r e S E A L R E V D A T E J O B N O . P R O J E C T T Y P E D E S D F T R C H K D E N G R A P P D D E S C R I P T I O N ABSAT ISSUE #DATEDESIGN 5 / 1 7 / 2 0 1 6 0 L E A C H A T E T A N K A N D S E C O N D A R Y C O N T A I N M E N T C H R C H R A A J C S J C S J L A N D F I L L 7 8 1 0 - 1 4 - 0 0 6 5