Loading...
HomeMy WebLinkAbout10045_NuTreadTireInspectionReport_9-8-2016Date of visit:9/8/2016 Time:2:10 PM Other BF staff:Personnel: 1)Industrial Commercial Institutional Recreation/Festival Residential Mixed Use Vacant 2)None 3) 4) 5) 6)None 7) 8) 9)Unknown 10) NuTread Tire Company Drive-by Inspection Type: Basements were not observed on the property. No monitoring wells observed. Exposure to Public: Storage of Chemicals: Use of surface water or groundwater: Last LURU received: Storage of chemicals was not observed. Use of Basements: The property has a fence along the perimeter to prevent access. Durham CREDO-1, LLC - 1/22/2015; BH-AG Durham Foster, LLC - None Brownfields Map Location Source: BFA Site & Boundary Layers 2016-6-30 Exposed Soils: Current use of property: Vapor mitigation is not required by the LURS. However, LUR 4 requires DEQ approval for certain uses of sub-grade areas within the brownfields. Structures on property: Vapor Mitigation: No structures observed on the brownfields property. Brownfields Program Site Inspection Sheet Project name: David Peacock 10045-06-032 545 Foster Street Project number: Project county:Durham Project address: Use of surface water was not observed. Use of groundwater was not observed. Exposed soils were not observed on the property. Condition of GW Monitoring Wells: County Verified by:ROD on-line or ROD office Instrument book page rec. date 6888 242 1/23/2012 7225 40 3/28/2013 188 389 1/23/2012 5358 671 9/18/2006 Lot No.book page rec. date -7779 314 9/1/2015 Lot No.Property occupants contact city state zip Vacant Property Deed Nu Tread Tire Co to Durham CREDO-1 LLC NCGS 130A- 310.35(d) compliantCurrent deeded owners note webaddress No Reverse Party: Durham CREDO-1, LLC; Corrected Deed concerning 545 Foster Street note Durham PD: Durham CREDO-1, LLC; First recording missing NBP enforcement language.BF NBP PD: Durham CREDO-1, LLC; Two pagesBF Plat PD: Durham CREDO-1, LLC; Second recording containing NBP enforcement language. BH-AG Durham Foster, LLC Register of Deeds Inspector Comments This inspection was initiated due to failure to receive the 2016 annual certification. A letter Notice of Noncompliance was issued to Durham CREDO- 1, LLC on March 7, 2016. Recorded property deeds show that the brownfields property was transferred on June 1, 2015 to BH-AG Durham Foster, LLC. Therefore, Durham CREDO-1, LLC was not required to submit a LURU in January 2016. To date no development has occurred at the property. A letter notice to file a LURU will be issued to the current owner. BF NBP Photos Photos cont..