Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4116_WIHighPoint_PH3PTCResponsetoComments_DIN26855_20161014.pdf
October 14, 2016 Mr. Allen Gaither Environmental Engineer NC DEQ, Division of Waste Management 1646 Mail Service Center Raleigh, NC 27699-1646 RE: WI High Point C&D Landfill --- Phase 3 (SWS Permit No. 41-16) Response to Comments --- Permit Renewal, Engineering Technical Review High Point, North Carolina Dear Mr. Gaither: Smith Gardner Inc. (S+G) is pleased to respond to your October 5, 2016 comments (Attached) on behalf of WI High Point Landfill. Please find our responses (bold) corresponding to your comments presented in italics. Facility and Engineering Plan Comment 1: Rule .0537(d)(1)(C) requires site development drawings which delineate the areal limits of grading, including borrow and stockpile areas. There were no borrow or stockpile areas indicated on the drawings. Response: With the exception of an existing stockpile south of Phase 1, all stockpiles and/or borrow shall occur within proposed waste limits. Comment 2. Rule .0537(d)(1)(F) requires site development drawings which delineate physical features including floodplains, wetlands, unstable areas and cultural resource areas as defined in Rule .0536. There were no floodplain, unstable or cultural resource areas indicated on the drawings. Response: There are no floodplains, unstable and/or cultural resource areas within the facility boundary. FEMA has designated this facility as Zone X, areas determined to be outside 0.2% annual chance floodplain. A note has been added to Drawing S1 (Existing Conditions) to reflect this. Comment 3. Sections 2.3.2, 2.3.3 and 2.3.4 reference Tables 2.3, 2.4 and 2.5, respectively. However, these tables are not referenced in the Table of Contents and could not be found in the Facility and Engineering Plan. Response: Reference to Tables 2.3, 2.4, and 2.5 have been revised to reference Table 2.2. Comment 4. Rule .0539(e)(4) requires engineering drawings to illustrate the cap system including base and top elevations, landfill gas devices, infiltration barrier, surface water removal, protective and vegetative cover, and details. Base elevations and cross-section cap details were not DocuSign Envelope ID: 3FE2EB82-F3B0-4FA2-8F76-6CAB2F6F0CDF Mr. Allen Gaither October 14, 2016 Page 2 of 4 apparent in the drawings provided. Response: Drawings X1 and X2 (Engineering Cross Sections) have been included to include base grades and final cover grades for the facility. Comment 5. Rule .0539(e)(6)(A) requires engineering drawings to illustrate vertical separation requirement estimates including cross- sections showing borings, which indicate existing ground surface elevations, base grades, seasonal high ground-water level, estimated long-term seasonal high ground-water level in accordance with Part (b)(2)(E) of Rule .0538 of this Section, and bedrock level in accordance with Part (b)(2)(F) of Rule .0538 of this section. There were no cross- sections in the drawings provided. Response: Drawings X1 and X2 (Engineering Cross Sections) have been included to provide boring locations, long term seasonal high groundwater surface, bedrock surface, base grades, and a minimum 4’ separation note. Comment 6. Rule .0539(e)(6)(B) requires an engineering drawings to illustrate vertical separation requirement estimates including a map showing the existing ground surface elevation and base grades. The map must include labeled boring locations which indicate seasonal high ground-water level, estimated long term high ground-water level in accordance with Part(b)(2)(E) of Rule .0538 of this Section, and bedrock level in accordance with Part (b)(2)(F) of Rule .0538 of this Section. The required map was not in the drawings provided. Response: Drawings X1 and X2 (Engineering Cross Sections) have been included to provide boring locations, long term seasonal high groundwater surface, bedrock surface, base grades, and a minimum 4’ separation note. Comment 7. Section 3.1, Alternative Final Cover System Design, states an alternative final cover system as described in Section 6.2 is proposed to eliminate the soil barrier component. However, the Table of Contents indicates Section 3.0 is the last Section in the Facility and Engineering Plan and the Alternative Final Cover System is described in Section 2.5.2. Response: Reference to Section 6.2 has been replaced to reference Section 2.5.2. Operations Plan Comment 8. Rule .0542(b)(1)(F) requires operation drawings to illustrate stockpile and borrow operations. There were no stockpile or borrow areas indicated on the drawings. Response: With the exception of an existing stockpile south of Phase 1, all stockpiles and/or borrow shall occur within proposed waste limits. Comment 9. Section 1.2.3 lists Dennis Shackelford as the Eastern District Supervisor. Mr. Shackelford has retired from the state. Additionally, the Field Operations Branch has been reorganized and Guilford County is now within the Western District which is supervised by Ms. Deb Aja. DocuSign Envelope ID: 3FE2EB82-F3B0-4FA2-8F76-6CAB2F6F0CDF Mr. Allen Gaither October 14, 2016 Page 3 of 4 Response: Western District Supervisor contact information has been updated for Deborah Aja. Comment 10. Section 2.2, Prohibited Wastes, lists some of the wastes excluded by Rule .0542(e), but not all. I would recommend referencing Rule .0542(e) as well as General Statute 130A-309.10(f) to ensure all prohibited wastes are included. Response: General Statute 130A-309.10(f) has been referenced in Section 2.2, Prohibited Wastes as stated: ‘‘Wastes as described within NC General Statute §130A-309.10(f) shall not be accepted; except wooden pallets which may be disposed in construction and demolition debris per §130A-309.10(f)(12).’’ Comment 11. Rule .0542(f)(1) requires solid waste be covered with six inches of earthen material when the waste disposal area exceeds one-half acre and at least once weekly. Section 3.1.4, Periodic Cover, only states each week or sooner, excluding the ½-acre requirement. Response: Section 3.1.4 now reads as: ‘‘When the waste disposal area exceeds one-half acre and at the completion of waste placement each week or sooner, a 6-inch layer of earthen material will be placed over the exposed waste. This periodic cover is intended to control vectors, fire, odors, and blowing debris.’’ Comment 12. Rule .0542(j)(8) prohibits the removal of solid waste from the landfill unit unless a recycling plan is included in the Operational Plan and approved by the Division. Additionally, the general public is prohibited from removing waste at the working face. These prohibitions were not mentioned in the Operations Manual. Response: The facilities recycling plan is discussed under Section 4.0 ‘‘Recovery Area Operations’’ of the submitted Operation Plan. The following paragraph has been added to Section 2.3.1: ‘‘The removal of solid waste from any landfill unit is prohibited except upon notification of the DWM (see Section 1.2.3). Regardless, the general public is prohibited from any waste removal activities from any landfill unit.’’ Comment 13. Rule .0542(l) requires surface water to be diverted from the operational area, prohibits surface water from being impounded over or in waste and prohibits waste from being disposed of in water. Section 5.1.1, Stormwater Diversion in Constructed Cells, only states waste shall not be placed in standing water. Response: Section 5.1.1 now reads as: ‘‘In accordance with 15A NCAC 13B .0542(l) surface water shall be diverted from the operational area or not be impounded over or in waste and waste shall not be placed in standing water. Collected stormwater within the cell shall be removed by pumping low areas. Particular care is required to ensure that surface water coming from the active face, e.g. having potential contact with the waste is allowed to percolate into the underlying waste. Only run-off from waste surfaces that have received adequate cover is not considered leachate and should be directed to the stormwater drainage system, where practical. ’’ DocuSign Envelope ID: 3FE2EB82-F3B0-4FA2-8F76-6CAB2F6F0CDF Mr. Allen Gaither October 14, 2016 Page 4 of 4 Please contact us with comments of questions at 919-828-0577 or by email below. Sincerely, SMITH GARDNER, INC. Madeline German, P.G. Stacey A. Smith, P.E. Project Geologist Senior Engineer madeline@smithgardnerinc.com stacey@smithgardnerinc.com Attachments: Revised Facility and Engineering Report Text Revised Operations Plan Text Revised Permit to Construct Drawings cc: Seth Heath, Waste Industries David Pepper, Waste Industries Ed Mussler, NCDEQ File DocuSign Envelope ID: 3FE2EB82-F3B0-4FA2-8F76-6CAB2F6F0CDF 10/14/2016 10/14/2016 Facility and Engineering Plan WI High Point C&D Landfill Jamestown, North Carolina Prepared for: WI High Point Landfill, LLC Jamestown, North Carolina May 2016 Prepared by: © 2016 Smith Gardner, Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner, Inc. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 Facility and Engineering Plan WI High Point C&D Landfill Jamestown, North Carolina Prepared For: WI High Point Landfill, LLC Jamestown, North Carolina S+G Project No. WIHIGHPOINT-16-1 May 2016 John R. Fearrington, E.I. Staff Engineer Stacey A. Smith, P.E. Senior Engineer DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Table of Contents Page i WI High Point C&D Landfill Jamestown, North Carolina Facility and Engineering Plan Table of Contents Page 1.0 SITE DESCRIPTION .................................................................................................... 1 2.0 FACILITY REPORT ...................................................................................................... 1 2.1 Facility Services and Waste Stream ....................................................................... 1 2.1.1 Facility Services .......................................................................................... 1 2.1.2 Types of Waste ............................................................................................ 1 2.1.3 Disposal Rates and Estimated Variances ................................................... 1 2.1.4 Service Area ................................................................................................ 2 2.1.5 Procedures for Waste Segregation ............................................................. 2 2.1.6 Equipment Requirements ........................................................................... 2 2.2 Landfill Capacity...................................................................................................... 2 2.2.1 Total Operating Capacity and Life Expectancy ............................................ 2 2.2.2 Airspace Utilization Factor and Percentage of Periodic Cover Soil ........... 2 2.3 Available Soil Resources and Required Soil Quantities.......................................... 3 2.3.1 Earthwork Quantities .................................................................................. 3 2.3.2 Daily and Intermediate Cover ..................................................................... 3 2.3.3 Vegetative Soil Layer ................................................................................... 3 2.3.4 Soil Summary .............................................................................................. 3 2.4 Facility Design Criteria ........................................................................................... 3 2.4.1 Horizontal Separation Requirements ......................................................... 3 2.4.2 Vertical Separation Requirements.............................................................. 4 2.5 Containment and Environmental Control Systems ................................................ 4 2.5.1 Landfill Subgrade and Perimeter Berms ................................................... 4 2.5.2 Final Cover System ..................................................................................... 4 2.5.3 Erosion and Sedimentation Control ............................................................ 5 2.5.4 Access and Roadways ................................................................................. 5 2.6 Slope Stability, Settlement, and Bearing Capacity ................................................. 6 2.7 Special Engineering Features ................................................................................. 6 2.7.1 Buffer Variance ........................................................................................... 6 2.7.2 Wetlands Mitigation .................................................................................... 6 2.7.3 Underdrain .................................................................................................. 7 3.0 FINAL COVER SYSTEM DESIGN ................................................................................. 9 3.1 Alternative Final Cover System Design .................................................................. 9 3.1.1 Final Cover Infiltration Analysis .................................................................. 9 3.1.1 Slope Stability ............................................................................................10 3.1.2 Drainage Layer Analysis ............................................................................10 3.1.3 Filter Geotextile Analysis ...........................................................................10 DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Table of Contents Page ii TABLES Table 2.1 Total Operating Capacity and Life Expectancy - -- CDLF Units ..................... 7 Table 2.2 Soil Summary .............................................................................................. 8 APPENDIX Appendix A Landfill Design Calculations DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 1 1.0 SITE DESCRIPTION The Phase 3 unit is a lateral expansion to the east and has a waste footprint of approximately 6.5 acres. The unit lies within the City of High Point Randleman Lake Water Supply Watershed and has requested a variance from the City allowing landfill activities to take place within the riparian buffers. There are wetland areas in the southern portion of the proposed footprint with mitigation plans in review by the Army Corps of Engineers. 2.0 FACILITY REPORT This section presents an updated plan for the development of the Phase 3 C&D landfill unit of the WI High Point C&D Landfill facility. This report has been prepared in accordance with the requirements of Rule .0531 and .0547 of the North Carolina Solid Waste Management Rules. 2.1 Facility Services and Waste Stream 2.1.1 Facility Services Currently, the following activities or services are provided at the WI High Point C&D Landfill facility as shown on Drawing S1 (Attachment O): • Scales and scale house facilities • Administrative offices and maintenance building • C&D landfill • Waste Reclamation Pad 2.1.2 Types of Waste The High Point C&D Landfill facility accepts construction and demolition debris (C&D) waste, land clearing and inert debris waste, and other wastes (i.e. asphalt and asbestos). Trained personnel screen waste received at the scale house entrance and direct loads to the working face or reclamation pad. 2.1.3 Disposal Rates and Estimated Variances Based on the 2015-2016 Solid Waste Management Annual Report information provided by Waste Industries, the landfill accepted 43,053 tons of C&D waste from 1/13/15 to 1/2/16 (average 3,587 tons per month or 151 tons per day based on 285 operating days per year). This tonnage has been typical for the facility in recent years. A conservative disposal rate of 45,000 tons per year was used in calculating phase life expectancy (Appendix A). As documented during the previous permit approval process, the maximum disposal rate for the landfill is 98,600 tons per year (average of 7,480 tons/month or 315 tons/day based on 285 operating days per year). DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 2 2.1.4 Service Area The landfill facility currently serves the Counties of Guilford, Surry, Stokes, Rockingham, Caswell, Yadkin, Forsyth, Alamance, Orange, Davie, Rowan, Davidson, Cabarrus, and Randolph. 2.1.5 Procedures for Waste Segregation Procedures for waste segregation at the proposed landfill will be similar to existing operations in Phases 1 and 2 including requirements for waste screening and contingency plans for managing any identified hazardous and liquid wastes. Refer to the Operations Manual (Attachment I) for more information. 2.1.6 Equipment Requirements WIHP will maintain on-site equipment required to perform the necessary landfill activities. Periodic maintenance of all landfilling equipment, and minor and major repair work will be performed at designated maintenance zones. 2.2 Landfill Capacity 2.2.1 Total Operating Capacity and Life Expectancy Drawing S2 (Site Development Plan - Base Grades) and Drawing S3 (Site Development Plan - Final Cover Grades), show conceptual subgrade and final cover grades for the development of Phase 3, respectively. The final cover side slopes will be at a 3H to 1V slope, then transition at flatter slopes (5 to 8%) to the peak elevations. The estimated gross and net operating capacities, life expectancies, and areas of existing and planned C&D landfill units are shown in Table 2.1. The net capacity for waste and corresponding life expectancy of each landfill unit accounts for daily and intermediate cover and/or final cover. As noted in Section 2.1.3, life expectancies were calculated based on a disposal rate of 45,000 tons per year. 2.2.2 Airspace Utilization Factor and Percentage of Periodic Cover Soil The capacities obtained were based on gross capacities (which includes waste, daily, and intermediate cover) and an assumed airspace utilization factor (AUF) (tons of waste disposed/volume filled) of 0.50 tons/cubic yard (tons/cy). AUF values are based on values calculated for actual historical filling conditions at the landfill. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 3 Note that AUF values are anticipated to be lower during initial filling of landfill units and increase over time due to the additional thickness of the waste mass and the degradation of organic wastes. Note also that changes in landfill operations (i.e. changes in the use of alternative daily cover and/or compaction equipment/methods) may affect the values assumed above and, thus, alter the life of the various landfill units. 2.3 Available Soil Resources and Required Soil Quantities 2.3.1 Earthwork Quantities The soils required to construct and operate the existing and planned C&D landfill units will be removed from on-site borrow sources. The soils removed during excavation of landfill units may be used for structural fill, soil liner, periodic cover, final cover, and general fill. These excavation (cut) and structural fill (fill) volumes are shown in Table 2.2. 2.3.2 Daily and Intermediate Cover Assuming the previously mentioned periodic cover ratios, the required in-place volume for use as daily and intermediate cover during operations of the Phase 3 unit is shown in Table 2.2. 2.3.3 Vegetative Soil Layer On the basis of the 1.5 foot thick vegetative soil layer required for the landfill final cover, the in-place volume required for each landfill unit is shown in Table 2.2. 2.3.4 Soil Summary The above on-site soil quantities are summarized in Table 2.2. 2.4 Facility Design Criteria Existing and proposed C&D landfill units were and will be constructed in accordance with Section .0540 and .0542 of the North Carolina Administrative Code, Title 15A, Chapter 13, Subchapter 13B including the following requirements: 2.4.1 Horizontal Separation Requirements The horizontal separation requirement between the disposal boundary (edge of waste) and the property lines is a minimum of 200 feet; the minimum buffer between private residences and wells and the disposal boundary is 500 feet; and DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 4 the minimum buffer between any surface water (wetland, stream, river, creek) and the disposal boundary is 50 feet. The proposed design satisfies all buffer requirements. 2.4.2 Vertical Separation Requirements The post-settlement bottom elevation of the liner system will meet the minimum requirement of four (4) feet above the seasonal high groundwater table and bedrock. 2.5 Containment and Environmental Control Systems The following systems and elements are the basic containment and environmental controls for the Phase 3 unit. Technical specifications and construction quality assurance requirements can be found in Attachments G and H, respectively. 2.5.1 Landfill Subgrade and Perimeter Berms The subgrade elevations will be achieved by excavation or placement of compacted structural fill (embankment). During excavation, a determination of unsuitable soils (i.e. soils which are too soft, wet, or organic) will be made. Where unsuitable soils are found, the soils will be undercut and backfilled with structural fill. The two (2) foot prepared subgrade will consist of in-situ or modified soils consisting of types SC, SM, ML, CL, MH, or CH. Structural fill will be used for berm and roadway construction. Structural fill will consist of on-site soils removed during excavation of the landfill units or imported borrow soils, except that no CH, OL, or OH soils will be allowed. 2.5.2 Final Cover System The final cover system for Phase 3 will consist of the following components (top- down): Regulatory Final Cover System (.0543(c)(2)) • an 18-inch thick vegetative soil layer; • an 18-inch thick soil liner with a hydraulic conductivity (k) of no more than 1.0 x 10-5 cm/sec (‘‘compacted soil barrier’’); and • a 12-inch thick intermediate cover layer. OR DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 5 Alternative Final Cover System Top Slopes (5 to 8%) • a 24-inch thick vegetative soil layer; • a drainage geocomposite (with drainage breaks); • a 40-mil textured LLDPE geomembrane; and • a 12-inch think intermediate cover layer Side Slopes (3H:1V) • a 24-inch thick vegetative soil layer The final cover system will be placed on prepared intermediate cover at a maximum slope of 3H:1V. Surface water control devices vents will also be incorporated into the final cover system. The final cover surface will be vegetated upon completion of the final cover installation according to the project seeding specifications. Analysis of the alternate final cover system is presented in Section 3.1. 2.5.3 Erosion and Sedimentation Control Erosion and sedimentation control devices/measures will be designed and maintained to manage the run-off generated by the 25-year 24-hour storm event and conform to the requirements of the North Carolina Sedimentation Pollution Control Law (15A, NCAC, 4). An Erosion and Sedimentation Control Plan designed to meet City of High Point stormwater design requirements1 for the entire site will be provided as a separate submittal from the PTC application. 2.5.4 Access and Roadways The facility is accessed from Riverdale Drive. A scale and a scale house are located near this entrance. Drawing S2 (Site Development Plan - Base Grades) shows this infrastructure. All-weather access to active areas as well as areas under intermediate cover will be provided. Access ramps into the landfill units will be provided where necessary. 1 City of High Point Engineering Services Department (2009 Update), City of High Point Stormwater Best Management Practices Design Manual, High Point, NC. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 6 2.6 Slope Stability, Settlement, and Bearing Capacity An evaluation of the slope stability of the overall waste mass of the Phase 3 unit is addressed in Appendix A. These analyses indicate that the proposed landfill configuration will be stable, even with the conservative approach of not reducing the peak ground acceleration for seismic runs, typical for landfill design. A summary of these results can be found below. Cross Section Analyzed Failure Type Method of Analysis Factor of Safety Static (FS ≥ 1.5) Seismic (FS ≥ 1.1) A-A Block Along Subgrade Simplified Janbu 2.95 2.28 Spencer’s 3.21 2.49 Circular Simplified Bishop 2.73 2.07 B-B Block Along Subgrade Simplified Janbu 2.94 2.22 Spencer’s 3.18 2.41 Circular Simplified Bishop 2.98 2.26 2.7 Special Engineering Features Special engineering features proposed for Phase 3 include riparian buffer variances and wetlands mitigation. 2.7.1 Buffer Variance Phase 3 will impact riparian buffers set forth by the Randleman Lake Buffer Rule. A submittal was made to the City to allow impact within these buffer areas and was approved in November 2015. The submittal was also issued to the North Carolina Environmental Management Commission (EMC) and is currently under review. 2.7.2 Wetlands Mitigation A Clean Water Act (CWA) permit application has been submitted to the Army Corps of Engineers to allow fill material to be placed within the stream channel and wetlands located in Phase 3. The TRC watershed plan application and major variance request and related documents are provided in Attachment F. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 7 2.7.3 Underdrain The development of Phase 3 includes impact to a non-functioning stream pending approval of the aforementioned CWA permit application. The underdrain system has been proposed to assist in drainage of any base seepage remaining from the impacted stream and to maintain vertical separation of groundwater from the waste. Refer to Appendix A for underdrain analysis. Table 2.1 Total Operating Capacity and Life Expectancy -- CDLF Units Landfill Unit Area (Acres) Gross Capacity (CY) Net (Waste) Capacity (CY) Life Expectancy (Years)1 C&D Landfill Units Phase 1 12.5 788,083 - Filled Phase 2A 4.3 240,140 - Filled Phase 2B-1 3.6 481,397 95,155 1.1 Phase 2B-2 1.5 213,136 176,844 2.0 Phase 3 6.5 744,681 723,708 8.0 Phase 4 5.6 728,676 710,607 7.9 Phase 5 8.5 757,216 729,789 8.1 Phase 6 3.6 820,639 809,023 9.0 Total: 46.1 4,773,968 3,245,126 36.1 Notes: 1. Life expectancy for the active Phase 2B-1 unit shown above is from 1/2/16. Life expectancies are based on a disposal rate of 45,000 tons/year and a placement rate of 0.5 tons per cubic yard (TCY). DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 8 Table 2.2 Soil Summary Material Quantity (CY) On-Site: Excavation 31,113 Structural Fill (92,159) Daily/Intermediate Cover (72,371) Vegetative Soil Layer1 (21,812) On-Site Total2: (155,229) Notes: 1. The quantities shown above assume a thickness of 24 inches. 2. On-site material refers to materials available and used within the landfill footprint (and related development areas) only. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 9 3.0 FINAL COVER SYSTEM DESIGN This section addresses the design of the final cover system for Phase 3. Technical specifications and construction quality assurance requirements for final cover system components can be found in Attachments G and H, respectively. A facility Closure and Post- Closure Plan, including cost analyses, is provided as Attachment J. Also refer to the Permit to Construct Drawings (Attachment O) for final cover system details. 3.1 Alternative Final Cover System Design An alternative final cover system as described in Section 2.5.2 is proposed to eliminate the soil barrier component 3.1.1 Final Cover Infiltration Analysis A final cover infiltration analysis was performed to demonstrate that the alternate cover system allows less infiltration than the regulatory final cover system (see Appendix A). An analysis of the alternate final cover drainage layer (drainage geocomposite) is provided in Appendix A. This analysis focused on determining the required transmissivity to maintain the peak head within the drainage geocomposite. An analysis is also provided in Appendix A which shows that the upper geotextile of the drainage geocomposite will perform acceptably as a filter when covered with typical site soils. The Hydrologic Evaluation of Landfill Performance (HELP) Model (Version 3.95) was used to evaluate the effectiveness of the alternative final cover at minimizing infiltration on both the flatter top slopes and the steeper side slopes. For both the top and side slopes, the infiltration analysis demonstrates that the addition of a drainage geocomposite over the geomembrane significantly reduces the head on the barrier and, thereby, significantly reduces the calculated infiltration as compared to the regulatory minimum cover (see Appendix A). Condition Alternate Final Cover System Regulatory Minimum Final Cover System Average Annual Infiltration (inches) Top Slopes (5%): 0.006 14.5 Side Slopes (3H:1V): 14.4 14.4 DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 10 3.1.1 Slope Stability An evaluation of the veneer stability of the landfill final cover is provided in Appendix A. The evaluation indicates that the final cover system will satisfy design criteria (FSstatic = 1.5; FSseismic = 1.1) if the minimum peak interface shear strength for the weakest interface is defined by the following values: Normal Loads </= 200 psf (Based on Veneer Stability): Cohesion = 0 psf Phi = 30.0 degrees 3.1.2 Drainage Layer Analysis The analysis of the alternative final cover drainage layer (drainage geocomposite is provided in Appendix A. This analysis focused on determining the required value of transmissivity to maintain peak heads within the drainage geocomposite. The analysis was performed based on a worst case condition of 3H:1V (18.4 degrees) slopes and a maximum 200 foot flow length (horizontal projection) to drainage breaks in the drainage geocomposite (coincides with the maximum side slope length between side slope swales). This condition represents the worst case in that adequate transmissivity is required along the steeper side slopes to maintain flow within the geocomposite and, thus, minimize seepage forces in the vegetative soil layer which could affect stability. Calculations were carried out assuming the maximum permeability of the vegetative soil layer is 1 x 10-4 cm/sec. The calculations, which include an overall reduction factor of 6 (accounts for a factor of safety of 2 plus a combined reduction factor of 3 for long-term intrusion, creep, and clogging concerns), indicate that a minimum transmissivity of 6.6 x 10-4 m3/m/sec is required for the drainage geocomposite; however, material specifications shall require a minimum transmissivity of 1 x 10-3 m3/m/sec. Transmissivity tests should be conducted based on anticipated field conditions (maximum normal load, boundary conditions, and gradient). The soils proposed for use as the vegetative soil layer should be confirmed prior to construction to ensure compatibility with all the design assumptions stated herein. 3.1.3 Filter Geotextile Analysis A filter geotextile analysis was performed to determine the apparent opening size (AOS) and permittivity required to ensure the proper performance of the upper geotextile component of the drainage geocomposite as a filter. The analysis (see Appendix A) assumes that the vegetative soil layer will be silts or clays (based on the typical grain size curves evaluated) and non-dispersive. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 11 Based on the filter geotextile analysis, recommended AOS and permittivity of the upper geotextile component of the drainage composite are as follows: AOS (upper geotextile) (ASTM D 4751): 60+ (U.S. Sieve) Permittivity (upper geotextile) (ASTM D 4491): 1.0 sec-1 AOS and permittivity were determined based on typical values for a 6 oz./SY nonwoven geotextile. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Facility and Engineering Plan May 2016 Page 12 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 OPERATIONS MANUAL WI High Point C&D Landfill Jamestown, North Carolina NC Solid Waste Permit No. 41-16 Prepared for: WI High Point, LLC (a Waste Industries Company) Jamestown, North Carolina May 2016 Revised: October 2016 Prepared by: © 2016 Smith Gardner, Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed on by the client and Smith Gardner, Inc. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 OPERATIONS MANUAL WI High Point C&D Landfill NC Solid Waste Permit No. 41-16 Jamestown, North Carolina Prepared For: WI High Point, LLC Jamestown, North Carolina S+G Project No. WI High Point 16-1 May 2016 Revised: October 2016 © 2016 Smith Gardner, Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed on by the client and Smith Gardner, Inc. Madeline German, P.G. Project Geologist Stacey A. Smith, P.E. Senior Engineer DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 10/14/2016 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Table of Contents Page i WI High Point C&D Landfill NC Solid Waste Permit No. 41-16 Operations Manual Table of Contents Page 1.0 GENERAL FACILITY OPERATION ............................................................................... 1 1.1 Overview ...................................................................................................................1 1.2 Contact Information .................................................................................................1 1.2.1 WI High Point, LLC ...................................................................................... 1 1.2.2 Waste Industries USA, Inc. .......................................................................... 2 1.2.3 North Carolina Department of Environmental Quality ............................... 2 1.3 Facility Operations ...................................................................................................3 1.3.1 Facility Operating Hours ............................................................................. 3 1.3.2 Operating Capacity ...................................................................................... 3 1.3.3 Service Area ................................................................................................ 3 1.4 Access Control .........................................................................................................3 1.4.1 Physical Restraints ..................................................................................... 3 1.4.2 Security ....................................................................................................... 4 1.5 Signage ....................................................................................................................4 1.5.1 Waste Limit Markers................................................................................... 4 1.6 Communications ......................................................................................................4 1.7 Fire Control ..............................................................................................................4 1.7.1 Open Burning .............................................................................................. 5 1.7.2 Fire Tetrahedron ......................................................................................... 5 1.7.3 Equipment ................................................................................................... 5 1.7.4 General Fire Management Strategies ........................................................ 5 1.7.5 Fires Within Disposal Areas ........................................................................ 6 1.7.6 Notification .................................................................................................. 6 1.7.7 Coordination With Local Fire Department .................................................. 6 1.8 Severe Weather Conditions .....................................................................................6 1.8.1 Ice Storms ................................................................................................... 7 1.8.2 Heavy Rains ................................................................................................. 7 1.8.3 Electrical Storms ........................................................................................ 7 1.8.4 Windy Conditions ......................................................................................... 7 1.8.5 Violent Storms............................................................................................. 7 1.9 Equipment Requirements ........................................................................................7 1.10 Personnel Requirements .........................................................................................8 1.11 Health and Safety .....................................................................................................8 1.11.1 Personal Hygiene ....................................................................................... 9 1.11.2 Personal Protective Equipment ................................................................. 9 1.11.3 Mechanical Equipment Hazard Prevention ..............................................10 1.11.4 Employee Health and Safety .....................................................................10 DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Table of Contents Page ii 1.11.5 Physical Exposure.....................................................................................10 1.11.6 Safety Data Sheets ....................................................................................10 1.12 Utilities ................................................................................................................... 10 1.13 Recordkeeping Program ........................................................................................ 11 2.0 WASTE HANDLING OPERATIONS ............................................................................ 12 2.1 Acceptable Waste ................................................................................................... 12 2.2 Prohibited Wastes .................................................................................................. 12 2.3 Waste Screening Programs ................................................................................... 13 2.3.1 Waste Receiving and Inspection ................................................................13 3.0 HAZARDOUS WASTE CONTINGENCY PLAN ............................................................. 15 3.1 Waste Disposal....................................................................................................... 15 3.1.1 Access ........................................................................................................15 3.1.2 General Procedures ...................................................................................15 3.1.3 Special Waste Management.......................................................................16 3.1.3.1 Asbestos Management ............................................................................................ 16 3.1.4 Periodic Cover ............................................................................................18 3.2 Height Monitoring .................................................................................................. 18 3.3 Recordkeeping ....................................................................................................... 18 4.0 RECOVERY AREA OPERATIONS ............................................................................... 19 4.1 Access .................................................................................................................... 19 4.2 Recovered Material Management .......................................................................... 19 4.3 General Procedures ............................................................................................... 19 4.4 Shingles Management ........................................................................................... 20 4.4.1 Asbestos Management...............................................................................21 4.4.2 Air Quality ...................................................................................................21 4.5 Recovered Material Storage .................................................................................. 21 4.6 Recovered Materials and End Uses ....................................................................... 21 4.7 Safety ..................................................................................................................... 22 4.8 Equipment .............................................................................................................. 23 4.9 Personnel ............................................................................................................... 23 4.10 Recordkeeping ....................................................................................................... 23 5.0 ENVIRONMENTAL MANAGEMENT ........................................................................... 24 5.1 Erosion and Sedimentation Control ....................................................................... 24 5.1.1 Stormwater Diversion in Constructed Cells ..............................................24 5.2 Groundwater Monitoring ........................................................................................ 25 5.3 Landfill Gas Control ............................................................................................... 25 5.4 Litter Control ......................................................................................................... 25 5.5 Vector Control ........................................................................................................ 25 5.6 Odor Control........................................................................................................... 25 5.7 Dust Control ........................................................................................................... 25 5.8 Interim Cover ......................................................................................................... 25 5.8.1 Interim Cover Monitoring ...........................................................................26 DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Table of Contents Page iii TABLES (within text) Table 1 Equipment Requirements Table 2 Personnel Requirements Table 3 Recovered Materials and End Uses FIGURES Figure 1 Site Location Map Figure 2 Facility Map Figure 3 Service Area Map Figure 4 Waste Placement Grid Figure 5 Reclamation Facility Site Map Figure 6 Facility Operations Flow Chart APPENDICES Appendix A Fire Occurrence Notification Form Appendix B Waste Screening Form Appendix C Paint Filter Liquids Test – EPA Method 9095 Appendix D Shingle Supplier Certification Form DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 This page intentionally left blank. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 1 1.0 GENERAL FACILITY OPERATION 1.1 Overview This Operations Manual was prepared for the WI High Point Landfill Facility, which operates as a construction and demolition debris (C&D) landfill (Permit No. 41-16) and is owned by WI High Point, LLC (a subsidiary of Waste Industries USA, Inc.). The WI High Point LF is located at 5830 Riverdale Road in Jamestown, North Carolina; as shown on the Site Vicinity Map, included as Figure 1. This document discusses C&D landfill unit operations and other solid waste management activities: • Scales and scale house facilities; • Construction and Demolition Debris (C&D) landfill; • Reclamation Activities. Figure 2 presents existing and proposed landfill units and other solid waste management activity locations. The information contained herein was prepared to provide facility with a clear understanding of how the Design Engineer assumed that the completed facility would be operated. While deviations from the operations outlined here may be acceptable, they should be reviewed and approved by the Design Engineer. Please refer to the appropriate permit application for a detailed discussion and calculations for the individual components of each landfill unit, including phasing plans. 1.2 Contact Information Correspondence and questions concerning the operation of the WI High Point LF facility should be directed to the appropriate Operator and State personnel listed below. WI High Point, LLC is a wholly owned subsidiary of Waste Industries USA, Inc. For fire or police emergencies, dial 911. 1.2.1 WI High Point, LLC Address: 5830 Riverdale Drive Jamestown, North Carolina 27282 Scale House Phone: (336) 886-3560 Fax: (336) 886-7496 General Manager: Seth Heath Email: seth.heath@wasteindustries.com Phone: (336) 870-4171 DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 2 1.2.2 Waste Industries USA, Inc. Address: 3301 Benson Drive, Suite 600 Raleigh, North Carolina 27609 Region Manager: Ben Habets Email: ben.habets@wasteindustries.com Phone: (919) 795-2023 Fax: (919) 325-4040 1.2.3 North Carolina Department of Environmental Quality North Carolina DEQ - Raleigh Central Office (RCO) Address: 217 West Jones Street 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Phone: (919) 707-8200 Fax: (919) 707-8200 North Carolina DEQ – Winston Salem Regional Office Address: 585 Waughtown Street Winston Salem, North Carolina 27107 Phone: (336) 707-8200 Fax: (336) 707-4630 Division of Waste Management (DWM) - Solid Waste Section: Field Operations Branch Head: Jason Watkins (WSRO) Email: jason.watkins@ncdenr.gov Western District Supervisor: Deborah Aja (FBO) Email: deborah.aja@ncdenr.gov Environmental Senior Specialist: John Patrone Email: john.patrone@ncdenr.gov Division of Energy, Mineral and Land Resources- Land Quality Section Address: 585 Waughtown Street Winston Salem, North Carolina Phone: (336) 771-5000 Fax: (336) 771-4630 Regional Engineer: Matthew Gantt, P.E. (WSRO) Email: matthew.gnatt@ncdenr.gov Environmental Engineer I: Shannon Leonard (WSRO) Email: shannon.leonard@ncdenr.gov DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 3 1.3 Facility Operations 1.3.1 Facility Operating Hours Normal hours of operation will be 7:00 A.M. to 4:00 P.M. Monday through Friday and occasionally on Saturdays as needed. The facility will be closed on holidays as designated by the Owner. The Owner may elect to modify these hours from time to time. 1.3.2 Operating Capacity The WI High Point LF is approved to accept approximately 315 tons per day, assuming 285 operational days per year, or 98,600 tons per year, per the franchise amendment granted by the High Point City Council on May 18, 2009.1 1.3.3 Service Area The WI High Point facility is permitted to receive solid waste generated within the following Counties of the State of North Carolina (Figure 3) consistent with the franchise amendment approved by the City of High Point: Guilford, Randolph, Davidson, Forsyth, Rockingham, Caswell, Alamance, Orange, Cabarrus, Rowan, Davie, Yadkin, Surry, and Stokes. 1.4 Access Control Limiting access to the WI High Point LF facility is important for the following reasons: • Unauthorized and illegal dumping of waste materials is prevented. • Trespassing, and injury resulting therefrom, is discouraged. • The risk of vandalism is greatly reduced. Access to active areas of the landfill will be controlled by a combination of fences and natural barriers, and strictly enforced operating hours through the landfill entrance off of Riverdale Road. A scalehouse attendant will be on duty at all times when the landfill facility is open for public use to enforce access restrictions. 1.4.1 Physical Restraints The site is accessed by an entrance road that intersects Riverdale Road on the eastern edge of the property. Scales and a scale house are provided along the entrance road where all refuse trucks entering the facility are weighed when entering and exiting the facility. 1 May 18, 2009- Ordinance Amending and Expanding A Solid Waste Franchise to WCA of High Point, LLC. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 4 1.4.2 Security The entrance, on Riverdale Road, has a gate that is securely locked during non- operating hours. Frequent gate and fence inspections will be performed by landfill personnel. Evidence of trespassing, vandalism, or illegal operation will be reported to the Owner. 1.5 Signage A prominent sign(s) containing the information required by the DWM is located immediately inside the main entrance to the facility. This sign(s) will provide information on operating hours, operating procedures, acceptable wastes and/or information as required under the facility permit. Additional signage will be provided as necessary within the waste disposal complex to distinguish the roadways to the active waste disposal areas, manage and direct traffic, regulate speed limits, identify groundwater monitoring wells, and define waste boundaries. Service and maintenance roads for use by operations personnel will be clearly marked and barriers (e.g., traffic cones, barrels, etc.) will be provided as required. Landfill personnel will routinely inspect the conditions of the posted signage to ensure that they are clearly visible and intact. Damaged or missing signage will be replaced. 1.5.1 Waste Limit Markers During construction of new phases, expansion of the facility, or following closure of areas, waste limit markers will be used to identify the permitted limits of waste. The waste markers will be constructed of non-degradable material and will clearly state “waste limit” or “edge of liner” in bold lettering. Offsets are acceptable such that all wording is clear to DWM and operational staff. The waste markers will be maintained and replaced when damaged. 1.6 Communications Two way radio communications is maintained between the landfill and reclamation operations, the landfill manager, and the scale house and office. The scale house and site office have telephones in case of emergency and for the conduct of day-to-day business. Emergency telephone numbers are displayed in these locations. Cellular phones are available for key operating staff (i.e. managers, operators). 1.7 Fire Control Although no open burning of waste is allowed at the facility, the possibility of fire within the processing and storage areas, the landfill, or a piece of equipment must be anticipated in the daily operation of the facility. Potential fire hazards include both surface conditions and subsurface conditions. Surface conditions include equipment operations and newly placed waste. Subsurface conditions include existing waste previously landfilled. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 5 1.7.1 Open Burning With the exception of the controlled burning of land clearing debris generated on-site or from emergency clean-up operations, no open burning is allowed at the facility. Controlled burning will occur only if permitted or approval by the DWM, the Division of Air Quality (DAQ), and the local fire department. 1.7.2 Fire Tetrahedron2 To better understand the properties of fire we can examine the fundamental methods to extinguish it. The fire “tetrahedron” illustrates the rule that to ignite and burn, each component represents a property of flaming fire; fuel, oxygen, heat, and chemical chain reaction. A fire is prevented or extinguished by removing any one of them. A fire naturally occurs when the elements are combined in the right mixture (e.g., more heat needed for igniting some fuels, unless there is concentrated oxygen). The fire tetrahedron is a more modern adaptation of the traditional fire “triangle” recognizing the chemical reactions that may occur as a component – “the uninhibited chain reaction”. This chain reaction is the feedback of heat to the fuel to produce the gaseous fuel used in the flame. In other words, the chain reaction provides the heat necessary to maintain the fire. These principles are integral in the prevention and management of potential fire situations. Please note this information is considered as a basis of understanding and may be superseded by the direction and skill of the local Fire Marshall. 1.7.3 Equipment A combination of factory installed fire suppression systems and/or portable fire extinguishers will be operational on heavy equipment at all times. Potential fire hazards are created from the build-up of fine, dry dust particles on and around operational motors and control panels. The presence of these build-ups can cause overheating and potential fire if periodic equipment cleaning and maintenance are not practiced. Portable fire extinguishers should be maintained in a state of readiness on each piece of moving equipment and equipment should be cleaned periodically. 1.7.4 General Fire Management Strategies Each fire situation is site specific; however, general strategies for active fire management include the following (in no particular order): 2 National Fire Protection Association (www.nfpa.org) DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 6 • Accelerated high temperature combustion (displacing fuel); • Covering of the landfill burn area with soil (reduce oxygen); • Covering of the burn area with foams (reduce oxygen); • Flooding the burn area with water (reduce heat); • Injecting an inert gas such as CO2 (reduce oxygen); • Excavating the burning material (displacing fuel) and then extinguishing it in small controlled areas; and • Applying extinguishing agents that will interfere with and inhibit the combustion process at the molecular level (break the chemical reaction). 1.7.5 Fires Within Disposal Areas Fires within the landfill disposal areas will be limited by the use of periodic cover as a fire break and control of "hot" loads entering the landfill. Trained personnel at the scale house will turn away trucks containing waste that is suspected to be hot. If a hot load is placed on the working face, then the load will be spread as thin as possible and cover soil will be immediately placed on the waste to extinguish the fire. In general, fires that break out close to the surface of the disposal area should be excavated and smothered with cover material. Deep fires should be smothered out by placing moist soil on the surface and by constructing soil barriers around the fire. Where the smothering technique fails, the burning material must be excavated and smothered or quenched with water once the burning material is brought to the surface. Water is usually not effective unless it can be directly applied to the burning material. 1.7.6 Notification The Operator will verbally notify the DWM (Section 1.2.3) within 24 hours of discovery of a fire within any landfill disposal area. In addition, written documentation describing the fire, the actions carried out to extinguish the fire, and a strategy for preventing future occurrences will be provided to the DWM within 15 days following any such occurrence on the Fire Occurrence Notification Form included in Appendix A. 1.7.7 Coordination With Local Fire Department A copy of this Operations Manual will be filed with the local fire department including all contact information for the facility. 1.8 Severe Weather Conditions Unusual weather conditions can directly affect the operation of the facility. Some of these weather conditions and recommended operational responses are as follows. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 7 1.8.1 Ice Storms An ice storm can make access to the facility dangerous, prevent movement or placement of cover soil, thus, may require closure of the landfill and reclamation area until the ice is removed or has melted. The determination to discontinue activities due to inclement weather conditions will be made by the Landfill Manager. 1.8.2 Heavy Rains Exposed soil surfaces can create a muddy situation in some portions of the facility during rainy periods. The control of drainage and use of crushed stone on unpaved roads should provide all-weather access for the site and promote drainage away from critical areas. In areas where the aggregate surface is washed away or otherwise damaged, new aggregate should be used for repair. Intense rains can affect newly constructed drainage structures such as swales, diversions, cover soils, and vegetation. After such a rain event, inspection by facility personnel will be initiated and corrective measures implemented to repair any damage found before the next rainfall. 1.8.3 Electrical Storms The open area of a landfill is susceptible to the hazards of an electrical storm. If necessary, facility activities will be temporarily suspended during such an event. Refuge will be sought as necessary in on-site buildings or in rubber-tired vehicles. 1.8.4 Windy Conditions Facility operations during a particularly windy period may require that the working face be temporarily shifted to a more sheltered area. When this is done, the previously exposed face will be immediately covered with cover materials. 1.8.5 Violent Storms In the event of hurricane, tornado, or severe winter storm warning issued by the National Weather Service, facility operations may be temporarily suspended until the warning is lifted. Equipment will be properly secured. A radio capable of tuning to NOAA Weather Radio-Providence shall be periodically monitored by landfill personnel. 1.9 Equipment Requirements The Operator will make available the equipment required to perform the necessary facility activities. Periodic equipment maintenance and minor and major repair work will be performed at designated maintenance zones. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 8 The anticipated equipment requirements for operation and maintenance of the site are listed in the following table. These may vary based on volume coming into the facility for recovery or disposal. Table 1: Equipment Requirements Description Primary Function (Allocation) 1) Compactors (1) Waste placement and compaction 2) Dozers (1) Stripping and grading of borrow areas, fine grading, slope work, and site cleanup 3) Water Truck (1) Dust control 4) Excavator (1) General site work, loading and placement of cover material, sediment control cleanup 5.) Articulated Dump Truck (1) Hauling soils and other materials 6) Other Equipment As needed. 1.10 Personnel Requirements At least one responsible individual trained and certified in facility operations will be present at all times during all operating hours of the facility. An attendant will be present to oversee the loading and unloading of waste. Annually, a supervisor, certified as a Manager of Landfill Operations (MOLO) by the Solid Waste Association of North America (SWANA) will train each facility employee. As part of this training, personnel learn to recognize loads which may contain prohibited wastes. The anticipated personnel requirements for operation and maintenance of the site are listed in the following table. The numbers of site personnel can be adjusted based on volume of waste received for disposal. Table 2: Personnel Requirements Description Primary Function (Allocation) 1) General Manager (1) Overall management of the facility 2) Operations Manager (1) Manage facility operations 3) Scalehouse Attendant (1) Receiving and weight for incoming loads 4) Operators (4) Management of workface, inspect cover, cover placement 5) Temp Labor (as needed) General labor and operational staff around the site 1.11 Health and Safety Facility operations were developed with the health and safety of the operating staff, customers, and neighbors in mind. Prior to commencement of operations of the facility, a member of the operating staff will be designated site safety officer. This individual, DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 9 together with the facility's management will modify the site safety and emergency response program to remain consistent with SWANA and Occupational Safety and Health Administration (OSHA) guidance. Safety equipment provided includes equipment rollover protective cabs, seat belts, audible reverse warning devices, hard hats, safety shoes, and first aid kits. Facility personnel will be encouraged to complete the American Red Cross Basic First Aid Course. Other safety requirements may also be implemented as designated by the Owner and Operator. Facility employees training in health and safety by supervisory staff will be documented. All on-the-job injuries are required to be reviewed by a doctor. The following are some general recommendations for the health and safety of workers: 1.11.1 Personal Hygiene The following items are recommended as a minimum of practice: • Wash hands before eating, drinking, or smoking. • Wear personal protective equipment as described in Section 1.11.2. • Wash, disinfect, and bandage ANY cut, no matter how small. Any break in the skin can become a source of infection. • Keep fingernails closely trimmed and clean (dirty nails can harbor pathogens). 1.11.2 Personal Protective Equipment Personal Protective Equipment (PPE) must be evaluated as to the level of protection necessary for particular operating conditions and then made available to facility employees. The list below includes the PPE typically used and/or required in a solid waste management facility workplace. • Safety shoes with steel toes. • Noise reduction protection should be used in areas where extended exposure to continuous high decibel levels is expected. • Disposable rubber latex or chemical resistant gloves for handling and/or sampling of waste materials. • Dust filter masks. • Hard hats (in designated areas) • Portable eyewash. • Safety goggles. • Safety vests. Following use, PPE’s should be disposed of or adequately cleaned, dried, or readied for reuse. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 10 1.11.3 Mechanical Equipment Hazard Prevention Equipment should be operated with care and caution. Safety equipment such as horns, backup alarms, and lights should be functional. A Lockout-Tagout program will be used to identify equipment in-need-of or under repair and insure that operation is “off-limits” prior to maintenance or repair. Operators will be trained in proper equipment operation. 1.11.4 Employee Health and Safety Some general safety rules are: • Consider safety first when planning and conducting activities. • Review the equipment O&M manual(s) prior to attempting repairs/changes. • Remember the buddy system for repair of mechanical equipment. • Post emergency contact phone numbers. • Provide easy and visible access to the Right to Know materials. • Provide easy and visible access to first aid kits and fire extinguishers. 1.11.5 Physical Exposure Facility personnel may come in contact with the fluids, solids, and airborne constituents found at the facility. Routine training should be conducted regarding the individual and collective materials used at the facility and their associated hazards. Training concerning safe work practices around these potential exposures should cover the use of equipment and proper disposal procedures. 1.11.6 Safety Data Sheets Safety Data Sheets (SDS) will be collected on every waste (if available and appropriate) that enters the facility. Information will also be made available for all chemicals stored on site for use at the facility. SDS sheets will be stored in a location with the other Right to Know information for the site. 1.12 Utilities Electrical power, water, telephone, and restrooms will be provided at the scale house and site office. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 11 1.13 Recordkeeping Program The Operator will maintain the following records in an operating record at the landfill: A. Current permit(s) (Permit to Construct, Permit to Operate, etc.); B. Current operations manual/plan and engineering plan; C. Inspection reports; D. Audit and compliance records; E. Annual landfill reports (including survey and other documentation related to airspace usage); F. Waste inspection records (Section 2.4.1); G. Daily tonnage records and disposal records maintained at the scale house - including source of generation; H. Waste determination records; I. Quantity, disposal location, generator, and special handling procedures for all special wastes disposed of at the site (if applicable); J. List of generators and haulers that have attempted to dispose of restricted wastes; K. Employee training procedures and records of training completed; L. Groundwater monitoring and surface water quality information (See the current Water Quality Monitoring Plan) including: 1. Monitoring well construction records; 2. Sampling dates and results; 3. Statistical analyses; and 4. Results of inspections, repairs, etc. M. LFG monitoring results and remedial measures as required (see the current LFG Monitoring Plan); N. Closure and post-closure information, where applicable, including: 1. Notification of intent to close; 2. Testing; 3. Certification; and 4. Recording. O. Cost estimates or financial assurance documentation; P. A notation of the date and time of final cover placement; Q. OSHA 300 logs; R. Asbestos disposal records; S. Concrete Grinding Logs T. Laboratory Testing identifying soil or mulch properties such as density and gradation (if performed) The operating record will be kept up to date by the Operator or his designee. It will be presented on request to the DWM for inspection. A copy of this Operations Manual will be kept at the facility and will be available for use at all times. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 12 2.0 WASTE HANDLING OPERATIONS This section describes the required waste handling operations for the WI High Point LF. 2.1 Acceptable Waste The WI High Point LF will only accept waste that is generated from the approved service areas (Figure 3) and is consistent with the North Carolina solid waste regulations and general conditions established in the operating permit. The acceptance of waste materials must satisfy the following definitions: • Construction and Demolition Debris Waste: as defined in G.S. 130A-290 (a)(4) means solid waste resulting solely from construction, remodeling, repair or demolition operations on pavement, buildings, or other structures, but does not include inert debris, land-clearing debris or yard waste. • Inert Debris Waste: as defined in G.S. 130A-290 (a)(14) means solid waste which consists solely of material that is virtually inert and that is likely to retain its physical and chemical structure under expected conditions of disposal, materials such as unpainted rock, brick, concrete, concrete block, uncontaminated soil, rock, and gravel. • Land Clearing and Inert Debris Waste: as defined in G.S. 130A-290 (a)(15) means solid waste that is generated solely from land-clearing activities, such as yard trash, stumps, and tree trunks. • Asphalt: in accordance with G.S. 130-294 (m). • Asbestos: as defined by 40 CFR 61. • Other Waste: other solid waste as approved by the Solid Waste Section of the Division of Waste Management. In addition, the special wastes described in Section 2.4.3 may also be accepted at this facility. 2.2 Prohibited Wastes In accordance with 15A NCAC 13B .0542(e), municipal solid waste (MSW), liquid or industrial waste and yard trash will not be accepted at the facility. Shingles identified as asbestos containing materials (ACMs) as defined by 40 CFR 61 will not be processed at the reclamation pad. Shingles will be managed in accordance with the procedures described in Section 3.4. Hazardous waste as defined by 15A NCAC 13A including hazardous waste from conditionally exempt small quantity generators will not be accepted at the facility. Wastes as described within NC General Statute §130A-309.10(f) shall not be accepted, except wooden pallets which may be disposed in construction and demolition debris per §130A-309.10(f)(12). Barrels and drums shall not be accepted unless they are empty and perforated with no materials or wastes contained within. No polychlorinated biphenyl (PCB) waste will be accepted. WI High Point Landfill, LLC will DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 13 implement a waste screening program described in Section 2.3, to prohibit these types of waste. WI High Point Landfill, LLC will not knowingly dispose of C&D waste from areas by which local government ordinances prohibit the disposal of C&D waste. Asbestos waste may be accepted by the facility if handled according to Section 2.4.3.1. 2.3 Waste Screening Programs To assure prohibited wastes are not entering the landfill facility, screening programs have been implemented. Waste received at the scale house entrance and directed to the working face or reclamation area is inspected by trained personnel. These individuals have been trained to spot indications of unacceptable and suspicious wastes, including: hazardous placarding or markings, liquids, powders or dusts, sludges, bright or unusual colors, drums or commercial size containers, and "chemical" odors. Screening programs for visual and olfactory characteristics of prohibited wastes are an ongoing part of the facility operation. 2.3.1 Waste Receiving and Inspection Vehicles must stop at the scale house located near the entrance of the facility and visitors are required to sign-in. Waste transportation vehicles are weighed and the content of the load assessed. The scale attendant(s) requests a waste description from the vehicle driver to ensure that unacceptable waste is not allowed into the landfill. The attendant(s) then visually checks the vehicle as it crosses the scale. Signs informing users of the acceptable and unacceptable waste types are posted at the scale house or in the vicinity of the entrance to the site. Once passing the scales, the vehicles containing recyclable materials are routed to the recovery area and vehicles containing C&D wastes are routed to the landfill. Vehicles are randomly selected for screening on a regular basis, depending on personnel availability. At least one vehicle per week, but not less than 1% by weight of the waste stream entering the facility (based on the previous week’s total), will be randomly selected by inspection personnel. A random truck number and time will be selected (e.g., the tenth load after 10:00 a.m.) on the day of inspections. However, if something looks suspicious is spotted in any waste load, that load is inspected further. Selected vehicles are directed to an area of intermediate cover adjacent to the working face where the vehicle will be unloaded. Waste is carefully spread using suitable equipment. An attendant trained to identify wastes that are unacceptable at the landfill inspects the waste discharged at the screening site. If unacceptable waste is found, the load will be isolated and secured by flagging, barrels, cones or flags around the area. All random waste inspections will be DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 14 documented by landfill staff using the waste screening form provided in Appendix B. Unacceptable wastes that are nonhazardous will be removed from the C&D area and removed from the facility. For unacceptable wastes that are hazardous, the Hazardous Waste Contingency Plan outlined in Section 2.3.2 will be followed. Written notification will be provided to DWM within 15 days following the incident. To determine the liquid content of the waste, a liquid determination will be performed by the paint filter test (see Appendix C for apparatus and procedures). The hauler is responsible for removing unacceptable waste from the landfill property. If no unacceptable waste is found, the load will be pushed to the working face and incorporated into the daily waste cell. The removal of solid waste from any landfill unit is prohibited except upon notification of the DWM (see Section 1.2.3). Regardless, the general public is prohibited from any waste removal activities from any landfill unit. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 15 3.0 HAZARDOUS WASTE CONTINGENCY PLAN In the event that identifiable hazardous waste or waste of questionable character is detected at the recovery center or landfill, appropriate equipment, protective equipment, personnel, and materials as necessary will be employed to isolate the wastes. DWM will be notified immediately (see Section 1.2.3) that an attempt was made to dispose of hazardous waste at the facility. If the vehicle attempting disposal of such waste is known, all attempts will be made to prevent that vehicle from leaving the site or, if the vehicle has left the site, immediate notice will be served on the owner of the vehicle that hazardous waste, for which they have responsibility, has been disposed of at the facility. The facility staff will assist the DWM as necessary and appropriate in the removal and disposition of the hazardous waste and in the prosecution of responsible parties. If needed, the hazardous waste will be covered with either on-site soils or other tarping material until such time when an appropriate method can be implemented to properly handle the waste. The cost of the removal and disposing of the hazardous waste will be charged to the owner of the vehicle involved. Any vehicle owner or operator who knowingly dumps hazardous waste in the landfill may be barred using the landfill. Should an incident where hazardous waste is found at the landfill occur, the event will be documented by landfill staff using the waste screening form provided in Appendix B. Records of information gathered as part of the waste screening programs will be maintained at the landfill site during its active life and as long as required by WI High Point, LLC and DWM. 3.1 Waste Disposal 3.1.1 Access Access road location during waste placement will be determined by operations personnel to reflect waste placement strategy. 3.1.2 General Procedures Waste transportation vehicles will arrive at the working face at random intervals. There may be a number of vehicles unloading waste at the same time, while other vehicles are waiting. To maintain control over the unloading of waste, a certain number of vehicles will be allowed on the working face at a time. The actual number will be determined by the truck spotter or equipment operator. This procedure will be used to minimize the potential of unloading unacceptable waste and to control disposal activity. Operations at the working face will be DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 16 conducted in a manner which will encourage the efficient movement of transportation vehicles to and from the working face, and to expedite waste unloading. The approach to the working face will be maintained such that two or more vehicles may safely unload side by side. A vehicle turn-around area large enough to enable vehicles to arrive and turn around safely with reasonable speed will be provided adjacent to the unloading area. The vehicles will back to a vacant area near the working face to unload. Following completion of the unloading operation, the transportation vehicles will immediately leave the working face area. Personnel will direct traffic necessary to expedite safe movement of vehicles. Waste unloading at the landfill will be controlled to prevent disposal in locations other than those specified by site management. Such control will also be used to confine the working face to a minimum width, yet allow safe and efficient operations. The width and length of the working face will be maintained as small as practical to maintain the appearance of the site, control windblown waste, and minimize the amount of cover required each day. Normally, only one working face will be active on any given day, with deposited waste in other areas covered by either periodic or final cover, as appropriate. Solid waste placement and compaction procedures include: vehicle unloading, waste spreading into adequately sized lifts, and compaction on relatively flat slopes (i.e. 5H:1V max.), in two-foot intervals, using a minimum number of three full passes. The use of portable signs with directional arrows and portable traffic barricades will facilitate waste unloading to the designated disposal locations. These signs and barricades will be placed along the access route to the landfill working face or other designated disposal areas which may be established. 3.1.3 Special Waste Management 3.1.3.1 Asbestos Management WI High Point, LLC may dispose of regulated asbestos containing materials (RACM) within the C&D landfill. RACM means: (a) Friable asbestos material; (b) Category I nonfriable asbestos-containing material (ACM) that has become friable; (c) Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; or DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 17 (d) Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation operations regulated by this subpart. Asbestos containing materials are further defined as: • Category I nonfriable asbestos-containing material (ACM) means asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy. • Category II ACM means any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos as determined using the methods specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. • Nonfriable Asbestos-containing material means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure. This material is non-regulated. Asbestos will only be accepted if it has been processed and packaged in accordance with State and Federal (40 CFR 61) regulations. Disposal of asbestos waste must be in accordance with 15A NCAC 13B .0542(c). Asbestos will arrive at the site in vehicles that contain only the asbestos waste and only after advance notification by the generator. Once the hauler brings the ACM to the landfill, the hauler will be directed to the designated asbestos disposal area by operations personnel. The designated disposal area will be prepared by operations personnel by leveling a small area using a dozer or loader. Prior to disposal, the landfill operators will stockpile cover soil near the designated asbestos disposal area. The volume of soil stockpiled will be sufficient to cover the waste and to provide any berms, etc. to maintain temporary separation from other landfill traffic. Once placed in the prepared area, the asbestos waste will be covered with a minimum of 18 inches of daily cover soil placed in a single lift. The surface of the cover soil will be compacted and graded using a tracked dozer or loader. The landfill compactor will be prohibited from operating over asbestos disposal areas until at least 18 inches of cover are in-place. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 18 The landfill staff will use the Waste Placement Grid (Figure 4) to record the approximate location and elevation of the asbestos waste once cover is in-place. The Landfill Manager or other supervisory staff will review pertinent disposal and location information to assure compliance with regulatory requirements and enter the information into the Operating Record. Once disposal and recording for asbestos waste is completed, the disposal area may be covered with waste. No excavation into designated asbestos disposal areas will be permitted. 3.1.4 Periodic Cover When the waste disposal area exceeds one-half acre or at the completion of waste placement each week or sooner, a 6 inch layer of earthen material will be placed over the exposed waste. This periodic cover is intended to control vectors, fire, odors, and blowing debris. 3.2 Height Monitoring The landfill staff will monitor landfill top and side slope elevations. When such elevations approach the grades shown in the facility Permit Drawings- S3 (Phase 3 - Final Grading Plan), the final top of waste grades will be staked to limit over placement of waste. 3.3 Recordkeeping The facility will maintain an accurate record of the amount of solid waste received at the landfill. On or before August 1 annually, the operator will submit a facility report to the DWM and to each county from which waste was received. Minimally, the facility report will document the waste in tons received on a monthly basis, the waste origin, the waste type received, the tons diverted, and the tons disposed. A measurement of the volume utilized in the landfill cells must be performed during the first and second quarter of each calendar year. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 19 4.0 RECOVERY AREA OPERATIONS The facility’s material recovery operation is intended to segregate co-mingled recyclable and/or reusable materials from the site’s waste stream and temporarily store these materials within the permitted facility. The material recovery operation will occur within the reclamation area and recovered materials will be relocated within this area due to space constraints from time to time. Material recovery operations will only occur within the permitted waste limits (Figure 5). Temporary material storage (prior to the end use) may be necessary in adjacent areas where waste processing has not yet begun, but still within the permitted limits of active area. 4.1 Access Traffic will be clearly directed to the appropriate processing or recovery area. The traffic speed on the site should be less than 10 MPH. Rutting of gravel roadway surfaces must be repaired by the placement of additional gravel on the roadway and not solely by grading the rut. This will maintain the separator geotextile placed below most gravel roadway surfaces. 4.2 Recovered Material Management Only waste loads which are predominantly recyclable materials will be diverted to the sorting area. It is anticipated that up to 20% of the C&D waste stream (by weight) delivered to the site will be segregated, recovered, recycled and/or reused. Recovered materials that are removed from the waste stream for re-use on-site (i.e., processed wood waste/mulch, crushed concrete, etc.) will be re-weighed on the site’s scales prior to being used on-site. Materials that are not recoverable, but which were received within the sorting area, will be reloaded and hauled to the landfill for proper disposal. 4.3 General Procedures The processing and recovery operations will be conducted in accordance with the approved Operation Plan and conditions of the Solid Waste Permit issued by the DWM. Refer to Figure 6 for a flowchart outlining overall facility operations. Facility operations are anticipated as follows: 1. Collection vehicles delivering waste to the facility will enter through the main entrance on Riverdale Drive; 2. Vehicle will pass over the scales, be weighed, and inspected; 3. Vehicles will be directed to the tipping area or storage area; 4. Source separated wood pallets and cardboard from non-C&D waste sources must not be unloaded onto the tipping floor. Wood pallets must be unloaded DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 20 onto the sorted clean wood pile or into a container. Cardboard must be unloaded into a storage container. 5. By-pass materials directed to the storage area will include untreated wood, brick/block, shingles, metal, and other miscellaneous materials. With the exception of shingles, by-pass materials will not be subjected to secondary screening at the tipping floor or the pick line. Shingles will not be processed until asbestos-free testing verification results are received. 6. Clean wood materials will be sold off-site or stockpiled for on-site wood grinding. Ground wood will be stockpiled on-site for offsite sales. 7. The attendant will direct vehicles to a designated area of the tipping floor. 8. Once the vehicle is in position, the waste load will be discharged directly onto the tipping floor. A spotter will inspect the discharged waste. If no unacceptable materials are identified in the load, the materials will be processed as recyclable materials. 9. Heavy equipment will load the materials onto the screener where metals, fine materials, and unacceptable content can be removed. Unacceptable materials and fines recovered by the screening equipment will be transported to the onsite landfill. Recovered metals will be sold off-site. 10. Recoverable materials will be conveyed to the pick line. Hand separation of materials will occur, as needed. Sorted recoverable materials will be transferred to the storage areas or directly into trailers for off-site sales. 11. Discarded materials will be segregated and stockpiled for re-loading and hauling to the on-site landfill. 4.4 Shingles Management WI High Point Landfill, LLC accepts source separated shingles at the recycling facility. No grinding or physical manipulation of shingles other than sorting and reclaiming metals from these materials occurs at the facility. Each transportation vehicle delivering shingles for recycling is weighed and inspected at the scale house. A secondary screening occurs at the processing area. Vehicles containing source-separated shingles are directed to the shingles storage area. Testing for ACM is provided by S.T. Wooten. WI High Point Landfill, LLC does not process any loads containing shingles until the ACM content is known and verification from S.T. Wooten is received confirming that the shingles do not contain asbestos. Shingles that cannot be processed due to possible ACM content are reloaded and transported to the landfill for disposal. Tested and asbestos-free shingles delivered to the storage area are reloaded and transported to the screener and conveyor. Metals and fines are removed from the shingles as the material is conveyed to the pick line. A water line is available to control dust and keep the shingles moist, as needed. The shingles are sorted and placed into containers or stockpiled for off-site sales. The recovered metal materials are placed into containers for off-site sales. The fines are reloaded into containers and transported to the on-site landfill for disposal. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 21 A shingle supplier certification form is included as Appendix D. 4.4.1 Asbestos Management WI High Point Landfill, LLC does not process any known or recognized shingles containing asbestos materials. For unacceptable waste that is discovered, the Hazardous Waste Contingency Plan outlined in Section 2.3.2 will be followed. At least one individual trained in the provisions of the National Emission Standards for Hazardous Air Pollutants (NESHAP) as an Asbestos Abatement Contractor/Supervisor will be present during facility operating hours. This individual will receive annual refresher training with respect to Asbestos Hazardous Emergency Response Act (AHERA). In addition, site employees will receive annual training on asbestos awareness and the identification of ACMs. 4.4.2 Air Quality Air quality and dust control for the materials processing operation are controlled by a water line located near the conveyor system. This water line will be utilized as needed to adequately dampen the material to control air borne particles. A water truck will be used to control the generated dust and overall site appearance. 4.5 Recovered Material Storage Except for wood, concrete, and inert material, recovered materials must be placed in containers by the end of each operating day unless covered by a tarp to prevent leaching by rainfall. Recovered materials placed in containers must be removed from the site once the container is full. Non-recoverable materials must be placed in storage containers or in trucks at the end of each operating day. Windblown materials must be collected at the end of the day and no material may be allowed to leave the facility boundary. Storage containers containing non-recoverable materials must be disposed in the on-site landfill at the end of the operating day. 4.6 Recovered Materials and End Uses The recovered materials will generally be removed by hand. Heavy equipment and screeners will assist with materials separation, as needed. Materials will be placed into containers or stockpiles, processed, transported for disposal, and either re-used on-site or sold. Recovered materials will not be stored speculatively. The anticipated wastes to be recovered and their anticipated end uses include the following: DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 22 Table 3: Recovered Materials and End Uses RECOVERED WASTE GENERAL OPERATION ANTICIPATED END USES Corrugated Cardboard Source separated delivery or segregated by hand; and placed into closed (covered) roll-off box (not baled). Sold off-site. Clean Wood Waste (no painted, stained, or otherwise contaminated wood) Source separated or segregated with heavy equipment; metal separated (magnets); and placed into roll-off box or stockpiled; wood will be chipped and/or ground on-site or shipped off-site for grinding. Sold off-site, or used for on- site mulching, erosion control. Removed metal will be sold off- site. Scrap Metals Source separated or segregated by hand and/or heavy equipment and placed into roll-off box. Removed metal sold off-site. Gypsum Wallboard Segregated by hand and/or heavy equipment and placed into roll-off box. Sold off-site. Clean Concrete Source separated or segregated with heavy equipment; rebar separated (magnets); directly delivered to landfill or stockpiled on-site. Used for on-site road aggregate, delivered to landfill, or sold off-site. Removed metal sold off-site. Shingles Materials received as segregated loads or separated with heavy equipment; metal separated (magnets); and placed into roll-off box or stockpiled Shingles sold off-site. Removed metal sold off-site. 4.7 Safety Equipment operating in the recycling area will be equipped with back-up alarms. Appropriate Personal Protective Equipment will be worn by workers in the recycling area, including two-way radios between the workers and equipment operators. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 23 Asbestos Containing Waste (ACW) or suspected ACW will not be hauled to, or dumped into, the sorting area. ACW will be buried in accordance with applicable North Carolina and NESHAP requirements. 4.8 Equipment Anticipated equipment to be used in and around the recycling area will include: • one small rubber-tired loader, skid-steer, or bobcat • one small excavator. Other equipment may be added as needed. Containers will generally consist of steel roll-off boxes, both covered and open, depending on the contents, and will be stored in proximity to the reclamation area. Cardboard and wallboard containers will be covered. Containers will generally be removed from the site as they are filled. 4.9 Personnel Based on permitted site tonnage, up to 3 site personnel, including equipment operators, are anticipated for operations within the reclamation area of the site. 4.10 Recordkeeping The facility will maintain accurate records of daily waste and recovered material activities. Daily records will document the weight of waste received and recovered and the origins of the loads. Additionally, the operator will maintain monthly records of the amount of recovered materials sold or used on-site and the amount of waste transported for disposal. Documentation of end-users/processors/recyclers of the recovered materials will be maintained on-site. On or before August 1 annually, the operator will submit a facility report to the DWM and to each county from which waste was received. Minimally, the facility report will document the tons of waste received on a monthly basis, the origin of the waste, the type of waste received, the tons diverted, and the tons DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 24 5.0 ENVIRONMENTAL MANAGEMENT This section reviews the overall environmental management tasks required for the successful operation of WI High Point LLC. 5.1 Erosion and Sedimentation Control A separate erosion and sedimentation control plan is provided in the Erosion and Sedimentation Control Plan (Attachment E) of the Permit Application. This plan describes the engineered features and practices for preventing erosion and controlling sedimentation at this site. The erosion and sediment control system consists of the following major components: 1. Drainage Channels, 2. Diversion Berms (Side Slope Swales and Cap Diversion Berm), 3. Down Pipes, and 4. Sediment Basins/Traps. The landfill side slopes are designed with 3H:1V slopes and diversion berms placed along the slope. The berms are designed to keep water volumes and velocities low enough to minimize erosion of the landfill cover. Maintenance of the cover system will involve periodic mowing and repair of any erosion problems and bare spots. These items will be inspected at least once a month and after any significant rainfall events. The down pipes are designed to carry concentrated flows of surface water off of the landfill. The down pipes will be inspected at least once a month and after any significant rainfall event. Additional erosion control measures have been implemented within the drainage channels and at points of stormwater discharge. Final cover should be inspected regularly for erosion damage and promptly repaired. Stormwater run-off from the C&D landfill is conveyed to sediment basins and traps. These structures should be inspected regularly for sediment build-up or erosion damage and should be cleaned out, at a minimum, when sediments fill the lower half of each structure. 5.1.1 Stormwater Diversion in Constructed Cells In accordance with 15A NCAC 13B .0542(l) surface water shall be diverted from the operational area or not be impounded over or in waste and waste shall not be placed in standing water. Collected stormwater within the cell shall be removed by pumping low areas. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 25 Particular care is required to ensure that surface water coming from the active face, e.g. having potential contact with the waste is allowed to percolate into the underlying waste. Only run-off from waste surfaces that have received adequate cover is not considered leachate and should be directed to the stormwater drainage system, where practical. 5.2 Groundwater Monitoring A separate water quality management plan has been prepared for the site under a separate cover (Attachment L). Groundwater monitoring and regulatory reporting will be completed in accordance with this plan. 5.3 Landfill Gas Control A landfill gas control and monitoring plan has been prepared for the site and is presented in Landfill Gas Management Plan (Attachment M). Landfill gas monitoring and regulatory reporting will be completed in accordance with this plan. 5.4 Litter Control The vegetative trees/brushes act as a barrier to keep litter contained within the site and a litter control crew will pick up litter around the site and on access roads routinely as required. 5.5 Vector Control Due to the nature of the waste disposed in this landfill, vector control is not expected to be of concern. 5.6 Odor Control Due to the nature of the waste disposed in this landfill, odor is not expected to be of concern. 5.7 Dust Control Dust related to waste hauler traffic on the access roads will be minimized by using a water truck to limit dust on the gravel portion of the road. Dust generated by excavation of cover soil will be limited by watering the cut soil areas if accessible to the water truck. 5.8 Interim Cover In addition to the occasional placement of the 6 inches of earthen material over the exposed waste, an additional 12 inches of earthen cover should be placed on waste surfaces that have not received waste in 30 days but are below final elevation. This intermediate cover should be graded and seeded such that precipitation run-off is channeled to the stormwater collection system. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 WI High Point C&D Landfill Operations Manual May 2016 Page 26 5.8.1 Interim Cover Monitoring Routine inspections of the entire site will include monitoring the interim cover to ensure the adequacy of the vegetative protective cover and to identify potential erosion concerns. Corrective actions will be implemented to address identified areas of concern. DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 SITE LOCATION MAP NOT TO SCALE STANDARD DETAIL CALLOUT SECTION REFERENCED SHEET WHERE SECTION IS PRESENTED SHEET SET REVISION NUMBER STANDARD DETAIL LABEL AND CALLOUT DETAIL REFERENCED STANDARD SECTION LOCATION CALLOUT (SHEET AND DETAIL) STANDARD REVISION CALLOUT (SHEET AND DETAIL) SHEET WHERE DETAIL IS PRESENTED SHEET WHERE DETAIL IS PRESENTED DETAIL REFERENCED SITE LOCATION WI HIGH POINT LANDFILL, LLC HIGH POINT, NORTH CAROLINA HIGH POINT C&D LANDFILL PHASE 3 PERMIT TO CONSTRUCT DRAWINGS MAY 2016 A WASTE INDUSTRIES COMPANY SEAL SEAL Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 3 9 . d w g - 10 / 1 2 / 2 0 1 6 4 : 1 7 P M SMITH 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 GARDNER+ REV.DATE DESCRIPTION © 2016 Smith Gardner, Inc. 1 10/16 RESPONSE TO NCDEQ COMMENTS DATED 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE SHEET NO.DRAWING NO.DRAWING TITLE REVISION 1 -TITLE - COVER SHEET 2 S1 EXISTING CONDITIONS 3 S2 PHASE 3 SUBGRADE GRADING AND DRAINAGE PLAN 4 S3 PHASE 3 FINAL COVER GRADING AND DRAINAGE PLAN 5 EC1 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 1 OF 3) 6 EC2 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 2 OF 3) 7 EC3 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 3 OF 3) 8 FC1 FINAL COVER DETAILS 9 X1 ENGINEERING CROSS SECTIONS (SHEET 1 OF 2) 10 X2 ENGINEERING CROSS SECTIONS (SHEET 2 OF 2) 11 P1 PHASING PLAN DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 3 8 . d w g - 10 / 1 4 / 2 0 1 6 9 : 4 4 A M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS EXISTING CONDITIONS C.T.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1138 2 S1 1 10/16 RESPONSE TO NCDEQ COMMENTS DATED 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 0 . d w g - 10 / 1 2 / 2 0 1 6 4 : 1 6 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS PHASE 3 SUBGRADE GRADING AND DRAINAGE PLAN C.T.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1140 3 S2 1 10/16 RESPONSE TO NCDEQ COMMENTS DATE 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 0 . d w g - 10 / 1 2 / 2 0 1 6 4 : 1 6 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS PHASE 3 FINAL COVER GRADING AND DRAINAGE PLAN C.T.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1140 4 S3 1 10/16 RESPONSE TO NCDEQ COMMENTS DATED 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 1 . d w g - 5/ 2 7 / 2 0 1 6 3 : 4 2 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 1 OF 3) C.T.S. T.R.S. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1141 5 EC1 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 1 . d w g - 5/ 2 7 / 2 0 1 6 3 : 4 2 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 2 OF 3) C.T.S. T.R.S. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1141 6 EC2 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 1 . d w g - 5/ 2 7 / 2 0 1 6 3 : 4 2 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 3 OF 3) C.T.S. T.R.S. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1141 7 EC3 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 1 . d w g - 5/ 2 7 / 2 0 1 6 3 : 4 2 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS FINAL COVER DETAILS C.T.S. T.R.S. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1141 8 FC1 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 SECTIONAA PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 0 . d w g - 10 / 1 2 / 2 0 1 6 4 : 1 6 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS ENGINEERING CROSS SECTIONS (SHEET 1 OF 2) C.T.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1140 9 X1 1 10/16 RESPONSE TO NCDEQ COMMENTS DATED 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 SECTIONBB PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 4 0 . d w g - 10 / 1 2 / 2 0 1 6 4 : 1 6 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS ENGINEERING CROSS SECTIONS (SHEET 2 OF 2) C.T.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1140 10 X2 1 10/16 RESPONSE TO NCDEQ COMMENTS DATE 10/5/16 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016 PROJECT TITLE: DRAWING TITLE: REV.DATE DESCRIPTION DESIGNED: DRAWN: APPROVED: PROJECT NO: SCALE: FILENAME: PREPARED BY: PREPARED FOR: SHEET NUMBER:DRAWING NUMBER: DATE: G: \ C A D \ W C A H i g h P o i n t \ W I H I G H P O I N T 1 6 - 1 \ s h e e t s \ W I - D 1 1 7 0 . d w g - 5/ 2 7 / 2 0 1 6 3 : 5 6 P M SEAL SEAL SMITHGARDNER ENGINEERS + 14 N. Boylan Avenue, Raleigh NC 27603 NC LIC. NO. C-0828 (ENGINEERING) 919.828.0577 Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. © 2016 Smith Gardner, Inc. WI HIGH POINT LANDFILL, LLC (A WASTE INDUSTRIES COMPANY) HIGH POINT C&D LANDILL PHASE 3 PERMIT TO CONSTRUCT PERMIT DRAWINGS PHASING PLAN S.A.S. C.T.J. WIHIGHPOINT 16-1 AS SHOWN MAY 2016 WI-D1170 11 P1 PHASE 3 PHASE 4 PHASE 6PHASE 5 NOT FOR CONSTRUCTION PERMIT ISSUE DocuSign Envelope ID: 3FCB3572-B017-4254-82D2-BC5574429A81 10/14/2016