Loading...
HomeMy WebLinkAbout71A_RunningDeerLCID_PermitCoverLetter_DIN26830_2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director October 11, 2016 Mr. Clyde Wisecarver 6524 Murrayville Road Wilmington NC 28411 Re: Running Deer LCID Landfill – Pender County Permit to Construct/Permit to Operate Permit 71A-LCID Dear Mr. Wisecarver: Please find enclosed the signed Permit to Construct/Permit to Operate (DIN 26800) for the Running Deer LCID landfill in Pender County, NC. This permit issuance approves the construction of Section E and the continued operation of the facility under the terms and conditions of the permit. In general, the facility permit does not reiterate permit conditions included in the Solid Waste Management Rules, 15A NCAC 13B, nor does it restate specific conditions that are included within the approved plans, such as site specific operations. Please review the conditions of the permit carefully. A copy of the current permit, updated Operations Plan, and other required documentation must be kept on site at all times. Please note the permit must be recorded with the Pender County Register of Deeds within 30 days. In addition, prior to receiving any materials for the new Section E, you must follow the conditions specifically spelled out in Attachment 2 of the Permit. If you have any questions regarding the permit or its conditions, please feel free to contact me at (919) 707-8258 or at perry.sugg@ncdenr.gov. The SWS Specialist for the facility is Mr. Wes Hare. He can be reached at (919) 280-5135. Please send a copy of the recorded permit to my attention at the address at the bottom. With Best Regards, Perry Sugg, PG Permitting Hydrogeologist Solid Waste Section Cc: Ed Mussler, PE - SWS Permitting Branch Supervisor Wes Hare - SWS Environmental Specialist Shane Lippard, PE – Right Angle Engineering  DIN 26830