HomeMy WebLinkAbout3612_Duke_Allen_DrainageChannel_DIN26764_20160927526 South Church Street:
Mail Code EC13K
Charlotte, North Carolina 28202
704-382-4761
September 23, 2016
North Carolina Department of Environmental Quality
Division of Waste Management
Solid Waste Section
2090 U.S. Highway 70
Swannanoa, North Carolina 28778
Attn: Mr. Larry Frost
Re: Retired Ash Basin (RAB) Ash Landfill
South Drainage Channel Improvements – Plans and Specifications
Permit No.: 3612-INDUS
Allen Steam Station
Gaston County
Belmont, North Carolina 28012
Dear Mr. Frost,
As previously discussed, Duke Energy plans to make improvements to the drainage channel that runs
along the southern edge of the Retired Ash Basin (RAB) Ash Landfill at Allen Steam Station (Permit No.
3612-INDUS). Engineering consultant S&ME, Inc. has prepared plans and specifications for these
improvements, which are attached for your review. Duke would appreciate concurrence from the
Division concerning these plans prior to commencing construction activities.
If there are any questions regarding these plans, please contact me at (704) 382-4761.
Respectfully Submitted,
Sean DeNeale
Environmental Services
Cc (via e-mail): Ed Mussler, NCDEQ
Kyle Baucom, Duke Energy
Scott Harris, Duke Energy
Steve Loskota, S&ME, Inc.
Mark Taylor, S&ME, Inc.
Attachments: Plans (drawings prepared by S&ME, Inc.)
Specifications (document prepared by S&ME, Inc.)
X
X
X
X
X
X
O
H
-
E
O
H
-
E
O
H
-
E
O
H
-
E
O
H
-
E
O
H
-
E
O
H
-
E
MW
6
3
0
640
6
4
0
640
64
0
64
0
64
0
640
640
6
4
0
65
0
6
5
0
650
650
65
0
66
0
660 660
660
66
0
66
0
6
6
0
67
0
670
67
0
670
67
0
640
640
640
640
59
0
59
0
59
0
6
0
0
60
0
61
0
61
0
62
0
620
63
0
630
63
0
63
0
630
630
63
0
6
3
0
63
0
630
630
630
630
64
0
58
0
640
62
0
620
620
620
570
661.3
631.6
631.1
644.6
644.8
641.0
641.1
642.2
618.7
643.8
623.6
624.7
625.0
627.1
658.1
658.2
658.1
679.4
679.2
678.8
678.8
677.1677.3
677.2
677.2
677.3
677.0676.9
656.5
657.8
657.7
657.8657.7
657.8
657.9
642.4
643.0
639.2
640.8
580.9
580.8
580.8
580.9
580.8
580.9
581.2
619.3(est.)
612.8(est.)615.8(est.)
616.3(est.)616.8(est.)
RAB LANDFILL
CAPPED PIPES
CAPPED
PIPES
PI
P
E
S
PI
P
E
S
R
A
I
L
R
O
A
D
TRV 3
U
G
-
E
U G -E U G-E UG-E U G -E U G -E U G -E U G -E UG -E U G -E
U G -U U G -U
U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U
U
G
-
U
SOUTH CHANNEL DRAINAGE IMPROVEMENTS
ALLEN STEAM STATION RAB LANDFILL
BELMONT, GASTON COUNTY, NORTH CAROLINA
S&ME PROJECT NO. 7235-15-035
09/02/2016
SITE DATA
OWNER:DUKE ENERGYADDRESS:253 PLANT ALLEN ROADBELMONT, NORTH CAROLINA 28012PHONE NO.:980.373.6344CONTACT NAME:KYLE BAUCOM, P.E.
CONTACT E-MAIL ADDRESS:kyle.baucom@duke-energy.com
PROJECT ENGINEER:S&ME, INC.ADDRESS:9751 SOUTHERN PINE BLVD.CHARLOTTE, NC 28273PHONE NO.:704.523.4726
CONTACT NAME:STEVE LOSKOTA
CONTACT E-MAIL ADDRESS:sloskota@smeinc.com
VICINITY MAP
NOT TO SCALE
PREPARED FOR
253 PLANT ALLEN ROAD
BELMONT, NORTH CAROLINA 28012
980.373.6344
N
GRAPHIC SCALE
0 100 20050 300
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_COV.1.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
H
W
Y
2
7
3
I
-
4
8
5
I-85
74/29
RI
V
E
R
CAT
A
W
B
A
SITE A
I
R
P
O
R
T
S
O
U
T
H
P
O
I
N
T
R
D
253 PLANT ALLEN RD, BELMONT, NC
ALN_C907.001.001
1
1
COVER
1"=100'
SHEET LIST
SHEET NO. SHEET TITLE DUKE DRAWING NO.
1 COVER ALN_C907.001.001
2 EXISTING CONDITIONS ALN_C907.001.002
3 PLAN AND PROFILE-WEST ALN_C907.001.003
4 PLAN AND PROFILE-EAST ALN_C907.001.004
5 SECTIONS ALN_C907.001.005
6 EROSION CONTROL PLAN ALN_C907.001.006
7 DETAILS ALN_C907.001.007
8 DETAILS AND NOTES ALN_C907.001.008
X
X
620 63
0
640
6
4
0
64
0
6
4
0
640
6
4
0
640
640
650
650
6
5
0
650
650
6
5
0
660
660
660
6
6
0
6
6
0
6
6
0
6
6
0
6
7
0
670
6
7
0
670
6
7
0
640
640
640
6
0
0
6
1
0
6
1
0
6
2
0
630
630
630
6
3
0
630
630
6
3
0
6
3
0
630
630
630
630
6
2
0
620
620
620
644.6 644.8
641.0
641.1
642.2
618.7
643.8
623.6
624.7
625.0
632.7
658.2
658.1
679.4
679.2
678.8
678.8
677.1
677.3
677.2
677.2
677.3
677.0
676.9
656.5
657.8
657.7
657.8
657.7
657.8
657.9
642.4
643.0
639.2
640.8
580.8
619.3
(est.)
612.8
(est.)
615.8
(est.)
616.3
(est.)
616.8
(est.)
RAB LA
N
D
F
I
L
L
PIPES
P
I
P
E
S
U
G
-
E
U
G
-
E
U
G
-
E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U
G
-
U
627.0'
626.8'
627.8'
628.4'
625.7'
621.6'
621.2'
621.3'
621.3'
621.4'
621.4'
621.3'
621.2'
620.6'
620.6'
620.6'
620.7'
620.8'
620.7'
620.8'
624.3'
619.7'
619.6'
620.4'
620.1'
619.5'
619.5'
619.3'
619.2'
625.1'
625.3'
620.9'
619.6'
619.4'
619.6'
619.7'
619.7'
619.4'
619.1'
623.5'
623.5'
624.1'625.6'
619.4'
NEW
SPILLWAY
617.88'
36
"
H
D
P
E
TBM 1
TBM 2
24"HDP
E
x
2
PANEL
PANEL
VA
VA
630
630
625
625
625
625
625
625
6
3
0
6
2
5
625
620
620
620
620
620
620
620
620
620
620
620
615
625
630
6
3
0
6
2
5
6
2
5
620
620
630
625
625
625
HDPEx2
36" HDPE622.06'
EXISTING DI-7TOP GRATE: 620.58'TOP CONCRETE: 620.2'BOTTOM OF STRUCTURE: 615.80'
LOST SIGNAL
18" HDPE: 619.10'
POSSIBLE VAULT ORCONNECTION POINT
18" HDPE: 619.40'
24" HDPEx2613.15'
EXISTING DI-8TOP GRATE: 619.84'TOP CONCRETE: 619.5'BOTTOM OF STRUCTURE: 613.27'
30" HDPE
30" HDPE
30" HDPE
END OF PIPESINACCESSIBLE
RAB LANDFILL
STORMWATER POND
FM
FM
FM
FM
FM
FM
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
N
GRAPHIC SCALE
0 50 10025 150
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_EXI.2.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
GENERAL SUREVEY NOTES:
1. BASIS OF BEARINGS: NC GRID NAD83/2011.
2. ELEVATIONS ARE BASED ON NAVD88.
3. THE AREA WITHIN THE SURVEY LIMITS IS BASED ON A FIELD SURVEY BY WSPCONDUCTED ON APRIL 26-27, 2016.
4. THE CONTOUR INTERVAL IS ONE FOOT INSIDE THE SURVEY LIMITS, BENCHMARKS ASSHOWN.
5. THIS MAP IS NOT A BOUNDARY SURVEY.
6. THE DASHED PLANIMETRIC LOCATION ON THIS MAP OUTSIDE OF THE SURVEY LIMITS ISBASED ON PHOTOGRAMMETRIC MAPPING OF IMAGERY COLLECTED ON APRIL 17, 2014.[ALTITUDE OF SENSOR = 3,600' / SENSOR FOCAL LENGTH = 153.558mm] THE IMAGERYCAPTURED IS SUITABLE TO CREATE 1”=100' SCALE MAPPING AND CONTOURS AT ANINTERVAL OF 2', AND MEETS THE NATIONAL MAP ACCURACY STANDARDS FOR 1”=100'
SCALE MAPPING. DATA PROVIDED WHERE CLEAR AND VISIBLE ON THE IMAGERY ISWITHIN 2' OF ITS TRUE POSITION. NO INFORMATION OUTSIDE THE SURVEY LIMITS WASUPDATED FOR THIS EXHIBIT.
7. UNDERGROUND UTILITIES SHOWN HEREON WERE MARKED IN THE FIELD BY PYRAMIDENVIRONMENTAL ON APRIL 25, 2016.
8. FLOOD LINES NOT SHOWN HEREON, FLOOD HAZARD AREA IS OUTSIDE OF THE SURVEYLIMITS. PER WWW.FRIS.NC.GOV.
9. ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES IN U.S. SURVEY FEET UNLESSOTHERWISE NOTED.
10. THE AREA SHOWN HEREON WAS COMPUTED USING THE COORDINATE COMPUTATIONMETHOD.
11. LINES NOT SURVEYED ARE SHOWN AS BROKEN LINES FROM INFORMATIONREFERENCED ON THE FACE OF THIS PLAT.
12. PROPERTY SUBJECT TO ALL EASEMENTS AND RESTRICTIONS OF RECORD.
BENCHMARKS
TBM 1N: 527,087.056E: 1,399,043.368EL: 621.72'NAIL SET SOUTH OFGRAVEL ACCESS ROAD
TBM2
N: 527,157.924E: 1,400,473.434EL: 623.80'NAIL SET CENTERLINEGRAVEL ACCESS ROAD
TBM 2 BENCHMARK
BOLLARD
PIPE
DRAIN
DRAIN LINE
UNKNOWN UTILITY (WHITE PAINT)*
ELECTRIC LINE (RED PAINT)
RIP RAP
MAY 10, 2016 SURVEY LIMITS
VAULT
*EXISTING FORCE MAIN
*PER LANDFILL DESIGN DRAWING, EXISTING FORCEMAIN SHOULD BE ON THE SOUTH SIDE OF THE
GRAVEL ACCESS ROAD (PER PLANS). SIGNAL OFUNKNOWN LINE WAS LOST ON WESTERN ENDNEAR STORM STRUCTURE.
VA
EXISTING FEATURES LEGEND
UG-U
UG-E
ALN_C907.001.002
2
2
EXISTING CONDITIONS
1"=50'
FM FM
640
640
650
650
660
630
620
620
616.3
(est.)
616.8
(est.)
UG-E UG -E U G -E UG-E UG-E U G -E
U G -E U G -E U G -E U G -E U G -E U G -E U G -E U G -E U G-E UG -E U G -E U G -E U G -E U G -E U G-E UG
U G -U UG -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U
U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U
621.6'
621.2'
621.3'
621.3'
621.4'
621.4'
621.3'
621.2'
620.1'619.5'
619.5'
619.3'
619.2'
619.4'
619.1'619.4'
3
0
"
H
D
P
E
END OF PIPESINACCESSIBLE
TBM 1
PANELVA
TOP GRATE: 620.58'TOP CONCRETE: 620.2'BOTTOM OF STRUCTURE: 615.80'
LOST SIGNAL
630
630
625
625
625
625
620
620
620
620
620 620630
625
18"HDPE: 619.10'HD
P
E
x
2
POSSIBLE VAULT OR CONNECTIONPOINT
0+00 1+00
2+00
3+00
4+00
5+00
6+00
7+00 8+00PROPOSED CULVERT 1STA:3+88.02
INLET:N:527130.35 E:1399309.10
OUTLET: N:527103.45 E:1399312.28
DRAINAGE DIVIDESTA:1+79.35
DRAINAGE DIVIDESTA:7+07.64
CULVERT 1
5
FLOW
EXISTING DI-7
FLOW
620
620
620
620
620
620
620
620
620
620 620
620
BEGIN CHANNEL ALIGNMENTN:527108.86E:1398921.76
L1 L2
L3 L4 L5 L6
L7
L8 L9
L10 L11
L12
L13 L14FLOW
FLOW
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
FM
EXISTING FORCE MAIN
SOUTH DRAINAGE CHANNEL - WEST PROFILE
SCALE H:1"=30'; V:1"=3'
610
615
620
625
630
610
615
620
625
630
0+50
EG
:
6
1
9
.
3
PG
:
6
1
9
.
1
9
1+00
EG
:
6
1
9
.
4
PG
:
6
1
9
.
2
7
1+50
EG
:
6
1
9
.
4
PG
:
6
1
9
.
3
6
2+00
EG
:
6
1
9
.
3
PG
:
6
1
9
.
3
1
2+50
EG
:
6
2
0
.
4
PG
:
6
1
9
.
0
6
3+00
EG
:
6
1
9
.
6
PG
:
6
1
8
.
8
4
3+50
EG
:
6
1
9
.
5
PG
:
6
1
8
.
5
6
4+00
EG
:
6
1
9
.
5
PG
:
6
1
8
.
4
0
4+50
EG
:
6
1
9
.
7
PG
:
6
1
8
.
6
6
5+00
EG
:
6
1
9
.
8
PG
:
6
1
8
.
9
2
5+50
EG
:
6
1
9
.
7
PG
:
6
1
9
.
1
8
6+00
EG
:
6
1
9
.
6
PG
:
6
1
9
.
4
4
6+50
EG
:
6
1
9
.
8
PG
:
6
1
9
.
7
0
7+00
EG
:
6
2
0
.
0
PG
:
6
1
9
.
9
6
7+50
EG
:
6
2
0
.
0
PG
:
6
1
9
.
5
5
8+00
EG
:
6
1
9
.
9
PG
:
6
1
9
.
0
2
0.52%0.18%-0.51%
-0.56%
-1.07%
BEGIN CHANNEL IMPROVEMENTSAT EXISTING DI-7
STA 0+05.00
ELEV 619.11
DRAINAGE DIVIDESTA 1+79.35ELEV 619.42
PROPOSED CULVERT 12 x 24" RCPSTA 3+88.02ELEV 618.35
EXISTING 18" CULVERTSTA 2+55.63ELEV 619.06
DRAINAGE DIVIDESTA 7+07.64ELEV 620.00
Line Table: South Drainage Channel Alignment
Line #
L1
L2
L3
L4
L5
L6
L7
L8
L9
Length
43.49
179.14
27.60
10.80
15.08
73.05
91.52
75.55
4.96
Direction
S88° 53' 42.08"E
N86° 28' 18.26"E
N82° 36' 01.80"E
N85° 14' 37.74"E
N88° 42' 59.95"E
N85° 50' 17.51"E
N83° 14' 36.17"E
N82° 13' 23.72"E
N87° 47' 27.80"E
Start Point
(1398921.76,527108.86)
(1398965.24,527108.02)
(1399144.05,527119.05)
(1399171.42,527122.60)
(1399182.18,527123.50)
(1399197.25,527123.84)
(1399270.11,527129.14)
(1399360.99,527139.90)
(1399435.84,527150.13)
End Point
(1398965.24,527108.02)
(1399144.05,527119.05)
(1399171.42,527122.60)
(1399182.18,527123.50)
(1399197.25,527123.84)
(1399270.11,527129.14)
(1399360.99,527139.90)
(1399435.84,527150.13)
(1399440.80,527150.32)
Line Table: South Drainage Channel Alignment
Line #
L10
L11
L12
L13
L14
L15
L16
L17
L18
Length
59.37
127.09
7.20
27.72
114.17
97.64
14.21
27.53
54.14
Direction
N85° 46' 15.68"E
N86° 24' 08.37"E
N87° 47' 17.69"E
N87° 52' 34.33"E
N87° 56' 29.57"E
N85° 07' 33.54"E
N79° 27' 31.64"E
N80° 20' 01.77"E
N82° 17' 28.11"E
Start Point
(1399440.80,527150.32)
(1399500.01,527154.70)
(1399626.84,527162.67)
(1399634.04,527162.95)
(1399661.74,527163.98)
(1399775.83,527168.08)
(1399873.13,527176.37)
(1399887.09,527178.97)
(1399914.23,527183.59)
End Point
(1399500.01,527154.70)
(1399626.84,527162.67)
(1399634.04,527162.95)
(1399661.74,527163.98)
(1399775.83,527168.08)
(1399873.13,527176.37)
(1399887.09,527178.97)
(1399914.23,527183.59)
(1399967.88,527190.86)
Line Table: South Drainage Channel Alignment
Line #
L19
L20
L21
L22
L23
L24
L25
Length
10.20
15.49
104.78
135.58
36.46
55.60
56.64
Direction
N82° 42' 26.93"E
S89° 54' 43.61"E
N85° 12' 59.64"E
N85° 55' 08.54"E
N85° 54' 57.67"E
N86° 51' 20.00"E
N84° 13' 59.26"E
Start Point
(1399967.88,527190.86)
(1399978.00,527192.15)
(1399993.48,527192.13)
(1400097.90,527200.87)
(1400233.14,527210.51)
(1400269.50,527213.11)
(1400325.02,527216.16)
End Point
(1399978.00,527192.15)
(1399993.48,527192.13)
(1400097.90,527200.87)
(1400233.14,527210.51)
(1400269.50,527213.11)
(1400325.02,527216.16)
(1400381.38,527221.85)
N
HORIZONTAL SCALE
0 30 6015 90
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_GRA.3.4.5.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
MA
T
C
H
L
I
N
E
S
H
E
E
T
4
MA
T
C
H
L
I
N
E
S
H
E
E
T
4
ALN_C907.001.003
3
3
PLAN AND PROFILE-WEST
1"=30'
PROPOSED GRADE
EXISTING GRADE
PROPOSED FEATURES LEGEND
PROPOSED 5FT CONTOUR(PROPOSED GROUND PROFILE)
PROPOSED 1 FT CONTOUR
EXISTING GROUND(PROFILE)
BENCHMARKS
TBM 1N: 527,087.056E: 1,399,043.368EL: 621.72'NAIL SET SOUTH OFGRAVEL ACCESS ROAD
TBM2
N: 527,157.924E: 1,400,473.434EL: 623.80'NAIL SET CENTERLINEGRAVEL ACCESS ROADVERTICAL SCALE
0 3 61.5 9
HORIZONTAL SCALE
0 30 6015 90
1"=30'
650
660
630
630
630
620
620
623.6
625.0
612.8
(est.)
615.8
(est.)
G -E U G -E U G-E U G -E U G -E U G-E U G -E U G -E U G -E U G -E U G -E
U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U U G -U
U G -U
U G -U
621.4'621.2'620.6'
620.6'
620.6'
620.7'
620.8'
620.7'620.8'
619.7'
619.6'
620.1'
620.9'
619.6'619.4'
619.6'
619.7'
619.7'
3
0
"
H
D
P
E
24"HDPEx2613.15'
24"HDPEx2
PANEL VA
620 620
620
620
620
620
615
625
630
620
620
625
625
625
18"HDPE: 619.40'
TOP GRATE: 619.84'TOP CONCRETE: 619.5'BOTTOM OF STRUCTURE: 613.27'
7+00 8+00
9+00
10+00
11+00
12+00
13+00
14+00
14+65
PROPOSED CULVERT 2STA:8+72.17INLET: N:527166.61 E:1399791.45OUTLET: N:527137.56 E:1399793.93
PROPOSED CULVERT 3STA:11+88.38INLET: N:527198.96 E:1400105.71
OUTLET: N:527171.43 E:1400107.68
DRAINAGE DIVIDE
STA:7+07.64
DRAINAGE DIVIDE
STA:10+55.35
DRAINAGE DIVIDESTA:13+52.76
CULVERT 2
5
CULVERT 3
5
FLOWFLOW
FLOWFLOW
EXISTING DI-8
FLOW
620620
620
620
620 620
620
620
620
620
620
END CHANNEL ALIGNMENTN:527221.85E:1400381.38
L11
L12
L13 L14
L15 L16 L17
L18 L19 L20 L21
L22
L23 L24 L25
FLOW
FM
FM
FM
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
EXISTING FORCE MAIN
SOUTH DRAINAGE CHANNEL - EAST PROFILE
SCALE H:1"=30'; V:1"=3'
610
615
620
625
630
610
615
620
625
630
7+00
EG
:
6
2
0
.
0
PG
:
6
1
9
.
9
6
7+50
EG
:
6
2
0
.
0
PG
:
6
1
9
.
9
8
8+00
EG
:
6
1
9
.
9
PG
:
6
1
9
.
9
2
8+50
EG
:
6
1
9
.
7
PG
:
6
1
9
.
7
0
9+00
EG
:
6
1
9
.
7
PG
:
6
1
9
.
6
6
9+50
EG
:
6
1
9
.
9
PG
:
6
1
9
.
9
1
10+00
EG
:
6
1
9
.
6
PG
:
6
1
9
.
5
5
10+50
EG
:
6
1
9
.
8
PG
:
6
1
9
.
7
6
11+00
EG
:
6
1
9
.
8
PG
:
6
1
9
.
8
1
11+50
EG
:
6
1
9
.
8
PG
:
6
1
9
.
7
7
12+00
EG
:
6
1
9
.
7
PG
:
6
1
9
.
6
7
12+50
EG
:
6
1
9
.
7
PG
:
6
1
9
.
7
2
13+00
EG
:
6
1
9
.
7
PG
:
6
1
9
.
6
9
13+50
EG
:
6
1
9
.
8
PG
:
6
1
9
.
8
4
14+00
EG
:
6
1
9
.
8
PG
:
6
1
9
.
8
4
14+50
EG
:
6
1
9
.
5
PG
:
6
1
9
.
5
4
DRAINAGE DIVIDESTA 7+07.64ELEV 620.00
PROPOSED CULVERT 22 x 18" RCPSTA 8+72.17ELEV 618.26
EXISTING 18" CULVERT/DRAINAGE DIVIDE
STA 10+55.35ELEV 619.40
PROPOSED CULVERT 3
2 x 24" RCP
STA 11+88.38ELEV 617.87
DRAINAGE DIVIDE
STA 13+52.76
ELEV 619.86
END CHANNEL IMPROVEMENTSAT EXISTING DI-8STA 14+65.00ELEV 619.44
0.64%1.22%
-0.38%
-1.21%
-1.07%
N
HORIZONTAL SCALE
0 30 6015 90
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_GRA.3.4.5.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
PROPOSED FEATURES LEGEND
PROPOSED 5FT CONTOUR(PROPOSED GROUND PROFILE)
PROPOSED 1 FT CONTOUR
EXISTING GROUND(PROFILE)
ALN_C907.001.004
4
4
PLAN AND PROFILE-EAST
1"=30'
EXISTING GRADE
PROPOSED GRADE
MA
T
C
H
L
I
N
E
S
H
E
E
T
3
MA
T
C
H
L
I
N
E
S
H
E
E
T
3
BENCHMARKS
TBM 1N: 527,087.056E: 1,399,043.368EL: 621.72'NAIL SET SOUTH OFGRAVEL ACCESS ROAD
TBM2N: 527,157.924E: 1,400,473.434EL: 623.80'NAIL SET CENTERLINEGRAVEL ACCESS ROADVERTICAL SCALE
0 3 61.5 9
HORIZONTAL SCALE
0 30 6015 90
1"=30'
TYPICAL CHANNEL SECTION
SCALE H:1"=5'; V:1"=5'
0+00 0+05 0+10 0+15 0+20
-45.0
0
%
VARIES-TIE TOROAD SHOULDER
EXISTING GROUND
PROPOSEDCHANNEL
CULVERT 1 SECTION
SCALE H:1"=5''; V:1"=5''
610
615
620
625
630
610
615
620
625
630
0+10
EG
:
6
2
3
.
9
PG
:
0+20
EG
:
6
2
0
.
5
PG
:
0+30
EG
:
6
2
1
.
2
PG
:
6
1
7
.
9
8
0+40
EG
:
6
2
1
.
2
PG
:
6
1
7
.
4
6
0+50
EG
:
6
1
8
.
0
PG
:
6
1
6
.
9
3
0+60
EG
:
PG
:
STA 0+22.86ELEV 618.35
STA 0+28.02ELEV 621.09
STA 0+41.29ELEV 621.22
STA 0+53.33
ELEV 616.76
STA 0+26.24
ELEV 618.17
-5.22%
2 x 24" DIA. RCPCULVERTS
EXISTING LANDFILL SUBGRADE SLOPE
PROPOSED
CHANNEL GRADE
1
F
T
(
M
I
N
.
)
EXISTING FORCEMAIN
FILL BEHIND WALL WITHTYPE A 1 AGGREGATE
CULVERT 2 SECTION
SCALE H:1"=5''; V:1"=5''
610
615
620
625
630
610
615
620
625
630
0+10
EG
:
6
2
3
.
2
PG
:
0+20
EG
:
6
2
0
.
1
PG
:
0+30
EG
:
6
2
0
.
5
PG
:
6
1
7
.
6
5
0+40
EG
:
6
2
0
.
5
PG
:
6
1
6
.
8
3
0+50
EG
:
6
1
7
.
4
PG
:
6
1
6
.
0
0
0+60
EG
:
PG
:
STA 0+22.69ELEV 618.26
STA 0+27.66ELEV 620.41
STA 0+42.48ELEV 620.37
STA 0+54.63ELEV 615.62
STA 0+25.48ELEV 618.03
-8.27%
2 x 18" DIA. RCPCULVERTS
EXISTING LANDFILL SUBGRADE SLOPE
PROPOSEDCHANNEL GRADE
1
F
T
(
M
I
N
.
)
EXISTING FORCEMAIN
FILL BEHIND WALL WITH
TYPE A 1 AGGREGATE
CULVERT 3 SECTION
SCALE H:1"=5''; V:1"=5''
610
615
620
625
630
610
615
620
625
630
0+10
EG
:
6
2
3
.
6
PG
:
0+20
EG
:
6
2
0
.
6
PG
:
0+30
EG
:
6
2
0
.
6
PG
:
6
1
7
.
3
8
0+40
EG
:
6
2
0
.
6
PG
:
6
1
6
.
6
3
0+50
EG
:
6
1
6
.
9
PG
:
6
1
5
.
8
8
0+60
EG
:
PG
:
STA 0+23.51ELEV 617.87
STA 0+27.42ELEV 620.58
STA 0+39.79
ELEV 620.71
STA 0+53.57ELEV 615.61
STA 0+25.97ELEV 617.68
-7.51%
2 x 24" DIA. RCP CULVERTS
EXISTING LANDFILL SUBGRADE SLOPE
PROPOSEDCHANNEL GRADE
1
F
T
(
M
I
N
.
)
EXISTING FORCEMAIN
FILL BEHIND WALL WITHTYPE A 1 AGGREGATE
GRAPHIC SCALE
0 5 102.5 15
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_GRA.3.4.5.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
ALN_C907.001.005
5
5
SECTIONS
1"=5'
1
7
PIPE INSTALLATION
2
7
CONCRETE ENDWALL
24" DOUBLE PIPE
2
7
CONCRETE ENDWALL18" DOUBLE PIPE
2
7
CONCRETE ENDWALL
24" DOUBLE PIPE
1
7
PIPE INSTALLATION
1
7
PIPE INSTALLATION
U
G
-
E
U
G
-
E
U
G
-
E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -E
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U G -U
U
G
-
U
627.0'
626.8'
627.8'
628.4'
625.7'
621.6'
621.2'
621.3'
621.3'
621.4'
621.4'
621.3'
621.2'
620.6'
620.6'
620.6'
620.7'
620.8'
620.7'
620.8'
624.3'
619.7'
619.6'
620.4'
620.1'
619.5'
619.5'
619.3'
619.2'
625.1'
625.3'
620.9'
619.6'
619.4'
619.6'
619.7'
619.7'
619.4'
619.1'
623.5'
623.5'
624.1'625.6'
619.4'
NEW
SPILLWAY
617.88'
36
"
H
D
P
E
TBM 1
TBM 2
24"HDP
E
x
2
PANEL
PANEL
VA
VA
630
630
625
625
625
625
625
625
6
3
0
6
2
5
625
620
620
620
620
620
620
620
620
620
620
620
615
625
630
6
3
0
6
2
5
6
2
5
620
620
630
625
625
625
HDPEx2
X
X
63
0
640
6
4
0
64
0
6
4
0
640
6
4
0
640
640
650
650
6
5
0
650
650
6
5
0
660
660
660
6
6
0
6
6
0
6
6
0
6
7
0
670
6
7
0
670
6
7
0
640
640
640
6
0
0
6
1
0
6
1
0
6
2
0
630
630
630
6
3
0
630
630
6
3
0
6
3
0
630
630
630
630
6
2
0
620
620
620
644.6 644.8
641.0
641.1
642.2
618.7
643.8
623.6
624.7
625.0
632.7
658.2
658.1
679.4
679.2
678.8
678.8
677.1
677.3
677.2
677.2
677.3
677.0
676.9
656.5
657.8
657.7
657.8
657.7
657.8
657.9
642.4
643.0
639.2
640.8
580.8
619.3
(est.)
612.8
(est.)
615.8
(est.)
616.3
(est.)
616.8
(est.)
RAB LA
N
D
F
I
L
L
PIPES
P
I
P
E
S
36" HDPE622.06'
TOP GRATE: 620.58'TOP CONCRETE: 620.2'BOTTOM OF STRUCTURE: 615.80'
LOST SIGNAL
18" HDPE: 619.10'
POSSIBLE VAULT ORCONNECTION POINT
18" HDPE: 619.40'
24" HDPEx2613.15'
TOP GRATE: 619.84'TOP CONCRETE: 619.5'BOTTOM OF STRUCTURE: 613.27'
30" HDPE
30" HDPE
30" HDPE
END OF PIPESINACCESSIBLE
RAB LANDFILL
STORMWATER POND
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
OD
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L O D
L
O D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
L
O
D
L
O D
L
O D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O D
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_ERO.6.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
LIMITS OF DISTURBANCE
RECP
RIPRAP
INLET PROTECTION
PROPOSED FEATURES LEGEND
ALN_C907.001.006
6
6
EROSION CONTROL PLAN
1"=50'
N
GRAPHIC SCALE
0 50 10025 150
CULVERT 1
2x24"∅RCP
CULVERT 22x18"∅RCP
CULVERT 32x24"∅RCP
6
8
RIPRAP ENERGY DISSIPATORRA-3
6
8
RIPRAP ENERGY DISSIPATORRA-2
6
8
RIPRAP ENERGY DISSIPATORRA-1
5
7
INLET PROTECTION
5
7
INLET PROTECTION
3
7
CHANNEL RECP
INSTALL IN DISTURBEDCHANNEL AREAS
4
7
SLOPE RECPINSTALL ON DISTURBEDPORTIONS OF LANDFILL SLOPEAND TIE TO CHANNEL RECP
7
8
PERMANENT SEEDINGAPPLY PERMANENT SEEDINGTO ALL DISTURBED AREAS
LOD
6
8
RIPRAP ENERGY DISSIPATORRA-1
REPLENISH
6
8
RIPRAP ENERGY DISSIPATOR
RA-1
REPLENISH
6
8
RIPRAP ENERGY DISSIPATORRA-1
REPLENISH
EXISTING STAGE
1 LIMITS OF
DISTURBANCE
EXISTING STAGE 2 LIMITSOF DISTURBANCE
EXISTING STAGE 2 LIMITSOF DISTURBANCE
EXISTING STAGE1 LIMITS OFDISTURBANCE
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_DET.7.8.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
1 PIPE INSTALLATION
NOT TO SCALE
2 CONCRETE ENDWALL
NOT TO SCALE
CHANNEL RECP INSTALLATION
NOT TO SCALE
SLOPE RECP INSTALLATION
NOT TO SCALE
3
4
ALN_C907.001.007
7
7
DETAILS
N.T.S.
O.D. + 1.5'
I.
D
.
/
6
(
M
I
N
.
)
NO
T
L
E
S
S
T
H
A
N
6
"
TOP OF FILL
PIPE BEDDING: COMPACT AFTERPIPE IS PLACED AND PRIOR TOPLACEMENT OF FILL A2
HGROUND LINE
NORMAL EARTH FOUNDATION
NOTES:
1. PIPE SHALL BE CLASS IV OR CLASS V REINFORCED CONCRETE PIPE (AASHTOM170).
2. I.D. IS THE MAXIMUM HORIZONTAL INSIDE DIAMETER OF THE PIPE.
3. O.D. IS THE MAXIMUM HORIZONTAL OUTSIDE DIAMETER OF THE PIPE.
4. H IS THE FILL HEIGHT VERTICALLY TO ANY POINT ALONG THE PIPE FROM
THE TOP OF THE PIPE TO THE TOP OF THE EMBANKMENT AT THAT POINT.
5. MINIMUM H SHALL BE 1 FOOT AS MEASURED FROM THE TOP OF PIPE TO
BOTTOM OF PAVEMENT STRUCTURE.
6. BEDDING MATERIAL SHALL BE LOOSELY PLACED SELECT MATERIALAGGREGATE A2. LEAVE SECTION DIRECTLY BENEATH PIPE UNCOMPACTEDAS PIPE SEATING AND BACKFILL WILL ACCOMPLISH COMPACTION.
7. SOURCE: NCDOT STANDARD DRAWING 300.01.
PLAN
ELEVATION
G M G
DOWEL
OPTIONAL CONSTRUCTION JOINT
B
H D
9"
S
10
"
3"
3"
T
PLACE GROOVE OR
BELL END OF PIPE
TO FACE OF WALL
FOOTING(IF CONST. JOIN IS USED)
EMBANKMENT
SLOPE
END ELEVATION
DOWEL
BAR - "X"
L 12"
2
'
-
6
"
#4 BARS
NOTES:1. CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1".
2. PLACE 2 #6 "Y" BARS IN THE TOP OF ALL ENDWALL FOR PIPE CULVERTS 42" AND OVER WITH A
MINIMUM OF 3" COVER AND A LENGTH OF 6" LESS THAN ENDWALL LENGTH.
3. CONSTRUCT BOTTOM SLAB WITH FORMS.
4. DO NOT INTERPRET WALL THICKNESS (T) SHOWN FOR THE THICKNESS ACCEPTABLE, BUT ISUSED IN COMPUTING ENDWALL QUANTITIES.
5. IF CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE, PLACEBAR "X" DOWELS IN THE BASE AS SHOWN. SPACE BARS APPROXIMATELY ON 12" CENTERSUNLESS OTHERWISE DIRECTED BY THE ENGINEER.
6. IF THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPEAND POUR THE BASE SEPARATELY, LEAVE THE POUR ROUGH.
7. CONCRETE SHALL BE CLASS "B" CONCRETE.
8. SOURCE: NCDOT STANDARD DRAWING 838.01.
NOTES:1. NAG S75BN OR APPROVED EQUAL SHALL BE APPLIED TO ALL DISTURBED CHANNEL AND SLOPE AREAS.
2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY
NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
3. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE
TRENCH WITH APPROXIMATELY 12"(30CM) OF RECPS EXTENDED BEYOND THE UP-SLOPE PORTION OF THETRENCH. USE SHOREMAX MAT AT THE CHANNEL/CULVERT OUTLET AS SUPPLEMENTAL SCOUR PROTECTIONAS NEEDED. ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART INTHE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THECOMPACTED SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED ANDCOMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED
APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE RECPS.
4. ROLL CENTER RECPS IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECPS WILL UNROLL WITHAPPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACEBY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.
5. PLACE CONSECUTIVE RECPS END-OVER-END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROWOF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE RECPS.
6. FULL LENGTH EDGE OF RECPS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF
STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
7. ADJACENT RECPS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5-12.5CM) (DEPENDING ON RECPS TYPE)AND STAPLED.
8. IN HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9-12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM) APART AND 4"(10CM) ON CENTEROVER ENTIRE WIDTH OF THE CHANNEL.
9. THE TERMINAL END OF THE RECPS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY
12" (30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH
AFTER STAPLING.
10. SOURCE: NORTH AMERICAN GREEN.
2"-5"
6
2
4
12"
6"
6"
4"-6"
8
6"
5 7
4"
3
1
A
B C
A
B C
NOTES:*HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IFNECESSARY TO ALLOW STAPLES TO SECURE THECRITICAL POINTS ALONG THE CHANNEL SURFACE.
**IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE ORSTAKE LENGTHS GREATER THAN 6"(15CM) MAY BENECESSARY TO PROPERLY SECURE THE RECP'S.
CRITICAL POINTSA. OVERLAPS AND SEAMSB. PROJECTED WATER LINEC. CHANNEL BOTTOM/SIDE SLOPE VERTICES
4"
6"
NOTES:1. NAG S75BN OR APPROVED EQUAL SHALL BE APPLIED TO ALL DISTURBED CHANNEL AND SLOPE AREAS.
2. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY
NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
3. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCHWITH APPROXIMATELY 12" (30CM) OF RECPS EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH.ANCHOR THE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN THE BOTTOMOF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED
SOIL AND FOLD THE REMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED
SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY
12"(30CM) APART ACROSS THE WIDTH OF THE RECPS.
4. ROLL THE RECPS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE. RECPS WILL UNROLL WITHAPPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACEBY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.
5. THE EDGES OF PARALLEL RECPS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5-12.5CM) OVERLAPDEPENDING ON THE RECPS TYPE.
6. CONSECUTIVE RECPS SPLICED DOWN THE SLOPE MUST BE END OVER END (SHINGLE STYLE) WITH AN
APPROXIMATE 3"(7.5CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12"(30CM)APART ACROSS ENTIRE RECPS WIDTH.
2"-5"
3B
4
2
5
1
3A
12"
6"
6"
*NOTE:IN LOOSE SOIL CONDITIONS, THE USEOF STAPLE OR STAKE LENGTHS GREATERTHAN 6"(15CM) MAY BE NECESSARY TOPROPERLY SECURE THE RECP'S.
3"
2'
4.0' MAX.
2'
16"
NCDOT #5 OR #57WASHED STONE
2H:1
V2H:1V
19-GUAGEHARDWARE CLOTH
(14 MESH OPENINGS)
NCDOT #5 OR #57WASHED STONE
2H:1V2H:1V
2H
:
1
V
2H
:
1
V
5-FT STEEL T-POST
5-FT STEEL T-POST
CONSTRUCTION SPECIFICATIONS:
1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET.
2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE
INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A
MAXIMUM OF 4 FEET APART. OMIT THIS STEP IF STEEL POSTS CANNOT BE
INSTALLED (I.E. DUE TO LOCATION IN CONCRETE CHANNEL)
3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THEWIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM.PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR
ANCHORING IS RECOMMENDED. OMIT THIS STEP IF STEEL POSTS CANNOT
BE INSTALLED (I.E. DUE TO LOCATION IN CONCRETE CHANNEL)
4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH AHEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVENGRADE.
5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE
ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS.
6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUNDCOVER.
7. CONTRACTOR TO REMOVE INLET PROTECTION UPON ATTAINMENT OFFINAL STABILIZATION.
MAINTENANCE NOTES:
1. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH RAINFALL EVENT THAT
EXCEEDS 0.5 INCHES WITHIN A 24 HOUR PERIOD. CLEAR THE MESH WIRE OF
ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR
SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THEWIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED.
*REF: 6.51.2 NC Erosion and Sediment Control Planning and Design Manual, 2006
3'
19-GUAGEHARDWARE CLOTH
(14 MESH OPENINGS)
2 FOOT ANCHOR FLAP(PROJECTED, SEE NOTE 3)
FINAL GRADE
2 FOOT ANCHOR FLAP(SEE NOTE 3)
5 INLET PROTECTION
NOT TO SCALE
SELECT BACKFILL MATERIAL
FILL TYPE S1 (A2) TO TOP OF
PIPE.
O.D. + 1.5'
"M" FROM
DETAIL 2
TOP OF ROADWAY(REPAIR ROADWAY TO EXISTING CONDITIONS)
"Y" BARS
10 20 30TENTHSINCHES123
DWG SIZE REVISION
FOR
DRAWING NO.
TITLE
FILENAME:
DWG TYPE:
JOB NO:
DATE:
SCALE:DES:
DFTR:
CHKD:
ENGR:
APPD:
A
F
E
D
C
B
2 3 4 5 7 8 96
4 5 7 8 9 106
A
F
C
B
24.0"x35.5"
ARCH D
WWW.SMEINC.COM
9751 SOUTHERN PINE BLVD
CHARLOTTE, NC 28273
(704) 523-4726
ENGINEERING FIRM LICENSE NUMBER: F-0176
09/02/2016
7235-15-035
DWG
SJL
SJL
PLM
BCW
BCW
7235-15-035_DET.7.8.dwg
0
0
0
ISSUED FOR CONSTRUCTION
BELMONT,GASTON COUNTY, NORTH CAROLINA
ALLEN STEAM STATION
RETIRED ASH BASIN (RAB) ASH LANDFILL
SOUTH DRAINAGE CHANNEL IMPROVEMENTS
REV JOB NO.DATE PROJECT TYPE CHKD ENGR APPDDES DFTR DESCRIPTION
DEFINITION
CONTROLLING RUNOFF AND EROSION ON DISTURBED AREAS BY ESTABLISHING
PERENNIAL VEGETATIVE COVER WITH SEED.
PURPOSETO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS,AND TO PERMANENTLY STABILIZE SUCH AREAS IN A MANNER THAT ISECONOMICAL, ADAPTS TO SITE CONDITIONS, AND ALLOWS SELECTION OF THE
MOST APPROPRIATE PLANT MATERIALS.
SPECIFICATIONS
SEEDBED REQUIREMENTSESTABLISHMENT OF VEGETATION SHOULD NOT BE ATTEMPTED ON SITES THAT AREUNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE,POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPEUNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS.
TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL MUST MEET CERTAIN
MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE EXISTING SOIL SHOULDHAVE THESE CRITERIA:
·ENOUGH FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATEMOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST.05 INCHES WATER TO 1 INCH OF SOIL).
·SUFFICIENT PORE SPACE TO PERMIT ROOT PENETRATION.
·SUFFICIENT DEPTH OF SOIL TO PROVIDE AN ADEQUATE ROOT ZONE. THE
DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHOULD BE12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THEADDITION OF SOIL IS NOT FEASIBLE.
·A FAVORABLE PH RANGE FOR PLANT GROWTH, USUALLY 6.0 - 6.5.
·FREE FROM LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR
TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER
THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED.
IF ANY OF THE ABOVE CRITERIA ARE NOT MET - I.E., IF EXISTING SOIL IS TOOCOARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIALAMENDMENTS ARE REQUIRED. THE SOIL CONDITIONERS DESCRIBED BELOW MAYBE BENEFICIAL OR, PREFERABLY, TOPSOIL MAY BE APPLIED.
SEEDBED PREPARATION
INSTALL NECESSARY MECHANICAL EROSION AND SEDIMENTATION CONTROLPRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THEAPPROVED PLAN.
LIME AND FERTILIZER NEEDS SHOULD BE DETERMINED BY SOIL TESTS. DIRECTIONS,SAMPLE CARTONS, AND INFORMATION SHEETS ARE AVAILABLE THROUGH COUNTYAGRICULTURAL EXTENSION OFFICES. TESTING IS ALSO DONE BY COMMERCIAL
LABORATORIES.
WHEN SOIL TESTS RESULTS ARE NOT AVAILABLE, FOLLOW RATES SUGGESTED INTHE SEEDING SPECIFICATIONS SHOWN AT RIGHT. APPLICATION RATES USUALLYFALL INTO THE FOLLOWING RANGES:
·GROUND AGRICULTURAL LIMESTONE:LIGHT-TEXTURED, SANDY SOILS: 1 TO 1-1/2 TONS/ACRE
HEAVY-TEXTURED, CLAYEY SOILS: 2-3 TONS/ACRE
·FERTILIZER:
GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT)GRASS-LEGUME MIXTURES: 800-1200 LB/ACRE OF 5-10-10 (OR THE EQUIVALENT). SEE VEGETATION MANAGEMENT IMPLEMENTATION PLAN FORFERTILIZER REQUIREMENTS.
APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES
OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE
CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO AROUGH, LOOSE SURFACE.
ROUGHEN SURFACES PRIOR TO SEEDING.
COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKINGINTO A SMOOTH, UNIFORM SURFACE. FILL IN OR LEVEL DEPRESSIONS THAT CANCOLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT
HAS NOT BEEN SEALED BY RAINFALL.
SEEDINGSEEDING DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS AREDESIGNATED AS "BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHINTHE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TOHAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES.
HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES
RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE
CHANGES OF SUCCESS BY 30-50%. ALWAYS TAKE THIS INTO ACCOUNT IN
SCHEDULING LAND-DISTURBING ACTIVITIES.
USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE.
LABELING OF NON-CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAINIMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OFWOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUSWEEDS. DO NO ACCEPT SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED.
INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE
SPECIES OF LEGUME.
APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP-TYPE SPREADER, DRILL,
CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED.
WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORETHAN 1 INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2 INCH.EQUIPMENT SHOULD BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDINGRATE.
WHEN USING BROADCAST-SEEDING METHODS, SUBDIVIDE THE AREA INTO
WORKABLE SECTIONS AND DETERMINE THE AMOUNT OF SEED NEEDED FOR EACH
SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSSTHE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THESAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS.
MULCH OR APPLY RECP TO ALL PLANTINGS IMMEDIATELY AFTER SEEDING.
MAINTENANCE
GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY
ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR
FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARYREPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE.
RESEEDING--IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OFPLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THESTAND AFTER SEEDBED PREPARATION OR OVER- SEED THE STAND. CONSIDER
SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE
FOR PERMANENT SEEDING.
IF VEGETATION FAILS TO GROW, SOIL MUST BE TESTED TO DETERMINE IF ACIDITYOR NUTRIENT IMBALANCE IS RESPONSIBLE.
FERTILIZATION--ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLYREQUIRES RE-FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURFREQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR
FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE.
TEMPORARY SEEDING SPECIFICATIONS
GROUND STABILIZATION SHALL BE PERFORMED WITHIN 7 CALENDAR DAYS ONPERIMETER AREAS AND SLOPES GREATER THAN 3H:1V. GROUND STABILIZATIONSHALL BE PERFORMED WITHIN 14 CALENDAR DAYS IN OTHER AREAS.
SEEDING MIXTURE (FALL)
SPECIES* RATE (LB/ACRE)
RYE GRAIN (SECALE CEREALE)125
SEEDING MIXTURE (LATE WINTER EARLY SPRING)
SPECIES* RATE (LB/ACRE)
RYE GRAIN (SECALE CEREALE)125
ANNUAL RYE 50
SEEDING MIXTURE (SUMMER)
SPECIES* RATE (LB/ACRE)
GERMAN MILLET (SETARIA ITALICA)50
SEEDING DATES (PIEDMONT)
FALL: SEPT. - DEC.
LATE WINTER (EARLY SPRING): JAN. - APRIL
LATE SUMMER: MAY - AUG.
SOIL AMENDMENTS
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY AT THE FOLLOWINGRATES:
GROUND AGGREGATE LIMESTONE: 3,000 LB.ACRE
NITROGEN 160 LB/ACRE
PHOSPHOROUS 80 LB/ACRE
POTASSIUM 60 LB/ACRE
CONSULT SITE SPECIFIC VMIP FOR ADDITIONAL INFORMATION.
MULCH
APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER
SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY ROVING, MULCHANCHORING TOOL, OR NETTING. A DISK WITH BLADES SET NEARLY STRAIGHT CANBE USED AS A MULCH ANCHORING TOOL. NETTING IS THE PREFERRED ANCHORINGMETHOD ON STEEP SLOPES.
*REF: VEGETATION MAINTENANCE IMPLEMENTATION PLAN (VMIP), DUKE ENERGYALLEN STEAM STATION, 2011, S&ME PROJECT NO. 1265-10-362
MAINTENANCE*
RE-FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE-FERTILIZE ANDMULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.
*REF: 6.10 A,B AND C, NC EROSION AND SEDIMENT CONTROL PLANNING ANDDESIGN MANUAL, 2006
PERMANENT SEEDING SPECIFICATIONS
GROUND STABILIZATION SHALL BE PERFORMED WITHIN 7 CALENDAR DAYS ONPERIMETER AREAS AND SLOPES GREATER THAN 3H:1V. GROUND STABILIZATION
SHALL BE PERFORMED WITHIN 14 CALENDAR DAYS IN OTHER AREAS.
SEEDING MIXTURE
SPECIES*RATE (LB/ACRE)
TALL FESCUE (KENTUCKY 31) (GRASS LINED CHANNELS) 200
TALL FESCUE (KENTUCKY 31) (OTHER AREAS)100
NURSE PLANTS
BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET (SETARIAITALICA) OR 15 LB/ACRE SUDAN GRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD40 LB/ACRE RYE GRAIN (FESTUCA ARUNDINACEA).
SEEDING DATES
BESTFALL: SEPT. - APRIL
SPRING - SUMMER: MAY - AUG.
SOIL AMENDMENTS
CONSULT VMIP
MULCH
APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHERSUITABLE MULCHING MATERIAL. ANCHOR MULCH BY ROVING, MULCH
ANCHORING TOOL, OR NETTING. A DISK WITH BLADES SET NEARLY STRAIGHT CAN
BE USED AS A MULCH ANCHORING TOOL. NETTING IS THE PREFERRED ANCHORING
METHOD ON STEEP SLOPES.
MAINTENANCE
RE-FERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BEMOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED,FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.
*REF: VEGETATION MAINTENANCE IMPLEMENTATION PLAN (VMIP), DUKE ENERGY
ALLEN STEAM STATION, 2011, S&ME PROJECT NO. 1265-10-362
6 OUTLET STABILIZATION STRUCTURE
NOT TO SCALE
GENERAL SEEDING SPECIFICATIONS7
ALN_C907.001.008
8
8
DETAILS AND NOTES
La
WaWpDp
Dp
T
CONSTRUCTION SPECIFICATIONS
1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES ANDGRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THEDENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ONUNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS.
2. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED
FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE
RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALLCONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FT. IF THE DAMAGE IS EXTENSIVE,REPLACE THE ENTIRE FILTER CLOTH.
3. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER.
4. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONEDIAMETER.
5. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR,
HIGHLY WEATHER-RESISTANT AND WELL GRADED.
6. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF
THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOWIT.
7. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STEAM AND PREFERABLYSTRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE INTHE UPPER SECTION OF THE APRON.
8. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION.
MAINTENANCE
1. INSPECT OUTLET STABILIZATION STRUCTURES AT LEAST WEEKLY AND AFTER EACH RAINFALL
EVENT THAT EXCEEDS 0.5 INCHES WITHIN A 24 HOUR PERIOD.
*REF: N.C. EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL, 2006.
NCDOT RIPRAPUNDERLAIN WITH 8 OZ/SYNON-WOVEN GEOTEXTILE
RIPRAP ENERGY DISSIPATOR SCHEDULE
APRON
PIPEDIAMETER(FT)
PEAKDISCHARGE25 YR. 24HR. STORM
La(FT)Wp(FT)Wa(FT)
NCDOTRIPRAPCLASS
d50(IN)
dMAX(IN)
APRONTHICKNESS(FT)
RA-1 2 55.98 26 6 28 1 10 17 2
RA-2 1.5 32.71 22 4.5 23.5 1 10 17 2
RA-3 2 67.15 30 6 32 2 14 23 3
EXTEND RIPRAPAROUND PIPE END
FOR NCDOT RIPRAPTYPE SEE TABLE BELOW
8 OZ/SY NON-WOVEN GEOTEXTILE
T
N.T.S.
GENERAL NOTES
1. BASE INFORMATION PROVIDED BY WSP USA CORP. IN A SURVEY DRAWING ENTITLED TOPOGRAPHIC SURVEY ALLEN
STEAM STATION - RAB LANDFILL DATED MAY 10, 2016. FIELD SURVEY WAS CONDUCTED ON APRIL 26-27, 2016.
2. THE CONTRACTOR SHALL CHECK ALL EXISTING CONDITIONS, (i.e. INVERTS, UTILITY ROUTINGS, UTILITY CROSSINGS,AND DIMENSIONS) IN THE FIELD PRIOR TO COMMENCEMENT OF WORK. REPORT ANY DISCREPANCIES TO THEENGINEER.
3. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES. TAKE CARE TO PROTECT UTILITIES
THAT ARE TO REMAIN. REPAIR ANY DAMAGE ACCORDING TO LOCAL STANDARDS AND AT THE CONTRACTOR'S
EXPENSE. COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALLCALL PRIVATE UTILITY LOCATOR 72 HOURS PRIOR TO PROCEEDING WITH ANY EXCAVATION.
4. THE CONTRACTOR SHALL CONFORM TO ALL LOCAL CODES AND RECEIVE APPROVAL WHERE NECESSARY BEFORECONSTRUCTION.
5. EXISTING ROADWAYS SHALL BE REPAIRED TO PRE-CONSTRUCTION CONDITION AFTER INSTALLATION OF PROPOSEDIMPROVEMENTS.
6. PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING AND PROPOSED GRADES. SLIGHT FIELD ADJUSTMENT OF FINAL
GRADES MAY BE NECESSARY.
7. UNDER NO CIRCUMSTANCES WILL S&ME, INC. BE HELD RESPONSIBLE FOR SITE SAFETY.
8. ALL CONSTRUCTION MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL GOVERNING AGENCY AND STATE
DOT REGULATIONS AND SPECIFICATIONS.
EROSION CONTROL NOTES:
1. THE DISTURBED AREA FOR THIS PROJECT IS APPROXIMATELY 0.74 ACRES.
2. EROSION PREVENTION AND SEDIMENT CONTROL MEASURES MUST BE IN PLACE AND FUNCTIONAL BEFORE EARTH
MOVING OPERATION BEGINS AND MUST BE CONSTRUCTED AND MAINTAINED THROUGHOUT THE CONSTRUCTIONPERIOD. TEMPORARY MEASURES MAY BE REMOVED AT THE BEGINNING OF THE WORKDAY BUT MUST BE REPLACED ATTHE END OF THE WORKDAY.
3. PRE-CONSTRUCTION VEGETATIVE GROUND COVER SHALL NOT BE DESTROYED, REMOVED OR DISTURBED MORE THAN10 DAYS PRIOR TO GRADING OR EARTH MOVING UNLESS THE AREA IS SEEDED AND/OR MULCHED OR OTHERTEMPORARY COVER IS INSTALLED.
4. MULCH OR APPLY RECP AND SEED ALL DISTURBED AREAS AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED,
UNLESS OTHERWISE INDICATED. CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO ESTABLISHPERMANENT SOIL STABILIZATION. CONSTRUCTION MUST BE SEQUENCED TO MINIMIZE THE EXPOSURE TIME OFGRADED OR DENUDED AREAS.
5. PROVIDE TEMPORARY CONSTRUCTION ACCESS(ES) AT THE POINT(S) WHERE CONSTRUCTION VEHICLES EXIT THECONSTRUCTION AREA. MAINTAIN PUBLIC ROADWAYS FREE OF TRACKED MUD AND DIRT.
6. SEDIMENT SHOULD BE REMOVED FROM SEDIMENT TRAPS, SILT FENCES, SEDIMENTATION PONDS AND OTHER
SEDIMENT CONTROLS AS NECESSARY AND MUST BE REMOVED WHEN DESIGN CAPACITY HAS BEEN REDUCED BY 50%OR AS DIRECTED BY OWNERS REPRESENTATIVE.
7. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM ALL DRAINAGE STRUCTURES UPON ESTABLISHMENT OF
PERENNIAL VEGETATION.
8. SEDIMENT REMOVED FROM SEDIMENT CONTROL STRUCTURES IS TO BE PLACED AT A SITE APPROVED BY THE
ENGINEER OR OWNER. IT SHALL BE TREATED IN A MANNER SO THAT THE AREA AROUND THE DISPOSAL SITE WILL NOT
BE CONTAMINATED OR DAMAGED BY THE SEDIMENT IN THE RUN-OFF. THE CONTRACTOR SHALL OBTAIN THE
DISPOSAL SITE AS PART OF THIS WORK.
9. STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE TREATED SO THE SEDIMENT RUN-OFF WILL NOT CONTAMINATE
SURROUNDING AREAS OR ENTER NEARBY STREAMS.
10. THE CONTRACTOR SHALL REMOVE THE TEMPORARY EROSION AND WATER POLLUTION CONTROL DEVICES AFTER A
SOLID STAND OF GRASS HAS BEEN ESTABLISHED ON GRADED AREAS AND WHEN IN THE OPINION OF THE OWNER'S
REPRESENTATIVE, THEY ARE NO LONGER NEEDED.
SITE GRADING NOTES
1. THE CONTRACTOR SHALL CHECK ALL EXISTING GRADES AND DIMENSIONS IN THE FIELD PRIOR TO BEGINNING
WORK AND REPORT ANY DISCREPANCIES TO THE ENGINEER.
2. PROPOSED CONTOUR LINES AND SPOT ELEVATIONS ARE THE RESULT OF AN ENGINEERED GRADING DESIGN AND
REFLECT A PLANNED INTENT WITH REGARD TO DRAINAGE AND MOVEMENT OF MATERIALS. SHOULD THE
CONTRACTOR HAVE ANY QUESTION OF THE INTENT OR ANY PROBLEM WITH THE CONTINUITY OF GRADES, THE
ENGINEER SHALL BE CONTACTED IMMEDIATELY.
3. ALL EARTHWORK, INCLUDING THE EXCAVATED SUBGRADE AND EACH LAYER OF FILL, SHALL BE MONITORED ANDAPPROVED BY A QUALIFIED GEOTECHNICAL ENGINEER, OR HIS REPRESENTATIVE.
4. THESE PLANS ARE NOT A DETERMINATION OR GUARANTEE OF THE SUITABILITY OF THE SUBSURFACE CONDITIONSFOR THE WORK INDICATED. DETERMINATION OF THE SUBSURFACE CONDITIONS FOR THE WORK INDICATED ISSOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
5. IN NO CASE SHALL SLOPE, HEIGHT, SLOPE INCLINATION, OR EXCAVATION DEPTH, INCLUDING TRENCHCONSTRUCTION, EXCEED THOSE SPECIFIED IN LOCAL, STATE AND FEDERAL REGULATIONS, SPECIFICALLY THECURRENT OSHA HEALTH AND SAFETY STANDARDS FOR EXCAVATIONS (29 CRF PART 1926) SHALL BE FOLLOWED.
6. DO NOT DISTURB VEGETATION OR REMOVE TREES EXCEPT WHEN NECESSARY FOR GRADING PURPOSES.
7. STRIP TOPSOIL FROM ALL CUT AND FILL AREAS AND STOCKPILE. UPON COMPLETION OF GENERAL GRADING APPLYTOPSOIL OVER ALL DISTURBED AREAS (THAT ARE NOT OTHERWISE STABILIZED) , TO A MINIMUM DEPTH OF 4”.CONTRACTOR SHALL SUPPLY ADDITIONAL TOP SOIL IF INSUFFICIENT QUANTITIES EXIST ON SITE.
8. WHERE ASH IS UNCOVERED DURING EXCAVATION, THE ASH SHOULD BE OVEREXCAVATED TO PROVIDE A MINIMUMOF 2' SOIL COVER. ALL ASH WILL BE DISPOSED OF IN THE ON-SITE LANDFILL.
9. POSITIVE DRAINAGE SHALL BE ESTABLISHED AS THE FIRST ORDER OF WORK AND SHALL BE MAINTAINED AT ALLTIMES DURING AND AFTER CONSTRUCTION.
10. ALL FILL MATERIAL SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. THIS MATERIALSHALL BE PLACED IN LIFTS DIRECTED BY THE GEOTECHNICAL ENGINEER AND COMPACTED TO 95% STANDARD
PROCTOR.
11. ANY SITE USED FOR DISPOSAL AND/OR STOCKPILE OF ANY MATERIAL SHALL BE PROPERLY PERMITTED FOR SUCH
ACTIVITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SEE THAT ALL REQUIRED PERMITS ARE SECURED FOR
EACH PROPERTY UTILIZED. A COPY OF THE APPROVED PERMIT MUST BE PROVIDED TO THE INSPECTOR PRIOR TOCOMMENCEMENT OF WORK ON ANY PROPERTY. FAILURE TO DO SO MAY RESULT IN THE CONTRACTOR REMOVINGANY ILLEGALLY PLACED MATERIAL AT HIS OWN EXPENSE.
12. DISTURBANCE TO EXISTING PERIMETER ROAD SHALL BE REPAIRED TO EXISTING CONDITIONS. (I.E. 12" ABC STONE(AGGREGATE TYPE A 1) UNDERLAIN BY WOVEN GEOTEXTILE).
13. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO WASTE EXCESS EARTH MATERIAL OFF SITE AT NO ADDITIONALCOST TO THE OWNER. THE CONTRACTOR SHALL FIRST OFFER THE EXCESS MATERIAL TO THE OWNER. IF NOTACCEPTED BY THE OWNER, THE CONTRACTOR SHALL DISPOSE OF EARTH MATERIAL OFF SITE. IT SHALL ALSO BE THECONTRACTOR'S RESPONSIBILITY TO IMPORT SUITABLE MATERIAL (AT NO ADDITIONAL COST TO THE OWNER) FOR
EARTHWORK OPERATIONS IF SUFFICIENT AMOUNTS OF EARTH MATERIAL ARE NOT AVAILABLE ON SITE.
TECHNICAL SPECIFICATIONSSOUTH DRAINAGE CHANNEL IMPROVEMENTSALLEN STEAM STATION RAB LANDFILLBELMONT, NORTH CAROLINA
S&ME Project No.7235-15-035
Prepared for:
Duke Energy – Allen Steam Station
253 Plant Allen Road
Belmont, North Carolina 28012
Prepared by:
Charlotte, North Carolina
September 2016
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 0000 General Requirements
01 1000 Summary of Work
DIVISION 03 – CONCRETE
03 1000 Concrete Forms and Accessories
03 3000 Cast-In-Place Concrete
03 4800 Precast Concrete Specialties
DIVISION 31 - EARTHWORK
31 0516 Aggregate
31 1100 Clearing and Grubbing
31 1413-16 Soil Stockpiling
31 2316 Excavation
31 2316.13 Trenching
31 2319 Dewatering
31 2323.13 Backfill
31 2500 Erosion and Sediment Control Devices
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 9219 Seeding
DIVISION 33 – EXTERIOR IMPROVEMENTS
32 4213 Concrete Culvert Pipe
DIVISION 01
GENERAL REQUIREMENTS
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 1 of 20 General Requirements
SECTION 01 0000
GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Summary Work
a. Project Summary
b. Engineer Responsibilities
c. Contractor and Subcontractor Qualifications
d. Work Sequence
2. Schedule
a. General Requirements
b. Schedule
c. Meetings
3. Construction Work Plan
a. Preliminary Work Plan
b. Contractor’s Work Plan Contents
c. Delays and Recovery
4. Price Payment
a. Measurement
b. Calculation of Quantities
c. Payment
d. Change Procedures.
e. Defect Assessment
f. Force Account Work
g. Unit Prices
h. Dewatering
5. Administrative Requirements
a. Project Management
b. Construction Coordination
c. Meetings
d. Submittal Procedures
6. Quality Requirements
a. Quality Control and Control of Installation
b. Tolerances
c. Testing and Observation Requirements
d. Certificates of Compliance
7. Temporary Facility Controls
a. Temporary Controls
b. Temporary Facilities
c. Site Security
8. Environmental Protection
a. General
b. Protection of Land Resources
c. Protection of Water Resources
d. Storage and Disposal of Petroleum Products
e. Control of Air Pollutants
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 2 of 20 General Requirements
9. Product Requirements
a. Product Substitution Procedures
10. Execution Requirements
a. Closeout Procedures
b. Project Record Documents
11. Performance Acceptance Criteria
12. References
PART 2 SUMMARY WORK
2.01 PROJECT SUMMARY
A. The summary of work is defined in Section 01 1000.
B. Perform Work of Contract under stipulated sum with Duke Energy (Owner) in accordance
with Conditions of Contract.
C. Work of Contract shall be constructed to the lines and elevations as shown on the Drawings
and as identified in these Technical Specifications. Any deviations from the Drawings or
Technical Specifications require the prior written approval of S&ME Inc. (ENGINEER) and
must be documented by "record" revisions to the Drawings and/or Technical Specifications.
D. During phases of construction, construction will be tested, monitored, and evaluated prior to
approval.
2.02 ENGINEER RESPONSIBILITIES
A. Engineer will be Owner’s representative during the construction period. The duties and
responsibilities and the limitations of authority of Engineer as Owner’s representative during
construction are set forth as follows and will not be changed without written consent of
Owner and Engineer.
1. Neither Engineer’s authority or responsibility under this Section or under any other
provision of the Contract Documents nor any decision made by Engineer in good faith
either to exercise or not exercise such authority or responsibility or the undertaking,
exercise, or performance of any authority or responsibility by Engineer shall create,
impose, or give rise to any duty in contract, tort, or otherwise owed by Engineer to
Vendor (Contractor), any Subcontractor, any Supplier, any other individual or entity, or
to any surety for or employee or agent of any of them.
2. Engineer will not supervise, direct, control, or have authority over or be responsible for
Contractor’s means, methods, techniques, sequences, or procedures of construction, or
the safety precautions and programs incident thereto, or for any failure of Contractor to
comply with Laws and Regulations applicable to the performance of the Work. Engineer
will not be responsible for Contractor’s failure to perform the Work in accordance with
the Contract Documents.
3. Engineer will not be responsible for the acts or omissions of Contractor or of any
Subcontractor, any Supplier, or of any other individual or entity performing any of the
Work.
4. Engineer’s review of the final Application for Payment and accompanying
documentation and all maintenance and operating instructions, schedules, guarantees,
bonds, certificates of inspection, tests and approvals, and other documentation required to
be delivered by the Contract Documents will only be to determine generally that their
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 3 of 20 General Requirements
content complies with the requirements of, and in the case of certificates of inspections,
tests, and approvals that the results certified indicate compliance with the Contract
Documents.
5. The limitations upon authority and responsibility set forth in this Section shall also apply
to the Resident Project Representative, if any, and assistants, if any.
2.03 CONTRACTOR AND SUBCONTRACTOR QUALIFICATIONS
A. General Contractor (Contractor AND Subcontractor):
1. The Contractor AND Subcontractor must be qualified and experienced in construction
work and must submit qualifications as required by the Bid Instructions.
B. Surveyor:
1. All field layouts shall be performed by or under the supervision of a licensed Professional
Land Surveyor registered in the state where the Work is to be conducted. The Contractor
shall establish and maintain a minimum of two permanent benchmarks. Horizontal and
vertical locations of the benchmarks shall be recorded on the Record Drawings.
2.04 WORK SEQUENCE
A. General Order of Construction. During and prior to construction period, coordinate
construction schedule and operations with Owner, Engineer, and any other applicable parties.
B. The work sequence shall generally follow the work description summarized in
Section 01 1000, and shall be consistent with the work sequences identified in the Erosion
Control Plan and existing NPDES permit.
PART 3 SCHEDULE
3.01 GENERAL REQUIREMENTS
A. The platform for this schedule shall be in an electronic format agreeable to the Owner.
B. Specific schedule format shall include activities, start date, finish date, duration, activity logic
(predecessor and successor activities), percent progress, and milestones.
C. The Contractor shall only be permitted to work during daylight hours. The Contractor may
seek exceptions to these work hours with Owner authorization.
D. The schedule calendar shall be depicted with defined work hours i.e. 4 – 10’s, 5 – 10’s, etc.
E. Bidders shall submit a proposed project schedule with their bids and the successful Bidder
shall submit a final project schedule within 15 days of award.
F. Bidders shall comply with Duke Energy Safety Handbook, including MICCS card program,
Site Orientation, daily pre-job briefs, JHAs, supplemental EHS requirements.
3.02 SCHEDULE
A. It is suggested that the schedule include at a minimum those items described in the scope of
work in Section 01 1000.
B. The schedule shall include but not be limited to the following milestones:
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 4 of 20 General Requirements
1. Install erosion and sediment control measures
2. Locate utilities within the work area
3. Excavate and re-grade existing drainage channel
4. Construct culverts
5. Construct headwalls and endwalls
6. Construct outlet stabilization
7. Seeding and site stabilization
8. Project Substantial Completion
9. Demobilization
10. Acceptance of Work
C. During construction, the schedule shall be updated on a monthly basis.
3.03 MEETINGS
A. The successful bidder shall allow and plan for the following meetings in the project schedule:
1. Preconstruction meeting with the Owner, Engineer, and NCDENR regulatory personnel if
required
2. Regular weekly construction progress meetings with the Owner.
PART 4 CONSTRUCTION WORK PLAN
4.01 PRELIMINARY WORK PLAN
A. Prepare and submit with Bid, a preliminary Work Plan.
B. Owner will review the preliminary Work Plan as part of the bid evaluation.
C. The Contractor may be interviewed by the Owner to determine the Contractor 's
understanding of the project, and ability to complete the work in a timely and efficient
manner.
D. Submit final Work Plan 10 days after signing Contractor / Owner Agreement.
4.02 CONTRACTOR'S WORK PLAN CONTENTS
A. Work Plan shall summarize personnel, equipment, and procedures required to accomplish
specific items of work, including:
1. Safety readiness review, safety matrix and any other pertinent safety requirements in
order to start work.
2. Organization chart, showing Contractor, Subcontractors, Subconsultants and key
personnel.
3. Equipment and routes for moving and stockpiling materials on site.
4. Methods for conditioning the moisture content of soils prior to using them for
constructing engineered fills.
5. Methods and equipment for hauling and placing materials.
6. Dewatering construction methods.
7. Methods for erosion prevention and sediment control.
8. Plans for maintaining as-built information.
9. Project Schedule as specified in this Section.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 5 of 20 General Requirements
4.03 DELAYS AND RECOVERY
A. If, at any time during Project, Contractor fails to complete an activity by its latest scheduled
completion date, Contractor must submit, within two working days, a written statement which
details the methods by which Contractor proposes to return to current construction schedule.
B. The Project Manager may require the Contractor to implement some or all of the following:
1. Increase construction staffing in such quantities and crafts.
2. Increase number of working hours per shift, shifts per work day, work days per week, or
amount of construction equipment, or combination of foregoing.
3. Reschedule work items to achieve concurrence of accomplishment.
C. Under no circumstances will the addition of equipment or construction resources, an increase
in working hours or any other method, manner or procedure implemented to return the project
to current Construction Progress Schedule be considered justification for a contract
modification or treated as an acceleration.
PART 5 PRICE PAYMENT
5.01 MEASUREMENT
A. Performed according to United States Standard measure.
B. Based on actual units installed or neat line dimensions of work completed.
5.02 CALCULATION OF QUANTITIES
A. Progress Payment Quantities:
1. Contractor will compute all quantities of Work performed, or of materials and equipment
delivered to the site for progress payment purposes.
2. Owner may at any time verify quantities calculated by Contractor.
B. Final Payment Quantities: Contractor will compute all quantities of Work performed, or of
materials and equipment delivered to the site for final payment purposes. Owner may verify
all quantities.
C. Earthwork quantities: Quantities of earthwork will be measured in their final installed
location only. It is anticipated that soil disposal or stockpiling may require multiple handling
of materials. Include any necessary costs for multiple handling of materials or temporary
stockpiling in bid item prices for other specified work.
5.03 PAYMENT
A. In accordance with lump sum, unit prices, or force account rates shown on the Bid Proposal
Form.
B. Includes all costs for overhead and profit and for supplying materials, labor, equipment, tools,
necessary to complete the Work in accordance with the Specifications, Drawings, and
Contract Conditions.
5.04 CHANGE PROCEDURES
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 6 of 20 General Requirements
A. Submittals: Submit name of individual authorized to receive change documents, and be
responsible for informing others in Contractor's employ or Subcontractors of changes to the
Work.
B. The Owner will advise of minor changes in the Work not involving adjustment to Contract
Sum/Price or Contract Time.
C. The Owner may issue a Notice of Change including a detailed description of proposed
change with supplementary or revised Drawings and specifications, a change in Contract
Time for executing the change, and the period of time during which the requested price will
be considered valid. Contractor will prepare and submit estimate within five days.
D. Contractor may propose changes by submitting a request for change to Owner, describing
proposed change and its full effect on the Work. Include a statement describing reason for
the change, and effect on Contract Sum/Price and Contract Time with full documentation and
a statement describing effect on Work by separate or other Contractors. Document requested
substitutions in accordance with this Specification.
E. Work Directive Change: Owner may issue directive instructing Contractor to proceed with
change in the Work, for subsequent inclusion in a Change Order. Document will describe
changes in the Work, and designate method of determining any change in Contract Sum/Price
or Contract Time. Promptly execute change.
5.05 DEFECT ASSESSMENT
A. Replace the Work, or portions of the Work, not conforming to specified requirements.
B. If, in the opinion of the Engineer and/or Owner, it is not practical to remove and replace the
Work, the Engineer will direct appropriate remedy or adjust payment.
C. Individual specification sections may modify these options or may identify specific formula
or percentage sum/price reduction.
D. Authority of Engineer and/or Owner to assess defects and identify payment adjustments is
final.
E. Non-Payment for Rejected Products: Payment will not be made for rejected products for any
of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from transporting vehicle.
4. Products placed beyond lines and levels of required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected products.
5.06 FORCE ACCOUNT WORK
A. Payment for Force Account work will be determined as follows:
B. Labor.
1. Payment for labor will be based on the Force Account Labor Rate Schedule submitted
with the bid.
2. Payment constitutes full compensation for labor including wages, benefits, overhead, and
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 7 of 20 General Requirements
profit for each individual.
C. Equipment.
1. Payment for equipment will be based on the Force Account Equipment Rate Schedule
submitted with the bid.
2. Payment constitutes full compensation for supplying equipment and includes all costs for
maintenance, fuel, insurance, overhead, profit and any other costs necessary to provide
and operate the equipment. Payment does not include operator labor cost.
D. Materials.
1. Payment for materials will be paid for at cost plus 10 percent.
2. Payment will be based on invoices from suppliers indicating cost to Contractor.
3. Where invoices are not available, a unit cost must be approved by the Owner prior to use
of the material.
E. Where requested by Owner, force account work will be based on three bids from suppliers or
Subcontractors.
F. Standby Time:
1. Payment for standby time will be based on the Force Account Labor Rate, Force Account
Equipment Rate (minus an agreed upon percentage for fuel, maintenance and wear and
tear) and Overhead Profit Percentage.
2. Measurement will be by written approval of the Owner dated prior to Standby time
starting.
5.07 UNIT PRICES
A. Unit Quantities
1. Measurement methods delineated in individual specification sections complement criteria
of this section. In event of conflict, requirements of individual specification section
govern.
2. Take measurements and compute quantities. Engineer will verify measurements and
quantities.
3. Quantities and measurements indicated in Bid Form and/or Contract Documents are for
contract purposes only. Quantities and measurements supplied or placed in the Work
shall determine payment. Final payment for Work governed by unit prices will be made
on basis of actual measurements and quantities accepted by Engineer multiplied by unit
sum/price for Work incorporated in or made necessary by the Work.
a. When actual Work requires more or fewer quantities than those quantities indicated,
provide required quantities at unit prices contracted.
b. When actual Work requires 30 percent or greater change in quantity than those
quantities indicated, Owner or Contractor may claim for Contract Price adjustment.
B. Unit Prices
1. Payment Includes: Full compensation for required labor, products, tools, equipment, plant
and facilities, transportation, services and incidentals; erection, application or installation
of item of the Work; overhead and profit.
2. Specific Item Unit Pricing is delineated in the individual specification sections.
3. Mobilization
a. Basis of Measurement: By lump sum.
b. Basis of Payment: Includes mobilization for the project.
4. Surveying
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 8 of 20 General Requirements
a. Basis of Measurement: By lump sum.
b. Basis of Payment: Includes surveying to the locations and grades according to the
plans and specifications and providing record drawings, and any incidentals in
completing the contract. Surveys required to complete record drawings shall include,
at a minimum, the following:
1) Existing Conditions Survey: after clearing, before stripping.
2) Final Subgrade Survey: after excavation, cut, and fill for construction of
drainage channel.
3) Installed stormwater piping and associated structures..
5.08 DEWATERING
A. No measurement or payment will be made for dewatering.
B. Include unit rate cost for this work in other bid items, dewatering may not be limited to:
1. Lowering groundwater to perform excavation for drainage channel excavation.
2. Providing, installing, and operating temporary pump for groundwater control for
trenching, and placement of outlet stabilization in the existing sediment pond.
3. Constructing any necessary temporary storm water drainage features.
PART 6 ADMINISTRATIVE REQUIREMENTS
6.01 PROJECT MANAGEMENT
A. Owner will provide a Project Manager. The Project Manager represents the Owner. Any
reference to coordination or communication, both written and verbal, with the Owner, must
be through the Project Manager.
B. The Project Manager also represents the various Engineer's and consultants responsible for
project design. All communication with the Engineers and consultants must go through the
Project Manager.
C. Project Manager: To be identified at the pre-construction meeting.
6.02 CONSTRUCTION COORDINATION
A. Cooperate with the Project Manager in allocation of mobilization areas of site; for field
offices and sheds, for access, traffic, and parking facilities.
B. During construction, coordinate use of site and facilities through the Project Manager.
C. Comply with Project Manager's procedures for intra-project communications; submittals,
reports and records, schedules, coordination of drawings, and recommendations; and
resolution of ambiguities and conflicts.
D. Comply with instructions of the Project Manager for use of temporary utilities and
construction facilities.
E. Coordinate field engineering and layout work under instructions of the Project Manager.
6.03 MEETINGS
A. Pre-construction meeting.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 9 of 20 General Requirements
1. Owner will schedule a preconstruction meeting and location after Notice of Award
2. Attendance:
a. Contractor's On-Site Field Superintendent.
b. Any Subcontractors or Supplier's representatives whom Contractor may desire to
invite or Owner may request.
c. Engineer.
d. Owner‘s Representatives.
e. Project Manager.
3. An agenda will be prepared by the Project Manager and may include the following:
a. Presentation of a proposed construction progress schedule and submittals per this
Section.
b. Review of critical work sequencing.
c. Procedures for handling submittals and proposed substitutions.
d. Direction of correspondence, coordinating responsibility between Contractor and
Owner, and defining lines of communication and authority.
e. Weekly progress meetings.
f. Establish procedures for reviewing test data and correcting non-conforming work.
g. Procedures for field decisions and change orders.
h. Health and safety.
i. Site security.
j. Owner’s site regulations.
k. Review the construction drawings, specifications, CQA plan, and related issues.
l. Provide all parties with relevant documents.
m. Review responsibilities for each party, and key personnel.
n. Establish reporting and documenting procedures.
o. Conduct a site inspection to discuss work area, stockpile areas, lay down areas,
access roads, haul roads, and related items.
4. The meeting will be documented by the Owner in the form of meeting minutes. Copies
of the minutes and relevant documents will be provided to all parties, following the
meeting.
B. Weekly Progress Meetings.
1. Project Manager will hold progress meetings at the project site at regular intervals, once
per week or as required. Project Manager will coordinate and schedule meeting dates and
times and notify parties that need to attend.
2. Attendance:
a. Contractor's superintendent.
b. Subcontractors as appropriate to agenda.
c. Suppliers as appropriate to agenda.
d. CQA Field Manager.
e. Project Manager.
3. Meeting requirements:
a. Owner will administer and document the following general requirements for progress
meetings:
1) Prepare agenda for meetings.
2) Make physical arrangements for meetings.
3) Preside at meetings.
b. Owner will record significant proceedings and decisions of meeting and reproduce
and distribute copies of meeting record within 3 days after each meeting to
participants in meeting and to parties affected by decisions made at meeting.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 10 of 20 General Requirements
c. Contractor shall prepare and distribute a brief report at each weekly meeting that
includes:
1) Summary and progress to date.
2) Potential problems and impacts to the project.
3) Status of Submittals.
4) Status of Requests for Information.
5) Summary of following weeks activities.
6) Updated schedule.
This report will form part of the meeting minutes.
4. Suggested Agenda:
a. Review and approval of record minutes of previous meeting.
b. Health and safety.
c. Review of work progress since previous meeting with weekly quantities.
d. Progress planned for next week.
e. Field decisions.
f. Problems which impede work schedule.
g. Anticipated future problems.
h. Maintenance of quality and work standards (QA/QC).
i. Review of as-built documentation.
j. Review of submittal schedule and status of submittals.
k. Pending changes and substitutions.
l. Review of off-site delivery schedules.
m. Review and revisions to project schedule.
n. Erosion and sediment control.
o. Other business.
C. DAILY PROGRESS MEETINGS
1. An informal progress meeting may be conducted daily before the start of work. At a
minimum, this meeting will be attended by the Owner and Contractor to review the
previous day's activities and accomplishments. This meeting will be documented by the
Contractor in his daily report.
D. OTHER MEETINGS
1. The Project Manager will hold other meetings at his discretion during the Contract.
6.04 SUBMITTAL PROCEDURES
A. Contractor shall submit a submittal register in duplicate within 10 days after Notice of Award
and prior to preconstruction meeting. Submittal register shall identify all submittal
requirements contained in the plans and specifications, with references to the plan or
specification numbers.
B. Transmit each submittal with Owner accepted form.
C. Sequentially number transmittal forms. Mark revised submittals with original number and
sequential alphabetic suffix.
D. Identify Project, Contractor, Subcontractor and Supplier; pertinent drawing and detail
number, and specification section number, appropriate to submittal.
E. Apply Contractor’s stamp, signed or initialed certifying that review, approval, verification of
products required, field dimensions, adjacent construction Work, and coordination of
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 11 of 20 General Requirements
information is in accordance with requirements of the Work and Contract Documents.
F. Schedule submittals to expedite the Project and deliver in the time frame specified.
Coordinate submission of related items.
G. Allow 10 days review time for each submittal excluding delivery time to and from the
Contractor.
H. Identify variations from Contract Documents and product or system limitations, which may
be detrimental to successful performance of completed Work.
I. If necessary, revise and resubmit, and identify all changes made since previous submission.
J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report
any inability to comply with provisions.
K. When revised for resubmission, identify changes made since previous submission.
L. Submittals not requested will not be recognized or processed.
PART 7 LAYOUT OF WORK AND SURVEYS
7.01 SUMMARY
A. Section includes general requirements for survey work to be performed by the Contractor.
1. Set offset stakes, slope stakes, and grade stakes for field layout of features of the Work.
2. Perform surveys for measurement of pay quantities.
3. Perform surveys to record as-built conditions of the project.
7.02 DESCRIPTION
A.Reference Points. Prior to construction, verify with Owner the locations of site reference
points and survey control points. Notify Owner if survey control points are damaged upon
discovery. Also notify Owner of any damage caused by Contractor, then repair or replace
control points at no additional cost to Owner. The Owner reserves the right to perform any
desired checking and correction of the Contractor 's surveys but this does not relieve the
Contractor of the responsibility for adequate performance of the Work.
B.Equipment and Personnel. Provide instruments and other survey equipment that is
accurate, suitable for the surveys required in accordance with recognized professional
standards, and in proper condition and adjustment at all times. Perform work under the direct
supervision of a licensed surveyor licensed in the state of North Carolina.
C.Field Notes and Records. Record surveys in field notebooks. Electronic notes may be used
if printouts are furnished to the Owner by request and if the format of the printed information
is approved by the Owner.
D.Use by the OWNER. The Owner may at any time use line and grade points and markers
established by the Contractor. The Contractor 's surveys are a part of the Work and may be
checked by the Owner or representatives of the Owner at any time. The Contractor is
responsible for (1) any lines, grades, or measurements which do not comply with specified
design criteria or proper tolerances, or which are otherwise defective, and (2) for any
resultant defects in the Work. The Contractor will be required to conduct re-surveys or check
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 12 of 20 General Requirements
surveys to correct errors indicated by review of the field notebooks or otherwise detected.
7.03 SURVEYS FOR LAYOUT AND PERFORMANCE OF WORK
A. Perform surveys for layout and performance of the Work, reduce the field notes, make
necessary calculations, and prepare drawings necessary to carry out such work.
7.04 SURVEYS FOR RECORD DRAWINGS AND MEASUREMENT FOR PAYMENT
A. When the Specifications require items of work to be measured by surveying methods, the
Contractor will perform the surveys and perform necessary calculations to determine payment
quantities. The Owner may perform independent checks.
B. Items requiring surveys for determining pay quantities are given in this Section, Price
Payment.
C. Provide record (as-built) drawings to the Owner for the following items:
1. Drainage Channel.
2. Elevation and limits for earthwork.
3. Stormwater culvert locations, invert elevations.
4. Leachate force main piping, where found.
5. Ditch flow lines if necessary.
6. Initial and finish grades for the surface water control features.
7. Limits of hydroseeding.
8. Stockpile grades if necessary.
D. Provide as-built survey drawings in digital format, same stationing, and same orientation for
each element as shown on the design drawings. Provide as-built survey information and
associated pint data on the same datum and coordinate basis as design drawings. All point
data must have clear, easy to understand descriptions. Submit survey information to the
Owner before the items are covered.
E. Provide information in digital format in accordance with Owner’s request.
F. As-built survey drawings are due on or before substantial completion date.
7.05 SURVEYING ACCURACY AND TOLERANCES IN SETTING OF SURVEY STAKES
A. Perform control traverse field surveys and computations to an accuracy of at least 1:10,000.
B. The tolerances applicable in setting survey stakes are set forth below. Such tolerances do not
supersede stricter tolerances required by the Drawings or Specifications, and do not otherwise
relieve the Contractor of responsibility for measurements in compliance therewith.
TABLE
OF MARK
HORIZONTAL
POSTION ELEVATION
Permanent reference points 1 in 10,000 ±.01 ft
General excavation and earthwork ±1.0 ft ±.10 ft
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 13 of 20 General Requirements
C. Tolerances for designed thicknesses shown on Drawings shown on the Drawings are
minimum thicknesses, unless otherwise specified.
7.06 MONITORING DEVICE PROTECTION
A. Prior to beginning any site work, locate all monitoring wells, piezometers, utility boxes, valve
boxes, leachate force main piping, electrical lines or other utilities.
B. Install markers identifying the location of these devices.
C. The purpose of the work is to protect these items during construction.
D. Any items damaged during construction by the Contractor will be replaced by the Contractor
at no cost to the Owner.
E. An example replacement cost for a monitoring well is approximately $7,500.
7.07 COORDINATION WITH OWNER
A. Keep Owner informed on progress of survey work to allow Owner sufficient time and ample
opportunity to verify survey work without inconvenience or delay to Contractor.
PART 8 QUALITY REQUIREMENTS
8.01 QUALITY CONTROL AND CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and
workmanship, to produce Work of specified quality.
B. Comply with manufacturers' and/or supplier’s instructions, including each step in sequence.
C. When manufacturers' and/or supplier’s instructions conflict with Contract Documents,
request clarification from Engineer before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more
stringent tolerances, codes, or specified requirements indicate higher standards or more
precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify field measurements are as indicated on Construction Drawings or as instructed by
manufacturer.
G. Materials stored off the site shall be stored in accordance with Manufacturer
recommendations and stored in a bonded warehouse and shall be clearly marked as being for
this project.
8.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable
Work. Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with
Contract Documents, request clarification from Engineer before proceeding.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 14 of 20 General Requirements
C. Adjust products to appropriate dimensions; position before securing products in place.
8.03 TESTING AND OBSERVATION REQUIREMENTS
A. Testing and observation services for the purpose of conducting tests shall be performed by
the Engineer or approved third party contractor as required by the technical specifications.
All costs of testing shall be paid by the Owner. The entity providing the testing and
observation services shall be referred to as the construction quality assurance (CQA) agent
herein.
B. Testing, observations and source quality control may occur on or off project site. Perform
off-site testing as required by Engineer or Owner.
C. Cooperate with CQA agent; furnish samples of materials, equipment, tools, storage, safe
access, and assistance by incidental labor as requested.
1. The Contractor shall give ample advance notice to the CQA agent and Engineer prior to
expected time for operations requiring testing services and/or before covering up items
that require inspection.
2. Make arrangements with CQA agent and pay for additional samples and tests required for
Contractor's use.
D. Testing and employment of testing agency or laboratory shall not relieve Contractor of
obligation to perform Work in accordance with requirements of Contract Documents.
E. Re-testing or observation required because of non-conformance to specified requirements
shall be performed by same CQA agent on instructions by Engineer. Payment for re-testing
will be charged to Contractor by deducting testing charges from Contract Sum/Price.
F. CQA Agent Responsibilities:
1. Provide qualified personnel at site. Cooperate with Owner, Engineer and Contractor in
performance of services.
2. Perform specified sampling and testing of products in accordance with specified
standards.
3. Ascertain compliance of materials with requirements of Contract Documents.
4. Promptly notify Owner, Engineer and Contractor of observed irregularities or non-
conformance of Work or products.
5. Perform additional tests required by Owner, Engineer.
6. Attend preconstruction meetings and progress meetings.
8.04 CERTIFICATES OF COMPLIANCE
A. Contractor may use certificates of compliance for certain materials and products in lieu of the
specified sampling and testing procedures. Certificates must be signed by an authorized
representative of the producer or manufacturer and state that the material complies in all
respects with the requirements of the Contract Documents. In the case of multiple shipments,
each shipment must be accompanied or preceded by a Certificate of Compliance.
B. Owner reserves the right to refuse the use of certain materials on the basis of a Certificate of
Compliance.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 15 of 20 General Requirements
PART 9 TEMPORARY FACILITY CONTROLS
9.01 TEMPORARY CONTROLS
A. Barriers
1. Provide barriers to prevent unauthorized entry to construction areas and to protect
existing facilities and adjacent properties from damage from construction operations and
demolition.
B. Water Control
1. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain
pumping equipment.
2. Provide water barriers as required to protect site from soil erosion according to project’s
Erosion Control Plan.
C. Dust Control
1. Execute Work by methods to minimize raising dust from construction operations.
2. Provide positive means to prevent air-borne dust from dispersing into atmosphere.
D. Erosion and Sediment Control
1. Follow project’s Erosion Control Plan.
2. Perform any and all inspections required by the project’s Erosion Control Plan. The
Contractor or designated Owner representative shall perform Erosion and Sediment
Control (E&SC) inspections until site stabilization and closeout of the project E&SC
permit, or up to 6 months following Substantial Completion.
3. Plan and execute construction by methods to control surface drainage from cuts and fills,
from borrow and waste disposal areas. Prevent erosion and sedimentation.
4. Minimize surface area of bare soil exposed at one time.
5. Provide temporary measures including berms, dikes, and drains, and other devices to
prevent water flow across disturbed areas.
6. Construct fill and waste areas by selective placement to avoid erosive surface.
7. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly
apply corrective measures.
E. Traffic and Safety Controls
1. Provide barricades or safety cones, barrels, etc., to protect workers and site personnel
from trenching operations at the site.
2. Control traffic associated with the contract work so that ongoing maintenance and
operations of the landfill and its vendors are not disrupted.
9.02 TEMPORARY FACILITIES
A. Contractor shall provide portable toilet and hand-wash facilities for their employees and
subcontractors in accordance with OSHA’s per-person ratio, at no additional expense to the
owner (price to be included in the base bid). Toilets will be serviced and maintained such
that no sustained nuisance odors come from them.
9.03 SITE SECURITY
A. The Contractor is responsible for securing the work area, equipment, and materials. Owner
will not be responsible for vandalism, damage, or theft of equipment and materials on the job
site.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 16 of 20 General Requirements
PART 10 ENVIRONMENTAL PROTECTION
10.01 GENERAL
A. The control of environmental pollution, which could result from construction operations
under this PO, requires consideration of land, water, and air quality at the site.
B. The Contractor shall comply with all applicable federal, state, and local laws and regulations
concerning environmental pollution control or abatement. The Contractor shall make sure
that necessary permits have been obtained and that this work is in compliance with such
permits concerning environmental protection.
C. The Owner and the Contractor shall establish the criteria for compliance and administration
of the environmental pollution control program prior to commencement of work.
D. The Owner will notify the Contractor in writing of any noncompliance with this specification
and the action to be taken. The Contractor shall immediately take corrective action.
10.02 PROTECTION OF LAND RESOURCES
A. Land resources adjacent to the project boundaries shall be preserved in their present condition
or restored to a natural appearance.
B. The Contractor shall exercise care in conducting all operations on private property to
minimize the amount of disturbance and damage related to gaining access to, and working at
the planned location(s). The Contractor shall not injure or destroy trees or shrubs adjacent to
the project site. Construction activities shall be confined within the construction limits shown
on the drawings.
C. The Contractor shall maintain a stable, clean, workable surface in the construction area.
Contractor will be responsible for purchasing, hauling and placement of stone, if needed. The
Contractor shall be responsible for prevention of littering, removal of all trash and material
from the site, and all reasonable preventive measures to maintain all private property in a
condition acceptable to the Owner.
D. The Contractor shall perform the final restoration of the construction area (e.g., plant grass).
Repairs which are, in the opinion of the Owner, required to restore any land, structures, or
appurtenances damaged through carelessness, negligence, or irresponsible acts on the part of
the Contractor, or any of their employees, shall be the sole responsibility of the Contractor
and will not be paid for by the Owner. Such repairs shall be carried out in a timely manner at
the direction of, and to the satisfaction of the Owner in accordance with the station specific
Vegetation Maintenance Implementation Plan.
10.03 PROTECTION OF WATER RESOURCES
A. The Contractor shall not adversely affect the existing water quality within or adjacent to the
project site. No construction wastes or other harmful materials shall be permitted to enter
these water resources.
B. Surface drainage from work activities shall be protected by effective erosion and sediment
control measures as shown on the drawings or as directed by the Engineer to control erosion
and siltation within acceptable limits in accordance with the North Carolina Erosion and
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 17 of 20 General Requirements
Sediment Control Planning and Design Manual, latest edition. These measures shall be
incorporated into the project at the earliest practicable time and maintained until permanent
drainage and erosion control facilities are completed.
C. Unless otherwise approved in writing by the Engineer, construction operations in
jurisdictional rivers, streams and other water impoundments shall be restricted to those areas
where channel changes are shown in the drawings and to those areas which must be entered
for the construction or removal of temporary or permanent structures as shown on the
drawings.
D. All work in or over jurisdictional waters shall be in accordance with conditions contained in
the permit obtained by the Owner from the regulatory authority granting the permit. The
Contractor shall prepare drawings necessary to obtain any permit addenda that may be
required for means and methods of construction operations that are not included in the
Owner’s permit. The Contractor shall coordinate the permit addenda submission with the
Engineer and Owner.
E. Exercise every reasonable precaution throughout the life of the project to prevent pollution of
ground waters and surface waters. Do not discharge onto the ground or surface waters any
pollutants. Operate and maintain equipment on site in a manner as to prevent the potential or
actual pollution of surface or ground waters. Accidental releases shall be reported in
accordance with the Erosion and Sediment Control Plan.
10.04 STORAGE AND DISPOSAL OF PETROLEUM PRODUCTS
A. During project construction, store all petroleum products in such a way as to prevent
contamination of all ground and surface waters. Petroleum products include gasoline, diesel
fuel, lubricants, heating oils, and refined and used oil. Provide storage with secondary
containment greater than or equal to the volume of stored petroleum products.
B. Lubricating oil may be brought into the project area in steel drums or other means, as
Contractor elects. Store used lubricating oil in steel drums, or other approved means, and
return to the supplier for disposal. Do not burn or otherwise dispose of at the project area.
C. If the total volume of stored petroleum products is greater than 1,320 gallons and these
products are stored above ground, prepare a spill prevention control and countermeasure plan
in accordance with applicable EPA and other state regulations. Submit plan to Owner.
10.05 CONTROL OF AIR POLLUTANTS
A. No fires shall be allowed to dispose of debris unless approved by the Owner.
B. The Contractor shall maintain the project site and access roads free from dust, which would
cause a hazard or nuisance to others.
PART 11 PRODUCT REQUIREMENTS
11.01 PRODUCT SUBSTITUTION PROCEDURES
A. Substitutions may be considered when a product becomes unavailable through no fault of
Contractor.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 18 of 20 General Requirements
B. Document each request with complete data substantiating compliance of proposed
Substitution with Contract Documents.
C. Substitutions will not be considered when they are indicated or implied on Shop Drawing or
Product Data submittals, without separate written request, or when acceptance will require
revision to Contract Documents.
D. Document each request with complete data substantiating compliance of proposed
Substitution with Contract Documents.
E. A request constitutes a representation that Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level
of specified product.
2. Will provide same warranty for Substitution as for specified product.
3. Will coordinate installation and make changes to other Work which may be required for
the Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension which may subsequently become
apparent.
5. Will reimburse Owner and/or Engineer for review or redesign services associated with re-
approval by authorities having jurisdiction.
F. Substitutions will not be considered when they are indicated or implied on Shop Drawing or
Product Data submittals, without separate written request, or when acceptance will require
revision to Contract Documents.
G. Substitution Submittal Procedure:
1. Submit three copies of request for Substitution for consideration. Limit each request to
one proposed Substitution.
2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed
product equivalence. Burden of proof is on proposer.
3. Engineer will notify Contractor in writing of decision to accept or reject request.
PART 12 EXECUTION REQUIREMENTS
12.01 CLOSEOUT PROCEDURES
A. Final Application for Payment shall be accompanied by the following documents:
1. Record Drawings (reproducible).
2. Guarantees of all materials and workmanship.
3. Contractor’s Affidavit, Release and Waiver of Claims.
4. Consent of Surety (if applicable).
5. Final State/County Sales/Use Tax Statement (if applicable).
6. Complete list of all Subcontractors and areas of work performed.
7. Proof of Compliance with Building Standards.
8. MWBE Documentation of Final Contract Payments (if applicable).
9. Warranties as required.
12.02 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the
Work:
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 19 of 20 General Requirements
1. Drawings.
2. Specifications.
3. Erosion Control Plan.
4. Addenda.
5. Change Orders and other modifications to the Contract.
6. Reviewed Shop Drawings, Product Data, and Samples.
7. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress, not less than weekly. For each
item, include percentage of work complete versus percentage of work invoiced.
E. Specifications: Legibly mark and record at each product section description of actual
products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings: Certified by a Professional Land Surveyor licensed in the state of North
Carolina. Legibly mark each item to record actual construction including:
1. Measured depths of foundations in relation to finish floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances,
referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction,
referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Contract drawings.
G. Submit documents to Engineer.
PART 13 REFERENCES
13.01 DESCRIPTIONS
A. The Contract Documents contain references to various standard Specifications, codes,
practices, and requirements for materials, workmanship, installation inspections, and tests,
which references are published and issued by the organizations, societies, and associations
listed below by abbreviation and name. Such references are hereby made a part of the
Contract Documents to the extent cited.
B. Any material, method, or procedure specified by reference to the number, symbol, or title of a
specific Specification or standard, such as a Commercial Standard, American National
Standard, Federal or State Specification, Industry or Government Code, a trade association
code or standard, or other similar standard, must comply with the requirements of the edition
in effect on the date of Bid Opening.
C. The code, specification, or standard referred to, except as modified in these Specifications,
will have full force and effect as though printed in these Specifications. These Specifications
and standards are not furnished to bidders since manufacturers and trades involved are
assumed to be familiar with their requirements. Owner will furnish, upon request,
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 0000 – Page 20 of 20 General Requirements
information as to how copies of the standard Specifications and other standards referred to
may be obtained.
13.02 ABBREVIATIONS
A. Whenever in the Contract the following abbreviations are used, their meanings shall be as
follows:
END OF SECTION
AASHTO AmericanAssociation of State Highway and Transportation Officials
ACI American Concrete Institute
ANSI American National Standards Institute
ASCE American Society of Civil Engineers
ASTM American Society for Testing and Materials
AWWA American Water WorksAssociation
COE Corps of Engineers
CRSI Concrete Reinforcing Steel Institute
GRI Geosynthetics Research Institute
FS
NCDOT
Federal Specifications
North Carolina Department of Transportation
NFPA National Fire ProtectionAssociation
OSHA Occupational Safety and HealthAdministration
PPI Plastic Pipe Institute
SSPC Steel Structures Painting Council
UL Underwriters Laboratories straight
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 1000 – Page 1 of 4 Summary of Work
SECTION 01 1000
SUMMARY OF WORK
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Project Considerations
2. Start / Completion Schedule
3. Scope of Work
4. General Project Information and Design Considerations
5. Applicable Codes and Standards
6. Project Requirements
7. Construction Drawings
8. Technical Specifications
9. Bid Worksheet
10. CQA Plan
11. Erosion and Sediment Control Plan
PART 2 PROJECT CONSIDERATIONS
2.01 PERMITS
A. All related permits, such as erosion and sediment control permits, wetlands permits, must be
“in-hand” before construction can start. The Contractor shall verify with the Owner prior to
starting work that related permits are in-hand. The Contractor will be responsible for
obtaining local permits required for burning clearing debris on-site, and prior to construction
of temporary facilities.
B. Vendor shall maintain erosion and sediment control measures consistent with the North
Carolina Erosion and Sediment Control Planning & Design Manual (NCESCPDM). North
Carolina Department of Environment and Natural Resources (now NCDEQ), June, 2006,
Chapters 6 and 8 revised May, 2013.
C. Maintenance of Erosion and Sediment Control devices shall continue until the site is
stabilized, or the provisions of the Seeding Maintenance Warranty are met. Following
stabilization, temporary erosion and sediment control measures shall be removed.
2.02 CONSTRUCTION
A. The construction of drainage improvements to the South Drainage Channel, located on the
south side of the existing RAB landfill.
B. Installation of culverts, headwalls and outlet protection to convey stormwater from the South
Drainage Channel into the adjacent sediment pond.
PART 3 START/COMPLETION SCHEDULE
Project Completion: Construction to be completed by October 7, 2016.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 1000 – Page 2 of 4 Summary of Work
PART 4 SCOPE OF WORK
Work Description: Work includes and consists of furnishing all labor, materials, supervision, equipment
and services necessary to complete the project construction as indicated in the Technical Specifications,
Construction Drawings, and Bid Worksheet for construction. The work will include but not necessarily
limited to the following items:
1. Install erosion and sediment control measures
2. Locate utilities within the work area
3. Excavate and re-grade existing drainage channel
4. Construct culverts
5. Construct headwalls and endwalls
6. Construct outlet stabilization
7. Seeding, roadway repairs, and site stabilization
PART 5 GENERAL PROJECT INFORMATION AND DESIGN CONSIDERATIONS
The subject scope of work includes the construction of drainage improvements as described above. The
project is located at the Duke Energy, Allen Steam Station in Belmont, North Carolina. The drainage
channel to be improved is located at the base of an existing flyash landfill.
The subsurface conditions in the work area consist of soil fill over flyash on the landfill side of the
drainage channel and soil fill over natural residual soils in other areas.
Duke Energy contractors may be actively placing flyash into the landfill at the time the work is to be
performed. The Vendor shall coordinate work activities with the Duke Energy landfill contractor.
The Vendor is responsible for verifying existing as-built conditions and dimensions. No additional
charges will be allowed for changes required due to evident as-built conditions if different from that
shown on the drawings provided in this Specification.
PART 6 APPLICABLE CODES AND STANDARDS
The following codes and standards shall be a part of this specification. The latest issue of each, along
with additions or amendments as of the date of the Purchase Order shall apply, unless noted otherwise:
A. American Society for Testing and Materials (ASTM)
B. “Erosion and Sediment Control Planning and Design Manual”, North Carolina Department of
Environmental and Natural Resources, 2006.
C. “Standard Specifications for Roads and Structures”, North Carolina Department of
Transportation.
PART 7 PROJECT REQUIREMENTS
7.01 PROJECT DOCUMENTS
A. The detailed project requirements and scope of work is communicated in the following
documents referred to collectively as the Project Documents: Construction Drawings;
Technical Specifications and Bid Worksheet. These documents are summarized as follows.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 1000 – Page 3 of 4 Summary of Work
7.02 CONSTRUCTION DRAWINGS
A. Construction Drawings prepared by S&ME, Inc.
B. Drawing Title: South Channel, Drainage Improvements, Allen Steam Station RAB Landfill
1 ALN_C907.001.001 Cover Sheet
2 ALN_C907.001.002 Existing Conditions
3 ALN_C907.001.003 Plan and Profile - West
4 ALN_C907.001.004 Plan and Profile - East
5 ALN_C907.001.005 Sections
6 ALN_C907.001.006 Erosion Control Plan
7 ALN_C907.001.007 Details
8 ALN_C907.001.008 Details and Notes
7.03 TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 0000 General Requirements
01 1000 Summary of Work
DIVISION 03 - CONCRETE
03 1000 Concrete Forms and Accessories
03 3000 Cast-In-Place Concrete
03 4800 Precast Concrete Specialties
DIVISION 31 - EARTHWORK
31 0516 Aggregate
31 0519.13 Geotextiles (Non-Woven) for Earthwork
31 1100 Clearing and Grubbing
31 1413.16 Soil Stockpiling
31 2316 Excavation
31 2316.13 Trenching
31 2319 Dewatering
31 2323.13 Backfill
31 2500 Erosion and Sediment Control Devices
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 9219 Seeding
DIVISION 33 – UTILITIES
33 4213 Stormwater Culverts
7.04 BID WORKSHEET
A. The bid worksheet, prepared by Duke Energy, defines specific work elements established for
bidding and payment purposes. The completed bid worksheet shall be incorporated into the
contract documents.
7.05 CQA PLAN
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 01 1000 – Page 4 of 4 Summary of Work
A. NA.
7.06 EROSION AND SEDIMENT CONTROL PLAN
A. The erosion control plan prepared by S&ME, Inc., consists of Drawings 6, 7 and 8 within the
drawing set. The primary Erosion Control Plan is Drawing 6, titled: Erosion Control Plan,
South Drainage Channel Improvements, Retired Ash Basin (RAB) Ash Landfill, Allen Steam
Station, Belmont, Gaston County, North Carolina.
B. The site falls under an existing DEQ E&SC Permit ID 2009-GASTO-001 for the construction
of the landfill. Sediment generated as a result of improvements to the south drainage channel
(0.74 acres of total disturbance), is discharged to and treated by, an existing active sediment
pond on-site. As such, a formal erosion and sediment control plan is not required by the
North Carolina Department of Environmental Quality (NCDEQ).
END OF SECTION
DIVISION 03
CONCRETE
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 1000 – Page 1 of 5 Concrete Forms and Accessories
SECTION 03 1000
CONCRETE FORMS AND ACCESSORIES
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Formwork for cast-in place concrete.
2. Shoring, bracing, and anchorage.
3. Form accessories.
4. Form stripping.
B. Related Sections:
1. Section 31 2500 - Erosion and Sediment Control Devices.
2. Section 03 3000 - Cast-In-Place Concrete.
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Formwork for cast-in-place concrete:
1. Basis of Measurement: N/A. Included with Section 03 3000.
2. Basis of Payment: N/A. Included with Section 03 3000.
1.03 REFERENCES
A. American Concrete Institute:
1. ACI 301 - Specifications for Structural Concrete.
2.ACI 318 - Building Code Requirements for Structural Concrete.
3. ACI 347 - Guide to Formwork for Concrete.
1.04 DESIGN REQUIREMENTS
A. Design, engineer, and construct formwork, shoring and bracing to conform to design and
code requirements to achieve concrete shape, line and dimension as indicated on Drawings.
1.05 SUBMITTALS
A. N/A
1.06 QUALITY ASSURANCE
A. Perform Work in accordance with ACI 301,ACI 318, and ACI 347.
B. For wood products furnished for work of this Section, comply with the American Forest and
Paper Association (AF & PA).
C. Perform Work in accordance with NCDOT standards.
1.07 QUALIFICATIONS
A. Design formwork under direct supervision of Professional Engineer experienced in design of
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 1000 – Page 2 of 5 Concrete Forms and Accessories
this Work and licensed in State of project.
1.08 COORDINATION
A. Coordinate this Section with other sections of work, requiring attachment of components to
formwork.
PART 2 PRODUCTS
2.01 WOOD FORM MATERIALS
A. Form Materials: At discretion of Contractor unless otherwise directed by Engineer due to
special conditions or situations.
2.02 PREFABRICATED FORMS
A. Furnish materials in accordance with NCDOT standards.
2.03 FORMWORK ACCESSORIES
A. Form Ties: At discretion of Contractor unless otherwise directed by Engineer due to special
conditions or situations.
B. Spreaders: Standard, non-corrosive metal form clamp assembly, of type acting as spreaders
and leaving no metal within 1 inch of concrete face. Wire ties, wood spreaders or through
bolts are not permitted.
C. Form Anchors and Hangers:
1. Do not use anchors and hangers leaving exposed metal at concrete surface.
2. Symmetrically arrange hangers supporting forms from structural steel members to
minimize twisting or rotation of member.
3. Penetration of structural steel members is not permitted.
D. Form Release Agent: Colorless mineral oil that will not stain concrete, or absorb moisture or
impair natural bonding or color characteristics of coating intended for use on concrete.
E. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Size, strength and character to maintain
formwork in place while placing concrete.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels, and centers before proceeding with formwork. Verify dimensions agree
with Drawings.
B. When formwork is placed after reinforcement resulting in insufficient concrete cover over
reinforcement before proceeding, request instructions from Engineer.
3.02 INSTALLATION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 1000 – Page 3 of 5 Concrete Forms and Accessories
A. Earth Forms:
1. Earth forms are not permitted.
B. Formwork - General:
1. Provide top form for sloped surfaces steeper than 1.5 horizontal to 1 vertical to hold
shape of concrete during placement, unless it can be demonstrated that top forms can be
omitted.
2. Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient
strength to maintain shape and position under imposed loads from construction
operations.
3. Camber forms where necessary to produce level finished soffits unless otherwise shown
on Drawings.
4. Carefully verify horizontal and vertical positions of forms. Correct misaligned or
misplaced forms before placing concrete.
5. Complete wedging and bracing before placing concrete.
C. Forms for Smooth Finish Concrete:
1. Use steel, plywood or lined board forms.
2. Use clean and smooth plywood and form liners, uniform in size, and free from surface
and edge damage capable of affecting resulting concrete finish.
3. Install form lining with close-fitting square joints between separate sheets without
springing into place.
4. Use full size sheets of form lines and plywood wherever possible.
5. Tape joints to prevent protrusions in concrete.
6. Use care in forming and stripping wood forms to protect corners and edges.
7. Level and continue horizontal joints.
8. Keep wood forms wet until stripped.
D. Forms for Surfaces to Receive Membrane Waterproofing: Use plywood or steel forms. After
erection of forms, tape form joints to prevent protrusions in concrete.
E. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with
requirements of ACI 301.
F. Arrange and assemble formwork to permit dismantling and stripping. Do not damage
concrete during stripping. Permit removal of remaining principal shores.
G. Obtain Engineer’s approval before framing openings in structural members not indicated on
Drawings.
H. Install void forms in accordance with manufacturer's recommendations.
I. Do not reuse wood formwork more than 3 times for concrete surfaces to be exposed to view.
Do not patch formwork.
3.03 APPLICATION - FORM RELEASE AGENT
A. Apply form release agent on formwork in accordance with manufacturer's recommendations.
B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.
C. Do not apply form release agent where concrete surfaces are indicated to receive special
finishes or applied coverings that are affected by agent. Soak inside surfaces of untreated
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 1000 – Page 4 of 5 Concrete Forms and Accessories
forms with clean water. Keep surfaces coated prior to placement of concrete.
D. Reuse and Coating of Forms: Thoroughly clean forms and reapply form coating before each
reuse. For exposed work, do not reuse forms with damaged faces or edges. Apply form
coating to forms in accordance with manufacturer’s specifications. Do not coat forms for
concrete indicated to receive “scored finish”. Apply form coatings before placing reinforcing
steel.
3.04 INSTALLATION - INSERTS, EMBEDDED PARTS, AND OPENINGS
A. Install formed openings for items to be embedded in or passing through concrete work.
B. Locate and set in place items required to be cast directly into concrete.
C. Coordinate with Work of other sections in forming and placing openings, slots, reglets,
recesses, sleeves, bolts, anchors, other inserts, and components of other Work.
D. Install accessories straight, level, and plumb. Ensure items are not disturbed during concrete
placement.
E. Install water stops continuous without displacing reinforcement.
F. Provide temporary ports or openings in formwork where required to facilitate cleaning and
inspection. Locate openings at bottom of forms to allow flushing water to drain.
G. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly
fitted so joints will not be apparent in exposed concrete surfaces.
H. Form Ties:
1. Use sufficient strength and sufficient quantity to prevent spreading of forms.
2. Place ties at least 1 inch away from finished surface of concrete.
3. Leave inner rods in concrete when forms are stripped.
4. Space form ties equidistant, symmetrical and aligned vertically and horizontally unless
otherwise shown on Drawings.
I. Arrangement: Arrange formwork to allow proper erection sequence and to permit form
removal without damage to concrete.
3.05 FORM CLEANING
A. Clean forms as erection proceeds, to remove foreign matter within forms.
B. Clean formed cavities of debris prior to placing concrete.
C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that
water and debris drain to exterior through clean-out ports.
D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do
not use water to clean out forms, unless formwork and concrete construction proceed within
heated enclosure. Use compressed air or other means to remove foreign matter.
3.06 FORM REMOVAL
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 1000 – Page 5 of 5 Concrete Forms and Accessories
A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own
weight and imposed loads and removal has been approved by formwork design Engineer.
B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete
surfaces scheduled for exposure to view.
C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be
damaged. Discard damaged forms.
D. Leave forms in place for minimum number of days as specified in ACI 347.
3.07 ERECTION TOLERANCES
A. Construct formwork to maintain tolerances required by ACI 301.
3.08 FIELD QUALITY CONTROL
A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with
formwork design, and that supports, fastenings, wedges, ties, and items are secure.
B. Notify Engineer after placement of reinforcing steel in forms, but prior to placing concrete.
C. Schedule concrete placement to permit formwork inspection before placing concrete.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 3000 – Page 1 of 5 Cast-In-Place Concrete
SECTION 03 3000
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.01 SUMMARY
A. Section includes cast-in-place concrete for the following:
1. Headwalls, endwalls and catch basins.
2. Miscellaneous cast-in-place concrete as needed.
B. Related Sections:
1. Section 03 1000 - Concrete Forms and Accessories
2. Section 31 2323.13 - Backfill
3. Section 31 2500 - Erosion and Sediment Control Devices
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Headwalls, Endwalls and Catch Basins:
1. Basis of Measurement: By each unit.
2. Basis of Payment: Number of units installed times the unit price per each unit.
a. Includes subgrade preparation, placement moisture condition and compaction of
ABC subbase, concrete mix design, supplying to site, preparing base, welded wire
mesh, reinforcement, placing, floating, finishing, joints, and joint accessories.
1.03 REFERENCES
A. American Concrete Institute:
1. ACI 301 - Specifications for Structural Concrete.
2. ACI 305R - Hot Weather Concreting.
3. ACI 306.1 - Standard Specification for Cold Weather Concreting.
4. ACI 308 (American Concrete Institute) - Standard Practice for Curing Concrete.
5. ACI 318 - Building Code Requirements for Structural Concrete.
B. ASTM International:
1. ASTM C33 - Standard Specification for Concrete Aggregates.
2. ASTM C94 - Standard Specification for Ready-Mixed Concrete.
3. ASTM C138/C138M-16 – Standard Test Method for Density, Yield, and Air Content of
Concrete.
4. ASTM C150 - Standard Specification for Portland Cement.
5. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.
6. ASTM C494 - Standard Specification for Chemical Admixtures for Concrete.
7. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural
Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete.
8. ASTM C1017 - Standard Specification for Chemical Admixtures for Use in Producing
Flowing Concrete.
9. ASTM C1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout
(Nonshrink).
10. ASTM C1116 - Standard Specification for Fiber-Reinforced Concrete.
11. ASTM C1611 - Standard Test Method for Slump Flow of Self-Consolidating Concrete.
1.04 SUBMITTALS
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 3000 – Page 2 of 5 Cast-In-Place Concrete
A. Product Data: Submit data on:
1. Concrete mix design at least 14 days prior to using the mixture.
B. Design Data:
1. Submit concrete mix design for each concrete strength. Submit separate mix designs
when admixtures are required for the following:
a. Hot and cold weather concrete work.
b. Air entrained concrete work.
2. Identify mix ingredients and proportions, including admixtures.
1.05 CLOSEOUT SUBMITTALS
A. Project Record Documents: Accurately record actual locations of embedded utilities and
components concealed from view in finished construction.
1.06 QUALITY ASSURANCE
A. Perform Work in accordance with ACI 301.
B. Perform any waterproofing in accordance with Manufacturer’s recommendations..
C. Acquire cement and aggregate from one source for Work.
D. Conform to ACI 305R when concreting during hot weather.
E. Conform to ACI 306.1 when concreting during cold weather.
1.07 QUALIFICATIONS
A. Waterproofing Material Manufacturer (if applicable): Company specializing in waterproofing
membrane with minimum three years documented experience.
B. Waterproofing Applicator (if applicable): Company specializing in performing the work of
this section with minimum three years documented experience.
PART 2 PRODUCTS
2.01 CONCRETE MATERIALS
A. Cement: ASTM C150, Type I or Type II.
B. Fine and Coarse Aggregates: ASTM C33.
C. Water: Clean and not detrimental to concrete.
2.02 ADMIXTURES (ENGINEER’S APPROVAL REQUIRED PRIOR TO USING ANY
ADMIXTURES).
A. Furnish materials in accordance with NCDOT standards.
B. Air Entrainment: ASTM C260.
C. Chemical: ASTM C494; Type F - Water Reducing, High Range, Type G - Water Reducing,
High Range and Retarding.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 3000 – Page 3 of 5 Cast-In-Place Concrete
D. Fly Ash, Calcined Pozzolan: ASTM C618; Class Type C or F, limit fly ash to maximum 25
percent of cement content by weight.
E. Plasticizing: ASTM C1017.
2.03 CONCRETE MIX
A. Mix concrete in accordance with ACI 301. Deliver concrete in accordance with ASTM C94.
B. Select proportions for normal weight concrete (if applicable) in accordance with ACI 301.
C. Select aggregate proportions for light weight concrete (if applicable) in accordance with ACI
301.
D. Provide concrete to the following criteria:
Unit Measurement
Compressive Strength (7 day) 3,000 psi
Compressive Strength (28 day) 4,000 psi
Water/Cement Ratio (maximum) 0.45 by weight (mass)
Air Entrained 4 - 6 percent
Slump 2-4 inches
E. Admixtures: Include admixture types and quantities indicated in concrete mix designs
approved by Engineer through submittal process.
1. Use accelerating admixtures in cold weather. Use of admixtures will not relax cold
weather placement requirements.
2. Use set retarding admixtures during hot weather.
3. Add air entraining agent to normal weight concrete mix for work exposed to exterior.
4. Air Entrainment: ASTM C260.
5. Chemical: ASTM C494 Type A - Water Reducing, Type B – Retarding, Type C –
Accelerating, Type D - Water Reducing and Retarding, Type E - Water Reducing and
Accelerating, Type F - Water Reducing, High Range, Type G - Water Reducing, High
Range and Retarding.
6. Fly Ash, Calcined Pozzolan: ASTM C618.
7. Plasticizing: ASTM C1017.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify requirements for concrete cover over reinforcement.
B. Verify anchors, seats, plates, reinforcement and other items to be cast into concrete are
accurately placed, positioned securely, and will not interfere with placing concrete.
C. Verify substrate surfaces are smooth, free of honeycomb or pitting, and not detrimental to full
contact bond of waterproofing materials.
D. Verify items penetrating surfaces to receive waterproofing are securely installed.
E. Verify substrate surface slopes to drain for horizontal waterproofing applications.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 3000 – Page 4 of 5 Cast-In-Place Concrete
3.02 PREPARATION
A. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent.
B. In locations where new concrete is doweled to existing work, drill holes in existing concrete,
insert steel dowels and pack solid with non-shrink grout.
C. Seal cracks and joints with sealant materials using depth to width ratio as recommended by
sealant manufacturer.
3.03 PLACING CONCRETE
A. Place concrete in accordance with ACI 318.
B. Notify Engineer minimum 24 hours prior to commencement of operations.
C. Ensure reinforcement, inserts, and embedded parts are not disturbed during concrete
placement.
D. Maintain records of concrete placement. Record date, location, quantity, air temperature, and
test samples taken.
E. Do not interrupt successive placement; do not permit cold joints to occur.
F. If inside lined area, protect liner and all geosynthetic components from damage during
installation and placement of concrete. Any damage caused to the liner as a result of the
Contractor’s action shall be repaired at his expense
3.04 CONCRETE FINISHING
A. Provide formed concrete surfaces to be left exposed with smooth rubbed finish.
3.05 CURING AND PROTECTION
A. Immediately after placement, protect concrete from premature drying, excessively hot or cold
temperatures, and mechanical injury.
B. Maintain concrete with minimal moisture loss at relatively constant temperature for period
necessary for hydration of cement and hardening of concrete.
C. Cure all concrete in accordance with ACI 308 unless otherwise directed by Engineer.
3.06 BACKFILLING
A. Concrete should have a minimum of 75 percent of design 28-day compressive strength prior
to backfilling concrete structures unless approved by the Engineer
3.07 FIELD QUALITY CONTROL
A. Provide free access to Work and cooperate with appointed firm.
B. Submit proposed mix design of each class of concrete to inspection and testing firm and
Engineer for review 14 days prior to commencement of Work.
C. Tests of cement and aggregates may be performed to ensure conformance with specified
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 3000 – Page 5 of 5 Cast-In-Place Concrete
requirements.
D. A minimum of four concrete test cylinders will be taken for every 100 cubic yards or fraction
thereof or a minimum of one set of cylinders per each structure or type/class of concrete
placed.
E. One additional test cylinder will be taken during cold weather concreting, cured on job site
under same conditions as concrete it represents.
F. One slump test will be taken for each set of test cylinders taken in accordance with ASTM
1611.
G. One air content and unit weight test will be made for each set of test cylinders taken. In
accordance with ASTM C138/C138M-16.
H. Maintain records of concrete placement. Record date, location, quantity, air temperature and
test samples taken.
3.08 PATCHING
A. Allow Engineer to inspect concrete surfaces immediately upon removal of forms.
B. Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Engineer
upon discovery.
C. Patch imperfections in accordance with ACI 301.
3.09 DEFECTIVE CONCRETE
A. Defective Concrete: Concrete not conforming to required lines, details, dimensions,
tolerances or specified requirements.
B. Repair or replacement of defective concrete will be determined by Engineer.
C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction
of Engineer for each individual area.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 4800 – Page 1 of 4 Precast Concrete Specialties
SECTION 03 4800
PRECAST CONCRETE SPECIALTIES
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Precast Concrete Specialties
B. Related Sections:
1. Section 31 2316 - Excavation
2. Section 31 2323.13 - Backfill
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Precast Concrete Specialties:
1. Basis of Measurement: By each unit.
2. Basis of Payment: Time and Materials not to exceed
a. Includes unit, excavating, bedding, backfilling, compacting, joining, sealing, fittings
and accessories assembled.
1.03 REFERENCES
A. American Concrete Institute
1. ACI 318 - Building Code Requirements for Reinforced Concrete.
2. ACI 350 - Environmental Engineering Concrete Structures.
B. ASTM International
1. ASTM A185 - Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete
Reinforcement.
2. ASTM A615 - Standard Specification for Deformed and Plain Billet-Steel Bars for
Concrete Reinforcement.
3. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded
Bars, Rods, Wire, Profiles, and Tubes.
4. ASTM C33 - Standard Specification for Concrete Aggregates.
5. ASTM C150 - Standard Specification for Portland Cement.
6. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.
7. ASTM C443 - Joints.
8. ASTM C789 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains,
and Sewers.
9. ASTM C 850 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains,
and Sewers with less than 2 feet of cover subjected to highway loadings.
10. ASTM C890 - Standard Practice for Minimum Structural Design Loading for Monolithic
or Sectional Pre-cast Concrete Water and Wastewater Structures.
11. ASTM C913 - Standard Specification for Pre-cast Concrete Water and Wastewater
Structures.
12. ASTM C923 - Resilient Connectors Between Reinforced Concrete Manhole Structures
and Pipes.
13. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Pre-
cast Box Sections Using Preformed Flexible Joints Sealants.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 4800 – Page 2 of 4 Precast Concrete Specialties
14. ASTM C1433 - Standard Specification for Pre-cast Reinforced Concrete Box Sections
for Culverts, Storm Drains, and Sewers.
15. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft
3).
16. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth).
17. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by
Nuclear Methods (Shallow Depth).
C. American Association of State Highway and Transportation Officials
1. AASHTO M198 - Butyl Rubber Sealants.
2. AASHTO M259 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm
Drains, and Sewers.
3. AASHTO M273 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm
Drains, and Sewers with less than 2 feet of cover subjected to highway loadings.
1.04 DESIGN REQUIREMENTS
A. Design Criteria:
1. Honeycombed or retempered concrete is not permitted.
2. Equivalent strength: Based on structural design of reinforced concrete as outlined in ACI
318, Design for H20 Loading.
3. Design of Lifting Devices for Pre-cast Structures: In accordance with ASTM C 913.
4. Design of Joints for Pre-cast Structures: In accordance with ASTM C443.
1.05 SUBMITTALS
A. Shop Drawing: Indicate structure locations, elevations, piping, sizes and elevations of
penetrations.
B. Product Data: Submit covers, component construction, features, configuration, and
dimensions.
C. Manufacturer’s Certificates: Submit Statement of Compliance, supporting data, from
Materials Suppliers attesting that pre-cast concrete structures provided meet or exceed ASTM
Standards and Specification requirements.
1.06 CLOSEOUT SUBMITTALS
A. Project Record Documents: Accurately record actual locations and inverts of buried pipe,
components and connections.
1.07 QUALITY ASSURANCE
A. Perform Work in accordance with State and Local Municipality standards.
1.08 DELIVERY, STORAGE AND HANDLING
A. Comply with Pre-cast Concrete Manufacturer’s instructions for unloading, storing and
moving pre-cast structures.
B. Store pre-cast concrete structures to prevent damage to Owner’s property or other public or
private property. Repair property damaged from materials storage.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 4800 – Page 3 of 4 Precast Concrete Specialties
C. Mark each pre-cast structure by indentation or waterproof paint showing date of manufacture,
Manufacturer, and identifying symbols and numbers shown on Drawings to indicate its
intended use.
1.09 ENVIRONMENTAL REQUIREMENTS
A. Conduct operations not to interfere with, interrupt, damage, destroy, or endanger integrity of
surface or subsurface structures or utilities, and landscape in immediate or adjacent areas.
PART 2 PRODUCTS
2.01 PRECAST CONCRETE STRUCTURES
A. Manufacturers products and configurations shall be provided and installed as specified on the
Drawings.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify connections, sizes, locations and inverts are as indicated on Drawings.
B. Verify items provided by other sections of Work are properly sized and located.
C. Verify excavations for the structures are correct.
3.02 PREPARATION
A. Coordinate placement of connecting pipes required by other Sections of Work as described in
these Specifications.
B. Do not install structures where site conditions induce loads exceeding structural capacity of
structures.
C. Inspect pre-cast concrete structures immediately prior to placement in excavation to verify
structures are internally clean and free from damage. Remove and replace damaged units.
3.03 INSTALLATION
A. Excavation and Backfill:
1. Excavate for pre-cast concrete structures in accordance with Section 31 2316 of these
Specifications in location and to depth shown. Provide clearance around sidewalls of
structure for construction operations.
2. When groundwater is encountered, prevent accumulation of water in excavations. Place
pre-cast concrete structures in dry trench.
3. Where possibility exists of watertight structure becoming buoyant in flooded excavation,
anchor structure to avoid flotation.
B. Lift pre-cast structures at lifting points designated by Manufacturer.
C. When lowering pre-cast concrete structures into excavations and joining pipe to units, take
precautions to ensure interior of pipeline and structure remains clean.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 03 4800 – Page 4 of 4 Precast Concrete Specialties
D. Set cover frames and covers level without tipping, to correct elevations.
E. Coordinate with other Sections of Work as described in these Specifications to provide
correct size, shape, and location.
3.04 FIELD QUALITY CONTROL
A. Request observation by Engineer prior to placing cover over piping.
B. Compaction Testing: In accordance with Section 31 2323.13.
C. When tests indicate Work does not meet specified requirements, remove Work, replace and
retest.
END OF SECTION
DIVISION 31
EARTHWORK
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 0516 – Page 1 of 4 Aggregate
SECTION 31 0516
AGGREGATE
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Aggregate Type A1 - ABC stone for roadways.
2. Aggregate Type A2 - No. 57 stone for culvert bedding and backfill, drainage aggregate
and erosion and sediment control devices.
3. Aggregate Type A3 - Class 1 riprap for erosion and sediment control devices.
4. Aggregate Type A4 - Class 2 riprap for erosion and sediment control devices.
B. Related Sections:
1. Section 31 2323.13 - Backfill
2. Section 31 2500 - Erosion and Sediment Control Devices
3. Section 33 4213 - Culverts
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Coarse and Fine Aggregate:
1. Basis of Measurement: A1, A2, A3, and A4 by the in place cubic yard or as otherwise
indicated in other Sections of these Specifications. Installation quantities shall not
include quantities placed beyond the lines and grades shown on the Drawings.
2. Basis of Payment: By the cubic yard placed times the unit price for each aggregate type,
or as otherwise indicated in these Specifications.
a. Includes supplying aggregate materials, hauling, stockpiling, and placement.
b. Requested payment quantities will be submitted by the Contractor with final approval
by the Engineer. If a dispute exists relative to payment quantities, the Contractor at his
expense will uncover any buried or covered material for re-evaluation.
1.03 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T11 – Standard Method of Test for Materials Finer than 75 µm (No. 200)
Sieve in Mineral Aggregates by Washing.
2. AASHTO T27 – Standard Method of Test for Sieve Analysis of Fine and Coarse
Aggregates.
3. AASHTO T180 – Standard Method of Test for Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop (as modified by NCDOT).
B. ASTM International:
1. ASTM C33 – Standard Specification for Construction Aggregates
2. ASTM C136 – Standard Test Method for Sieve Analysis of Fine and Coarse Aggregate.
3. ASTM D421 – Standard Practice for Dry Preparation of Soil Samples for Particle-Size
Analysis and Determination of Soil Constants.
4. ASTM D422 – Standard Test Method for Particle Size Analysis of Soils.
5. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12 400 ft-lbf/ft
3 (600 kN-m/m
3)).
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 0516 – Page 2 of 4 Aggregate
6. ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in Place by
the Sand-Cone Method.
7. ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and Soil-
Aggregate Mixtures, Using 10 lb Rammer and 18 inch Drop.
8. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by
the Rubber Balloon Method.
9. ASTM D4253 – Standard Test Methods for Maximum Index Density and Unit Weight of
Soils Using a Vibratory Table.
10. ASTM D4254 – Standard Test Method for Minimum Index Density and Unit Weight of
Soils and Calculation of Relative Density.
11. ASTM D 6938 – Standard Test Methods for In-Place Density and Water Content of soil
and Soil-Aggregate by Nuclear Methods.
C. North Carolina Department of Transportation (NCDOT) Standard specifications for Roads
and Structures.
1.04 SUBMITTALS
A. Materials Source: Submit name of imported materials suppliers and description of material.
B. Manufacturer’s/Supplier’s Certificate: Certify materials meet or exceed specified
requirements.
C. For aggregate type A1, submit supplier’s Modified Proctor (AASTHTO T180 as modified by
NCDOT) curve information.
D. Requested payment quantities will be submitted by the Contractor with final approval by the
Engineer.
1.05 QUALITY ASSURANCE
A. Furnish each aggregate material type from single source throughout the Work.
B. Perform Work in accordance with North Carolina Department of Transportation Standard
Specifications for Roads and Structures or as otherwise specified.
PART 2 PRODUCTS
2.01 FINE AND COARSE AGGREGATE MATERIALS
A. Coarse Aggregate Type A1 - Roadways: Conforming to ABC Stone NCDOT standards.
Coarse Aggregate Type A1 shall be used for roadways and where shown on the Drawings.
B. Coarse Aggregate Type A2 – Drainage Aggregate: Subangular, subrounded, rounded, or well
rounded particle shaped conforming to No. 57 Stone NCDOT Standards. Coarse Aggregate
Type A2 shall be used in the LCS and LDS corridors, sumps, and other drainage
applications, for construction of erosion and sediment control structures, and where shown
on the Drawings.
C. Coarse Aggregate Type A3: Conforming to Class 1 Riprap NCDOT standards. Coarse
Aggregate Type A3 shall be used for drainage feature inlet and outlet protection, for
construction of erosion and sediment control structures, and where shown on the Drawings.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 0516 – Page 3 of 4 Aggregate
D. Coarse Aggregate Type A4: Conforming to Class 2 Riprap NCDOT standards. Coarse
aggregate Type A4 shall be used for drainage feature outlet protection, for erosion and
sediment control structures, and where shown on the Drawings.
2.02 SOURCE QUALITY CONTROL
A. Aggregate Material - Testing and Analysis: Perform in accordance with ASTM C33, ASTM
C136, ASTM D421, ASTM D422, ASTM D4253, ASTM D4254, AASHTO T11, and/or
AASHTO T27.
B. When tests indicate materials do not meet specified requirements, change material or
material source and retest.
C. Furnish materials of each type from same source throughout the Work.
PART 3 EXECUTION
3.01 STOCKPILING
A. Stockpile materials on site at locations agreed upon by Engineer and Owner.
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
C. Separate differing materials with dividers or stockpile apart to prevent mixing.
D. Direct surface water away from stockpile site so as to prevent erosion or deterioration of
materials.
3.02 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free
standing surface water and restore to original site conditions.
3.03 EXAMINATION
A. Verify substrate has been inspected, gradients and elevations are correct, and is dry.
3.04 PREPARATION
A. Correct irregularities in substrate gradient and elevation by scarifying, reshaping, and re-
compacting.
B. Do not place fill on soft, muddy, or frozen surfaces.
3.05 AGGREGATE PLACEMENT
A. Spread aggregate over prepared substrate to a total compacted thickness as specified on
Drawings.
B. Place aggregate in a maximum layer and compact to specified density.
C. Level and contour surfaces to elevations and gradients indicated.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 0516 – Page 4 of 4 Aggregate
D. Place aggregate in a maximum layer and compact to specified density.
E. Level and contour surfaces to elevations and gradients indicated.
F. Add water to assist compaction. If excess water is apparent, remove aggregate and aerate to
reduce moisture content.
G. Use mechanical tamping equipment in areas inaccessible to compaction equipment.
H. Coarse aggregate Type A1, ABC stone for roadways
1. Spread aggregate over prepared substrate to a total compacted thickness as specified on
Drawings.
2. Add small quantities of fine aggregate to coarse aggregate as appropriate to assist
compaction.
3.06 TOLERANCES
A. Scheduled Compacted Thickness: Within ¼ inch.
B. Variation From Design Elevation: Within ½ inch.
3.07 FIELD QUALITY CONTROL
A. Coarse aggregate Type A1, where used for road surfacing applications, shall be compacted to
a density of 95 percent of its modified Proctor (ASTM D1557) maximum dry density and in
accordance with these Specifications. Field density testing shall be performed at a minimum
frequency of one test per 2,500 square feet per compacted lift.
B. Compaction testing will be performed in accordance with ASTM D1556, ASTM D2167,
ASTM D6938.
C. If tests indicate Work does not meet specified requirements, remove Work, replace and
retest.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 1100 – Page 1 of 3 Clearing and Grubbing
SECTION 31 1100
CLEARING and GRUBBING
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Site Clearing and Grubbing.
2. Stripping/Topsoil Excavation.
B. Related Sections:
1. Section 31 2316 - Excavation
2. Section 31 2500 - Erosion and Sediment Control Devices
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Site Clearing and Grubbing:
1. Basis of Measurement: By the 2-dimensional acre of the original ground surface that is
cleared and grubbed. Computation of the quantities of clearing and grubbing will be
based on surveyed surface areas (provided by the Contractor) cleared and grubbed and
will be mutually agreed to in writing by the Owner, Engineer and Contractor for each
particular area.
2. Basis of Payment: By the 2-dimensional acre times unit price per acre for clearing and
grubbing.
a. Includes clearing and grubbing site and burning waste materials on-site (if local
permit conditions at the time allow).
b. Optional bid item: includes clearing and grubbing site, loading, hauling, and
removing waste materials from site.
B. Stripping / Topsoil Excavation:
1. Basis of Measurement: By the 2-dimensional acre of the original ground surface that is
excavated of topsoil. Computation of the quantities of topsoil excavation will be based
on surveyed surface areas (provided by the Contractor) excavated of topsoil and will be
mutually agreed to in writing by the Engineer and Contractor for each particular area.
2. Basis of Payment: Made at contract price per 2-dimensional acre for stripping/topsoil
excavation.
a. Includes removal, loading, hauling, and either stockpiling material approved by the
Engineer for re-use as topsoil at the designated on-site stockpile location, or
removing waste materials not approved by the Engineer for re-use as topsoil from site
(unless permitted to dispose of on-site by Owner).
1.03 SUBMITTALS
A. Submit results of soil nutrient and organic content testing for materials approved by the
Engineer for re-use as topsoil.
1.04 QUALITY ASSURANCE
A. Perform Work in accordance with State and local standards and ordinances.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 1100 – Page 2 of 3 Clearing and Grubbing
B. Conform to applicable codes for environmental requirements, disposal of debris, and burning
debris on site (if allowed by OWNER).
PART 2 PRODUCTS
2.01 MATERIALS
A. N/A
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify existing plant life designated to remain is tagged or identified.
B. Identify topsoil stockpile area and waste area for materials not approved for re-use as topsoil.
May dispose on site if permitted by Owner in Owner designated area.
3.02 PREPARATION
A. Call Private Utility Line Locator to have utilities marked no less than three working days
before performing Work.
1. Request underground utilities to be located and marked within and surrounding
construction areas.
3.03 PROTECTION
A. Locate, identify, and protect from damage utilities indicated to remain.
B. Protect trees, plant growth, and features designated to remain as final landscaping as specified
on Drawings.
C. Protect bench marks, survey control points, groundwater monitoring wells, and existing
structures from damage or displacement.
3.04 SITE CLEARING AND GRUBBING
A. Notify Engineer prior to commencing with clearing activities.
B. Install erosion control devices as shown on the Drawings and as specified in Section 31 2500
– Erosion and Sediment Control Devices.
C. Clear areas required for access to site and execution of Work.
D. Remove trees and shrubs within construction area. Remove all trash or debris. Remove all
materials to a depth necessary to eliminate soils containing more than 5 percent by weight
fibrous organic matter, rubbish, vegetable matter, small stones, stumps, roots, root system, or
other objectionable deleterious material within the clearing limits.
E. Clear undergrowth and deadwood.
F. Allow inspection of cleared areas by Engineer or his representative prior to beginning other
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 1100 – Page 3 of 3 Clearing and Grubbing
construction activities.
3.05 REMOVAL
A. Remove debris, rock, and extracted vegetation from site. If permitted by Owner, may dispose
of on-site in Owner specified location.
B. Remove construction debris and other materials that cannot be used in earthwork construction
or final vegetation. Materials shall be disposed off-site unless permitted by Owner to dispose
of on-site in Owner designated location.
C. Do not burn or bury materials on-site unless permitted by State and local ordinances and laws
and given permission by Owner to do so. Leave site in clean condition.
3.06 STRIPPING/TOPSOIL EXCAVATION
A. Excavate topsoil from areas to be further excavated, or re-graded without mixing with foreign
materials for use in finish grading. The minimum topsoil stripping depth shall be four inches
or as determined by the Engineer.
B. Stockpile material at the designated on-site stockpile location and protect from erosion.
C. Remove excess topsoil not intended for reuse, from site unless permitted by owner to dispose
of on-site in Owner designated location.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 1413.16 – Page 1 of 2 Soil Stockpiling
SECTION 31 1413.16
SOIL STOCKPILING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Loading, hauling, placing, and constructing temporary or permanent stockpiles.
B. Processing in-place soils or stockpiled soils so they can be utilized for various earthfills.
1.02 RELATED SECTIONS
A. Section 31 1100 - Site Clearing and Grubbing
B. Section 31 2316 - Excavation
C. Section 31 2323.13 - Backfill
PART 2 PRODUCTS
2.01 GENERAL FILL
A. Soil obtained from on-site excavations that meet the requirements of Section 31 2323.13,
Part 2.01.
2.02 CLEARED, GRUBBED AND STRIPPED MATERIALS
A. Grass, trees, shrubbery, roots, logs, boulders.
2.03 IMPORTED SOILS (IF APPLICABLE)
A. Owner supplied materials that meet the requirements of Section 31 2323.13.
B. Contractor supplied materials that meet the requirements of Section 31 2323.13.
PART 3 EXECUTION
3.01 STOCKPILING MATERIALS
A. Construct stockpiles at locations approved per the solid waste permit and by the Owner.
B. Provide quality control during operations to assure that materials go to appropriate stockpiles.
C. Provide separation between stockpiles to allow equipment access.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 1413.16 – Page 2 of 2 Soil Stockpiling
D. Construct side slopes no steeper than 2H:1V or natural angle of repose, whichever is
shallower.
E. Construct no surface flatter than 5 percent.
F. Shape each stockpile to uniform lines and grades.
G. Water or cover stockpiles as necessary to control dust, prevent erosion, and control sediment.
H. Install erosion and sediment control structures per the Erosion and Sediment Control Plan.
3.02 QUALITY ASSURANCE
A. Sampling and testing of materials to determine material type may be performed at the
stockpile, at the material source, or at the place of use.
B. Cooperate fully with the Owner in obtaining samples and performing tests. Include all costs
for assistance in unit prices for work.
3.03 SOIL MANAGEMENT
A. Process excavated materials as necessary in stockpiles or in-place, if possible.
B. As part of the project, plan for soil processing in stockpile areas to process excavated soils.
C. Processing may be required for, but not necessarily limited to the following, clod size
reduction, and conditioning soil to modify moisture.
D. Monitor organic stockpiles to detect and control fires.
END SECTION
Technical Specifications
South Drainage Channel Improvements Issued for Construction, September 2, 2016
Allen Steam Station RAB Landfill S&ME Project No. 7235-15-035
Revision 0 31 2316 – Page 1 of 4 Excavation
SECTION 31 2316
EXCAVATION
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Excavating Soil Materials
2. Excavating Unsuitable Material (Undercut)
3. Stockpiling Excavated Material
B. Related Sections:
1. Section 03 4800 - Precast Concrete Specialties
2. Section 31 1100 - Site Clearing
3. Section 31 1413.16 - Soil Stockpiling
4. Section 31 2316.13 - Trenching
5. Section 31 2323.13 - Backfill
6. Section 31 2500 - Erosion and Sediment Control Devices
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Excavating Soil Materials:
1. Definition: Soil is defined as any material that can be excavated by conventional
methods, up to and including ripping using a D8 dozer with a single-tooth blade.
2. Basis of Measurement: By the cubic yard of excavation.
a. The quantity of excavation will be based upon survey information collected before
and after the excavation. A grid pattern as approved by the Engineer of ground
surface elevations in the area shall be surveyed and reference points installed by the
Contractor prior to excavation and prior to placement of overlying fill. The Engineer
shall check the as-built finished grades and determine the excavated volume of soil
based on survey data provided by the Contractor.
b. In the case of small volume areas of excavation, it will be acceptable to use an
average depth times area volume computation, if both the Contractor and Owner
agree prior to measurement. Both the Contractor and Owner or his designee should
be represented when average depth measurements are made.
3. Basis of Payment: By the cubic yard of excavation times the unit price for excavation.
a. Includes excavating to required elevations, and any and all necessary de-watering
during excavation.
b. Requested payment quantities will be submitted by the Contractor with final approval
by the Engineer. If a dispute exists relative to payment quantities, the Contractor at
his expense will uncover any buried or covered material for re-evaluation.
B. Excavating Unsuitable Material (Undercut):
1. Basis of Measurement: By the cubic yard.
a. The quantity of undercutting will be based upon survey information collected before
and after the undercut. See Part 1.2 A.2.a above.
b. In the case of small volume areas of undercutting, it will be acceptable to use an
average depth times area volume computation, if both the Contractor and Owner
agree prior to measurement. Both the Contractor and Owner or his designee should
Technical Specifications
South Drainage Channel Improvements Issued for Construction, September 2, 2016
Allen Steam Station RAB Landfill S&ME Project No. 7235-15-035
Revision 0 31 2316 – Page 2 of 4 Excavation
be represented when average depth measurements are made.
c. Unsuitable materials shall be removed to the satisfaction of the Engineer.
2. Basis of Payment: By the cubic yard of undercut times the unit price for undercut.
a. Includes excavating to required elevations, loading and placing materials in stockpile
by material type, and any and all necessary de-watering during excavation.
C. Stockpiling Excavated Material:
1. Basis of Measurement: By the cubic yard.
a. The quantity of stockpiled excavated material will be based upon the difference of
the quantity of excavated material (see Part 1.2.A.2.a above) and the quantity of
structural backfill (see Section 31 2323.13).
2. Basis of Payment: By the cubic yard of stockpiled excavated material times the unit
price for stockpiling.
a. Includes visually classifying material as topsoil or structural fill prior to loading,
loading by material type, hauling, and stockpiling by material type as directed by the
Owner.
PART 2 PRODUCTS
2.01 N/A.
PART 3 EXECUTION
3.01 PREPARATION
A. Call Private Utility Line Locator to have utilities marked no less than three working days
before performing Work.
1. Have the underground utilities to be located and marked within and surrounding
construction areas.
B. The Contractor shall protect all existing facilities, including, but not limited to existing
electrical lines and poles, and monitoring wells during excavations and stockpiling.
Damaged facilities shall be promptly replaced at the Contractor's expense.
C. Notify utility company to remove and relocate any utilities.
D. Perform site clearing, grubbing, rotary mowing, necessary surveys, and topsoil excavation per
Section 31 1100 – Clearing and Grubbing. Any depths of removal of twelve inches or less
shall be considered Site Clearing and Grubbing.
E. Identify required lines, levels, contours, and datum locations.
F. Protect bench marks, survey control points, and existing structures from excavating
equipment and vehicular traffic.
3.02 EXCAVATION
A. Install erosion control measures as specified on the Drawings.
B. Excavate subsoil to accommodate site structures and construction operations.
Technical Specifications
South Drainage Channel Improvements Issued for Construction, September 2, 2016
Allen Steam Station RAB Landfill S&ME Project No. 7235-15-035
Revision 0 31 2316 – Page 3 of 4 Excavation
C. Drainage ditch subgrade shall be excavated to the lines and grades shown on the Drawings.
D. Slope banks with machine to angle of repose or less unless shored as per OSHA standards.
E. Remove lumped subsoil, boulders, and rock.
F. Notify Engineer of unexpected subsurface conditions and discontinue affected Work in area
until notified to resume Work.
G. Materials determined unsuitable by the Engineer shall be excavated per the direction of the
engineer or his representative.
H. If ash is encountered in any excavation, the Owner shall be notified and the area shall be
overexcavated and backfilled with 2 feet of soil cover.
I. Excavated unsuitable areas shall be replaced with structural fill, lean concrete, or aggregate as
recommended by the Engineer.
J. If necessary, the area of excavation/undercutting shall be dewatered to a depth of at least one
foot below the bottom of the excavation and shall be maintained in the dewatered condition until
the excavation is filled with compacted material to a level that is above the original water level
or to original ground level, whichever is higher.
K. Perform temporary dewatering as necessary during excavation to minimize softening of
exposed subgrade soils. A temporary sump may be constructed for accumulation of impounded
waters resulting from rain or seepage. A pump with adequate capacity shall be provided and
operated to maintain a low water level in the sump.
L. Correct over-excavated areas with select backfill and compact replacement as specified for
authorized excavation per Section 31 2323.13 - Backfill. No payment will be made for over-
excavation or corrections made to over-excavated areas.
M. Excavated material not placed as backfill shall be stockpiled by material type (topsoil or
structural fill in a designated area free of contaminating soil, clearing debris, or other
objectionable materials in an area acceptable to Owner and Engineer. Engineer will assist the
Contractor in the determination of soil types for stockpiling.
N. All reconditioning of structural fill to obtain the required compaction will be the responsibility of
the Contractor.
O. Furnish all labor, materials, supervision, and equipment required for constructing and
maintaining temporary diversion measures as required for construction of the landfill and all
structures. Furnish, install, maintain, and operate all pumping equipment for diversion or
removal of water and maintaining the work area free from water throughout construction
including temporary ditches and sump construction.
P. Protect and or divert stormwater flows from the work area utilizing Erosion and Sediment
Control Devices referenced in Section 31 2500.
Q. Provide survey information before and after excavation.
3.03 FIELD QUALITY CONTROL
Technical Specifications
South Drainage Channel Improvements Issued for Construction, September 2, 2016
Allen Steam Station RAB Landfill S&ME Project No. 7235-15-035
Revision 0 31 2316 – Page 4 of 4 Excavation
A. Request visual inspection of bearing surfaces by Engineer before installing subsequent work.
B. Excavation is complete when the Engineer approves the Final Subgrade Survey.
3.04 PROTECTION
A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.
B. Protect bottom of excavations and soil adjacent to and beneath structures from freezing.
C. Protect structures, utilities and other facilities from damage caused by settlement, lateral
movement, undermining, stormwater, groundwater and other hazards created by earth
operations.
D. Grade top perimeter of excavation to prevent surface water from draining into excavation.
E. Protect outlet of excavations from potential sediment deposit by placing sediment control
measures such as silt fence and/or temporary sediment traps.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No: 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2316.13 – Page 1 of 5 Trenching
SECTION 31 2316.13
TRENCHING
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Trenching for buried pipe.
B. Related Sections:
1. Section 31 2316 - Excavation
2. Section 31 2323.13 - Backfill
3. Section 33 4216 - Culverts
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Trenching for buried piping:
1. Basis of Measurement: N/A. Included with Section 33 4216.
2. Basis of Payment: N/A. Included with Section 33 4216.
1.03 REFERENCES
A. American Association of State Highway and Transportation Officials:
1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a
4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
B. American Society for Testing and Materials (ASTM) standards:
1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft
3) (Standard Proctor Test).
2. ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in place by
the Sand-Cone Method.
3. ASTM D1557 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Modified Effort (6,000 ft-lbf/ft
3) (Modified Proctor Test).
4. ASTM D2216 - Standard Test Method for Moisture Content.
5. ASTM D2937 – Standard Test Method for Density of Soil in place by the Drive-Cylinder
Method Test.
6. ASTM D4959 – Standard Test Method for Determination of Water Content of Soil be
Direct Heating.
7. ASTM D 6938 – Standard Test Methods for In-Place Density and Water Content of soil
and Soil-Aggregate by Nuclear Methods.
1.04 DEFINITIONS
A. Utility: Any buried pipe, duct, conduit, or cable.
1.05 SUBMITTALS
A. As site conditions may dictate, the Contractor shall prepare an excavation protection plan
under direct supervision of Professional Engineer experienced in design of this Work and
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No: 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2316.13 – Page 2 of 5 Trenching
licensed in State of project.
1.06 QUALITY ASSURANCE
A. Perform Work in accordance with North Carolina Department of Transportation (NCDOT)
standards.
B. Perform Work in accordance with applicable Federal, State, and local excavation safety
standards.
1.07 FIELD MEASUREMENTS
A. Verify field measurements prior to placement of materials within trench.
1.08 COORDINATION
A. Verify Work associated with lower elevation utilities is complete before placing higher
elevation utilities.
PART 2 PRODUCTS
2.01 FILL MATERIALS
A. Bedding and backfill for culverts: Type A2 as specified in Section 31 0516.
B. Structural Fill for culvert backfill: Type S1 as specified in Section 31 2323.13.
PART 3 EXECUTION
3.01 LINES AND GRADES
A. Grades:
1. Lay pipes to lines and grades indicated on Drawings.
2. Maintain grade alignment of pipe using string line parallel with grade line and vertically
above centerline of pipe.
a. Establish string line on level batter boards at intervals of not more than 25 feet.
b. Install batter boards spanning trench, rigidly anchored to posts driven into ground on
both sides of trench.
c. Set three adjacent batter boards before laying pipe to verify grades and line.
d. Determine elevation and position of string line from elevation and position of offset
points or stakes located along pipe route.
e. Do not locate pipe using side lines for line or grade.
3. As an alternative method, use laser-beam instrument with qualified operator to establish
lines and grades.
B. Location of Pipe Lines:
1. Location and approximate depths of proposed pipe lines are shown on Drawings.
2. Engineer or Owner reserves right to make changes in lines, grades, and depths of pipe
lines and structures when changes are required for Project conditions.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No: 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2316.13 – Page 3 of 5 Trenching
3.02 PREPARATION
A. Call Local Utility Line Information service and the Owner not less than three working days
before performing Work.
1. Underground utilities must be located and marked within and surrounding construction
areas.
B. Identify required lines, levels, contours, and datum locations.
C. Protect bench marks and existing structures from excavating equipment and vehicular traffic.
D. Maintain and protect above and below grade utilities indicated to remain.
3.03 TRENCHING
A. Implement temporary dewatering measures to reduce softening of exposed subgrade soils as
excavation advances, until foundation construction is complete, and until fill placement is a
minimum of 3-feet above the groundwater level.
B. Do not advance open trench more than 100 feet ahead of installed pipe.
C. Cut trenches sufficiently wide to enable installation and allow inspection. Remove water or
materials that interfere with Work.
D. Excavate bottom of trenches maximum 16 inches wider than outside diameter of pipe or
structure.
E. Excavate trenches to depth indicated on Drawings. Provide uniform and continuous bearing
and support for pipe.
F. Do not disturb subgrade soils within a 45 degree zone of influence with depth of foundations,
if applicable.
G. When Project conditions permit, slope side walls of excavation starting 2 feet above top of
pipe. When side walls cannot be sloped, provide sheeting and shoring to protect excavation
as specified in this Section.
H. When required, perform excavations and provide temporary bracing, shoring, and/or
benching in accordance with applicable Federal, State, and local excavation safety standards.
I. When subsurface materials at bottom of trench are loose or soft, excavate to greater depth as
directed by Engineer until suitable material is encountered. Backfill according to Part 3.05 of
this Section.
J. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Fill Type S1
and compact to density equal to or greater than requirements for subsequent backfill material.
K. Hand trim excavation. Remove loose matter.
L. Correct over excavated areas with compacted backfill as specified for authorized excavation
or replace with lean concrete as directed by Engineer. Corrections for over excavation shall
be conducted at no cost to the Owner.
M. Stockpile excavated material in area designated on site and remove excess material not being
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No: 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2316.13 – Page 4 of 5 Trenching
used from site unless authorized by Owner to dispose of on-site in an Owner designated
location.
3.04 SHEETING AND SHORING
A. Comply with all OSHA, Federal, State, and local trench safety and excavation requirements.
B. Sheet, shore, and brace excavations to prevent danger to persons, structures and adjacent
properties and to prevent caving, erosion, and loss of surrounding subsoil.
C. Support trenches more than 4 feet deep excavated through unstable, loose, or soft material.
Provide sheeting, shoring, bracing, or other protection to maintain stability of excavation.
D. Design sheeting and shoring to be removed at completion of excavation work.
E. Repair damage caused by failure of the sheeting, shoring, or bracing and for settlement of
filled excavations or adjacent soil at no cost to the Owner.
F. Repair damage to pipe bedding work from settlement, water or earth pressure or other causes
resulting from inadequate sheeting, shoring, or bracing.
3.05 BACKFILLING
A. Trenches with Piping:
1. Cover pipe with Fill Type S1 in loose 8 inch or thinner lifts with unfrozen fill materials,
compacted uniformly to a minimum 95 percent of its Standard Proctor (ASTM D 698)
maximum dry density.
2. Compacted moisture content shall be within 3 percent of optimum moisture content for
all fill placed, or as otherwise approved by Engineer.
3. Employ placement method that does not disturb or damage utilities in trench.
B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over
porous, wet, frozen, or spongy subgrade surfaces.
C. Maintain optimum moisture content of fill materials to attain required compaction density.
D. Do not leave any trenches open at end of working day. Protect open trench to prevent danger
to the public.
E. Remove surplus fill materials from site unless authorized by Owner to dispose of on-site in an
Owner designated location.
F. Protect open trench to prevent danger to Owner.
3.06 TOLERANCES
A. Top Surface of General Backfilling: Plus or minus 1/2 inch from required elevations.
3.07 FIELD QUALITY CONTROL
A. Perform laboratory material tests in accordance with ASTM D698, and/or ASTM D1557 as
described in Section 31 2323.13.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No: 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2316.13 – Page 5 of 5 Trenching
B. Perform in place compaction tests in accordance with the following:
1. Density Tests: ASTM D1556, ASTM D6938, ASTM D2937.
2. Moisture Tests: ASTM D2216, ASTM D6938.
C. When tests indicate Work does not meet specified requirements, remove Work, replace,
compact, and retest.
D. Frequency of Tests: One test per compacted lift per culvert location for piping backfill.
3.08 PROTECTION OF INSTALLED CONSTRUCTION
A. Reshape and re-compact fills subjected to vehicular traffic during construction.
B. General construction traffic shall be limited to areas designated by the Engineer that have
been protected by at least 24 inches of compacted fill material.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2319 – Page 1 of 2 Dewatering
SECTION 31 2319
DEWATERING
PART 1 GENERAL
1.01 SUMMARY
A. The Contractor is responsible for dewatering of embankment soils, natural soils, and
structure construction locations to allow for excavation, placement and compaction of soil
fill or aggregate to the grades depicted on the drawings. The dewatering must be sufficient to
provide a stable working surface for the Contractor’s equipment during construction and a
stable surface after construction is completed. Dewatering shall also be performed to
provide stable conditions for utility and foundation excavations and construction where
necessary.
B. Dewatering means and methods are the responsibility of the Contractor. The time to dewater
using these methods will depend on numerous variables including but not limited to the
Contractor’s speed, equipment used, pumping rates, weather conditions, etc.
C. Dewatering activities shall include provisions to minimize the amount of sediment leaving
the work area. Additional erosion and sedimentation control measures beyond those
outlined on the Drawings may be required during dewatering activities to prevent sediment
from leaving the work area.
1.02 GENERAL SCOPE OF WORK
A. The scope of work includes but is not limited to providing the required labor, materials, and
equipment to perform all necessary efforts to lower and maintain the in-situ water levels
within embankment soils, natural soils, and structure construction areas, as well as diverting
and controlling stormwater away from areas ready to be excavated to allow all excavations to
be performed in dry conditions.
B. The work shall include the following:
1. Design and installation of sumps and pumps, wells, trenches, underdrains and any other
means selected by the Contractor to allow excavation and placement of soil to the lines
and grades shown on the contract drawings. Maintenance of the system(s) is also the
responsibility of the Contractor.
2. Installation and maintenance of erosion and sediment control devices related to
dewatering.
C. Related Sections:
1. Section 31 0516 - Aggregate
2. Section 31 2316 - Excavation
3. Section 31 2316.13 - Trenching
4. Section 31 2323.13 - Backfill
5. Section 31 2500 - Erosion and Sediment Control Devices
1.03 DESIGN AND PERFORMANCE REQUIREMENTS
A. Continuously monitor and maintain dewatering operations to ensure erosion control, stability
of excavations and perimeter slopes, that excavations do not flood, and that damage to
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2319 – Page 2 of 2 Dewatering
subgrades and permanent structures is prevented or minimized.
B. Control surface water that enters excavations by diversions, dikes, pumps or other means.
C. Accomplish dewatering without damage to existing dams, appurtenances, or other structures.
D. Remove dewatering systems when no longer required for construction.
1.04 SUBMITTALS
A. Provide names and credentials of all subcontractors responsible for dewatering, if any.
B. Provide a detailed plan of the means and methods that are to be used by the Contractor to
establish and maintain the dewatering system(s).
1.05 QUALITY ASSURANCE
A. Regulatory Requirements: Obtain all required Federal, State or Local permits and approval
from the NCDENR.
PART 2 PRODUCTS
The Contractor shall use dewatering products in accordance with the recommendations of the
manufacturer.
PART 3 EXECUTION
3.01 PREPARATION
A. Protect structures, haul roads, access roads, embankments, utilities, and other facilities from
potential damages or hazards resulting from dewatering operations.
B. Design and install dewatering system(s) to ensure minimum interference with haul roads,
construction access, stockpiling of materials, and construction activities in general.
C. Protect and maintain temporary and permanent erosion and sediment control devices during
dewatering operations.
3.02 OPERATION
A. Operate dewatering system as until dewatering is no longer required as directed by the
Engineer.
B. Avoid and/or discontinue pumping that leads to loss of fines, soil “piping”, subgrade
softening, or slope instability.
C. Dispose of water removed by dewatering in a manner that avoids endangering public health,
property, and portions of work under construction or completed.
D. Provide standby equipment, on site and available for immediate operation, to maintain
dewatering after storm events or in the event of flooded excavations.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2323.13 – Page 1 of 5 Backfill
SECTION 31 2323.13
BACKFILL
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Fill Type S1, Structural Fill, defined as compacted fill for perimeter berms, surface water
control systems, roadways, general fill, final cover system construction, or other systems
not intended to function as a migration barrier.
2. Fill Type S2, Topsoil or Vegetative Soil Cover, defined as soil material layer for the final
cover system of the closed landfill, capable of sustaining vegetation as specified in these
Specifications.
B. Related Sections:
1. Section 03 3000 - Cast-In-Place Concrete
2. Section 03 4800 - Precast Concrete Specialties
3. Section 31 0516 - Aggregate
4. Section 31 1413.16 - Soil Stockpiling
5. Section 31 2316 - Excavation
6. Section 31 2316.13 - Trenching
7. Section 31 2500 - Erosion and Sediment Control Devices
8. Section 32 9219 - Seeding
9. Section 40 0533 - High-Density Polyethylene Process Pipe
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Fill Type S1, Structural Fill:
1. Basis of Measurement: By the cubic yard filled. The quantity of structural fill will be
based upon the in-place volume between the excavated surface or prepared subgrade and
the structurally filled surface as determined by survey information collected before and
after the structural fill placement. A grid pattern of ground surface elevations as
approved by the Engineer in the area shall be surveyed and reference points installed by
the Earthwork Contractor prior to structural backfill placement and prior to placement of
any overlying material. The Engineer shall check the as-built finished grades and
determine the backfilled volume of structural fill based on survey data provided by the
Contractor.
2. Basis of Payment: By the cubic yard placed times the unit price for fill Type S1
placement.
a. Includes hauling, scraping, dust control, scarifying substrate surface, moisture
conditioning, placing where required, compacting, maintenance, temporary erosion
control measures as needed including temporary stockpile stabilization if necessary,
and removing accumulated water during construction.
b. Requested payment quantities will be submitted by the Contractor with final approval
by the Engineer. If a dispute exists relative to payment quantities, the Contractor, at
his expense, will uncover any buried or covered material for re-evaluation.
B. Fill Type S2, Topsoil or Vegetative Soil Cover:
1. Basis of Measurement: By the cubic yard placed.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2323.13 – Page 2 of 5 Backfill
2. Basis of Payment: By the cubic yard placed times the unit price for fill Type S3
placement. Payment quantities will be determined by the survey area for topsoil
placement times an assumed 6 inch depth of topsoil placement.
a. Includes borrow excavation and/or furnishing, hauling, scraping, scarifying fill
material, placing, maintenance, and temporary erosion control measures as needed
including temporary stockpile stabilization if necessary.
b. Requested payment quantities will be submitted by the Contractor with final approval
by the Engineer. If a dispute exists relative to payment quantities, the Contractor, at
his expense, will uncover any buried or covered material for re-evaluation.
1.03 REFERENCES
A. American Society for Testing and Materials (ASTM) standards:
1. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft
3).
2. ASTM D1556 - Standard Test Method for Density of Soil In Place by the Sand-Cone
Method.
3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft-lbf/ft
3)
4. ASTM D2216 - Standard Test Method for Laboratory Determination of Water (Moisture)
Content of Soil and Rock by Mass.
5. ASTM D2487 – Standard Practices for Classification of Soil for Engineering Purposes
(Unified Soil Classification System).
6. ASTM D2937 - Standard Test Method for Density of Soil in place by the Drive-Cylinder
Method.
7. ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity
Index of Soils.
8. ASTM D 6913 – Standard Test Methods for Particle Size Distribution of Soils Using
Sieve Analysis.
9. ASTM D 6938 – Standard Test Methods for In-Place Density and Water Content of soil
and Soil-Aggregate by Nuclear Methods.
B. North Carolina Department of Environmental Quality:
1.North Carolina Erosion and Sediment Control Planning & Design Manual
(NCESCPDM). North Carolina Department of Environment and Natural Resources (now
NCDEQ), June, 2006, Chapters 6 and 8 revised May, 2013.
1.04 SUBMITTALS
A. N/A.
PART 2 PRODUCTS
2.01 FILL MATERIALS
A. Fill Type S1, Structural Fill:
1. Structural fill is defined as compacted fill for perimeter berms, surface water control
systems, roadways, general fill, cover system construction, or other systems not intended
to function as a migration barrier.
2. Natural soil material from designated on-site borrow areas and/or stockpiles.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2323.13 – Page 3 of 5 Backfill
3. Structural fill shall be classified as SP, SM, SW, SC, SW-SM, SW-SC, SP-SM, ML, MH,
or CL soils according to the Unified Soil Classification System (ASTM D2487).
4. Free of topsoil, organic material, roots, stumps, brush, rocks larger than 4 inches, subsoil,
debris, vegetation, and other foreign matter.
5. Structural fill located within 1-foot of geosynthetics components shall be defined as
“prepared subgrade”; that is, having a maximum particle size of 3 inches; a smooth
surface; and no protrusions greater than 1/2 inch. The material shall be screened by the
Earthwork Contractor, if necessary, to remove particle sizes greater than 3 inches in
diameter. No more than 5 percent of the material should be retained on the No. 4 sieve.
6. All material clods will be broken down with tillers and/or discs to provide a
homogeneous soil that is free of clods greater than 4 inches in diameter with no more
than 15% retained on the No. 4 sieve.
B. Fill Type S2, Topsoil and Vegetative Soil Cover:
1. Topsoil or Vegetative Soil Cover is defined as soil material layer for the final cover
system of the closed landfill placed to support.
2. Excavated and reused materials from designated on-site or off-site borrow areas and/or
stockpiles.
3. Shall be classified as SM, SC, SW-SM, SW-SC, SP-SM, ML, MH, or CL soils according
to the Unified Soil Classification System (ASTM D2487).
4. Free of roots, stumps, brush, rocks larger than 2 inches, debris, and other foreign matter.
5. Topsoil or Vegetative Soil Cover material shall have nutrient content and pH capable of
supporting vegetation.
6. Shall have a minimum organic content of 2% by weight.
7. All material clods will be broken down with tillers and/or discs to provide a
homogeneous soil that is free of clods greater than 2 inches in diameter with no more
than 15% retained on the No. 4 sieve.
PART 3 EXECUTION
3.01 EXAMINATION
A. The Engineer will assist the Earthwork Contractor in the determination of Structural Fill and
non-select material during excavation operations (see Section 31 2316). The Earthwork
Contractor will be responsible for excavating, transporting, stockpiling, placing and
compacting all materials as needed.
3.02 PREPARATION
A. Proof roll subgrade to identify soft spots; fill and compact to density equal to or greater than
requirements for subsequent fill material if applicable, otherwise engineer shall visually
observe subgrade for soft spots.
B. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Type S1 fill
(as specified by the Engineer) and compact to density equal to or greater than requirements
for subsequent fill material.
C. Scarify subgrade surface to depth of 6 inches for areas with overlying soil. Smooth drum roll
subgrade surface for areas with overlying geosynthetics.
D. Grade subgrade to a tolerance of plus or minus 0.10 foot. All grade breaks must have a
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2323.13 – Page 4 of 5 Backfill
minimum radius of 1 foot.
E. Begin backfilling after Engineer’s acceptance of the appropriate survey for underlying
surface.
3.03 BACKFILLING
A. Backfill areas to contours and elevations as shown on Drawings with unfrozen materials.
B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over
porous, wet, frozen, or spongy subgrade surfaces.
C. Fill Type S1: Place and compact material in loose lifts not exceeding 8 inches in thickness
and not exceeding 6 inches compacted thickness. The first lift over geosynthetics shall be not
less than 12 inches in loose thickness. Refer to Specification Section 31 2316.13 - Trenching
for backfill requirements for drop inlets and culverts.
D. Fill Type S2: Scarify subgrade, place material in one lift and track in with backhoe or other
equipment approved by Engineer.
E. Employ placement method that does not disturb or damage other work.
F. Backfill against supported structures. Do not backfill against unsupported structures.
Backfill simultaneously on each side of unsupported structures until supports are in place.
G. Protect backfill from desiccation, crusting, or cracking.
H. Make gradual grade changes. Blend slope into level areas.
I. Remove surplus backfill materials from site unless authorized by Owner to dispose of on-site
in an Owner designated location.
J. Leave fill material stockpile areas free of excess fill materials.
K. Provide survey information before and after placement of structural fill.
3.04 TOLERANCES
A. Top Surface Type S1 fill shall be plus or minus 1 inch from required elevations.
3.05 FIELD QUALITY CONTROL
A. Laboratory Testing:
1. Perform laboratory material tests in accordance with ASTM D6913, ASTM D698,
ASTM D2216, and ASTM D4318.
2. Test at a frequency of:
a. 10,000 cubic yards of type S1 placed;
b. When materials using for structural fill change; and/or
c. When directed by the Engineer.
B. In Place Compaction and Natural Moisture Content Tests
1. Perform in place compaction tests in accordance with ASTM D1556, ASTM D6938, or
ASTM D2937.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2323.13 – Page 5 of 5 Backfill
2. Perform in place natural moisture content test in accordance with ASTM D6938.
3. Frequency of compaction/natural moisture content tests:
a. General fill, landfill subgrade, surface water control systems, or other systems not
intended to function as a migration barrier, in-place density and moisture: Each lift at
a minimum frequency of 1 per acre per lift, or as otherwise indicated in these
Specifications.
b. Perimeter berms and roadways: Each lift at a minimum frequency of 1 per 10,000 sq.
ft.
c. Drop inlets and culverts: see Section 31 2316.13.
4. Compaction criteria:
a. Type S1 fill shall be compacted to minimum 95 percent of its Standard Proctor
(ASTM D 698) maximum dry density.
b. Type S1 fill placed for roadways shall be compacted to a minimum 98 percent of its
Standard Proctor (ASTM D 698) maximum dry density.
c. Compacted moisture content shall be within 3 percent of optimum moisture content
for all fill placed, or as otherwise approved by Engineer.
d. Fill Type S2 should be placed in one continuous loose lift and tracked in by backhoe
or other equipment approved by Engineer.
e. Culverts: see Section 33 4213.
C. When tests indicate Work does not meet specified requirements, remove Work, replace and
retest.
3.06 PROTECTION OF WORK
A. Reshape and re-compact fills subjected to vehicular traffic.
END OF SECTION
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2500 – Page 1 of 5 Erosion and Sediment Control Devices
SECTION 31 2500
EROSION AND SEDIMENT CONTROL DEVICES
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Grass-Lined / Matted Channels / Diversion Berms
2. Riprap Energy Dissipater (Outlet Protection Apron)
3. Slope Matting
4. Grassing
5. Erosion Maintenance
B. Related Sections
1. Section 03 1000 - Concrete Forms and Accessories
2. Section 03 3000 - Cast-In-Place Concrete
3. Section 03 4800 - Precast Concrete Specialties
4. Section 31 0516 - Aggregate
5. Section 31 1100 - Site Clearing and Grubbing
6. Section 31 2316 - Excavation
7. Section 31 2323.13 - Backfill
8. Section 32 9219 - Seeding
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Grass-Lined / Matted Channels / Diversion Berms:
1. Basis of Measurement: By linear foot.
2. Basis of Payment: Linear footage installed, times the unit price per linear foot.
a. Includes excavating, windrowing, placing fill, compacting, installing erosion control
matting, maintaining during construction, seeding, and mulching for grass-lined
channels / diversion berms as indicated on Drawings, maintaining during
construction, and removal of temporary E&SC measures following ground
stabilization. Refer to Section 32 9219 for seeding and soil supplements for grassing.
b. Requested payment quantities will be submitted by the Contractor with final approval
by the Engineer. If a dispute exists relative to payment quantities, the Contractor at
his expense will uncover any buried or covered material for re-evaluation.
B. Riprap Energy Dissipater (Outlet Protection Apron):
1. Basis of Measurement: Each unit placed.
2. Basis of Payment: Unit Price for each unit placed.
a. Includes labor and materials for clearing, excavating, backfilling, placing
embankment, placing non-woven geotextile fabric in accordance with
Section 31 0519.13, placing rock, and required grouting as indicated on Drawings,
maintaining during construction, and removal of temporary E&SC measures
following ground stabilization.
C. Slope Matting:
1. Basis of Measurement: By the square yard.
2. Basis of Payment: Unit Price for each square yard placed.
a. Includes labor and materials for installing slope matting, and maintaining during
construction.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2500 – Page 2 of 5 Erosion and Sediment Control Devices
D. Grassing:
1. Basis of Measurement: By the Acre. Refer to Section 32 9219.
2. Basis of Payment: Unit Price for each acre seeded. Refer to Section 32 9219.
E. Erosion Maintenance:
1. Basis of Measurement: Lump sum.
2. Basis of Payment: Lump sum
a. Includes labor and materials for performance of all E&SC inspections as required by
NCDEQ throughout the project and until permit closeout, assumed to be 6 months
following Substantial Completion.
b. Includes labor and materials for maintaining E&SC measures after substantial
completion and until permit closeout.
1.03 REFERENCES
A. American Concrete Institute:
1. ACI 301 - Specifications for Structural Concrete.
B. ASTM International:
C. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).
D. North Carolina Department of Environmental Quality:
1.North Carolina Erosion and Sediment Control Planning & Design Manual
(NCESCPDM). North Carolina Department of Environment and Natural Resources (now
NCDEQ), June, 2006, Chapters 6 and 8 revised May, 2013.
1.04 SUBMITTALS
A. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.05 QUALITY ASSURANCE
A. Perform Work in accordance with requirements of these Project Specifications.
B. Perform Work in accordance with NCDOT standards.
1.06 PRE-INSTALLATION MEETINGS
A. Convene minimum one week prior to commencing work of this Section.
1.07 ENVIRONMENTAL REQUIREMENTS
A. Do not place grout when air temperature is below freezing.
B. Do not place concrete when base surface temperature is less than 40 degrees F or when
surface is wet or frozen.
PART 2 PRODUCTS
2.01 RIPRAP AND GEOTEXTILE MATERIALS
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2500 – Page 3 of 5 Erosion and Sediment Control Devices
A. Riprap: As shown on Drawings and as specified in Section 31 0516. Furnish in accordance
with NCDOT standards.
B. Geotextile Fabric: Non-biodegradable, non-woven geotextile, 8 oz/sy, UV stabilized filter
fabric as specified in Section 31 0519.13.
2.02 MATTING
A. Matting: As shown on Drawings.
2.03 CONCRETE MATERIALS AND REINFORCEMENT
A. Refer to Sections 03 1000, 03 3000, and 03 4800.
2.04 AGGREGATE AND SOIL MATERIALS
A. Fine and Coarse Aggregate: As shown on Drawings and as specified in Section 31 0516.
B. Soil Backfill: Soil Type S1 as specified in Section 31 2323.13. Subsoil with no rocks over 4
inches in diameter, frozen earth or foreign matter.
2.05 SILT FENCING
A. As specified on Drawings.
2.06 PLANTING MATERIALS
A. Seeding and Soil Supplements: As specified in Section 32 9219.
B. Mulch: As specified in Section 32 9219.
2.07 ACCESSORIES
A. Joint Sealers: Furnish in accordance with NCDOT standards and as indicated on Drawings.
B. Joint Filler: Furnish in accordance with NCDOT standards and as indicated on Drawings.
C. Grout: Furnish in accordance with NCDOT standards and as indicated on Drawings.
2.08 MIXES
A. Concrete: as specified in Section 03 3000. Furnish in accordance with NCDOT standards and
as indicated on Drawings.
2.09 SOURCE QUALITY CONTROL (AND TESTS)
A. Perform tests on cement, aggregates, backfill, and mixes to ensure conformance with
requirements of associated specifications.
B. Test samples in accordance with ACI 301.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2500 – Page 4 of 5 Erosion and Sediment Control Devices
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify compacted subgrade or granular base is acceptable and ready to support devices and
imposed loads.
B. Verify gradients and elevations of base or foundation for other work are correct.
3.02 GRASS-LINED / MATTED CHANNELS / DIVERSION BERMS
A. Windrow excavated material on low side of channel.
B. Place fill and compact to 95 percent of the maximum dry density as determined by ASTM
D698.
C. On entire channel area, apply soil supplements and sow seed as specified in Section 32 9219.
D. Mulch seeded areas with straw as specified in Section 32 9219.
E. Install erosion control matting as specified on Drawings.
3.03 RIPRAP ENERGY DISSIPATOR (OUTLET PROTECTION APRON)
A. Excavate to indicated depth of rock lining or nominal placement thickness as indicated on
Drawings. Remove loose, unsuitable material below bottom of rock lining, then replace with
suitable material. Thoroughly compact and finish entire foundation area to firm, even
surface.
B. Lay and overlay geotextile fabric over substrate. Lay fabric parallel to flow from upstream to
downstream. Overlap edges upstream over downstream and upslope over downslope.
Provide a minimum overlap of 2 feet. Offset adjacent roll ends a minimum of 5 feet when
lapped. Cover fabric as soon as possible and in no case leave fabric exposed more than 4
weeks.
C. Carefully place rock on geotextile fabric to produce an even distribution of pieces, with
minimum of voids and without tearing geotextile. Place as indicated on Drawings.
D. Unless indicated otherwise, place full course thickness in one operation to prevent
segregation and to avoid displacement of underlying material. Arrange individual rocks for
uniform distribution. Place evenly and carefully to minimize voids.
1. If grout is used to fill void spaces and where noted on the drawings, saturate rock with
water and let all standing water drain. Fill voids between pieces with grout, were shown
on Drawings, for at least top 6 inches. Sweep surface with stiff broom to remove excess
grout.
3.04 SILT FENCING
A. Install as specified on Drawings.
3.05 SILT FENCE OUTLETS
A. Locations as indicated on the Drawings and may be field-adjusted with Engineer’s approval.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 31 2500 – Page 5 of 5 Erosion and Sediment Control Devices
3.06 SITE STABILIZATION
A. Incorporate erosion control devices indicated on Drawings into the Project at the earliest
practicable time.
B. Construct, stabilize and activate erosion control measures before site disturbance within
tributary areas of those measures.
C. Stockpile and waste pile heights shall not exceed heights indicated on the drawings. Slope
stockpile sides at 2(H):1(V) or flatter or as otherwise indicated on the Drawings.
D. Stabilize any disturbed area of affected erosion control devices on which activity has ceased
and which will remain exposed for more than 15 calendar days.
1. During non-germinating periods, apply mulch at recommended rates.
2. Stabilize disturbed areas which are not at finished grade and which will be disturbed
within one year in accordance with Section 32 9219 and as specified on Drawings for
temporary seeding.
3. Stabilize disturbed areas which are either at finished grade or will not be disturbed within
one year in accordance with Section 32 9219 permanent seeding specifications.
E. Stabilize diversion channels and stockpiles immediately.
3.07 FIELD QUALITY CONTROL
A. Inspect erosion control devices on a weekly basis and after each runoff event in accordance
with applicable North Carolina regulations. Perform additional inspections as required by the
Self-Inspection Program. Make necessary repairs to ensure erosion and sediment controls are
in good working order.
B. Compaction Testing: As specified in Section 31 2323.13.
C. When tests indicate work does not meet specified requirements, remove work, replace and
retest.
3.08 CLEANING
A. Remove and dispose of sediment when sediment accumulation in sedimentation structures
has reached a point one-half depth of sediment structure or device, or as indicated on the
Drawings.
B. Do not damage structure or device during cleaning operations. Any damage caused by
cleaning operations shall be repaired at no cost to the Owner.
C. Do not permit sediment to erode into construction or site areas or natural waterways.
D. Clean channels when depth of sediment reaches approximately one half channel depth.
E. Do not damage channel or channel lining material during cleaning operations.
3.09 SCHEDULES
A. As indicated on Drawings.
END OF SECTION
DIVISION 32
EXTERIOR IMPROVEMENTS
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 32 9219 – Page 1 of 5 Seeding
SECTION 32 9219
SEEDING
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Preparation of subsoil.
2. Placing topsoil as needed.
3. Seeding.
4. Hydroseeding.
5. Mulching.
6. Fertilizing.
7. Maintenance.
B. Related Sections:
1. Section 31 2323.13 - Backfill
2. Section 31 2500 - Erosion and Sediment Control Devices
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Seeding:
1. Basis of Measurement: By the acre.
2. Basis of Payment: By the 2-dimensional acre seeded times the unit price for seeding.
a. Includes all labor, equipment and materials required to establish a permanent grass
cover on all graded surfaces including, but not limited to preparation of subsoil, soil
amendments, installation of erosion control matting, fertilizing, and seeding.
b. Includes fulfilling requirements of the maintenance agreement.
c. Includes any maintenance and protection required to control erosion on embankment
fill surfaces prior to beginning permanent grassing operations.
1.03 REFERENCES
A. North Carolina Department of Environmental Quality:
1.North Carolina Erosion and Sediment Control Planning & Design Manual
(NCESCPDM). North Carolina Department of Environment and Natural Resources (now
NCDEQ), June, 2006, Chapters 6 and 8 revised May, 2013.
2. Vegetation Maintenance Implementation Plan (VMIP), Duke Energy Allen Steam
Station, 2011, S&ME Project No. 1265-10-362
1.04 DEFINITIONS
A. Weeds: Vegetative species other than specified species to be established in given area.
1.05 SUBMITTALS
A. Product Data: Submit data for seed mix, fertilizer, mulch, and other accessories.
B. Soil test results and fertilizer and soil amendment recommendations from the North Carolina
Department of Agriculture and Consumer Affairs or a similar soil and nutrient testing
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 32 9219 – Page 2 of 5 Seeding
laboratory.
1.06 CLOSEOUT SUBMITTALS
A. Seeding maintenance warranty.
1.07 QUALITY ASSURANCE
A. Provide seed mixture in containers showing percentage of seed mix, germination percentage,
inert matter percentage, weed percentage, year of production, net weight, date of packaging,
and location of packaging.
B. Perform Work in accordance with North Carolina Erosion and Sedimentation Control
Planning and Design Manual.
C. Provide soil testing results indicating required fertilizer, lime, and nutrient demand for on-site
soils to promote vigorous vegetative growth.
1.08 DELIVERY, STORAGE, AND HANDLING
A. Deliver grass seed mixture in sealed containers. Seed in damaged packaging is not
acceptable.
B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of
manufacturer.
PART 2 PRODUCTS
2.01 SEED MIXTURE
A. Temporary Seed Mixture: As specified on Drawings.
B. Permanent Seed Mixture: As specified on Drawings.
2.02 SOIL MATERIALS
A. Topsoil: Excavated from site, imported, and/or a blend thereof reasonably free of weeds as
specified in Section 31 2323.13.
2.03 ACCESSORIES
A. Mulching Material: Oat or wheat straw, free from weeds, foreign matter detrimental to plant
life, and dry and as described in the North Carolina Erosion and Sediment Control Planning
and Design Manual.
B. Fertilizer: Commercial grade; recommended for grass; of proportion necessary to eliminate
deficiencies of topsoil as described in the North Carolina Erosion and Sediment Control
Planning and Design Manual and as indicated on Drawings.
C. Lime: Agricultural grade; recommended for grass; of proportion necessary to promote
germination of seed as described in the North Carolina Erosion and Sediment Control
Planning and Design Manual and as indicted on the Drawings.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 32 9219 – Page 3 of 5 Seeding
D. Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of
grass.
E. Erosion Fabric: Erosion control matting, as specified by the Engineer.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify prepared soil base is ready to receive the Work of this Section.
3.02 PREPARATION OF SUBSOIL
A. Prepare sub-soil to eliminate uneven areas and low spots. Maintain lines, levels, profiles and
contours. Make changes in grade gradual. Blend slopes into level areas.
B. Remove foreign materials, weeds and undesirable plants and their roots. Remove
contaminated sub-soil.
C. Tracked soil surface shall be oriented up and down slopes and not parallel to slopes to help
prevent erosion.
3.03 FERTILIZING
A. Provide minimum fertilizer, lime, and nutrient addition as recommend by soil testing results
to promote vigorous vegetative growth.
B. Apply fertilizer after smooth raking of topsoil.
C. Mix fertilizer thoroughly into upper 2 to 4 inches of soil.
D. Lightly water soil to aid dissipation of fertilizer. Irrigate top level of soil uniformly.
3.04 SEEDING
A. Stabilization and/or seeding must be completed per the erosion and sediment control permit
requirements. This is understood that disturbed areas are to be permanently stabilized or
seeded within 15 working days or 90 calendar days.
B. Apply seed at rate as indicated on Drawings evenly in two intersecting directions and in
accordance with the North Carolina Erosion and Sediment Control Planning and Design
Manual. Rake in lightly.
C. Do not seed areas in excess of that which can be mulched on same day.
D. Planting Season: As indicated on Drawings and in accordance with the North Carolina
Erosion and Sediment Control Planning and Design Manual.
E. Do not sow immediately following rain, when ground is too dry, or when winds are over 12
mph.
F. Immediately following seeding, apply mulch to thickness as specified on Drawings and in
accordance with the North Carolina Erosion and Sediment Control Planning and Design
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 32 9219 – Page 4 of 5 Seeding
Manual. Maintain clear of shrubs and trees.
G. Apply water with fine spray immediately after each area has been mulched. Saturate to 2
inches of soil.
3.05 HYDROSEEDING
A. Apply fertilizer, mulch and seeded slurry with hydraulic seeder at rate of 2000 lbs. per acres
evenly in one pass.
B. After application, apply water with fine spray immediately after each area has been
hydroseeded. Saturate to 4 inches of soil and maintain moisture levels two to four inches.
3.06 MAINTENANCE WARRANTY
A. The contractor is responsible for providing a sufficient quality vegetation consistent with the
engineers approved seeding mixture. The contractor shall be liable for maintenance,
substantial growth and acceptance for a period of twelve months after Substantial
Completion. The Owner shall retain a Maintenance Bond from the contractor in the amount
of 15% of the total price of seeding for a period of twelve months after Substantial
Completion.
B. Vegetation shall be monitored by the Owner or Owners representative and the contractor
during agreed upon dates. A corrective punch list and/or approval letter will then be
formulated and given to the contractor for each review. If the vegetation is deemed of
insufficient quality and/or erosion has occurred due to fault of the contractor, contractor will
take corrective measures and or replace at no cost to the owner. Contractor liability for
establishing vegetation does not include destructive acts by others including traffic, mowing,
chemicals, all other physical activities and force majeure.
C. Definitions:
1.corrective measures - may include any or all of the following: re-fertilizing, re-seeding,
correcting erosion issues caused by insufficient vegetation.
2.force majeure -acts of severe or abnormal conditions including but not limited to
parasitic insects or fungi, wildfire, flooding, wind damage, or extreme drought as defined
by the North Carolina Drought Management Advisory Council.
3.owner’s obligations -The Owner is obligated to monitor the vegetation at the frequency
defined above. If corrective measures need to be taken, the owner is responsible for
communicating to the Contractor the extent and location where corrective measures are
necessary.
4.sufficient quality of permanent vegetation - Permanent vegetation will be considered of
sufficient quality if the following two conditions are met:
a. No bare spots are larger than 25 square feet
b. Bare spots make up less than 2% of total seeded area
D. Terms and conditions of the maintenance warranty may be modified by a Notice of Change if
agreeable to the Owner, Engineer, and Contractor.
3.07 SCHEDULE
A. As indicated on Drawings.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 32 9219 – Page 5 of 5 Seeding
END OF SECTION
DIVISION 33
EXTERIOR IMPROVEMENTS
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 33 4213 – Page 1 of 4 Concrete Culvert Pipe
SECTION 33 4213
CONCRETE CULVERT PIPE
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Concrete Culvert Pipe
B. Related Sections:
1. Section 31 2316 - Excavation
2. Section 31 2316-13 – Trenching
3. Section 31 2323.13 – Backfill
4. Section 31 2319 - Dewatering
1.02 UNIT PRICE - MEASUREMENT AND PAYMENT
A. Concrete Culvert Pipe:
1. Basis of Measurement: By linear foot.
2. Basis of Payment: Linear footage installed, times the unit price per linear foot.
a. Includes unit, excavating, bedding, backfilling, compacting, joining, sealing, fittings
and accessories assembled.
1.03 REFERENCES
A. American Concrete Institute
1. ACI 318 - Building Code Requirements for Reinforced Concrete.
2. ACI 350 - Environmental Engineering Concrete Structures.
B. ASTM International
1. ASTM C76 - Standard Specification for Reinforced Concrete Culvert, Storm Drain, and
Sewer Pipe.
2. ASTM C443 - Standard Specification for Joints for Concrete Pipe and Manholes, Using
Rubber Gaskets.
3. ASTM C33 - Standard Specification for Concrete Aggregates.
4. ASTM C150 - Standard Specification for Portland Cement.
5. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.
6. ASTM C443 - Joints.
7. ASTM C913 - Standard Specification for Pre-cast Concrete Water and Wastewater
Structures.
8. ASTM C923 - Resilient Connectors Between Reinforced Concrete Manhole Structures
and Pipes.
9. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Pre-
cast Box Sections Using Preformed Flexible Joints Sealants.
10. ASTM C1433 - Standard Specification for Pre-cast Reinforced Concrete Box Sections
for Culverts, Storm Drains, and Sewers.
11. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft
3).
12. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by
Nuclear Methods (Shallow Depth).
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 33 4213 – Page 2 of 4 Concrete Culvert Pipe
13. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by
Nuclear Methods (Shallow Depth).
C. American Association of State Highway and Transportation Officials
1. AASHTO M198 - Butyl Rubber Sealants.
1.04 DESIGN REQUIREMENTS
A. Design Criteria:
1. Honeycombed or retempered concrete is not permitted.
2. Equivalent strength: Based on structural design of reinforced concrete as outlined in ACI
318, Design for H20 Loading.
3. Design of Lifting Devices for Pre-cast Structures: In accordance with ASTM C 913.
4. Design of Joints for Pre-cast Structures: In accordance with ASTM C443.
1.05 SUBMITTALS
A. Shop Drawing: Indicate structure locations such as adjoining headwalls or endwalls and catch
basins in relation to culvert installation for penetration and elevations of penetrations.
B. Product Data: Submit covers, component construction, features, configuration, and
dimensions.
C. Manufacturer’s Certificates: Submit Statement of Compliance, supporting data, from
Materials Suppliers attesting that concrete pipe provided meet or exceed ASTM Standards
and Specification requirements.
1.06 CLOSEOUT SUBMITTALS
A. Project Record Documents: Accurately record actual locations and inverts of buried pipe,
components and connections.
1.07 QUALITY ASSURANCE
A. Perform Work in accordance with NCDOT standards.
1.08 DELIVERY, STORAGE AND HANDLING
A. Comply with Manufacturer’s instructions for unloading, storing and moving concrete pipe
sections.
B. Store culverts to prevent damage to Owner’s property or other public or private property.
Repair property damaged from materials storage.
C. Mark each pre-cast structure by indentation or waterproof paint showing date of manufacture,
Manufacturer, and identifying symbols and numbers shown on Drawings to indicate its
intended use.
1.09 ENVIRONMENTAL REQUIREMENTS
A. Conduct operations not to interfere with, interrupt, damage, destroy, or endanger integrity of
surface or subsurface structures or utilities, and landscape in immediate or adjacent areas.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 33 4213 – Page 3 of 4 Concrete Culvert Pipe
PART 2 PRODUCTS
2.01 REINFORCED CONCRETE PIPE SECTIONS
A. Reinforced Concrete Pipe: ASTM C76, with bell and spigot joints to class shown on
Drawings
B. Joints: Rubber gaskets, ASTM C443.
C. Handling Holes:
1. Permitted only on reinforced concrete storm culvert pipe 21 in. or larger in dia.
2. One handling hole is permitted on straight lengths of pipe, less than 48 in. in dia., and two
on pipe 48 in. and larger, connection pipe, and cut off for curves.
3. Plug handling holes with mortar after pipe is laid before cover material is placed. Wipe
and clean inside face.
D. Manufacturer’s products and configurations shall be provided and installed as specified on
the Drawings.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify connections, sizes, locations and inverts are as indicated on Drawings.
B. Verify items provided by other sections of Work are properly sized and located.
C. Verify excavations meet line and grade requirements as indicated on the drawings.
3.02 PREPARATION
A. Coordinate placement of connecting pipes required by other Sections of Work as described in
these Specifications.
B. Inspect concrete culvert pipe immediately prior to placement in excavation to verify
structures are internally clean and free from damage. Remove and replace damaged units.
3.03 INSTALLATION
A. Excavation and Backfill:
1. Excavate for pre-cast concrete structures in accordance with Section 31 2316 of these
Specifications in location and to depth shown. Provide clearance around sidewalls of
structure for construction operations.
2. When groundwater is encountered, prevent accumulation of water in excavations. Place
pre-cast concrete structures in dry trench.
3. Where possibility exists of watertight structure becoming buoyant in flooded excavation,
anchor structure to avoid flotation.
B. Lift pipe at lifting points designated by Manufacturer.
C. When lowering concrete pipes into excavations and joining pipes together or to structures,
take precautions to ensure interior of pipeline and structure remains clean.
Technical Specifications Issued for Construction, September 2, 2016
South Drainage Channel Improvements S&ME Project No. 7235-15-035
Allen Steam Station RAB Landfill
Revision 0 33 4213 – Page 4 of 4 Concrete Culvert Pipe
D. Coupled Joints – Cement Mortar Joint for Tongue and Groove:
1. Wherever possible, use pre-cast connections.
2. Butter groove of last pipe laid with cement mortar on inner face throughout lower half of
pipe. Butter tongue of pipe to be laid on outer face throughout upper half.
3. Join and force pipe together until opening on outside of pipe is no less than 1/2 in. nor
more than 1/3 length of tongue.
4. Immediately before making joint, lubricate outside of gasket and inside of bell or groove
of last pipe with approved lubricant.
5. Trowel outside of joint with mortar and fill open space.
6. Cover outside of pipe joint with paper or tar paper.
7. For pipe 21 in. to 72 in. in diameter completely fill open section of inside joint face with
mortar and wipe clean.
E. Bell and Spigot Joints
1. Immediately before making joint, lubricate outside of gasket and inside of bell or groove
of last pipe with approved lubricant.
2. Gasket and ends of pipe shall be free of sand or gravel.
3. Insert spigot or tongue of pipe with gasket in place, into bell or groove end of previously
laid pipe.
4. Set pipe to line and grade, and jack or push home.
5. Use jack or "come along" to ensure joints are tight.
F. Coordinate with other Sections of Work as described in these Specifications to provide
correct size, shape, and location.
3.04 FIELD QUALITY CONTROL
A. Noticeable variations from true alignment and grade will be considered sufficient cause for
rejection of work.
B. Acceptance of fittings, stubs or other specially fabricated pipe sections shall be based on
visual inspection at job site.
C. Pipe shall be subject to rejection for failure to conform to requirements of Contract
Documents or following.
1. Fractures or cracks passing through pipe wall or socket, except single crack not exceeding
2 in. in length at either end of pipe or single fracture in socket not exceeding 3 in. in width
nor 2 in. in length shall not be considered cause for rejection unless these defects exist in
more than 5% of entire shipment or delivery.
2. Chips or fractures on interior of pipe exceeding 2 in. in length, 1 in. in width, and depth
more than 1/4 barrel thickness.
3. Cracks sufficient to impair strength, durability, or serviceability of pipe.
4. Defects indicating improper proportioning, mixing, and molding.
5. Variations of more than 1/8 in/lf in alignment of pipe intended to be straight.
6. Damaged ends, where such damage prevents making satisfactory joint.
D. Request observation by Engineer prior to placing cover over piping.
E. Compaction Testing: In accordance with Section 31 2323.13.
END OF SECTION