Loading...
HomeMy WebLinkAbout1812_Duke_Marshall_CompactReq_DIN26746_20160921526 South Church Street: Mail Code EC13K Charlotte, North Carolina 28202 980-373-5697 September 19, 2016 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, North Carolina 28778 Attn: Mr. Larry Frost Re: Industrial Landfill No.1 Compaction Modification Request Permit No.: 1812-INDUS Marshall Steam Station Catawba County Terrell, North Carolina 28682 Dear Mr. Frost, As discussed via phone conversation on September 7, 2016, Duke Energy requests approval for modification to the intermediate cover compaction specification for exterior slopes at Marshall Steam Station’s Industrial Landfill No. 1 (Permit No. 1812-INDUS). The requested modification is to revise the minimum compaction requirement from 95 percent of Standard Proctor (ASTM D 698) maximum dry density to 90 percent; this requirement is found in Section 2.4 of the Operations Quality Assurance Plan located in the Operations Plan – Revision 5, Duke Energy Carolinas, LLC – Marshall Steam Station, Industrial Landfill No. 1 – Phase 1, Permit No. 1812, Catawba County, Terrell, North Carolina. The requested modification is shown below by an underline. The current moisture content requirement would not change. 2.4 QA Field Testing QA field testing shall be performed to monitor the compaction and moisture conditioning during waste placement. Waste and interim cover soil shall be compacted to a minimum 95 percent of its Standard Proctor (ASTM D 698) maximum dry density, and interim cover soil shall be compacted to a minimum 90 percent of its Standard Proctor (ASTM D 698) maximum dry density. Compacted moisture content of waste shall be within 5 percent of the material’s optimum moisture content and within 3 percent for interim cover soil as determined by ASTM D 698. Duke Energy proposes to revise this section of the Operations Plan to include the above requested modification during the next Permit amendment or modification. If there are any questions regarding this request, please contact me at (980) 373-5697. Respectfully Submitted, Tyler Hardin Environmental Services Cc (via e-mail): Ed Mussler, NCDEQ Kyle Baucom, Duke Energy Dan Zakary, Duke Energy Jeff Jones, Duke Energy