Loading...
HomeMy WebLinkAboutSDTF3405_INSP_20160803FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Forsyth Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: SDTF-34-05 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF X FILE TYPE: COMPLIANCE Date of Site Inspection: August 3, 2016 Date of Last Inspection: July 15, 2016 FACILITY NAME AND ADDRESS: Carolinas Resource Recovery for Liberation Capital BG Winston-Salem, LLC (CRR) 750 Palmer Lane Winston-Salem, North Carolina 27127 GPS COORDINATES: N: 36.05051° W: 80.23022° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Dave VanDerZee Telephone: (704) 497-0445 Email address: dave@carolinaresourcerecovery.com FACILITY CONTACT ADDRESS: 4826 Worth Place Charlotte, North Carolina 28216 PARTICIPANTS: Troy Harrison, Composting & Land Application Branch Connie Wylie, Composting & Land Application Branch Louis Humphrey, Carolina Resource Recovery Dave VanDerZee, Carolina Resource Recovery Frank Cardenas, Liquid Environmental Solutions Josh Hanlon, Liquid Environmental Solutions STATUS OF PERMIT: Active Issued: October 28, 2015 Expiration Date: June 30, 2017 PURPOSE OF SITE VISIT: Permitting Inspection STATUS OF PAST NOTED VIOLATIONS: Past noted violations have been resolved OBSERVED VIOLATIONS: N/A The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. This septage treatment facility consists of one 10,000 gallon tank, one 10,000 raw material bin and three 25,000 gallon tanks for a total storage capacity of 95,000 gallons for the storage of untreated and treated septage. 2. CRR is required to submit total coliform analysis every six months to the Solid Waste Section (Section) and specify where in the facility operations the sample was taken. The most recent sampling event at the time of inspection was 7/14/2016 and the report was received by the section on 7/25/2016. The sample was taken at TK-202. 3. The facility is permitted for the storage and treatment of grease trappings only. 4. The current drawings and operation manual appears to be in agreement with what is on site. 5. The facility is surrounded by chain-length-fence to prevent unauthorized access. 6. No trespassing signs were located on the exterior side of the chain-length-fence. 7. All waste treatment was maintained to the interior of the building. 8. The truck off-loading area was free of residues and appeared to be well maintained. 9. The misting system, located on the southern side of the building, was observed not in operation. 10. Bin waste is collected into a small dumpster and disposed by Republic Services, everything else goes into roll-off boxes to Wallace Farms compost facility. 11. No odors were observed outside of the facility. 12. The facility logs were reviewed and appeared to be current. _______________________________________ Phone: 828-296-4701 Troy Harrison Environmental Senior Specialist Regional Representative Sent on: 9/1/2016 X Email Hand delivery US Mail Certified No. [ _] Copies: Michelle Sclafani, Composting & Land Application Branch Connie Wylie, Composting & Land Application Branch