HomeMy WebLinkAboutN0720_INSP_20160830FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID X YW Transfer Compost SLAS COUNTY: Pitt
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: LCIDN-N0720-
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 30 August 2016 Date of Last Inspection: 2 March 2016
FACILITY NAME AND ADDRESS:
Truck N Buckets VOA Landfill
VOA Site B Road
Grimesland, NC 27837
GPS COORDINATES: N: 35.48696 E: -077.22713
FACILITY CONTACT NAME AND PHONE NUMBER:
Chris Dixon
252.746.8955
FACILITY CONTACT ADDRESS:
Chris Dixon
4436 Leary Mills Road
Vanceboro, NC 28586
E-mail: chrisdixon@trucknbuckets.com
PARTICIPANTS:
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Notified LCID
PURPOSE OF SITE VISIT:
Comprehensive Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a Land-Clearing and Inert Debris (LCID) Landfill Notification.
2) This Facility is recorded with the Pitt County Register of Deeds at: Book #002341; Page #00131.
3) This Facility is permitted to receive for disposal:
a. Land Clearing Waste: stumps, trees, limbs, brush, grass, and other naturally occurring vegetative
materials generated solely from land clearing activities.
b. Yard Trash: brush, grass, tree limbs, and similar vegetative materials resulting from landscaping and
yard maintenance.
c. Inert Debris and Untreated Wood: concrete, brick, concrete block, uncontaminated soil, gravel and
rock, untreated and unpainted wood; and
d. Used Asphalt: used asphalt or asphalt mixed with dirt, sand, gravel, rock, and concrete.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
N0720_INSP_20160830
Page 2 of 4
4) The disposal area for this Facility may not exceed 2 acres in total size.
5) This Facility is secured by a locked gate at the Facility entrance and has controlled access for safety. The gate
was closed and locked upon my arrival and no attendant was on site during this Facility Compliance
Inspection.
6) Proper signage including the Facility name and emergency contact number is required. *Please install proper
signage at the Facility entrance as listed in 15NCAC 13B .0566 (16) on your LCID notification form.
7) The access road to the Facility is being managed properly at this time.
8) Marker stakes have not been placed around the toe of the landfill delineating the boundary of the 2-acre
disposal area. *The 2-acre waste disposal boundary should be measured and the perimeter of the landfill
should be staked with permanent, highly visible markers to identify the landfill footprint boundaries and all
required buffers as listed in 15A NCAC 13B .0564 (9) on your LCID notification form. Any waste found to
have been placed within this buffer should be pulled back to within the proper disposal area.
9) Inert debris consisting of scrap concrete, concrete block and brick is being stockpiled in an area adjacent to
the landfill access ramp. *Please note that the State rules regarding recovered materials state that for a
material to qualify as a recovered material, the majority of the material (75% or more) must be sold, used, or
re-used within twelve months. Any inert debris not re-used within twelve months of placement on-site, should
be properly disposed in the LCID landfill.
10) Exposed re-bar was observed in the scrap concrete staged on-site. *All re-bar should be cut off flush with the
surface of the concrete and removed from the site for recycling or proper disposal.
11) The waste type in the landfill was reviewed. The waste type being disposed was LCID only and no
unpermitted wastes were observed during this Facility Compliance Inspection.
12) The outside slopes have not been compacted and covered as required. *Please ensure that all outside slopes
are covered and graded at a slope not greater than 3:1, and are seeded and mulched to establish a groundcover
suitable to prevent erosion of the landfill cap system.
13) The active working area does not appear to have been covered within the last thirty days. *Please ensure the
active working area is covered monthly, or when the active working area reaches 1 acre in size, whichever
occurs first.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
N0720_INSP_20160830
Page 3 of 4
14) Erosion was observed in several areas on the top lift of the landfill. * Please repair this area by filling and re-
grading all erosion damage at a slope not greater than 3:1 and seed and mulch to establish a groundcover
suitable to prevent erosion of your landfill cap system.
15) A cover crop of native warm season grasses and coppice has been established on portions of the landfill
sideslopes. *Please work to establish a cover crop suitable to prevent erosion of your landfill cap system on
all outside slopes. All areas lacking in sufficient cover need to be seeded and mulched to establish a
groundcover suitable to prevent erosion of your landfill cap system.
16) The area around the toe of the landfill is inaccessible in several areas. *Please mow and remove any brush,
trees, and other woody vegetation growing in the access around the toe of the landfill for proper inspection
and maintenance of the landfill cap.
17) Surface water flow has been restricted in areas adjacent to the northwest and southeast sideslopes. Ponded
water was observed at the toe of each of these slopes. *Please grade these areas to insure that all surface
waters are directed away from the waste disposal area.
18) No off site erosion was observed during this Facility Compliance Inspection.
19) No violations were observed during this Facility Compliance Inspection.
20) *Corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
N0720_INSP_20160830
Page 4 of 4
Regional Representative
Delivered on: 31 August 2016 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov
C: \2016\Pitt\Notifications\N0720\Inspections\N0720_INSP_20160830
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.