HomeMy WebLinkAbout6708_INSP_20160825 (2)FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF X LCID YW Transfer Compost SLAS COUNTY: Onslow
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 6708-MSWLF-1997
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 25 August 2016 Date of Last Inspection: 11 February 2016
FACILITY NAME AND ADDRESS:
MCB Camp Lejeune MSW Landfill
Piney Greene Road
Camp Lejeune, NC 28452
GPS COORDINATES: N: 34.69065 E: -077.32384
FACILITY CONTACT NAME AND PHONE NUMBER:
Joe Powers
910.451.4998
FACILITY CONTACT ADDRESS:
U. S. Marine Corps Camp Lejeune MSWLF
C/o Commanding General
AC/S Facilities (Maintenance/Utilities) CP Lejeune
PSC Box 20004
Camp Lejeune, NC 28452
Attn: Joe Powers
e-mail: joseph.powers@usmc.mil
PARTICIPANTS:
Joe Powers; Landfill Director/MCB Camp Lejeune
Ray Williams; NCDEQ/Solid Waste
STATUS OF PERMIT:
Active; Permit to Construct (PTC) Phase IV and Permit to Operate (PTO) Phase III issued 13 May 2014. The Phase
III PTO expires 20 May 2024.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review.
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a Municipal Solid Waste Landfill.
2) This Facility is permitted to receive solid waste generated by and on Marine Corps Base Camp Lejeune,
Marine Corps Air Station Cherry Point, and all related ancillary Marine Facilities.
3) This Facility is secured by means of a locked gate at the facility entrance.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
6708_INSP_20160825
Page 2 of 4
4) Proper signage is posted at the entrance to the Facility stating the permit number, contact information, and
listing banned/excluded wastes.
5) Hours of operation for this Facility are Monday through Friday 7:30 AM to 3:30 PM. Ten Holidays are
observed: New Year’s Day, Martin Luther King Jr Day, President’s Day, Memorial Day, Independence Day,
Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.
6) This Facility screens all incoming loads for unpermitted materials. Waste screening activities are recorded in
a log which is maintained in the scalehouse. On average, this Facility records the screening of approximately
10% of all incoming loads.
7) This Facility is approved for the use of Posi-shell as an alternate daily cover and is currently alternating soil
and Posi-Shell for its daily cover.
8) This Facility manages landfill gas through a passive venting system.
9) The Facility access road is of all-weather construction and is being well maintained at this time.
10) Edge of liner markers have been installed throughout the landfill and are being maintained as required.
11) This landfill is currently operating in Phase III.
12) This Facility is currently receiving +/-160 tons of waste per day.
13) Soil is stockpiled adjacent to the active working face for use as cover.
14) The working face is being maintained in a compact and manageable size.
15) The waste type was reviewed during this Facility Compliance Inspection. Only MSW was observed at the
working face.
16) Portable fencing is being used on the downwind side of the working face to control windblown debris. This
portable fencing appears to be functioning well. All windblown debris is being collected and returned to the
working face as needed.
17) Windblown litter is well managed and no windblown litter was observed outside of the active working area
during this Facility Compliance Inspection.
18) This Facility requires five-day advance notice for the receipt of asbestos containing materials. All received
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
6708_INSP_20160825
Page 3 of 4
asbestos waste is disposed in an area adjacent to the working face, covered upon receipt, and mapped with a
GPS unit.
19) The stormwater management ponds were reviewed. The ponds were clear of windblown litter and brush, and
no areas of erosion were observed around the pond margins during this Facility Compliance Inspection.
20) Due to differential settlement within the landfill, portions of the Southeastern sideslope of Phase II have
slopes with an irregular contour. Some of these areas appear to have a slope greater than 3:1. This condition is
making the proper maintenance of these areas difficult. *As per our conversation, please fill and grade these
slopes at a slope not greater than 3:1. After grading, please seed and mulch to establish a groundcover suitable
to prevent erosion of your landfill cap system.
21) Overall, the closed areas of the landfill are well maintained with a well-established cover crop of native warm
season grasses. The Facility cover crop is mowed throughout the year as needed.
22) Construction of the Phase IV expansion project has been completed.
23) Areas of erosion were observed in various areas on the outside slopes of the Phase IV expansion area. *Please
fill and grade these eroded areas. All repaired areas should be seeded and mulched to establish a groundcover
suitable to prevent erosion of the landfill cap system.
24) Repairs to correct the leachate releases on the Southeastern sideslope are ongoing. *Please continue to
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
6708_INSP_20160825
Page 4 of 4
monitor all repaired areas for future leachate releases. Appropriate action should be taken if the repairs prove
to be ineffective.
25) The leachate collection system cleanouts are highly visible, readily accessible, protected, and well maintained.
26) Facility monitoring wells were reviewed during this Facility Compliance Inspection. Overall, the wells were
readily accessible, properly labeled, and secured with functioning locks. However, one of the groundwater
monitoring well #17 protective bollards has been knocked down. Many of the bollards in this area along the
southeastern access road appear to be insufficiently anchored to effectively protect the monitoring wells from
equipment. *Please repair this bollard and ensure that all protective bollards are sufficiently anchored and
properly secured so as to adequately protect the monitoring wells.
27) Leachate is stored in a lined on-site leachate management pond. The pond is secured by a locked chain link
fence. The gate was closed and locked during this Facility Compliance Inspection. The pond is well
maintained and no areas of erosion were observed during this Facility Compliance Inspection.
28) No off-site erosion was observed during this Facility Compliance Inspection.
29) *Corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 29 August 2016 by X Electronic delivery US Mail Certified No. [ _]
cc: Jenni Reed; Environmental Engineer/MCB Camp Lejeune EMD: jenni.reed@usmc.mil
Bradley W Hunter; Environmental Engineer/MCB Camp Lejeune EMD: bradley.w.hunter@usmc.mil
Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov
C: \2016\Onslow\Facilities\67-08\Inspections\6708_INSP_20160825
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.