HomeMy WebLinkAbout9226_INSP_20160609FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 4
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: WAKE
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 9226-CDLF-2001
CDLF X Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: June 9, 2016 Date of Last Inspection: July 7, 2015
FACILITY NAME AND ADDRESS:
Shotwell C&D Landfill, Inc.
4714 Smithfield Road
Wendell, NC 27591-8651
919-556-1182
919-217-0045
GPS COORDINATES: N: 35.72417 E: -78.4349
FACILITY CONTACT NAME AND PHONE NUMBER:
David King
919-427-4104
dking@debrisrp.com
FACILITY CONTACT ADDRESS:
Mr. David W. King, President
Shotwell Landfill, Inc.
3209 Gresham Lake Road, Suite 120
Raleigh, NC 27615
PARTICIPANTS:
Liz Patterson, NCDEQ-Solid Waste Section
Ron Postlethwait, Shotwell Landfill, Inc.
STATUS OF PERMIT:
PTC, Original Issue, Phase I - January 10, 2001
PTO, Phase I, Cell 1 - April 30, 2001
PTO, Modification - April 12, 2004
PTO, Phase I, additional 1 acre - March 30, 2006
PTC, Phase II - October 16, 2006
PTO, Phase II, Cell 1, 2 acre subcell - November 8, 2006
PTO, Phase II, Cell 1, remaining area - June 19, 2007
PTO, Phase II, Cell 2 - July 18, 2008
PTO, Phase II, Cell 3 - June 12, 2009
PTC, Phase III and PTO (all prior phases/cells) - October 26, 2010
PTC, Phase 3 amended and PTO (Phase 1-3A) - July 25, 2011
PTO, Phase 3, Cell B - June 15, 2012
PTO, Phase 3, Cell C – April 1, 2013
PTC, Phase 4, PTO Phases 1,2,3 - June 12, 2014
PTC – Phase 4B, PTO – Phases 1,2, and 3and 4A – April 24, 2015
PTO, Phases 1,2,3, and 4 – July 9, 2015
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 4
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
ADDITIONAL COMMENTS
The facility is a construction and demolition (C&D) debris landfill. The Permit to Operate Phases 1, 2, 3 and 4 was issued
July 9, 2015 and shall expire July 25, 2021. Construction of Phase 4A is complete. Per Condition #13 in Part III of
Attachment 3 of the Permit a permit amendment should be submitted to the SWS no later than January 25, 2021.
1. The facility is permitted to receive C&D waste generated within Wake and Johnston counties.
2. The facility is approved to accept 91,250 tons per year or approximately 250 tons per day, based on 365 operating
days per year, in accordance with the approved franchise granted by Wake County.
3. The facility is fenced and is secured by a locking gate when it is not open for operation. The correct signage is at
the entrance of the facility listing the facility name, permit number and emergency contact information as well as
materials accepted at the facility. The facility accepts waste Monday through Friday from 7:30 am until 4:00 pm.
4. Records were not reviewed at this inspection.
5. A perimeter road has been established around the entire footprint of the landfill. The perimeter road is being
well maintained.
6. Edge-of-waste markers have been installed and are being maintained around the landfill as required.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 4
7. The working face was appropriately sized for the expected waste. The exposed area was less than ½ acre and
appears that it is being covered at least once weekly.
Working face of landfill
8. Southwest corner of the landfill has been seeded and cover is being established. Heavy rains have washed out
areas and caused some bare spots and erosion that need attention and reseeding. Continue to monitor and control
erosion in this area as proper cover is establish.
Southern side of landfill
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 4
9. Wood processing and mulching is occurring in the area designated on the plan drawings. Ensure that positive
drainage is maintained at wood waste processing and mulching areas.
10. Digital photos were taken during the inspection
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 919-707-8286(O) 919-805-6499 (C)
Liz Patterson
Environmental Senior Specialist
Regional Representative
Sent on:7-6-2016 X Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor – Solid Waste Section
Pat Backus, Permitting Engineer – Solid Waste Section
Jaclynne Drummond, Compliance Hydrogeologist – Solid Waste Section
Jessica Montie, Compliance Officer – Solid Waste Section