Loading...
HomeMy WebLinkAboutSLAS2404_INSP_20160812FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS X COUNTY: Columbus Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: SLAS 24-04 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 8/12/2016 Date of Last Inspection: 7/15/2016 FACILITY NAME AND ADDRESS: S & S Septic Tank Pumping 388 Stancilway Drive Tabor City, NC 28463 GPS COORDINATES: N: 34.08530 E: -78.74926 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Stephen Stancil Telephone: (910) 377-2217 Email address: N/A Fax: N/A FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Connie Wylie, Chester Cobb Stephen Stancil, John Long STATUS OF PERMIT: Inactive – permit expires December 31, 2017 PURPOSE OF SITE VISIT: Repermit STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: N/A SEE BACK The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. Site visit in regards to issuing permit under new permit holder. Verified required setbacks & GPS’d fields for new site map. On Field 1 a 50’ setback is required on the west side (two trees will be marked as corner posts), a 50’ setback is required on the south side (a row of mature pines designate this line) and a 50’ setback is required along a portion of the front east side (placed two orange flags at each corner to delineate this front line – please replace with permanent posts). The storage tank currently sitting at the front corner of Field 1 shall be moved out of the disposal area. On Field 2 the required 100’ setback from neighboring ponds was measured (the fence line on this north west side meets the setback), a fence on the lower south side meets the required 50’ setback here, a fence on the east end cuts the field off at this point and soil was checked in the middle of this field to establish the boundary. Discussed that certain fence posts (that designated disposal boundaries) & all orange flags shall be replaced with permanent posts on Field 2. Various pieces of equipment stored along the fence lines of field 2 need to be removed. 2. Chester reviewed permit submittal with John Long. 3. No septage land application or storage occurring at this site or permitted at this time. Please contact me if you have any questions or concerns regarding this inspection report. Phone: (910) 433-3352 Connie S. Wylie Regional Representative Sent on: Email Hand delivery X US Mail Certified No. [ _]