HomeMy WebLinkAbout9231_BrownfieldRdCDLF_FA_DIN26524_20160726
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
MICHAEL SCOTT
Director
State of North Carolina | Environmental Quality | Waste Management
1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646
919 707 8200 T
July 26, 2016
Mr. Don Plessinger
General Manager
Wake Reclamation, LLC
2600 Brownfield Road
Raleigh, NC 27610
Subject: Financial Assurance Cost Estimate
Brownfield Road C&D Landfill
Permit No. 9321-CDLF-2012. Wake County, Document Id No. 26524
Dear Mr. Plessinger:
A revised financial assurance cost estimate for the Brownfield Road C&DLF was submitted to
the Division of Waste Management, Solid Waste Section, on your behalf by Smith Gardner. The
estimate is attached and is from the draft of the construction quality assurance report for the
partial closure of Phase 1 being finalized by Smith Gardner. Smith Gardner recently reviewed
landfill area and capacity calculations and this estimate is in agreement with the phase and
capacity information submitted (DIN 26522).
The revised estimate reflects both a reduction in closure due the partial closure of Phase 1, an
increase in the closure and post-closure cost due to the construction of Phase 2- Stage 2, and
adjustments to unit costs reflecting recent construction experience.
This letter approves the financial assurance as shown below.
Closure $2,259,872
Post-Closure $1,293,000
Corrective Action 0
Potential Assessment and
Corrective Action
$1,000,000
TOTAL $4,552,872
Mr. Don Plessinger
Brownfield Road C&D Landfill Financial Assurance – DIN 26524
Page 2
The financial assurance must be in place before a Permit to Operate for Phase 2-Stage 2 can be
issued. Ms. Sarah Rice may be contacted at (919) 707-8287 or by email at
sarah.rice@ncdenr.gov concerning mechanisms to demonstrate financial assurance.
If you have any other questions, you may contact me at (919) 707-8257 or by email at
pat.backus@ncdenr.gov.
Sincerely,
Patricia M. Backus, P.E., Environmental Engineer
Division of Waste Management, NCDEQ
cc: David Pepper, Waste Industries USA, Inc.
Stacey Smith, P.E., Smith + Gardner
Ed Mussler, P.E., Permitting Branch Supervisor
Drew Hammonds, Eastern District Supervisor
Elizabeth Patterson, Environmental Senior Specialist
Sarah Rice, Compliance Officer
DATE:27-Jun-16
BY:SAS
Brownfield Road C&D Landfill (NC Solid Waste Permit No. 92-31)
Engineer's Closure Construction Cost Estimate
Item Item Contractor
No.Description Unit Quantity Unit Price Total Price Comments
Closure Area (Horizontal Plan) ---->AC 30.4
1.0 Pre-Construction Subtotal $45,400.00
1.1 Construction Documents & Bidding AC 30 $15k + $1k/AC $45,400.00 S+G Estimate
2.0 Construction $1,993,632.00 Reference 1
2.1 Surveys and Layout AC 30 $250.00 $7,600.00 S+G Historical Estimate
2.2 Mobilization AC 30 $1,100.00 $33,440.00 Based on 2016 Closure Event No. 1 Costs
2.3 Site Preparation (repairs to intermediate cover layer)AC 30 $2,100.00 $63,840.00 Based on 2016 Closure Event No. 1 Costs
2.4 18" On-site Low Permeability Soil CY 73,568 $8.00 $588,544.00 S+G Historical Estimate
2.5 18" Vegetative Support Layer CY 73,568 $3.50 $257,488.00 S+G Historical Estimate
2.6 Landfill Gas Venting System AC 30 $3,000.00 $91,200.00 Based on 2016 Closure Event No. 1 Costs
2.7 Cap Drainage Structures (berms, piping, etc.)AC 30 $27,000.00 $820,800.00 Based on 2016 Closure Event No. 1 Costs
2.8 Erosion & Sediment Control (grading, silt fence, maintenance, etc.)AC 30 $1,800.00 $54,720.00 S+G Historical Estimate
2.9 Revegetation AC 30 $2,500.00 $76,000.00 S+G Historical Estimate
3.0 Quality Assurance, Certification, & Deed Notation $182,840.00
3.1 Field Monitoring AC 30 $3,000.00 $91,200.00 S+G Estimate
3.2 Laboratory Testing AC 30 $2,500.00 $76,000.00 S+G Estimate
3.3 Engineering Certification AC 30 $5k + $250/AC $12,600.00 S+G Estimate
3.4 Surveying and Deed Notation AC 30 $100.00 $3,040.00 S+G Historical Estimate
4.0 Miscellaneous Costs to Close $38,000.00
4.1 Erosion and Stormwater Control (outside landfill footprint)AC 30 $1,000.00 $30,400.00 S+G Historical Estimate
4.2 Engineering and Reporting AC 30 $250.00 $7,600.00 S+G Historical Estimate
5.0 Total Closure Costs
Construction Estimate ----->$2,259,872 (2016$)
Cost per Acre ---->$74,338
Total Estimate ---->$2,259,872 (2016$) (See Notes 1 & 2)
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDENR Division of Waste Management per http://portal.ncdenr.org/web/wm/sw/financialassurance
if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a +/- 10% of the Total Estimate value.
References:
1. Wake Reclamatinon, LLC., Brownfield Road C&D Landfill, Phase 2B Permit to Construction, October 2015, prepared by Smith Gardner, Inc.
2. Final Cover Event No. 1 CQA Documentation dated July 22, 2106 prepared by Smith Gardner, Inc. pending for 6.5 acres of closure.
Denotes values calculated in spreadsheet.
NOTE: Estimate for purpose of permitting only. Actual
estimate will be based on actual constructed area.
DR
A
F
T
2 of 2 Closure-Post Closure.- July 2016xls.xls
DATE:27-Jun-16
BY:SAS
Brownfield Road C&D Landfill (NC Solid Waste Permit No. 92-31)
Engineer's Post Closure Cost Estimate
Item Quantity Unit Comments
Groundwater Monitoring
Monitoring wells 9 wells Reference 1
Surface water point 3 points Reference 1
Sampling frequency 2 events Reference 1
Field sampling, collection, and shipping.$800 per event S+G estimate
Laboratory Analysis $350 per well S+G estimate
Data review, statistics, and reporting $2,000 per event S+G estimate
Maintenance and repair $100 per well S+G estimate
Subtotal Cost $14,900 per year Compares to current pricing by Golder
Landfill Gas Management
Control System Vents 16 vents Pro-rated @ one (1) per two (2) acres.
Sub-Surface Perimeter Monitoring Probes 10 probes Per Ref. 1
Control system monitoring, maintenance and repair $100 per vent per year S+G estimate
Semi-Annual Perimeter Monitoring $150 per probe per year S+G estimate
Subtotal Cost $3,100 per year Averaged over post-closure period
Final Cover Management
Area of maintenance 35 acres Extends to area immediately around landfill.
Mowing $200 per acre S+G estimate
Erosion and sediment control maintenance $200 per acre S+G estimate
Topdressing (seed & fertilizer)$150 per acre S+G estimate
Vector and rodent control $10 per acre S+G estimate
Maintenance Mobilization $2,000 per year S+G estimate
Subtotal Cost $21,600 per year
Administration, Inspections, and Reporting
Administration and record keeping $1,000 per year S+G estimate
Inspection $1,000 per year S+G estimate
Miscellaneous engineering $1,500 per year S+G estimate
Subtotal Cost $3,500 per year
Subtotal Post-Closure Costs
Estimated Average Annual Costs $43,100 per year (2016$)
Number of Years for Post-Closure 30 years
Cost per Acre $1,231 per year
Subtotal Post Closure Costs $1,293,000 (2016$) (See Notes 1 & 2)
Potential Assessment and Corrective (Remedial) Action
Minimum amount required by NCDENR Division of Waste Management $1,000,000 lump sum Regulatory requirement (G.S. 130A-295.2 (h1))
Subtotal Remedial Cost $1,000,000 lump sum
Total Post Closure and Remedial Costs $2,293,000 (2016$) (See Notes 1 & 2)
Total Closure, Post Closure, and Remedial Costs $4,552,872 (2016$) (See Notes 1 & 2)
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDENR Division of Waste Management
per http://portal.ncdenr.org/web/wm/sw/financialassurance if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a +/- 10% of the Total Estimate value.
References:
1. Wake Reclamatinon, LLC., Brownfield Road C&D Landfill, Phase 2B Permit to Construction, October 2015, prepared by Smith Gardner, Inc.
Denotes values calculated in spreadsheet.
NOTE: Estimate for purpose of permitting only. Actual estimate will be based
on actual constructed area.
DR
A
F
T