HomeMy WebLinkAboutNCS00250_INSP_20150609FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 2
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: Pitt
Closed
MSWLF HHW White
goods Incin T&P FIRM X PERMIT NO.: NCS-00250
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: 06/09/15 Date of Last Inspection:
FACILITY NAME AND ADDRESS:
Jim and Gaye Stallings
Jim’s Liquid Waste Hauling, LLC
4000 Bach Circle
Greenville, NC 27858
GPS COORDINATES: N: NA E: NA
FACILITY CONTACT INFORMATION:
Name: Jim Stallings
Address: Same as above
Telephone: 252-830-1016
Email address: jlwh@earthlink.net
PARTICIPANTS: Chester Cobb
STATUS OF PERMIT: Active EXPIRES: 12/31/15
PURPOSE OF SITE VISIT: New Vehicle
STATUS OF PAST NOTED VIOLATIONS:
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and
any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 2
AREAS OF CONCERN AND COMMENTS:
TRUCK LICENSE PLATE # VIN # TANK CAPACITY (gal)
YA124238 5PUNV8JP682S50067 2,500
1) All required present lettering except for the town name of “Greenville.” All lettering was at least 3 inches in
height. Called Gaye Stallings to let her know that “Greenville” needs to be added to both sides of the truck. Received
email on 06/25/15 with picture of pump truck with “Greenville” added.
2) Tank is made of carbon steel and appears to be structurally sound.
3) Tank bolted to the frame of the truck.
4) Valves and access ports appear to be in working order. Caps present on the pumping ports.
5) No leaks noticed.
Picture of pump truck on 06/09/15. Picture of “Greenville” added to the pump truck.
Picture received thru email on 06/25/15.
Please contact me if you have any questions or concerns regarding this inspection report.
____________________________ Phone: (919) 707-8283 .
Chester R. Cobb, Soil Scientist
Division of Waste Management, NCDEQ
Regional Representative
Sent on: 07/14/16 Email Hand delivery X US Mail Certified No. [ _]