Loading...
HomeMy WebLinkAbout0601-MSWLF-1987_AveryCountyMSW_GWMReport_DIN26448_20160225        This page intentionally left blank. FIGURE This page intentionally left blank. 0 2 0 0 ' 4 0 0 ' 123 456 4 G:\CAD\Avery County\Avery 13-6\sheets\AVERY-B0216.dwg - 12/3/2013 11:03 AM           Th i s P a g e I n t e n t i o n a l l y L e f t B l a n k TABLE This page intentionally left blank. DATE: BY:BPR Date/Time CH4 CO2 O2 Balance Init. Temperature Init. Static Pressure Adj. Static Pressure Adj. Diff. Pressure* Init. Flow Adj. Flow System Pressure mm/dd/yyyy %%%%deg F in H2O in H2O in H2O Scfm Scfm in H2O AVERY-W1 2/25/2016 7:10 0 0.1 21.6 78.3 NR -43.3 -43.3 1.686 50 50 -41.36 AVERY-W2 2/25/2016 7:00 0 0.1 21.6 78.3 NR -40.1 -40.1 1.773 51 51 -39.75 AVERY-W3 2/25/2016 7:21 0 0.1 21.6 78.3 NR -34 -34 -7.983 <<>><<>>-33.42 AVERY-W4 2/25/2016 6:55 0 0.1 21.5 78.4 NR -34.8 -34.8 -5.563 <<>><<>>-34.56 AVERY-W5 2/25/2016 6:44 29.8 21.3 3.9 45 NR -37.8 -32.2 2.919 5 5 -32.22 AVERY-W6 2/25/2016 6:38 18.3 21 2.6 58.1 NR -6.1 -6.1 -0.028 <<>><<>>-39.92 AVERY-W7 2/25/2016 6:49 8.4 10.4 13.3 67.9 NR -19.7 -19.7 4.807 1 1 -27.41 AVERY-W8 2/25/2016 NR NR NR NR NR NR NR NR NR NR NR AVERY-W9 2/25/2016 7:06 0 0.1 21.6 78.3 NR -36.6 -36.6 -1.301 <<>><<>>-32.86 AVERY-W10 2/25/2016 7:18 37.9 20 8.6 33.5 NR -37.8 -37.8 -4.218 <<>><<>>-42.51 Av-Flare 2/25/2016 6:11 25 15.9 8.4 50.7 NA 0 NA NA NA NA NA NR= not recorded Note 1. Extraction Well W-8 was monitored but the data was not recorded by the GEM 2000. Landfill Gas Collection and Control System Monitoring February 2016 *The differential pressure measurement should be positive. A negative differential pressure may indicate no gas flow. Negative differential pressure can be the result of dirt or water obstructing the pitot tube perforations. Overpulling by adjacent extraction wells may also result in negative pressure being displayed. February 25, 2016 Avery County Closed MSW Landfill TABLE 1 Device ID Th i s p a g e i n t e n t i o n a l l y l e f t b l a n k . Attachment 1 This page intentionally left blank. Attachment 2 This page intentionally left blank. By:DMM Updated by:SWH Date:3/1/2016 Methane Concetrations Between May 2011 and February 2016 Landfill Gas Monitoring Well Network Avery County MSW Landfill 0 10 20 30 40 50 60 70 No v - 1 1 De c - 1 1 Ja n - 1 2 Fe b - 1 2 Ma r - 1 2 Ap r - 1 2 Ma y - 1 2 Ju n - 1 2 Ju l - 1 2 Au g - 1 2 Se p - 1 2 Oc t - 1 2 No v - 1 2 De c - 1 2 Ja n - 1 3 Fe b - 1 3 Ma r - 1 3 Ap r - 1 3 Ma y - 1 3 Ju n - 1 3 Ju l - 1 3 Au g - 1 3 Se p - 1 3 Oc t - 1 3 No v - 1 3 De c - 1 3 Ja n - 1 4 Fe b - 1 4 Ma r - 1 4 Ap r - 1 4 Ma y - 1 4 Ju n - 1 4 Ju l - 1 4 Au g - 1 4 Se p - 1 4 Oc t - 1 4 No v - 1 4 De c - 1 4 Ja n - 1 5 Fe b - 1 5 Ma r - 1 5 Ap r - 1 5 Ma y - 1 5 Ju n - 1 5 Ju l - 1 5 Au g - 1 5 Se p - 1 5 Oc t - 1 5 No v - 1 5 De c - 1 5 Ja n - 1 6 Fe b - 1 6 P1 P3 P7 P11 P12 P13 Well % CH4 by Volume Installation of W9 and W10 (April 30, 2013) Installation of W9/P3 Connection (September 11, 2014 Installation of P7/W8 and P1/W10 Connection (September 3, 2015) This page intentionally left blank.