CONCRETE PRE-POUR INSPECTION REPORTS
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Feb. 5, 2016
Type of Pour: Slab Wall Other (explain)
Location of Pour: Panels 9 and 10 Scheduled Pour Date: Feb. 6, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
In several locations, the required 3 inches of clearance on the bottom matt have not been provided.
Several splice bars through bulkheads are not at correct elevation/location vertically. Inspection was
conducted with Nathan Buffum (S&ME), S&ME will verify all items are corrected prior to placement.
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
Signature, time and date
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Mar. 4, 2016
Type of Pour: Slab Wall Other (explain)
Location of Pour: Panel 8 Scheduled Pour Date: Mar. 7, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
No discrepancies
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
Signature, time and date
Mar. 4, 2016
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Mar. 31, 2016
Type of Pour: Slab Wall Other (explain) Continuous Spread Footing
Location of Pour: Building Footing Column line 2 Scheduled Pour Date: Apr. 1, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
1. Building footing length was incorrect.
2. Reinf splices were of incorrect length
3. Required reinf clearances not attained.
4. Footing projection of 2'6" not provided on either end
5. Columns not located per approved reinf drawings
6. Contractor undermined existing slab on South End
7. Contractor cut off existing slab reinf that was required
8. Columns not located in center of footing as shown on contract drawings.
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
Signature, time and date
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Apr. 8, 2016
Type of Pour: Slab Wall Other (explain) Continuous Spread Footing
Location of Pour: Building Footing Column line 2 Scheduled Pour Date: Apr. 11, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
1. Required clearance to bottom mat not attained on both end columns.
2. Reinforcement does not extend 2'6" from face of column wrap as shown on contract drawing plan.
3. Area of existing slab undermined during footing installation was indicated to be filled with concrete
placed monolithically with the footing per GC correspondence dated 04/07/2016. At time of review,
area was not formed thus it appeared as though this area would not be placed monolithically.
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
MCE will return Monday at 11 to verify all items have been addressed
Contractor’s Representative:
Signature, time and date
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Apr. 11, 2016
Type of Pour: Slab Wall Other (explain) Continuous Spread Footing
Location of Pour: Building Footing Column line 2 Scheduled Pour Date: Apr. 11, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
1. Area of existing slab undermined during footing installation was indicated to be filled with concrete
placed monolithically with the footing per GC correspondence dated 04/07/2016. At the time of review,
area was not formed thus it appeared as though this area will not be placed monolithically.
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
11am 04/11/2016
Signature, time and date
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: Apr.15, 2016
Type of Pour: Slab Wall Other (explain) Continuous Spread Footing
Location of Pour: Building Footing Column line 1 Scheduled Pour Date: Apr. 16, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
1. Instructed GC to rotate anchor bolts hooks to be under bottom mat reinf.
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
Signature, time and date
April 16, 2016 - 9 am
Concrete Pre-Placement Checklist
Project NHC C&DF
Checklist Date: May 4, 2016
Type of Pour: Slab Wall Other (explain)
Location of Pour: Slab pour #7 Scheduled Pour Date: May 5, 2016
Verify Form Work:
Square and Plumb
Grade Marks Adequate
Openings Adequately Patched
Wall Pipe/ Sleeves -Size/Location, Secured
Embedded Items- Secured, Proper Location
Cleanliness
Release Agent Properly Applied
Wall Ties and Adequate Bracing in Place
Chamfer strips in place
Verify Rebar Placement:
Correct Sizes Spacing, Tying
Correct Dowel Locations
Laps Splices Correct
Verify Correct Waterstop and Proper
Installation
Tie Wire Away From Formwork
Clearance
Re-inspection Required? Yes No
Project Representative’s Comments:
(List all Discrepant Items requiring corrective action prior to placement with time/date)
None
Contractor’s Comments:
(List time and date of corrective action taken for each item listed above)
ALL ISSUES RESOLVED:
Project Representative:
Signature, time and date
Contractor’s Representative:
Signature, time and date
May 4, 2016
MRRF Certification Letter
New Hanover County Secure Landfill June 2016
ATTACHMENT 2
SOIL COMPACTION AND CONCRETE MATERIALS TESTING
REPORTS
EARTHWORK
Fill Placement - Structural Fill - WALKER, PATRICIA A.
09/03/15 - 4.25 Hours - Part Time
Weather Conditions: Clear/80's
Personnel on Site: Patricia Walker-S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New Hanover Landfill representative, on a part-
time basis, to perform in-place compaction testing (nuclear gauge method) for structural fill placed in the truck
canopy,as shown on the attached sketch.
In-place compaction tests were performed at random locations within the areas backfilled prior to S&ME's arrival. Test
results were reported to the on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 98% in the top 12" and 95% below the top 12" compaction and +/-5%
optimum moisture. Any tests that did not meet, were reworked and retested. The tests performed this date represent
the compaction at the designed locations and elevation.
Supporting Reports:
PW-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
ONE POINT COMPACTION
Area
EARTHWORK
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the
site to perform specific services requested and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site. If this is a Technician Field Record, the
information presented has not been reviewed and should be considered preliminary.
Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
DAILY REPORT Report Date: 9/9/2015
Report #: AL-000003
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
PW-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
ONE POINT COMPACTION
Page 1 of 4
Page 2 of 4
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
1 9/3/15 7 D698-A SP 15.5 100.0 4.9 96.5 8 97 98 -5 / 5 FAIL
2 9/3/15 7 D698-A SP 15.5 100.0 5.5 95.5 8 96 98 -5 / 5 FAIL
3 1 9/3/15 7 D698-A SP 15.5 100.0 14.9 96.9 8 97 98 -5 / 5 FAIL
4 3 9/3/15 7 D698-A SP 15.5 100.0 13.9 102.3 8 102 98 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
1 MASS FILL: truck canopy 0.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
2 MASS FILL: truck canopy 0.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
3 MASS FILL: truck canopy 0.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
4 MASS FILL: truck canopy 0.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
Related Tests
Test #Related Test #Test Type
Remarks
FAIL: Density and Moisture test results DO NOT comply with
specifications.
FAIL: Density test results DO NOT comply with specifications.
Moisture test results comply with specifications.
PASS: Density and Moisture test results comply with
specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/9/2015
Report #: SNG-000001
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 3 of 4
Test Information
Test #Test Date Test Location Geologic Orgin Elevation Reference Field Technician
1 09/03/2015 MASS FILL: truck canopy pad Coastal Plain Geology 0.0 soil subgrade WALKER, PATRICIA A.
One-Point Compaction
Density Test Standard:ASTM D698 Method:D698-A
Weight of Soil & Mold (g):8.13 Mold Volume Factor:29.9400
Weight of Mold (g):4.45 Wet Density (pcf):110.2
Weight of Soil (g):3.68 Dry Density (pcf):98.0
Moisture Content
Moisture Type:One-Point Field
Moisture Content Standard:ASTM D4959
Wet Weight of Moisture Sample (g):501.9
Dry Weight of Moisture Sample (g):446.2
Weight of Water (g):55.7 55.7
Moisture Content (%):12.5 0.0
One-Point Measured Reference Tests One-Point Results
Family Name:Proctor ID:7
Dry Density (pcf):98.0 Dry Density (pcf):100.0 Interpreted Dry Density (pcf):100.0
Moisture Content (%):12.5 Moisture Content (%):15.5 Interpreted Moisture Content (%):15.5
Family Name -
The above tests were performed in accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
ONE POINT COMPACTION
Test Method: AASHTO T 272 Report Date: 9/9/2015
Report #: O-P-000001
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Page 4 of 4
EARTHWORK
Fill Placement - Structural Fill - WALKER, PATRICIA A.
09/04/15 - 4.50 Hours - Part Time
Weather Conditions: Clear/80's
Personnel on Site: Patricia Walker-S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New Hanover Landfill representative, on a part-
time basis, to perform in-place compaction testing (nuclear gauge method) for structural fill placed in the truck canopy,
as shown on the attached sketch.
In-place compaction tests were performed at random locations within the areas backfilled prior to S&ME's arrival. Test
results were reported to the on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 98% in the top 12" and 95% below the top 12" compaction and +/-5%
optimum moisture. The tests performed this date represent the compaction at the designed locations and elevation
Supporting Reports:
PW-Earthwork-Comp Test Locations
ONE POINT COMPACTION
DENSITY - NUCLEAR METHOD
Area
EARTHWORK
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the
site to perform specific services requested and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site. If this is a Technician Field Record, the
information presented has not been reviewed and should be considered preliminary.
Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
DAILY REPORT Report Date: 9/9/2015
Report #: AL-000004
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
PW-Earthwork-Comp Test Locations
ONE POINT COMPACTION
DENSITY - NUCLEAR METHOD
Page 1 of 5
Page 2 of 5
Test Information
Test #Test Date Test Location Geologic Orgin Elevation Reference Field Technician
2 09/04/2015 MASS FILL: 38'S x 38'E of NW
corner of truck canopy
Coastal Plain Geology 0.0 soil subgrade WALKER, PATRICIA A.
One-Point Compaction
Density Test Standard:ASTM D698 Method:D698-A
Weight of Soil & Mold (g):8.17 Mold Volume Factor:29.9400
Weight of Mold (g):4.45 Wet Density (pcf):111.4
Weight of Soil (g):3.72 Dry Density (pcf):98.0
Moisture Content
Moisture Type:One-Point Field
Moisture Content Standard:ASTM D4959
Wet Weight of Moisture Sample (g):503.2
Dry Weight of Moisture Sample (g):442.6
Weight of Water (g):60.6 60.6
Moisture Content (%):13.7 0.0
One-Point Measured Reference Tests One-Point Results
Family Name:Proctor ID:7
Dry Density (pcf):98.0 Dry Density (pcf):100.0 Interpreted Dry Density (pcf):100.0
Moisture Content (%):13.7 Moisture Content (%):15.5 Interpreted Moisture Content (%):15.5
Family Name -
The above tests were performed in accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
ONE POINT COMPACTION
Test Method: AASHTO T 272 Report Date: 9/9/2015
Report #: O-P-000002
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Page 3 of 5
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
5 2 9/4/15 7 D698-A SP 15.5 100.0 11.4 99.8 8 100 98 -5 / 5 PASS
6 9/4/15 7 D698-A SP 15.5 100.0 11.1 100.3 8 100 95 NA PASS
7 9/4/15 7 D698-A SP 15.5 100.0 7.0 98.1 8 98 95 NA PASS
8 9/4/15 7 D698-A SP 15.5 100.0 10.4 95.5 8 96 95 NA PASS
9 9/4/15 7 D698-A SP 15.5 100.0 14.2 97.8 8 98 95 NA PASS
10 9/4/15 7 D698-A SP 15.5 100.0 15.9 101.1 8 101 95 NA PASS
11 9/4/15 7 D698-A SP 15.5 100.0 13.3 100.4 8 100 95 NA PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
5 MASS FILL: truck canopy 0.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
6 MASS FILL: 10'S x 58'E of NW corner of truck canopy 1.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
7 MASS FILL: 25'N x 75'E of SW corner of truck canopy 1.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
8 MASS FILL: 43'S x 85'E of SW corner of truck canopy 2.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
9 MASS FILL: 43'S x 135'E of SW corner of truck canopy 3.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
10 MASS FILL: 93'S x 135'E of SW corner of truck canopy 3.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
11 MASS FILL: 93'S x 85'E of SW corner of truck canopy 3.0 soil subgrade Troxler 3430 29984 WALKER, PATRICIA
A.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 2
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/9/2015
Report #: SNG-000002
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 5
Related Tests
Test #Related Test #Test Type
6 7 Soil Nuclear Gauge
7 6 Soil Nuclear Gauge
7 8 Soil Nuclear Gauge
8 7 Soil Nuclear Gauge
8 9 Soil Nuclear Gauge
9 8 Soil Nuclear Gauge
9 10 Soil Nuclear Gauge
10 9 Soil Nuclear Gauge
10 11 Soil Nuclear Gauge
11 10 Soil Nuclear Gauge
Remarks
PASS: Density and Moisture test results comply with
specifications.
PASS: Density test results comply with specifications. Moisture
Not Specified.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 2 of 2
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/9/2015
Report #: SNG-000002
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 5 of 5
EARTHWORK
Fill Placement - Backfill - CONNELL, CORY
09/10/15 - 2.50 Hours - 08:00 to 10:30 - Part Time
Weather Conditions: Clear/80's
Personnel on Site: Cory Connell -S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New Hanover Landfill representative, on a part-
time basis, to perform in-place compaction testing (nuclear gauge method) for structural fill placed in the truck canopy,
as shown on the attached sketch.
In-place compaction tests were performed at random locations within the areas backfilled prior to S&ME's arrival. Test
results were reported to the on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 98% in the top 12" and 95% below the top 12" compaction but were
outside the recommended +/-5% from optimum moisture. Talked to Nate Buffum, PE about the moisture and he
recommended they keep moving forward and use the water truck to add water to the material. The tests performed
this date represent the compaction at the designed locations and elevation.
Two compaction tests were performed today, both tests were within the compaction range but out of the moisture
range.it was recommended that the contractor wet the material, no retesting would be necessary for moisture per Nate
Buffum.
Supporting Reports:
CC-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
ONE POINT COMPACTION
Area
EARTHWORK
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the
site to perform specific services requested and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site. If this is a Technician Field Record, the
information presented has not been reviewed and should be considered preliminary.
Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
DAILY REPORT Report Date: 9/15/2015
Report #: AL-000007
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
CC-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
ONE POINT COMPACTION
Page 1 of 4
P
a
g
e
2
o
f
4
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
12 9/10/15 7 D698-A SP 15.5 100.0 4.9 99.5 6 100 95 -5 / 5 FAIL
13 9/10/15 7 D698-A SP 15.5 100.0 4.9 100.9 6 101 95 -5 / 5 FAIL
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
12 BACKFILL: shown on sketch Troxler 3430 25548 CONNELL, CORY
13 BACKFILL: shown on sketch Troxler 3430 25548 CONNELL, CORY
Related Tests
Test #Related Test #Test Type
Remarks
FAIL: Density test results comply with specifications. Moisture
test results DO NOT comply with specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
12, 13: Note: talked to Nate Buffum about moisture, was okay with it being low
as they were using water truck
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/15/2015
Report #: SNG-000004
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 3 of 4
Test Information
Test #Test Date Test Location Geologic Orgin Elevation Reference Field Technician
3 09/10/2015 BACKFILL: as shown on sketch Coastal Plain Geology CONNELL, CORY
One-Point Compaction
Density Test Standard:ASTM D698 Method:D698-A
Weight of Soil & Mold (g):8.22 Mold Volume Factor:29.9400
Weight of Mold (g):4.45 Wet Density (pcf):112.9
Weight of Soil (g):3.77 Dry Density (pcf):99.2
Moisture Content
Moisture Type:One-Point Field
Moisture Content Standard:ASTM D4959
Wet Weight of Moisture Sample (g):500.0
Dry Weight of Moisture Sample (g):439.2
Weight of Water (g):60.8 60.8
Moisture Content (%):13.8 0.0
One-Point Measured Reference Tests One-Point Results
Family Name:Proctor ID:7
Dry Density (pcf):99.2 Dry Density (pcf):100.0 Interpreted Dry Density (pcf):100.0
Moisture Content (%):13.8 Moisture Content (%):15.5 Interpreted Moisture Content (%):15.5
Family Name -
The above tests were performed in accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
ONE POINT COMPACTION
Test Method: AASHTO T 272 Report Date: 9/15/2015
Report #: O-P-000003
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Page 4 of 4
EARTHWORK
Fill Placement - Backfill - CONNELL, CORY
09/14/15 - 3.50 Hours - 08:15 to 11:45 - Part Time
Weather Conditions: Clear/ High 70's
Personnel on Site: Cory Connell-S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New Hanover Landfill representative, on a part-
time basis, to perform in-place compaction testing (nuclear gauge method) for structural fill placed in the truck canopy
,as shown on the attached sketch.
In-place compaction tests were performed at random locations within the areas backfilled prior to S&ME's arrival. Test
results were reported to the on site contractor and are attached. We also performed a one point on the in place
materiel to match it up with our proctor made in our lab. The tests performed this day met the recommendations of the
geotechnical report of 98% in the top 12" and 95% below the top 12" compaction. However, some of the soils were
still slightly dry of the recommended +/-5% optimum moisture. Based on conversations with Nate Buffum, PE, we
indicated that the contractor was providing a water truck to add water to the soil as they were compacting. Based on
this we were okay with the soils being dryer.
Supporting Reports:
CC-Earthwork-Comp Test Locations
ONE POINT COMPACTION
DENSITY - NUCLEAR METHOD
Area
EARTHWORK
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the
site to perform specific services requested and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site. If this is a Technician Field Record, the
information presented has not been reviewed and should be considered preliminary.
Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
DAILY REPORT Report Date: 9/17/2015
Report #: AL-000008
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
CC-Earthwork-Comp Test Locations
ONE POINT COMPACTION
DENSITY - NUCLEAR METHOD
Page 1 of 4
P
a
g
e
2
o
f
4
Test Information
Test #Test Date Test Location Geologic Orgin Elevation Reference Field Technician
4 09/14/2015 BACKFILL: Shown on attached
sketch
Coastal Plain Geology -1.0 CONNELL, CORY
One-Point Compaction
Density Test Standard:ASTM D698 Method:D698-A
Weight of Soil & Mold (g):8.20 Mold Volume Factor:29.9400
Weight of Mold (g):4.45 Wet Density (pcf):112.3
Weight of Soil (g):3.75 Dry Density (pcf):99.0
Moisture Content
Moisture Type:One-Point Field
Moisture Content Standard:
Wet Weight of Moisture Sample (g):500.0
Dry Weight of Moisture Sample (g):441.0
Weight of Water (g):59.0 59.0
Moisture Content (%):13.4 0.0
One-Point Measured Reference Tests One-Point Results
Family Name:Proctor ID:7
Dry Density (pcf):99.0 Dry Density (pcf):100.0 Interpreted Dry Density (pcf):100.0
Moisture Content (%):13.4 Moisture Content (%):15.5 Interpreted Moisture Content (%):15.5
Family Name -
The above tests were performed in accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
ONE POINT COMPACTION
Test Method: AASHTO T 272 Report Date: 9/17/2015
Report #: O-P-000004
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Page 3 of 4
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
14 9/14/15 7 D698-A SP 15.5 100.0 3.6 100.3 6 100 95 -5 / 5 FAIL
15 9/14/15 7 D698-A SP 15.5 100.0 2.3 98.7 6 99 95 -5 / 5 FAIL
16 9/14/15 7 D698-A SP 15.5 100.0 6.8 101.1 6 101 95 -5 / 5 FAIL
17 9/14/15 7 D698-A SP 15.5 100.0 14.0 97.7 6 98 95 -5 / 5 PASS
18 9/14/15 7 D698-A SP 15.5 100.0 14.9 101.6 6 102 95 -5 / 5 PASS
19 9/14/15 7 D698-A SP 15.5 100.0 13.7 98.9 6 99 95 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
14 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
15 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
16 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
17 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
18 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
19 BACKFILL: shown on sketch -1.0 Troxler 3430 25548 CONNELL, CORY
Related Tests
Test #Related Test #Test Type
Remarks
FAIL: Density test results comply with specifications. Moisture
test results DO NOT comply with specifications.
PASS: Density and Moisture test results comply with
specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/17/2015
Report #: SNG-000005
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4
EARTHWORK
Fill Placement - Structural Fill - CONNELL, CORY
09/22/15 - 3.00 Hours - 08:30 to 11:30 - Part Time
Weather Conditions: Clear/80's
Personnel on Site: Cory Connell -S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New Hanover Landfill representative, on a part-
time basis, to perform in-place compaction testing (nuclear gauge method) for structural fill placed in the truck canopy
and future concrete apron areas, as shown on the attached sketch.
In-place compaction tests were performed at random locations within the areas backfilled prior to S&ME's arrival. Test
results were reported to the on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 98% in the top 12" and plus or minus five percent the optimum
moisture content. The tests performed this date represent the compaction at the designed locations and elevation.
All tests performed today were within the compaction range but out of the moisture range. If a test came back with a
low moisture content the contractor wet the materiel and we retested. Any retests came back with a passing moisture.
Supporting Reports:
CC-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
Area
EARTHWORK
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the
site to perform specific services requested and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site. If this is a Technician Field Record, the
information presented has not been reviewed and should be considered preliminary.
Page 1 of 1
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
DAILY REPORT Report Date: 9/24/2015
Report #: AL-000010
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
CC-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
Page 1 of 4
P
a
g
e
2
o
f
4
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
20 9/22/15 7 D698-A SP 15.5 100.0 10.6 95.5 6 96 98 -5 / 5 FAIL
21 20 9/22/15 7 D698-A SP 15.5 100.0 18.1 99.3 6 99 98 -5 / 5 PASS
22 9/22/15 7 D698-A SP 15.5 100.0 13.9 99.8 6 100 98 -5 / 5 PASS
23 9/22/15 7 D698-A SP 15.5 100.0 8.1 102.0 6 102 98 -5 / 5 FAIL
24 9/22/15 7 D698-A SP 15.5 100.0 16.0 98.2 6 98 98 -5 / 5 PASS
25 9/22/15 7 D698-A SP 15.5 100.0 18.1 99.3 6 99 98 -5 / 5 PASS
26 9/22/15 7 D698-A SP 15.5 100.0 10.8 100.2 6 100 98 -5 / 5 PASS
27 9/22/15 7 D698-A SP 15.5 100.0 18.0 99.5 6 100 98 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
20 BACKFILL: shown on attached sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
21 BACKFILL: shown on attached sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
22 BACKFILL: shown on attached sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
23 BACKFILL: shown on attached sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
24 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
25 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
26 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
27 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
Related Tests
Test #Related Test #Test Type
Remarks
FAIL: Density test results DO NOT comply with specifications.
Moisture test results comply with specifications.
PASS: Density and Moisture test results comply with
specifications.
FAIL: Density test results comply with specifications. Moisture
test results DO NOT comply with specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 2
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/24/2015
Report #: SNG-000006
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 3 of 4
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
28 9/22/15 7 D698-A SP 15.5 100.0 16.5 97.9 6 98 98 -5 / 5 PASS
29 9/22/15 7 D698-A SP 15.5 100.0 15.0 104.1 6 104 98 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
28 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
29 BACKFILL: shown on sketch 0.0 sg Troxler 3430 25548 CONNELL, CORY
Related Tests
Test #Related Test #Test Type
Remarks
PASS: Density and Moisture test results comply with
specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 2 of 2
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 9/24/2015
Report #: SNG-000006
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4
xEARTHWORK -Fill Placement -Structural Fill -Activity No.1
12/28/2015 -CONNELL, CORY -Part Time -
Weather Conditions: cloudy, rain, 60's
Personnel on Site: Cory Connell -S&ME, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New
Hanover Landfill representative, on a part-time basis, to perform in-place
compaction testing (nuclear gauge method) for structural fill placed in the
truck canopy and future concrete apron areas, as shown on the attached
sketch.
In-place compaction tests were performed at random locations within the
areas backfilled prior to S&ME's arrival. Test results were reported to the
on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 95% and plus or minus five
percent the optimum moisture content. The tests performed this date
represent the compaction at the designed locations and elevation.
All tests performed today were within the specified compaction range and
moisture range.
CC-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
DAILY REPORT DR-000002Report #:
1/6/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover Co. Environmental Mgmt.
5210 US Highway 421 North
Wilmington, NC 28401
Project:
350615057
New Hanover Co Landfill-TruckCanopy
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at
the site to perform specific services and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Jan 06, 2016
P
a
g
e
3
o
f
4
P
a
g
e
2
o
f
3
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
30 12/28/15 7 D698-A SP 15.5 100.0 19.9 98.8 6 99 95 -5 / 5 PASS
31 12/28/15 7 D698-A SP 15.5 100.0 19.4 100.3 6 100 95 -5 / 5 PASS
32 12/28/15 7 D698-A SP 15.5 100.0 11.3 99.4 6 99 95 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
30 BACKFILL: Extension of pad right of roadway Troxler 3430 25548 CONNELL, CORY
31 BACKFILL: Extension of pad right of roadway Troxler 3430 25548 CONNELL, CORY
32 BACKFILL: back corner extension Troxler 3430 25548 CONNELL, CORY
Related Tests
Test #Related Test #Test Type
Remarks
PASS: Density and Moisture test results comply with
specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above. The density determined
represents the soil density at the test location at the time of the test.
Page 1 of 1
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 1/6/2016
Report #: SNG-000007
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
EARTHWORK -Fill Placement -Structural Fill -Activity No.2
12/29/2015 -BEHAN, STEPHEN -Part Time -
Weather Conditions: Clear, 70's
Personnel on Site: S&ME- Stephen Behan, Sam-New Hanover Landfill
Services Provided: S&ME representative was on site as requested by New
Hanover Landfill representative, on a part-time basis, to perform in-place
compaction testing (nuclear gauge method) for structural fill placed in the
truck canopy and future concrete apron areas, as shown on the attached
sketch.
In-place compaction tests were performed at random locations within the
areas backfilled prior to S&ME's arrival. Test results were reported to the
on site contractor and are attached. The tests performed this day met the
recommendations of the geotechnical report of 98% and plus or minus five
percent the optimum moisture content. The tests performed this date
represent the compaction at the designed locations and elevation.
All tests performed today were within the specified compaction range and
the moisture range.
SB-Earthwork-Comp Test Locations
DENSITY - NUCLEAR METHOD
DAILY REPORT DR-000003Report #:
1/6/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover Co. Environmental Mgmt.
5210 US Highway 421 North
Wilmington, NC 28401
Project:
350615057
New Hanover Co Landfill-TruckCanopy
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at
the site to perform specific services and has certain responsibilities which are limited to those specifically authorized in our
agreement with our client. The results of tests or observations performed are only applicable to the time and location of the tests or
observations. If our work is scheduled by others, we are not responsible for the testing frequency. In no event shall S&ME be
responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Jan 06, 2016
Page 3 of 4Page 2 of 3
Test Results
Test #
Retest
Of
Test
Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry Density
(pcf)
In Place
Moisture
(%)
In Place
Dry Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min Comp.
(%)
Optimum
Moisture
Tolerance (%)Remark
33 12/29/15 7 D698-A SP 15.5 100.0 13.4 97.8 6 98 98 -5 / 5 PASS
34 12/29/15 7 D698-A SP 15.5 100.0 10.7 100.4 6 100 98 -5 / 5 PASS
Test Information
Test #Test Location Elevation Reference
Gauge
Make / Model / SN Field Technician
33 BUILDING PAD - Fill: Northeastern edge of Building Pad 0.0 grade Troxler 3440 23942 BEHAN, STEPHEN
34 BUILDING PAD - Fill: Near eastern corner of Building Pad 0.0 grade Troxler 3440 23942 BEHAN, STEPHEN
Related Tests
Test #Related Test #Test Type
Remarks
PASS: Density and Moisture test results comply with
specifications.
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter".
Gauge calibration data on file with the testing agency.
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above. The density determined
represents the soil density at the test location at the time of the test.
Page 1 of 1
DENSITY - NUCLEAR
METHOD
Test Method: ASTM D 6938
Report Date: 1/6/2016
Report #: SNG-000008
Client:
New Hanover Co. Environmental Mgmt.
Wilmington, NC 28401
5210 US Highway 421 North
Project:
New Hanover Co Landfill-TruckCanopy
350615057
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Pre-Placement -Reinforcement -Activity No.1
01/28/2016 -CONNELL, CLYDE R.-Periodic -Does NOT Generally Conform with Required -1.50 Hours -16:30
to 18:00
Weather: Cloudy, 40's
Personnel: S&ME- Richard Connell
Services Provided: S&ME representative was on site at the request of the contractor on a periodic basis in order to
evaluate the reinforcing steel placed for planned slab on grade pours 9 and 10 as noted on the attached sketch. The
contractor had left for the day and was not present during this evaluation.
Reinforcing steel was evaluated for bar size, spacing, general clearances, lap splice, and secureness against movement.
The rebar was placed in general conformance with the provided plans and specifications by the contractor WITH THE
EXCEPTIONS OF some reinforcing along the south side did not have enough clearance to edge of form/top of slab, and
a few lap splices were short in pour 9 area (laps for east/west bars). Called Stacey Magnus of McKim & Creed (Stacey
will be evaluating reinforcing tomorrow morning) and let him know I painted some areas on the south form where
clearance issues were noted. Spoke with Nate Buffum P. E. (S&ME Project Manager) when I returned to the office,
Nate will perform a re-evaluation of the reinforcing tomorrow with Stacey and prior to concrete placement.
It was noted that the reinforcing appeared to be tied at each bar crossing and the bottom mat was supported by concrete
blocks.
RC-Concrete-Reinf Steel Evaluations
DAILY REPORT DR-000004Report #:
2/3/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 3Page 1 of 2
NATHAN P. BUFFUM
Feb 03, 2016
P
a
g
e
3
o
f
3
P
a
g
e
2
o
f
2
CONCRETE -Pre-Placement -Reinforcement -Activity No.2
01/29/2016 -BUFFUM, NATHAN P.-Periodic -Generally Conforms with Required -2.50 Hours
Weather: Sunny 43 degrees at 9am, then 50 degrees at 3pm
Personnel: Nate Buffum, PE - S&ME
S&ME was on site at the request of the contractor to evaluate reinforcing steel as per the plans and structural details
prepared by McKim & Creed.
Reinforcing steel was evaluated on a periodic basis for bar size, general clearances from formwork and earth, lap splice
lengths, and general location.
Richard Connell of S&ME was on site on 1-28-16 and noted several issues regarding clearances, lap bar splices, and
rebar through construction joint formwork. I was to re-evaluate this rebar today. Upon arrival we discussed repairs and
the contractor asked for me to return again at 3pm to re-evaluate the repairs. (S&ME DN#1 were resolved)
Based on our re-evaluations, the contractor placed and repaired the reinforcing steel in general accordance with the
plans and specifications. Contractor plans to pour tomorrow morning between 200 and 250 cubic yards. S&ME will
obtain concrete samples at every 50 cubic yards.
NB-Concrete-Reinf Steel Evaluations
DAILY REPORT DR-000005Report #:
2/3/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 3Page 1 of 2
NATHAN P. BUFFUM
Feb 03, 2016
Page 3 of 3Page 2 of 2
CONCRETE -Post Placement -Sample Pickup -Activity No.4
02/01/2016 -CONNELL, CORY -Part Time --
Weather Conditions: Clear, 70's
Personnel on Site: S&ME- Cory Connell
Summary of Services Provided: S&ME representative was on site to picked up concrete test cylinders cast on 12/2/15
and transported them to S&ME laboratory for curing and compressive strength testing. Cylinders were stripped of molds,
logged, and stored in moist cure room for additional curing.
Time: 1.25 ( to: 115-130, on 130-145, from 145-200, login 315-330 report 330-345)
DAILY REPORT DR-000007Report #:
2/4/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Feb 04, 2016
CONCRETE -Pre-Placement -Reinforcement -Activity No.5
02/04/2016 -BUFFUM, NATHAN P.-Periodic -Generally Conforms with Required -1.00 Hours
Personnel: Nate Buffum, PE - S&ME
Service: S&ME was on site at the request of the contractor to evaluate the
dimensions and locations of the small trenches that are to be poured with a
concrete mat for support of the steel I-Beam embeds. Based on our
evaluations, the contractor had the approximate dimensions needed per
the plan. Contractor planned to pour concrete bottom prior to rain events
anticipated this afternoon.
Trenches for Steel I-Beam Embeds
Trenches for Steel I-Beam Embeds
DAILY REPORT DR-000009Report #:
2/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 2
DAILY REPORT DR-000009Report #:
2/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 2 of 2
NATHAN P. BUFFUM
Feb 08, 2016
CONCRETE -Pre-Placement -Reinforcement -Activity No.7
02/17/2016 -DEAN, Mark -Periodic -Does NOT Generally Conform with Required -1.00 Hours
Personnel on Site: Mark Dean - S&ME
Weather Conditions: Sunny / 60's
Services Provided: S&ME representative was on site, as requested by the contractor on a periodic basis, in order to re-
observe reinforcement for the location that is designated as area #1 and #2 on the reinforcing shop drawings, originally
observed on February 15, 2016.
Representative had attempted to contact general contractor prior to leaving for project site to confirm if reinforcing was
completed. After not being able to contact general contractor by telephone, representative left for the project site at the
scheduled time.
Upon site arrival, representative observed that the W8 beams were not in place, and a large amount of the top reinforcing
steel was missing, as well as fixing the lap splices with the already poured slab. Representative discussed with personnel
on site to call and reschedule re-observation with the S&ME office.
DAILY REPORT DR-000011Report #:
2/25/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Feb 25, 2016
CONCRETE -Pre-Placement -Reinforcement -Activity No.9
02/19/2016 -DEAN, Mark -Periodic -Generally Conforms with Required -4.00 Hours
Personnel on Site: Mark Dean - S&ME, David
Weather Conditions: Sunny / 50's
Services Provided: S&ME representative was on site, as requested by the contractor on a periodic basis in order to re-
observe the reinforcement for areas 1& 2 as designated on the approved reinforcing shop drawings. Representative was
requested to be on site this morning for observation. Upon arrival to the project site, representative met with the
reinforcing subcontractor David and was informed that reinforcing was not ready and requested S&ME return around
1pm.
Representative called David at 12:30pm and was informed that reinforcing was ready for observing. Upon site arrival,
representative observed that contractor was missing some of the #5 top mat slab reinforcing, some of the top mat
reinforcing was not at its designed location of 2" from top of slab around the W8 embeds, along the construction joint,
slab was only measured to 10" thick, reinforcing was easily displaced by walking (not tied), #5's running parallel to the
beam were not in place, some of the Z trough bars needed attention (cover and orientation), as well as other items.
Upon discussing these items with David, representative was requested to return to site around 4pm.
Upon returning to site at 4:00 pm, representative observed items from original observation on February 15, 2016, as well
as items identified today were in the process of being corrected. While on site, contractor was observed correcting
items such as missing top mat reinforcing steel as well as correcting the top mat reinforcing around the W8 embeds to
achieve proper clearance from top of slab as per specified in the construction documents. By the end of today's
observation, reinforcing generally appeared to conform with both structural plans dated September 30, 2015 and the
Reinforcing Shop Drawings dated February 2, 2016.
Standby / Re-observation time:
*10:30 - 11:00 - Not ready, still placing reinforcing
*12:30 - 14:00 - Not 100% ready, still having items needing attention
*15:30 - 17:30 - Fixing items while on site, re-observation from February 15, 2016.
DAILY REPORT DR-000012Report #:
2/25/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Feb 25, 2016
CONCRETE -Placement -Test -Activity No.10
02/22/2016 -WALKER, PATRICIA A.-Part Time -Generally Conforms with Required -8.25 Hours
Weather Conditions: Clear/ 60's
Personnel on Site: Patricia Walker-S&ME; Port City Builders
Services Provided: S&ME representative was on site on a part-time basis to perform concrete sampling and testing.
The location of the pour was for slab on grade for the east 1/2 of exterior slab, as shown on sketch.
Approximately 290 CY of (Ready Mixed mix code 50CAX55) concrete was placed using a pump truck. Fresh concrete
was tested for slump, air content, unit weight, concrete and air temperature, and cylinders were cast for each set. Six
sets of 6(4x8) strength cylinders were cast. Test results were reported to the contractor. We tested and noted air content
was low per specs on two sampled trucks but contractor chose to pour anyways.
PW-Concrete-Test Locations
CONCRETE PLACEMENT RECORD
DAILY REPORT DR-000013Report #:
2/29/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Feb 29, 2016
Page 3 of 4Page 2 of 3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
60036 6 1510 6724485 10 /03:22 EST 04:00 EST 04:26 EST 64 Slump 3-1/2 in.4.6 (%)67 63 None 6 4" X 8"Cast
Cylinder
60037 7 1403 6724488 10 /04:08 EST 04:45 EST 05:08 EST 60 Slump 4-1/2 in.4.6 (%)68 63 None 6 4" X 8"Cast
Cylinder
60038 8 1403 6724495 10 /05:46 EST 06:14 EST 06:31 EST 45 Slump 4-1/4 in.3.8 (%)67 61 None 6 4" X 8"Cast
Cylinder
60039 9 522 6724499 9 /06:27 EST 07:00 EST 07:31 EST 64 Slump 4-1/2 in.5.5 (%)67 61 None 6 4" X 8"Cast
Cylinder
60040 10 521 7006415 10 /07:02 EST 07:35 EST 07:50 EST 48 Slump 5-1/2 in.7.0 (%)69 61 None 6 4" X 8"Cast
Cylinder
60041 11 2704 6333271 10 /08:26 EST 08:40 EST 09:00 EST 34 Slump 5 in.3.5 (%)73 61 None 6 4" X 8"Cast
Cylinder
Pour Date: 2/22/2016 Placement Location:BUILDING - Slab-on-Grade Placement Method:Pump Technician:WALKER, PATRICIA A.
Weather: Location Details:east 1/2 of exterior slab Mix Design:Spec Strength (psi):5000
Contractor:port city builders Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 2/29/2016
Report #: CPS-000002
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Post Placement -Sample Pickup -Activity No.11
02/23/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -1.75 Hours
Weather Conditions: Cloudy, light rain at times, 50's
Personnel On Site: Cory Connell; S&ME
Services Provided: S&ME personnel was on site as requested to transport concrete test cylinders (six sets/ cast on 2-22-
16) to the S&ME Wilmington laboratory for further curing and compressive strength testing. Cylinders were logged in by
stripping from plastic molds and placed in moist curing room. No damage was observed to the cylinders.
DAILY REPORT DR-000014Report #:
2/29/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Feb 29, 2016
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: February 29, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
57370 Concrete Cylinder 1
57373 Concrete Cylinder 1
57375 Concrete Cylinder 1
57376 Concrete Cylinder 1
57377 Concrete Cylinder 1
60036 Concrete Cylinder 1
60037 Concrete Cylinder 1
60038 Concrete Cylinder 1
60039 Concrete Cylinder 1
60040 Concrete Cylinder 1
60041 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
1-1 7 02/06/16 2 / 5 4.00 12.57 65,410 5,200 3 U
1-2 7 02/06/16 2 / 5 4.00 12.57 68,175 5,420 2 U
1-3 28 02/27/16 2 / 26 4.00 12.57 81,585 6,490 3 P U
1-4 28 02/27/16 2 / 26 4.00 12.57 81,610 6,490 1 P U
1-5 28 02/27/16 2 / 26 4.00 12.57 81,530 6,490 1 P U
1-6 56 H 03/26/16 2 / 54
Test Age Average Strengths (psi):7 Day -5310, 28 Day -6490
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:1
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:1510 / 6724079
Contractor:Port City Builders Inc
Technician:BEHAN, STEPHEN
Cast By:BEHAN, STEPHEN
Date Cast:01/30/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:05:25 EST
Sampled:06:00 EST
Cast:06:10 EST
Truck Empty:06:30 EST
Placement Time:65 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:C&D Slab
Sample Location / Notes:North West Corner of Slab
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.0 (lb/ft³) (ASTM C138)
Air Content:5.4 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):5 (ASTM C143)
Air Temperature (F):30 Concrete Temp (F):54 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:57370
Report #:CC-000006
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
2-1 7 02/06/16 2 / 5 4.00 12.57 53,130 4,230 5 U
2-2 7 02/06/16 2 / 5 4.00 12.57 58,265 4,640 1 U
2-3 28 02/27/16 2 / 26 4.00 12.57 72,920 5,800 2 P U
2-4 28 02/27/16 2 / 26 4.00 12.57 73,045 5,810 2 P U
2-5 28 02/27/16 2 / 26 4.00 12.57 69,500 5,530 1 P U
2-6 56 H 03/26/16 2 / 54
Test Age Average Strengths (psi):7 Day -4430, 28 Day -5710
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:2
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:2555 / 6724081
Contractor:Port City Builders Inc
Technician:BEHAN, STEPHEN
Cast By:BEHAN, STEPHEN
Date Cast:01/30/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:05:55 EST
Sampled:07:00 EST
Cast:07:10 EST
Truck Empty:07:20 EST
Placement Time:85 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:C&D Slab
Sample Location / Notes:Near South Western Corner
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:138.0 (lb/ft³) (ASTM C138)
Air Content:6.0 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):5 (ASTM C143)
Air Temperature (F):34 Concrete Temp (F):53 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:57373
Report #:CC-000007
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
3-1 7 02/06/16 2 / 5 4.00 12.57 70,840 5,640 3 U
3-2 7 02/06/16 2 / 5 4.00 12.57 69,965 5,570 2 U
3-3 28 02/27/16 2 / 26 4.00 12.57 90,965 7,240 3 P U
3-4 28 02/27/16 2 / 26 4.00 12.57 85,475 6,800 3 P U
3-5 28 02/27/16 2 / 26 4.00 12.57 89,095 7,090 2 P U
3-6 56 H 03/26/16 2 / 54
Test Age Average Strengths (psi):7 Day -5600, 28 Day -7040
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:3
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:2825 / 6931425
Contractor:Port City Builders Inc
Technician:BEHAN, STEPHEN
Cast By:BEHAN, STEPHEN
Date Cast:01/30/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:07:25 EST
Sampled:07:50 EST
Cast:08:00 EST
Truck Empty:08:20 EST
Placement Time:55 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:C&D Slab
Sample Location / Notes:Near Western 1/3 or slab
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Leland - Plant 69 & 70
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.0 (lb/ft³) (ASTM C138)
Air Content:5.5 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):4-3/4 (ASTM C143)
Air Temperature (F):34 Concrete Temp (F):54 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:57375
Report #:CC-000008
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
4-1 7 02/06/16 2 / 5 4.00 12.57 66,245 5,270 3 U
4-2 7 02/06/16 2 / 5 4.00 12.57 65,275 5,190 1 U
4-3 28 02/27/16 2 / 26 4.00 12.57 83,610 6,650 2 P U
4-4 28 02/27/16 2 / 26 4.00 12.57 85,315 6,790 3 P U
4-5 28 02/27/16 2 / 26 4.00 12.57 83,015 6,600 5 P U
4-6 56 H 03/26/16 2 / 54
Test Age Average Strengths (psi):7 Day -5230, 28 Day -6680
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:4
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:
Contractor:Port City Builders Inc
Technician:BEHAN, STEPHEN
Cast By:BEHAN, STEPHEN
Date Cast:01/30/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:
Sampled:08:55 EST
Cast:09:05 EST
Truck Empty:
Placement Time:
Placement Location:BUILDING - Slab-on-Grade
Location Details:C&D Slab
Sample Location / Notes:Near 2/3rds mark of slab on eastern end
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Leland - Plant 69 & 70
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.8 (lb/ft³) (ASTM C138)
Air Content:5.2 (%) (ASTM C231)
Load Volume:
Weather:Slump (in):4-1/2 (ASTM C143)
Air Temperature (F):Concrete Temp (F):55 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:57376
Report #:CC-000009
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
5-1 7 02/06/16 2 / 5 4.00 12.57 59,950 4,770 2 U
5-2 7 02/06/16 2 / 5 4.00 12.57 59,025 4,700 1 U
5-3 28 02/27/16 2 / 26 4.00 12.57 78,635 6,260 1 P U
5-4 28 02/27/16 2 / 26 4.00 12.57 72,400 5,760 3 P U
5-5 28 02/27/16 2 / 26 4.00 12.57 75,045 5,970 1 P U
5-6 56 H 03/26/16 2 / 54
Test Age Average Strengths (psi):7 Day -4730, 28 Day -6000
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:5
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:521 / 6724093
Contractor:Port City Builders Inc
Technician:BEHAN, STEPHEN
Cast By:BEHAN, STEPHEN
Date Cast:01/30/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:09:52 EST
Sampled:10:20 EST
Cast:10:30 EST
Truck Empty:10:45 EST
Placement Time:53 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:C&D Slab
Sample Location / Notes:Near South East Corner of Slab
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.0 (lb/ft³) (ASTM C138)
Air Content:6.0 (%) (ASTM C231)
Load Volume:9 (yd³)
Weather:Slump (in):4-3/4 (ASTM C143)
Air Temperature (F):45 Concrete Temp (F):57 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:57377
Report #:CC-000010
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
6-1 7 02/29/16 1 / 6 4.00 12.57 68,500 5,450 1 U
6-2 7 02/29/16 1 / 6 4.00 12.57 67,865 5,400 2 U
6-3 28 03/21/16 1 / 27
6-4 28 03/21/16 1 / 27
6-5 28 03/21/16 1 / 27
6-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -5420
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:6
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:1510 / 6724485
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:03:22 EST
Sampled:04:04 EST
Cast:04:14 EST
Truck Empty:04:26 EST
Placement Time:64 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:sw corner of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:143.1 (lb/ft³) (ASTM C138)
Air Content:4.6 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):3-1/2 (ASTM C143)
Air Temperature (F):63 Concrete Temp (F):67 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60036
Report #:CC-000016
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
7-1 7 02/29/16 1 / 6 4.00 12.57 67,705 5,390 1 U
7-2 7 02/29/16 1 / 6 4.00 12.57 71,110 5,660 1 U
7-3 28 03/21/16 1 / 27
7-4 28 03/21/16 1 / 27
7-5 28 03/21/16 1 / 27
7-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -5520
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:7
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:1403 / 6724488
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:04:08 EST
Sampled:04:46 EST
Cast:04:56 EST
Truck Empty:05:08 EST
Placement Time:60 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:se corner of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:142.2 (lb/ft³) (ASTM C138)
Air Content:4.6 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):4-1/2 (ASTM C143)
Air Temperature (F):63 Concrete Temp (F):68 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60037
Report #:CC-000015
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
8-1 7 02/29/16 1 / 6 4.00 12.57 72,525 5,770 2 U
8-2 7 02/29/16 1 / 6 4.00 12.57 74,980 5,970 1 U
8-3 28 03/21/16 1 / 27
8-4 28 03/21/16 1 / 27
8-5 28 03/21/16 1 / 27
8-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -5870
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:8
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:1403 / 6724495
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:05:46 EST
Sampled:06:15 EST
Cast:06:25 EST
Truck Empty:06:31 EST
Placement Time:45 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:middle south of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:144.4 (lb/ft³) (ASTM C138)
Air Content:3.8 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):4-1/4 (ASTM C143)
Air Temperature (F):61 Concrete Temp (F):67 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60038
Report #:CC-000014
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
9-1 7 02/29/16 1 / 6 4.00 12.57 63,550 5,060 3 U
9-2 7 02/29/16 1 / 6 4.00 12.57 60,640 4,820 2 U
9-3 28 03/21/16 1 / 27
9-4 28 03/21/16 1 / 27
9-5 28 03/21/16 1 / 27
9-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -4940
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:9
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:522 / 6724499
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:06:27 EST
Sampled:07:03 EST
Cast:07:13 EST
Truck Empty:07:31 EST
Placement Time:64 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:north middle of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.2 (lb/ft³) (ASTM C138)
Air Content:5.5 (%) (ASTM C231)
Load Volume:9 (yd³)
Weather:Slump (in):4-1/2 (ASTM C143)
Air Temperature (F):61 Concrete Temp (F):67 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60039
Report #:CC-000013
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
10-1 7 02/29/16 1 / 6 4.00 12.57 48,720 3,880 3 U
10-2 7 02/29/16 1 / 6 4.00 12.57 48,880 3,890 2 U
10-3 28 03/21/16 1 / 27
10-4 28 03/21/16 1 / 27
10-5 28 03/21/16 1 / 27
10-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -3880
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:10
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:521 / 7006415
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:07:02 EST
Sampled:07:40 EST
Cast:07:50 EST
Truck Empty:07:50 EST
Placement Time:48 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:nw corner of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:136.4 (lb/ft³) (ASTM C138)
Air Content:7.0 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):5-1/2 (ASTM C143)
Air Temperature (F):61 Concrete Temp (F):69 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60040
Report #:CC-000012
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
11-1 7 02/29/16 1 / 6 4.00 12.57 70,775 5,630 1 U
11-2 7 02/29/16 1 / 6 4.00 12.57 69,985 5,570 2 U
11-3 28 03/21/16 1 / 27
11-4 28 03/21/16 1 / 27
11-5 28 03/21/16 1 / 27
11-6 56 H 04/18/16 1 / 55
Test Age Average Strengths (psi):7 Day -5600
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:11
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:2704 / 6333271
Contractor:port city builders
Technician:WALKER, PATRICIA A.
Cast By:WALKER, PATRICIA A.
Date Cast:02/22/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:08:26 EST
Sampled:08:49 EST
Cast:08:59 EST
Truck Empty:09:00 EST
Placement Time:34 (min)
Placement Location:BUILDING - Slab-on-Grade
Location Details:east 1/2 of exterior slab
Sample Location / Notes:ne corner of east 1/2 of exterior slab
Batch Log
Strength:5000 (psi)
Air:4.5 - 7.0 (%)
Slump:- 6 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:146.0 (lb/ft³) (ASTM C138)
Air Content:3.5 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):5 (ASTM C143)
Air Temperature (F):61 Concrete Temp (F):73 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:60041
Report #:CC-000011
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:2/29/2016
NATHAN P. BUFFUM
Feb 29, 2016
CONCRETE -Placement -Test -Activity No.12
03/07/2016 -WALKER, PATRICIA A.-Part Time -Generally Conforms with Required -5.25 Hours
Weather Conditions: Clear/ 30's
Personnel on Site: Patricia Walker-S&ME; David-Port City Builders
Services Provided: S&ME representative was on site on a part-time basis to perform concrete sampling and testing.
The location of the pour was for slab on grade for the west1/3 of exterior slab (pavement area) , as shown on sketch.
Approximately 99 CY of (Ready Mixed mix code 50CAX55) concrete was placed using a pump truck. Fresh concrete
was tested for slump, air content, unit weight, concrete and air temperature, and cylinders were cast for each set. two
sets of 6(4x8) strength cylinders were cast. Test results were reported to the contractor. Concrete was within
specifications.
PW-Concrete-Test Locations
CONCRETE PLACEMENT RECORD
DAILY REPORT DR-000019Report #:
3/11/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Mar 11, 2016
Page 3 of 4Page 2 of 3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
61485 12 40781401 6724797 10 /04:59 EST 05:31 EST 06:19 EST 80 Slump 5 in.4.3 (%)52 37 None 6 4" X 8"Cast
Cylinder
61486 13 2102 6724800 9 /05:45 EST 06:05 EST 07:38 EST 113 Slump 5 in.4.7 (%)52 39 None 6 4" X 8"Cast
Cylinder
Pour Date: 3/7/2016 Placement Location:PAVEMENT Placement Method:Pump Technician:WALKER, PATRICIA A.
Weather: Location Details:west portion of pavement area Mix Design:50CAX55 Spec Strength (psi):5000
Contractor:port city builders Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 3/11/2016
Report #: CPS-000003
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Placement -Test -Activity No.13
03/08/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -
Weather Conditions: Clear/ 50's
Personnel on Site: Cory Connell -S&ME; David-Port City Builders
Services Provided: S&ME representative was on site as requested on a part-time basis to perform concrete sampling
and testing. The location of the pour was for slab on grade for the west1/3 of exterior slab (pavement area) , as shown
on sketch.
Approximately 200 CY of (Ready Mixed mix code 50CAX55) concrete was placed using a pump truck. Fresh concrete
was tested for slump, air content, unit weight, concrete and air temperature, and cylinders were cast for each set. Four
sets of 6(4x8) strength cylinders were cast. Test results were reported to the contractor. Concrete was within
specifications.
CC-Concrete-Test Location
CONCRETE PLACEMENT RECORD
CONCRETE -Post Placement -Sample Pickup -Activity No.14
03/08/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -
Weather Conditions: Clear, 50's
Personnel On Site: Cory Connell; S&ME
Services Provided: S&ME personnel was on site as requested to transport concrete test cylinders (two sets/ cast on 3-7-
16) to the S&ME Wilmington laboratory for further curing and compressive strength testing. Cylinders were logged in by
stripping from plastic molds and placed in moist curing room. No damage was observed to the cylinders.
DAILY REPORT DR-000020Report #:
3/11/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Mar 11, 2016
Page 3 of 4 Page 2 of 3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
61724 14 526 6932315 10 /04:01 EST Slump 3-1/2 in.4.0 (%)63 52 None 6 4" X 8"Cast
Cylinder
61732 17 2207 6333445 10 /05:37 EST Slump 5 in.4.0 (%)66 59 None 6 4" X 8"Cast
Cylinder
61728 15 2710 6333439 10 /04:07 EST 04:45 EST Slump 5 in.4.2 (%)69 55 None 6 4" X 8"Cast
Cylinder
61730 16 8698 633342 10 /05:00 EST 05:30 EST Slump 5 in.4.0 (%)62 58 None 6 4" X 8"Cast
Cylinder
Pour Date: 3/8/2016 Placement Location:PAVEMENT - Apron Placement Method:Pump Technician:CONNELL, CORY
Weather: Location Details:SW concrete pavement apron Mix Design:50CAX55 Spec Strength (psi):5000
Contractor:Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 3/11/2016
Report #: CPS-000004
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: May 26, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
68434 Concrete Cylinder 1
68437 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
20-1 7 05/05/16 1 / 6 4.00 12.57 55,760 4,440 1 U
20-2 7 05/05/16 1 / 6 4.00 12.57 52,470 4,170 5 U
20-3 28 05/26/16 1 / 27 4.00 12.57 71,475 5,690 2 P U
20-4 28 05/26/16 1 / 27 4.00 12.57 67,785 5,390 3 P U
20-5 28 05/26/16 1 / 27 4.00 12.57 67,660 5,380 2 P U
20-6 56 H 06/23/16 1 / 55
Test Age Average Strengths (psi):7 Day -4310, 28 Day -5490
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:20
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:4078510 / 6726027
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:04/28/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:03:20 EDT
Sampled:04:00 EDT
Cast:04:15 EDT
Truck Empty:
Placement Time:
Placement Location:FOUNDATION - Mat
Location Details:Plan South section of canopy building slab
Sample Location / Notes:NorthWest part of slab section
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
Mix Design:50CAX55
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:131.1 (lb/ft³) (ASTM C138)
Air Content:5.5 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):4-1/2 (ASTM C143)
Air Temperature (F):68 Concrete Temp (F):80 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:68434
Report #:CC-000043
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:5/26/2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
21-1 7 05/05/16 1 / 6 4.00 12.57 56,850 4,520 2 U
21-2 7 05/05/16 1 / 6 4.00 12.57 56,100 4,460 1 U
21-3 28 05/26/16 1 / 27 4.00 12.57 71,175 5,660 5 P U
21-4 28 05/26/16 1 / 27 4.00 12.57 70,785 5,630 1 P U
21-5 28 05/26/16 1 / 27 4.00 12.57 75,005 5,970 2 P U
21-6 56 H 06/23/16 1 / 55
Test Age Average Strengths (psi):7 Day -4490, 28 Day -5750
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:21
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:2657 / 6726032
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:04/28/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:05:00 EDT
Sampled:05:00 EDT
Cast:05:15 EDT
Truck Empty:
Placement Time:
Placement Location:FOUNDATION - Mat
Location Details:Plan South section of canopy building slab
Sample Location / Notes:South pf the second column for this slab
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
Mix Design:50CAX55
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:131.6 (lb/ft³) (ASTM C138)
Air Content:5.3 (%) (ASTM C231)
Load Volume:9 (yd³)
Weather:Slump (in):5-1/4 (ASTM C143)
Air Temperature (F):70 Concrete Temp (F):77 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:68437
Report #:CC-000044
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:5/26/2016
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: June 2, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
69253 Concrete Cylinder 1
69269 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
22-1 7 05/12/16 1 / 6 4.00 12.57 61,320 4,880 3 U
22-2 7 05/12/16 1 / 6 4.00 12.57 60,585 4,820 2 U
22-3 28 06/02/16 1 / 27 4.00 12.57 75,835 6,030 3 P U
22-4 28 06/02/16 1 / 27 4.00 12.57 74,610 5,940 1 P U
22-5 28 06/02/16 1 / 27 4.00 12.57 75,750 6,030 3 P U
22-6 56 H 06/30/16 1 / 55
Test Age Average Strengths (psi):7 Day -4850, 28 Day -6000
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:22
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:1519 / 6726116
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:05/05/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:03:25 EDT
Sampled:04:20 EDT
Cast:04:35 EDT
Truck Empty:
Placement Time:
Placement Location:FOUNDATION - Mat
Location Details:NE portion of exterior slab
Sample Location / Notes:SE corner of slab poured today
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
Mix Design:50CAX55
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:141.6 (lb/ft³) (ASTM C138)
Air Content:5.0 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Slump (in):4 (ASTM C143)
Air Temperature (F):61 Concrete Temp (F):68 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:69253
Report #:CC-000045
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:6/2/2016
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
23-1 7 05/12/16 1 / 6 4.00 12.57 59,030 4,700 1 U
23-2 7 05/12/16 1 / 6 4.00 12.57 57,940 4,610 1 U
23-3 28 06/02/16 1 / 27 4.00 12.57 72,520 5,770 1 P U
23-4 28 06/02/16 1 / 27 4.00 12.57 78,005 6,210 1 P U
23-5 28 06/02/16 1 / 27 4.00 12.57 74,485 5,930 2 P U
23-6 56 H 06/30/16 1 / 55
Test Age Average Strengths (psi):7 Day -4650, 28 Day -5970
Break Remarks
P:The compressive strength test result meets or exceeds the 28-day specified strength.
Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:23
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:522 / 6726127
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:05/05/16
Sampled From:Chute
Placement Method:Pump
Sample Details
Batched:05:32 EDT
Sampled:06:25 EDT
Cast:06:40 EDT
Truck Empty:
Placement Time:
Placement Location:FOUNDATION - Mat
Location Details:NE portion of exterior slab
Sample Location / Notes:SW corner of sketch
Batch Log
Strength:5000 (psi)
Air:4.0 - 6.0 (%)
Slump:3 - 5 (in)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Wilmington - Plant 63
Mix Design:50CAX55
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:140.2 (lb/ft³) (ASTM C138)
Air Content:5.5 (%) (ASTM C231)
Load Volume:9 (yd³)
Weather:Slump (in):4-1/4 (ASTM C143)
Air Temperature (F):64 Concrete Temp (F):69 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:69269
Report #:CC-000046
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:6/2/2016
CONCRETE -Placement -Test -Activity No.30
06/03/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -2.75 Hours
Weather Conditions: Clear/ 70's
Personnel on Site: Cory Connell -S&ME; David-Port City Builders
Services Provided: S&ME representative was on site as requested on a part-time basis to perform concrete
sampling and testing. The location of the pour was for Column footings, as shown on sketch.
Approximately 5 cubic yards of (Ready Mixed mix code 30CAX312) concrete was placed using the truck chute.
Fresh concrete was tested for slump, air content, unit weight, concrete and air temperature, and cylinders were
cast. We cast one set of 6(4x8) strength cylinders. Test results were reported to the contractor immediately.
CC-Concrete-Test Locations
CONCRETE PLACEMENT RECORD
DAILY REPORT DR-000058Report #:
6/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Jun 08, 2016
P
a
g
e
3
o
f
4
P
a
g
e
2
o
f
3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
72993 24 40781510 6726878 5 /06:30 EDT 07:05 EDT Slump 5 in.5.5 (%)79 75 None 6 4" X 8"Cast
Cylinder
Pour Date: 6/3/2016 Placement Location:BUILDING - Column Placement Method:Chute Technician:CONNELL, CORY
Weather:Clear Location Details:two NE most columns on Strip"A"
NE most column on Strip "B"
Mix Design:30CAF312 Spec Strength (psi):3000
Contractor:Port City Builders Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 6/8/2016
Report #: CPS-000009
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Post Placement -Sample Pickup -Activity No.31
06/04/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -0.50 Hours
Weather: Clear
Personnel: S&ME Cory Connell
Services : Arrived on site and site was closed and locked so we could not get into the area to retrieve the
cylinders cast on 6-3-16.
DAILY REPORT DR-000059Report #:
6/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Jun 08, 2016
CONCRETE -Post Placement -Sample Pickup -Activity No.32
06/06/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -1.00 Hours
Weather: Cloudy, 70's
Personnel: S&ME-Cory Connell
Services: S&ME representative was on site to pick up and transport concrete test cylinders to the Wilmington
S&ME office for further curing and compressive strength testing. Cylinders were logged in by stripping from
molds and placed in moist curing room.
DAILY REPORT DR-000060Report #:
6/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Jun 08, 2016
CONCRETE -Placement -Test -Activity No.33
06/07/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -3.50 Hours
Weather Conditions: Rain/ 70's
Personnel on Site: Cory Connell -S&ME; David-Port City Builders
Services Provided: S&ME representative was on site as requested on a part-time basis to perform concrete
sampling and testing. The location of the pour was for Columns, as shown on sketch.
Approximately 8.5 CY of (Ready Mixed mix code 30CAX312) concrete was placed using the truck chute. Fresh
concrete was tested for slump, air content, unit weight, concrete and air temperature, and cylinders were cast. We
cast one set of 6(4x8) strength cylinders. Test results were reported to the contractor immediately.
CC-Concrete-Test Locations
CONCRETE PLACEMENT RECORD
DAILY REPORT DR-000061Report #:
6/8/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Jun 08, 2016
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: June 10, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
72993 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
SpecimenNumber TestAge Days
TestDate Field / LabCure Days
Average CylinderDiameter (in)
CylinderArea (in²)Max Load(lbs)Strength(psi)FractureType BreakRemark CappingMethod
24-1 7 06/10/16 3 / 4 4.00 12.57 22,495 1,790 5 U
24-2 7 06/10/16 3 / 4 4.00 12.57 22,480 1,790 1 U
24-3 28 07/01/16 3 / 25
24-4 28 07/01/16 3 / 25
24-5 28 07/01/16 3 / 25
24-6 56 H 07/29/16 3 / 53
Test Age Average Strengths (psi):7 Day -1790
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:24
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:40781510 / 6726878
Contractor:Port City Builders
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:06/03/16
Sampled From:Chute
Placement Method:Chute
Sample Details
Batched:06:30 EDT
Sampled:07:15 EDT
Cast:07:30 EDT
Truck Empty:
Placement Time:
Placement Location:BUILDING - Column
Location Details:two NE most columns on Strip"A"NE most column on Strip "B"
Sample Location / Notes:two Colums to the NE on strip "A"
Column to the NE on strip "B"
Batch Log
Strength:3000 (psi)
Air:3.0 - 6.0 (%)
Specifications
Supplier:06-Ready MixedConcrete Company
Plant:Scotts Hill - Plant 67
Mix Design:30CAF312
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:133.5 (lb/ft³) (ASTM C138)
Air Content:5.5 (%) (ASTM C231)
Load Volume:5 (yd³)
Weather:Clear Slump (in):5 (ASTM C143)
Air Temperature (F):75 Concrete Temp (F):79 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:72993
Report #:CC-000047
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:6/10/2016
P
a
g
e
3
o
f
4
P
a
g
e
2
o
f
3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
73305 25 521 6726926 8.5 /06:52 EDT Slump 4-3/4 in.4.3 (%)82 73 None 6 4" X 8"Cast
Cylinder
Pour Date: 6/7/2016 Placement Location:BUILDING - Column Placement Method:Chute Technician:CONNELL, CORY
Weather:Rain Location Details:Columns on line "A"- Three
columns to the South
Column line "B"- Two Columns to
The South
Mix Design:30CAF312 Spec Strength (psi):3000
Contractor:Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 6/8/2016
Report #: CPS-000010
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Placement -Test -Activity No.34
06/08/2016 -MURPHREY, CLAYTON -Periodic -Generally Conforms with Required -1.75 Hours
Weather Conditions: Clear / 75
Personnel onsite: Clayton Murphrey (S&ME), Port City Builders
Summary of services provided: The S&ME representative arrived onsite as requested to perform concrete testing
services on the 10 cubic yards of 5000 psi concrete. After the truck arrived and we sampled it, the contractor
informed us that they were sending it away as the rebar was not yet "signed off". We discarded our samples and
left the site.
The anticipated work was cancelled and rescheduled.
CONCRETE -Post Placement -Sample Pickup -Activity No.35
06/08/2016 -MURPHREY, CLAYTON -Periodic -Generally Conforms with Required -1.25 Hours
Weather Conditions: Clear / 75
Personnel onsite: Clayton Murphrey (S&ME), Port City Builders
Summary of services provided: The S&ME representative arrived onsite as requested to perform cylinder
collections services on the 1 set of 6 concrete cylinders casted on 6-7-16. Concrete cylinders were transported to
the S&ME office where they were stripped form molds and placed in a curing room.
DAILY REPORT DR-000063Report #:
6/9/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Jun 09, 2016
CONCRETE -Placement -Test -Activity No.36
06/09/2016 -CONNELL, CORY -Part Time -Generally Conforms with Required -3.00 Hours
Weather: Sunny, 70's
Personnel on Site: Cory Connell- S&ME
Services Provided: S&ME was on site on, a part-time basis, as requested to perform concrete sampling and
testing. 5,000 psi, Ready Mixed Concrete mix design 50CAX290 concrete was placed using a truck pump at the
slabs at the bottom of the columns.
Concrete was sampled and tested during the placement today. Concrete was tested for slump, air content, unit
weight, and temperature. One set of six 4x8 cylinders were cast. All tests today were in the specified range.
All test results were reported immediately to the contractor upon completion. Please see attached Concrete
Placement Record for test results and additional information.
CC-Concrete-Test Location
CONCRETE PLACEMENT RECORD
DAILY REPORT DR-000065Report #:
6/13/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1Page 1 of 4Page 1 of 3
NATHAN P. BUFFUM
Jun 13, 2016
P
a
g
e
3
o
f
4
P
a
g
e
2
o
f
3
Sample Set Truck #Ticket #
Load / Cume
Vol(yd³)
Time
Batched
Time
Arrived
Time
Empty
Placement
Time (min)
Slump/Spread/
T20
Air
(%)
Concrete
Temp (F)
Air Temp
(F)Admixtures
Specimens
Cast
Specimen Size Sample
Type
73733 26 407815 6726997 10 /09:58 EDT Slump 5 in.3.3 (%)75 80 None 6 4" X 8"Cast
Cylinder
Pour Date: 6/9/2016 Placement Location:BUILDING - Slab-on-Grade Placement Method:Chute Technician:CONNELL, CORY
Weather:Sunny Location Details:Slabs at bottom of Columns. "A"
line- column to the north, "B" line: 2
columns to the north
Mix Design:50CAX290 Spec Strength (psi):5000
Contractor:Supplier:06-Ready Mixed
Concrete Company
Mod of Rupture (psi):
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to perform specific
services requested and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The results of tests or
observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by others, we are not responsible for the
testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other parties at the project site.
Page 1 of 1
CONCRETE
PLACEMENT RECORD
Report Date: 6/13/2016
Report #: CPS-000011
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945 | Fax: 910-799-9958
Wilmington
Page 4 of 4Page 3 of 3
CONCRETE -Post Placement -Sample Pickup -Activity No.37
06/10/2016 -CONNELL, CLYDE R.-Part Time -Generally Conforms with Required -1.25 Hours -08:00 to 09:15
Weather Conditions: Sunny, 70's
Personnel On Site: S&ME- Richard Connell
Services Provided: S&ME personnel was on site as requested to transport concrete test cylinders (one set/ cast on
6-9-16) to the S&ME Wilmington laboratory for further curing and compressive strength testing. Cylinders were
logged in by stripping from plastic molds and placed in moist curing room. No damage was observed to the
cylinders.
DAILY REPORT DR-000066Report #:
6/13/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Jun 13, 2016
CONCRETE -Post Placement -Sample Pickup -Activity No.37
06/10/2016 -CONNELL, CLYDE R.-Part Time -Generally Conforms with Required -1.25 Hours -08:00 to 09:15
Weather Conditions: Sunny, 70's
Personnel On Site: S&ME- Richard Connell
Services Provided: S&ME personnel was on site as requested to transport concrete test cylinders (one set/ cast on
6-9-16) to the S&ME Wilmington laboratory for further curing and compressive strength testing. Cylinders were
logged in by stripping from plastic molds and placed in moist curing room. No damage was observed to the
cylinders.
DAILY REPORT DR-000066Report #:
6/13/2016Report Date:
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Client:
New Hanover County
200 Division Drive
Wilmington, NC 28401
Project:
350616001
NHC Landfill C&D Facility
New Hanover
Wilmington, NC 28401
The presence of S&ME at the project site shall not be construed as an acceptance or approval of activities at the site. S&ME is at the site to
perform specific services and has certain responsibilities which are limited to those specifically authorized in our agreement with our client. The
results of tests or observations performed are only applicable to the time and location of the tests or observations. If our work is scheduled by
others, we are not responsible for the testing frequency. In no event shall S&ME be responsible for the safety or means and methods of other
parties at the project site.
Page 1 of 1
NATHAN P. BUFFUM
Jun 13, 2016
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: June 14, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
73305 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
25-1 7 06/14/16 1 / 6 4.00 12.57 22,740 1,810 1 U
25-2 7 06/14/16 1 / 6 4.00 12.57 24,800 1,970 1 U
25-3 28 07/05/16 1 / 27
25-4 28 07/05/16 1 / 27
25-5 28 07/05/16 1 / 27
25-6 56 H 08/02/16 1 / 55
Test Age Average Strengths (psi):7 Day -1890
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:25
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:521 / 6726926
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:06/07/16
Sampled From:Chute
Placement Method:Chute
Sample Details
Batched:06:52 EDT
Sampled:08:00 EDT
Cast:08:15 EDT
Truck Empty:
Placement Time:
Placement Location:BUILDING - Column
Location Details:Columns on line "A"- Three columns to the South
Column line "B"- Two Columns to The South
Sample Location / Notes:Line "B"- Column to the south, (SE most Column)
Batch Log
Strength:3000 (psi)
Air:3.0 - 6.0 (%)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
Mix Design:30CAF312
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:129.0 (lb/ft³) (ASTM C138)
Air Content:4.3 (%) (ASTM C231)
Load Volume:8.5 (yd³)
Weather:Rain Slump (in):4-3/4 (ASTM C143)
Air Temperature (F):73 Concrete Temp (F):82 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:73305
Report #:CC-000048
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:6/14/2016
LETTER OF TRANSMITTAL
3006 Hall Waters Drive, Suite 100 Date: June 16, 2016
Wilmington, NC 28405-8786 S&ME Job #: 3506-16-001
Phone: (910) 799-9945 Project Name: NHC Landfill C & D Facility
Fax: (910) 799-9958 Proposal Number: 35-1600001
www.smeinc.com Proposal Date: January 5, 2016
Mr. Kevin Caison
New Hanover County
200 Division Drive
Wilmington, NC 28401
Reference: S&ME Laboratory Test Results Transmittal
Laboratory Tests: Performed in general accordance with referenced ASTM standards:
[A] ASTM C39 [D] ASTM C617 [G] ASTM C1231 [J] ASTM C231 [M] ASTM C31 [P] ASTM C939
[B] ASTM C42 [E] ASTM C780 [H] ASTM C172 [K] ASTM C1064 [N] ASTM C173
[C] ASTM C78 [F] ASTM C1077 [ I ] ASTM C143 [L] ASTM C138 [O] ASTM 109
Notes: Concrete Cylinder: A, F, G, H, I, J, K, L, M, N Concrete Flexural Beam: C, F, H, I, J, K, L, M
Grout Prism (Masonry): A, D, F, H, I, K, M Grout Cube (2x2): D, F, H, K, M, O, P
Mortar Strength: D, E, F, K, N, M, O Concrete Core: A, B, D, F
Laboratory Numbers Test Type Number of Copies
73733 Concrete Cylinder 1
These test reports are transmitted as checked below:
[ ] For Approval [x] For Your Use [ ] As Requested [ ] For Review & Comment [ ] ___________
Signed:
Distribution: Kevin Caison, kcaison@nhcgov.com
Bill Band, bband@mckimcreed.com
Joe Suleyman, jsuleyman@nhcgov.com
Sam Hawes, shawes@nhcgov.com
Stacey Magnus, smagnus@mckimcreed.com
IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE.
This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S&ME. Inc. which is
confidential and legally privileged. The information is intended only for the use of the individual or entity named in this Letter of
Transmittal. If you are not the authorized recipient, you are hereby notified that any disclosure, copying, distribution, or the taking of
any action in reliance on these documents is strictly prohibited.
Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
26-1 7 06/16/16 1 / 6 4.00 12.57 68,105 5,420 3 U
26-2 7 06/16/16 1 / 6 4.00 12.57 75,745 6,030 2 U
26-3 28 07/07/16 1 / 27
26-4 28 07/07/16 1 / 27
26-5 28 07/07/16 1 / 27
26-6 56 H 08/04/16 1 / 55
Test Age Average Strengths (psi):7 Day -5720
Break Remarks Capping Methods
U:Unbonded Caps (ASTM C1231)
Set #:26
Specimen Size:4" X 8"
Specimens In Set:6
Truck /Ticket #:407815 / 6726997
Contractor:
Technician:CONNELL, CORY
Cast By:CONNELL, CORY
Date Cast:06/09/16
Sampled From:Chute
Placement Method:Chute
Sample Details
Batched:09:58 EDT
Sampled:10:30 EDT
Cast:10:45 EDT
Truck Empty:
Placement Time:
Placement Location:BUILDING - Slab-on-Grade
Location Details:Slabs at bottom of Columns. "A" line- column to the north, "B" line: 2 columns to the north
Sample Location / Notes:"B" Column all the way to north
Batch Log
Strength:5000 (psi)
Air:3.0 - 6.0 (%)
Specifications
Supplier:06-Ready Mixed
Concrete Company
Plant:Scotts Hill - Plant 67
Mix Design:50CAX290
On-Site Admixtures:None
Location
Field Measurements
Plastic Unit Weight:136.2 (lb/ft³) (ASTM C138)
Air Content:3.3 (%) (ASTM C231)
Load Volume:10 (yd³)
Weather:Sunny Slump (in):5 (ASTM C143)
Air Temperature (F):80 Concrete Temp (F):75 (ASTM C1064)
Lab Test Results
Testing Lab:Wilmington, 3006 Hall Waters Drive, Suite 100, Wilmington, NC, 28405
The above tests were performed in general accordance with the applicable test method, except for known deviations noted above.Page 1 of 1
Client:
New Hanover County
Wilmington, NC 28401
200 Division Drive
Project:
NHC Landfill C&D Facility
350616001
Wilmington, NC 28401
New Hanover
CONCRETE COMPRESSIVE
STRENGTH
Test Method:ASTM C39
Sample:73733
Report #:CC-000049
Wilmington
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
Phone: 910-799-9945
Fax: 910-799-9958
Report Date:6/16/2016
MRRF Certification Letter
New Hanover County Secure Landfill June 2016
ATTACHMENT 3
OTHER CONSTRUCTION REPORTS
NCDOT Lab Number BB1-093015 Date Sampled:9/30/2015
Report on sample of:4x4x8 Jumbo Brick Date Received:10/16/2015
Identification marks:9/30/2015 Date Reported:10/20/2015
Sampled by:Plant Personnel Furnished by:Plant
Sample taken from:Production Line Location of supply:Morrisville, NC
Quan. Represented:40,320 Date Manufactured:9/30/2015
Number Length (in.)Width (in.)Height (in.)P.S.I.
6 7.6 3.6 2.3 4903
7 7.6 3.6 2.3 4143
8 7.6 3.6 2.3 4012
9 7.6 3.6 2.3 4677
10 7.6 3.6 2.3 4292
Average 7.6 3.6 2.3 4405
Number Length (in.)Width (in.)Height (in.)Density Abs. (#/cu.ft.)
1 7.6 3.6 2.3 130.5 8.5
2 7.6 3.6 2.3 129.5 8.6
3 7.6 3.6 2.3 131.7 8.0
4 7.6 3.6 2.3 130.7 7.6
5 7.6 3.6 2.3 131.5 8.1
Average 7.6 3.6 2.3 130.8 8.2
Remarks: Units tested are Normal 4"x4"x8" Jumbo Brick
Per ASTM C140, the strength specimens were saw cut to .6 aspect ratio and tested.
TJ Hammermeister
Quality Control
Morrisville, N.C. 27560
State of North Carolina
Department of Transportation - Materials and Tests Unit
Raleigh, North Carolina
Producer's Brick and Block Quality Control Test Summary
Testing Laboratory: Adams Products Company
Address: 5701 McCrimmon Parkway
NCDOT Lab Number BB1-110615 Date Sampled:11/6/2015
Report on sample of:2 1/4x4x8 Brick Date Received:11/18/2015
Identification marks:11/6/2015 Date Reported:11/23/2015
Sampled by:Plant Personnel Furnished by:Plant
Sample taken from:Production Line Location of supply:Morrisville, NC
Quan. Represented:70,560 Date Manufactured:11/6/2015
Number Length (in.)Width (in.)Height (in.)P.S.I.
6 7.6 3.6 2.3 4015
7 7.6 3.6 2.3 4124
8 7.6 3.6 2.3 4252
9 7.6 3.6 2.3 3699
10 7.6 3.6 2.3 3460
Average 7.6 3.6 2.3 3910
Number Length (in.)Width (in.)Height (in.)Density Abs. (#/cu.ft.)
1 7.6 3.6 2.3 131.2 8.3
2 7.6 3.6 2.3 129.0 10.0
3 7.6 3.6 2.3 127.0 9.7
4 7.6 3.6 2.3 129.0 9.2
5 7.6 3.6 2.3 129.8 8.3
Average 7.6 3.6 2.3 129.2 9.1
Remarks: Units tested are 2 1/4"x4"x8" Brick
TJ Hammermeister
Quality Control
Morrisville, N.C. 27560
State of North Carolina
Department of Transportation - Materials and Tests Unit
Raleigh, North Carolina
Producer's Brick and Block Quality Control Test Summary
Testing Laboratory: Adams Products Company
Address: 5701 McCrimmon Parkway
MRRF Certification Letter
New Hanover County Secure Landfill June 2016
ATTACHMENT 4
AERIAL PHOTOGRAPHY
MRRF Certification Letter
New Hanover County Secure Landfill June 2016
ATTACHMENT 5
CONSTRUCTION PHOTOS