HomeMy WebLinkAbout2908_INSP_20160420FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID YW Transfer X Compost SLAS COUNTY: Davidson
Closed
MSWLF HHW White
goods Incin T&P X FIRM PERMIT NO.: 29-08
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: 04/20/2016 Date of Last Inspection: 02/22/2016
FACILITY NAME AND ADDRESS:
Todco, Inc. Wood Recycling Facility
1123 Roy Lopp Road
Lexington, NC 27292
GPS COORDINATES: N: 35.82872° W: 80.17377°
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Todd Warfford
Telephone: 336-248-2001 (office)/ 336-240-2219 (mobile)
Email address: todd@todcoinc.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Todd Warfford, Todco, Inc.
Brian Warfford, Todco, Inc.
Susan Heim, Environmental Senior Specialist, Solid Waste Section
STATUS OF PERMIT:
Permit to Operate Solid Waste Treatment and Processing Facility Issued: April 29, 2004
Permit Renewal, Operations Plan Modification: April 30, 2009
Permit to Construct (PTC) C&D Transfer Station and Processing Facility Issued: March 5, 2013
Permit to Operate (PTO) C&D Transfer Station and Processing Facility Issued: June 10, 2013
PTO expires June 10, 2018
PURPOSE OF SITE VISIT:
Partial Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS
1. The facility consists of construction and demolition (C&D) transfer (TS) and treatment and processing (T&P)
operations and wood waste treatment and processing situated on ~34 acres of land.
2. Proper signage was observed at the facility entrance which included the facility permit number and emergency
contact information.
3. A review of the facility training records established that the following NC SWANA Transfer Station Operations
Specialist certifications were current: Becki A. Smith, expires 6/19/19; Brian A. Warfford, expires 4/16/16;
Todd A. Warfford, expires 4/16/19; Dalton Avery Warfford, expires 4/16/19.
4. The service area for the facility is defined as Cabarrus, Davie, Forsyth, Guilford, Montgomery, Randolph,
Rowan, Stanley and Davidson Counties.
5. In March 2016, the facility received 1670.82 tons of material, shipped out 1562.92 tons of boiler fuel, and
hauled 10.80 tons of residual C&D waste to the Davidson County MSWLF for proper disposal.
6. Vegetative and waste and wood waste are separated for processing into mulch and boiler fuel, respectively.
Piles were observed to be well defined. Todd Warfford stated that loads that come in mixed are processed for
use as boiler fuel only.
7. Processing of wood waste is accomplished onsite through use of a tub grinder, which was in operation at the
time of this inspection. Dust was confined to the processing area.
8. After processing, mulch and boiler fuel are stored in separate areas. No visible contamination was observed in
the mulch piles.
9. Todd Warfford explained that, in order to avoid composting taking place at the facility, mulch and boiler fuel
piles are turned regularly to avoid increased temperatures in the piles. Piles are inspected at least daily and
turned or moved as necessary.
10. Identified C&D loads are processed on a covered picking line to recover recyclable materials, including
cardboard, metals and wood. The picking line was not in operation during the inspection.
11. A small amount of waste left on the tipping floor was tarped as required by the permit and operations plan.
New facility entrance sign.
Tarped C&D waste on tipping floor.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
Please contact me if you have any questions or concerns regarding this inspection report.
________________________________________ Phone: 336-776-9672
Susan Heim
Environmental Senior Specialist
Regional Representative
Sent on: March 5, 2016 to Todd
Warfford and Brian Warfford.
X Email Hand delivery US Mail Certified No. [ ]
Copies: Deb Aja, Western District Supervisor - Solid Waste Section
Jessica Montie, Compliance Officer – Solid Waste Section
Site map.