Loading...
HomeMy WebLinkAbout2908_INSP_20160420FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: Davidson Closed MSWLF HHW White goods Incin T&P X FIRM PERMIT NO.: 29-08 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 04/20/2016 Date of Last Inspection: 02/22/2016 FACILITY NAME AND ADDRESS: Todco, Inc. Wood Recycling Facility 1123 Roy Lopp Road Lexington, NC 27292 GPS COORDINATES: N: 35.82872° W: 80.17377° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Todd Warfford Telephone: 336-248-2001 (office)/ 336-240-2219 (mobile) Email address: todd@todcoinc.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Todd Warfford, Todco, Inc. Brian Warfford, Todco, Inc. Susan Heim, Environmental Senior Specialist, Solid Waste Section STATUS OF PERMIT: Permit to Operate Solid Waste Treatment and Processing Facility Issued: April 29, 2004 Permit Renewal, Operations Plan Modification: April 30, 2009 Permit to Construct (PTC) C&D Transfer Station and Processing Facility Issued: March 5, 2013 Permit to Operate (PTO) C&D Transfer Station and Processing Facility Issued: June 10, 2013 PTO expires June 10, 2018 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS 1. The facility consists of construction and demolition (C&D) transfer (TS) and treatment and processing (T&P) operations and wood waste treatment and processing situated on ~34 acres of land. 2. Proper signage was observed at the facility entrance which included the facility permit number and emergency contact information. 3. A review of the facility training records established that the following NC SWANA Transfer Station Operations Specialist certifications were current: Becki A. Smith, expires 6/19/19; Brian A. Warfford, expires 4/16/16; Todd A. Warfford, expires 4/16/19; Dalton Avery Warfford, expires 4/16/19. 4. The service area for the facility is defined as Cabarrus, Davie, Forsyth, Guilford, Montgomery, Randolph, Rowan, Stanley and Davidson Counties. 5. In March 2016, the facility received 1670.82 tons of material, shipped out 1562.92 tons of boiler fuel, and hauled 10.80 tons of residual C&D waste to the Davidson County MSWLF for proper disposal. 6. Vegetative and waste and wood waste are separated for processing into mulch and boiler fuel, respectively. Piles were observed to be well defined. Todd Warfford stated that loads that come in mixed are processed for use as boiler fuel only. 7. Processing of wood waste is accomplished onsite through use of a tub grinder, which was in operation at the time of this inspection. Dust was confined to the processing area. 8. After processing, mulch and boiler fuel are stored in separate areas. No visible contamination was observed in the mulch piles. 9. Todd Warfford explained that, in order to avoid composting taking place at the facility, mulch and boiler fuel piles are turned regularly to avoid increased temperatures in the piles. Piles are inspected at least daily and turned or moved as necessary. 10. Identified C&D loads are processed on a covered picking line to recover recyclable materials, including cardboard, metals and wood. The picking line was not in operation during the inspection. 11. A small amount of waste left on the tipping floor was tarped as required by the permit and operations plan. New facility entrance sign. Tarped C&D waste on tipping floor. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 336-776-9672 Susan Heim Environmental Senior Specialist Regional Representative Sent on: March 5, 2016 to Todd Warfford and Brian Warfford. X Email Hand delivery US Mail Certified No. [ ] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Jessica Montie, Compliance Officer – Solid Waste Section Site map.