Loading...
HomeMy WebLinkAbout0403_ChambersMSWLF_UnderdrainRequest_DIN26258_20160601 June 1, 2016 Mr. Perry Sugg Solid Waste Section Division of Waste Management North Carolina Department of Environmental Quality 1646 Mail Service Center Raleigh, NC 27699 Dear Mr. Sugg: Subject: Anson Cell 2C North Underdrain Anson Waste Management Facility 375 Dozer Road, Polkton, NC CEC Project 142-962 Civil & Environmental Consultants, Inc. (CEC), on behalf of Waste Connections, Inc. (WCN), submits the following information for the Cell 2C North underdrain for the above mentioned facility. Specifically, CEC is including a USGS topo map showing the location of the project, a revised site comprehensive underdrain plan, and a detailed underdrain construction plan. Once approved and constructed the Cell 2C underdrain will surveyed and the comprehensive underdrain plan will be revised accordingly. As requested, the facility will conduct monthly monitoring of flow data for the underdrains on- site and will keep the monthly log on-site. Additionally, the Cell 2C North underdrain will be inspected annually when the leachate collection system is inspected, and cleaned as-needed, in the same manner as the leachate collection system. Should you have any questions or require any additional information in support of this application, please do not hesitate to contact Scott Brown at 704-773-6465. Sincerely, CIVIL & ENVIRONMENTAL CONSULTANTS, INC. Nathan Bivins, PE Scott L. Brown, PE Project Manager Vice President Enclosures cc: John Murray, SWS Engineer REFERENCE DATE:DWG SCALE: DRAWN BY:CHECKED BY:APPROVED BY: PROJECT NO: FIGURE NO.: USGS MAP 142-9621"=1000'MAY 2016 CTH NTB SLB 2-1 ANSON WASTE MANAGEMENT FACILITY ANSON NORTH CAROLINA www.cecinc.com 1900 Center Park Drive - Suite A - Charlotte, NC 28217 3KÃ)D[ NORTH 8 A B 3 4 5 67 1 2 C D E F G H 8 3 4 5 67 1 2 A B C D E F G H COMPOSITE UNDERDRAIN PLAN 142-962 1"=100' MARCH 2016 CTH NTB SLB 1 1 ANSON WASTE MANAGEMENT FACILITY CELL 2C EXPANSION CONSTRUCTION DRAWINGS NORTH