HomeMy WebLinkAbout0403_ChambersMSWLF_UnderdrainRequest_DIN26258_20160601
June 1, 2016
Mr. Perry Sugg
Solid Waste Section
Division of Waste Management North Carolina Department of Environmental Quality
1646 Mail Service Center
Raleigh, NC 27699
Dear Mr. Sugg:
Subject: Anson Cell 2C North Underdrain
Anson Waste Management Facility
375 Dozer Road, Polkton, NC
CEC Project 142-962
Civil & Environmental Consultants, Inc. (CEC), on behalf of Waste Connections, Inc. (WCN),
submits the following information for the Cell 2C North underdrain for the above mentioned
facility. Specifically, CEC is including a USGS topo map showing the location of the project, a
revised site comprehensive underdrain plan, and a detailed underdrain construction plan. Once approved and constructed the Cell 2C underdrain will surveyed and the comprehensive underdrain
plan will be revised accordingly.
As requested, the facility will conduct monthly monitoring of flow data for the underdrains on-
site and will keep the monthly log on-site. Additionally, the Cell 2C North underdrain will be inspected annually when the leachate collection system is inspected, and cleaned as-needed, in
the same manner as the leachate collection system.
Should you have any questions or require any additional information in support of this
application, please do not hesitate to contact Scott Brown at 704-773-6465.
Sincerely,
CIVIL & ENVIRONMENTAL CONSULTANTS, INC.
Nathan Bivins, PE Scott L. Brown, PE
Project Manager Vice President
Enclosures
cc: John Murray, SWS Engineer
REFERENCE
DATE:DWG SCALE:
DRAWN BY:CHECKED BY:APPROVED BY:
PROJECT NO:
FIGURE NO.:
USGS MAP
142-9621"=1000'MAY 2016
CTH NTB SLB 2-1
ANSON WASTE MANAGEMENT FACILITY
ANSON NORTH CAROLINA
www.cecinc.com
1900 Center Park Drive - Suite A - Charlotte, NC 28217
3KÃ)D[
NORTH
8
A
B
3
4
5
67
1
2
C
D
E
F
G
H
8
3
4
5
67
1
2
A B C D E F G H
COMPOSITE UNDERDRAIN PLAN
142-962
1"=100'
MARCH 2016 CTH
NTB
SLB
1
1
ANSON WASTE MANAGEMENT FACILITY
CELL 2C EXPANSION
CONSTRUCTION DRAWINGS
NORTH