HomeMy WebLinkAbout4204_Halifax_FacilityPTCPTO_DIN26096_20160603
Halifax County.
June 3, 2016
DIN 26096
Page 1 of 29
North Carolina Department of Environmental Quality
Division of Waste Management
Pat McCrory Donald R. van der Vaart
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone/Fax 919-707-8200 Internet: http://www.ncdenr.gov
An Equal Opportunity \ Affirmative Action Employer
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WASTE MANAGEMENT
SOLID WASTE SECTION
SOLID WASTE MANAGEMENT FACILITY
Permit No. 4204
HALIFAX COUNTY
is hereby issued a
PERMIT TO CONSTRUCT
4204-CDLF-2013, HALIFAX COUNTY C&D LANDFILL, AREA 2 - PHASE 1
PERMIT TO OPERATE
4204-INDUS-1994, HALIFAX COAL ASH LANDFILL
4204-CDLF-1998, HALIFAX COUNTY CDLF AREA 1, UNIT ON TOP OF A CLOSED MSW
LANDFILL
4204-TRANSFER-2013, HALIFAX COUNTY TRANSFER STATION
PERMIT FOR CLOSURE
4204-MSWLF-1981, HALIFAX COUNTY LANDFILL, CLOSED UNLINED MSW UNIT
Located at 921 Liles Road, southeast of Littleton, Halifax County, North Carolina, in accordance with
Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder
and subject to the conditions set forth in this permit. The legal description of the site is identified on the
deeds recorded for this property listed in Attachment 1 of this permit.
Edward F. Mussler, III, P.E., Supervisor
Permitting Branch, Solid Waste Section
Division of Waste Management, NCDEQ
Halifax County.
June 3, 2016
DIN 26096
Page 2 of 29
ATTACHMENT 1
GENERAL PERMIT CONDITIONS/INFORMATION
PART I: GENERAL FACILITY
Permit to Operate Date Table
Permit Status Issuance Expiration DIN
4204-MSWLF-1981 Halifax County
Landfill, Closed Unlined MSW Unit
Closed Not Applicable Not Applicable 13372
4204-CDLF-1998 Halifax County
CDLF – Area 1, Unit on Top of a
Closed MSW Landfill
Active June 3, 2016 March 25, 2021 26096
4204-CDLF-2013 Halifax County C&D
Landfill – Area 2
Proposed Not Applicable Not Applicable 26096
4204-INDUS-1994 Halifax Coal Ash
Landfill
Active March 27, 2012 March 27, 2017 15944
4204-TRANSFER-2013, Halifax
County Transfer Station
Active June 15, 2012 June 20, 2018 16757
General Conditions
1. This permit is issued by the North Carolina Department of Environment and Natural
Resources, Division of Waste Management, Solid Waste Section (Section). In accordance
with North Carolina Solid Waste Management Rule 15A NCAC 13B .0201(d), a solid waste
management facility permit shall have two parts: a Permit to Construct and a Permit to
Operate. The Permit to Construct must be implemented in accordance with Attachment 2 of
this permit. The Permit to Operate must be implemented in accordance with Attachment 3 of
this permit.
2. The persons to whom this permit is issued (“permittee”) are the owners and operators of the
solid waste management facility.
3. The Permit to Operate for Halifax Coal Ash Landfill dated March 27, 2012, was recorded in
the Halifax County Register of Deeds on April 10, 2012, in Deed Book 2372, Pages 239-249.
DIN 16461.
4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other
instrument of transfer shall contain in the description section in no smaller type than that
used in the body of the deed or instrument, a statement that the property has been used as a
solid waste management facility and a reference by book and page to the recordation of the
permit.
5. By receiving waste at this facility the permittee shall be considered to have accepted the
terms and conditions of this permit.
Halifax County.
June 3, 2016
DIN 26096
Page 3 of 29
6. Operation of this solid waste management facility shall be in accordance with the Solid
Waste Management Rules, 15A NCAC 13B, Article 9 of the Chapter 130A of the North
Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit;
and the approved plan. Should the approved plan and the rules conflict, the Solid Waste
Management Rules shall take precedence unless specifically addressed by permit condition.
Failure to comply may result in compliance action or permit revocation.
7. This permit is issued based on the documents submitted in support of the application for
permitting the facility including those identified in Attachment 1, “List of Documents for
Approved Plan,” and which constitute the approved plan for the facility. Where
discrepancies exist, the most recent submittals and the Conditions of Permit shall govern.
8. This permit may be transferred only with the approval of the Section, through the issuance of
a new or substantially amended permit in accordance with applicable statutes and rules. In
accordance with NCGS 130A-295.2(g) the permittee must notify the Section thirty (30) days
prior to any significant change in the identity or business structure of either the owner or the
operator, including but not limited to a proposed transfer of ownership of the facility or a
change in the parent company of the owner or operator of the facility.
9. The permittee is responsible for obtaining all permits and approvals necessary for the
development of this project including approval from appropriate agencies for a General or
Individual NPDES Stormwater Discharge Permit. Issuance of this permit does not remove
the permittee’s responsibilities for compliance with any other local, state or federal rule,
regulation or statute.
Properties Approved for the Solid Waste Management Facility
Halifax County NC Register of Deeds
Book Page Property Owner Acres
1131 298
Halifax County
210.53 1501 548
1501 551
1523 77
Plat Cabinet 4 Slide 72
Plat Cabinet 5 Slide 197
Map Book 10 Page 41
Map Book 6 Page 83
1649 602-604 Halifax County 30.00
Total Site Acreage: 240.53 acres
Halifax County.
June 3, 2016
DIN 26096
Page 4 of 29
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
4204-MSWLF-1981 Halifax County Landfill, Closed Unlined MSW Unit
Permitting History
Permit Type Date Issued DIN
Permit to Operate (PTO) MSWLF July 28, 1981 9957
Permit Amendment, PTO for vertical expansion on top of Phases I,
II, & III
October 25, 1991 9958
List of Documents for Approved Plan
Not Applicable
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
4204-CDLF-1998 Halifax County CDLF – Area 1, Unit on Top of a Closed MSW Landfill
Permitting History
The descriptions of previous/historical events are found in the Permit to Operate issued March
25, 2011. DIN 13372.
Permit Type Date Issued DIN
C&D Landfill on top of MSW Landfill
PTO C&DLF on top of MSW September 25,
1998
9966
Permit Modification # 3, PTO, 1-year extension December 30, 2002 9967
Permit Modification # 4, PTO December 22, 2006 774
Permit Amendment, PTO in compliance with Rule .0547(4) March 25, 2011 13372
Permit Amendment , Five (5) Year Renewal June 3, 2016 26096
List of Documents for Approved Plan
DIN Description
7668 Draft Corrective Action Plan (approval letter). June 8, 2009.
8694 Corrective Action Plan, Halifax County Landfill, Aurelian Springs, North Carolina.
Prepared by Richardson Smith Gardner & Associates (RSG). June 2008, revised
through May 2009.
12634 Permit Application Halifax County C&D Landfill (Permit 42-04) Area 1 Continued
Operations, Halifax County, North Carolina. Prepared by: RSG. June 2008, revised
through January 2010.
25676 Permit Application, Halifax County C&D Landfill, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
26108 Operations Manual, Halifax County Landfill Facility, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
26109 Monitoring Plans, Halifax County Landfill Facility, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
Halifax County.
June 3, 2016
DIN 26096
Page 5 of 29
4204-CDLF-2013 Halifax County C&D Landfill – Area 2 - Phase 1
Permitting History
Permit Type Date Issued DIN
Permit to Construct, Original Area 2 - Phase 1 September 18, 2013 18870
Permit to Construct, extended June 3, 2016 26096
List of Documents for Approved Plan
DIN Description
18899 Facility and Engineering Plan, Halifax County C&D Landfill – Area 2, Halifax,
North Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc.
December 2012.
18900 Technical Specifications, Halifax County C&D Landfill – Area 2, Halifax, North
Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc. December
2012.
18901 Construction Quality Assurance Manual, Halifax County C&D Landfill – Area 2,
Halifax, North Carolina. Prepared for Halifax County. Prepared by Smith Gardner,
Inc. December 2012.
18902 Closure and Post-Closure Plan, Halifax County Landfill Facility, Halifax, North
Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc. December
2012.
18903 Permit to Construct Drawings, Halifax County C&D Landfill – Area 2, Halifax,
North Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc.
December 2012.
19584 Design Hydrogeologic Report, Halifax County C&D Landfill – Area 2, Halifax,
North Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc.
December 2012, revised July 2013.
19585 Water Quality Monitoring Plan, Halifax County C&D Landfill – Area 2, Halifax,
North Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc.
December 2012, revised July 2013.
19586 Landfill Gas Monitoring Plan, Halifax County Landfill Facility, Halifax, North
Carolina. Prepared for Halifax County. Prepared by Smith Gardner, Inc. December
2012, revised July 2013.
19808 Operations Manual, Halifax County Landfill Facility, Halifax, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner, Inc. December 2012,
Revised September 2013.
25676 Permit Application, Halifax County C&D Landfill, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
26108 Operations Manual, Halifax County Landfill Facility, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
26109 Monitoring Plans, Halifax County Landfill Facility, Halifax County, North Carolina.
Prepared for Halifax County. Prepared by Smith Gardner. February 2016.
Halifax County.
June 3, 2016
DIN 26096
Page 6 of 29
PART IV: INDUSTRIAL LANDFILL UNIT(S)
4204-INDUS-1994 Halifax Coal Ash Landfill
Permitting History
The descriptions of previous/historical events are found in the Permit to Operate issued March
27, 2012. DIN 15944.
Permit Type Date Issued DIN
Original Issue PTC – Phase 1 May 12, 1993 9962
PTO Cell 1 February 17, 1994 9963
PTC Cell 2 May 17, 1996 9964
PTO Cell 2 May 15, 2000 9965
Permit to Operate, Amendment – 5 year renewal March 27, 2012 15944
List of Documents for Approved Plan
DIN Description
15675 Application for Permit Renewal (Amendment). Prepared by Richardson Smith
Gardner & Associates, Raleigh, NC. November 2011.
26163 Fugitive Dust Control Plan, Halifax County Ash Monofill, Halifax County, North
Carolina. Prepared for Halifax County. Prepared by Smith Gardner. May 2016.
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
4204-TRANSFER-2013 Halifax County Transfer Station
Permitting History
The descriptions of previous/historical events are found in the Permit to Operate issued March
27, 2012. DIN 15944.
Permit Type Date Issued DIN
Permit Amendment, Permit to Construct/Operate – Original
Issuance
June 12, 2012 16757
Approval to Operate July 1, 2013 19191
List of Documents for Approved Plan
DIN Description
16610 Permit Application for Halifax County Transfer Station. Prepared by Richardson,
Smith, Gardner and Associates, January 2012, Revised May 2012, finalized June
2012.
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable
- End of Section-
Halifax County.
June 3, 2016
DIN 26096
Page 7 of 29
ATTACHMENT 2
CONDITIONS OF PERMIT TO CONSTRUCT
PART I: GENERAL FACILITY
1. Construction of all solid waste management units within this facility must be in accordance
with the pertinent approved plans and only for those phases of development approved for
construction as described in Attachment 1, List of Documents for the Approved Plan.
2. Modifications or revisions of the approved documents or changes during construction require
approval by the Section, and may constitute a permit modification and be subject to a
permitting fee.
3. Any modification to the approved water quality and landfill gas monitoring, sampling, and
analysis plans must be submitted to the Section Hydrogeologist for review.
4. Pursuant to the NC Solid Waste Management Rule (Rule) 15A NCAC 13B.542(i)(2) burning
of land-clearing debris generated on site as a result of construction activities requires
approval by the Section prior to initiating the burn. In addition, the Facility must ensure the
activity is in compliance with all air pollution and open burning laws, regulations, and
ordinances.
5. All required sedimentation and erosion control measures must be installed and operable to
mitigate excessive on-site erosion and to prevent silt from leaving the area of the landfill unit
during the service life of the facility.
7. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act N.C.G.S. 113A-50, et seq., and rules promulgated under 15A
NCAC 4. The facility must furnish a copy of the approved Sedimentation and Erosion
Control Plan from the NC Division of Land Resources to the NC Solid Waste Section prior
to earth disturbing activities and/or commencement of construction.
8. Facility construction, operations or practices must not cause or result in a discharge of
pollution, dredged material, and/or fill material into waters of the state in violation of the
requirements under Sections 401 and 404 of the Clean Water Act, as amended.
9. Modifications to the approved sedimentation and erosion control activities require approval
by the North Carolina Land Quality Section. The Section must be notified of any
sedimentation and erosion control plan modifications.
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Not Applicable
Halifax County.
June 3, 2016
DIN 26096
Page 8 of 29
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
4204-CDLF-2013 Halifax County C&D Landfill – Area 2 - Phase 1
General
10. Pursuant to the NC Solid Waste Management Rules (Rule) 15A NCAC 13B.0201(c) and
(d)(1), this permit approves construction for Area 2 - Phase 1 consisting of approximately 3.3
acres with a calculated gross capacity of approximately 73,129 cubic yards.
11. The issuance date of the Permit to Construct is June 3, 2016. The initial, substantial,
construction authorized by this Permit to Construct must commence within 18 months from
the issuance date of this permit. If substantial construction does not begin within 18 months
from the issuance date of this permit, then the permit to construct shall expire. Substantial
construction includes, but is not limited to, issuance of construction contracts, mobilization
of equipment on site, and construction activities including installation of sedimentation and
erosion control structures. The permittee may reapply for the permit to construct prior to the
expiration date. The re-application will be subject to the statutes and rules in effect on that
date and may be subject to additional fees.
12. The permittee must conduct a preconstruction meeting at the facility prior to initiating
construction of any unit/cell and must notify the Section at least 10 days prior to the meeting.
Geologic, Groundwater, Surface water, Landfill Gas, and Monitoring Requirements
13. Samples from new ground water monitoring wells and surface water stations shall be
sampled for constituents listed in the approved Monitoring Plan and submitted to the Section
prior to receiving the Permit to Operate.
14. Prior to construction of the phase or cell(s) within the phase, all piezometers, borings, probes,
landfill gas monitoring wells, and groundwater monitoring wells within the footprint must be
properly abandoned in accordance with 15A NCAC 2C.0113(d), entitled “Abandonment of
Wells.”
15. In areas where soil is to be undercut, abandoned piezometers, monitoring wells and borings
must not be grouted to pregrade land surface, but to the proposed base grade surface to
prevent having to cut excess grout and possibly damage the wells.
16. A Licensed Geologist must report any pertinent geological feature(s) exposed during phase
or cell excavation. Prior to placing any landfill liner, the geologist must submit to the Section
hydrogeologist a written report that includes an accurate description of the exposed
geological feature(s), subsurface soil condition, and effect of the geological feature(s) on the
design, construction, and operation of the cell, phase, or unit.
17. A Licensed Geologist must supervise installation of groundwater monitoring wells, landfill
gas monitoring wells and probes, and surface water sampling stations.
18. Within 30 days of completed construction of any new groundwater and/or landfill gas
monitoring well, a well construction record (GW-1 form), typical well schematic, boring log,
field log and notes, and description of well development activities must be submitted to the
Section.
Halifax County.
June 3, 2016
DIN 26096
Page 9 of 29
19. The permittee must provide a legible plan sheet-sized, scaled topographical map with a
legend, showing the location and identification of all new, existing, and abandoned wells,
probes, and piezometers after installation of groundwater and landfill gas monitoring wells.
20. Within thirty (30) days of the completed permanent abandonment of a groundwater or
landfill gas monitoring well, the well abandonment record (GW-30 form) and any additional
information included in the abandonment record) must be submitted to the Section. The well
abandonment records must be submitted to the Solid Waste Section in accordance with 15A
NCAC 2C .0114(b) and be certified by a Licensed Geologist.
21. The following conditions must be met prior to operation of the Area 2:
a. The Permittee must obtain a Permit to Operate for Area 2 from the Section in accordance
with 15A NCAC 13B .0201(d).
b. Construction Quality Assurance (CQA) documentation as well as a certification by the
project engineer that the landfill was built in accordance with approved plans and the
conditions of the permit must be submitted to the Section for review and approval.
c. The Permittee must contact the appropriate regional environmental specialist and
permitting engineer to determine whether the Section chooses to hold a pre-operative
meeting with key landfill personnel and representatives of the Section.
d. The edge of the waste footprint must be identified with permanent physical markers.
e. The Financial Assurance instrument for approved Closure and Post-closure Care costs
must be submitted to the Section.
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable
- End of Section –
Halifax County.
June 3, 2016
DIN 26096
Page 10 of 29
ATTACHMENT 3
CONDITIONS OF PERMIT TO OPERATE
PART I: GENERAL FACILITY
1. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act NCGS 113A-50, et seq., and rules promulgated under 15A
NCAC 4. All required sedimentation and erosion control measures must be installed and
operable to mitigate excessive on-site erosion and to prevent silt from leaving the area of the
landfill unit during the service life of the facility.
2. Facility construction, operations or practices must not cause or result in a discharge of
pollution, dredged material, and/or fill material into waters of the state in violation of the
requirements under Sections 401 and 404 of the Clean Water Act, as amended.
3. Modifications to the approved sedimentation and erosion control activities require approval
by the North Carolina Land Quality Section. The Solid Waste Section must be notified of any
sedimentation and erosion control plan modifications.
4. Copies of this permit, the approved plans, and all records required to be maintained in the
operating record by the permittee must be maintained at the facility, unless otherwise
approved by the Section, and made available to the Section upon request during normal
business hours.
5. All forms, reports, maps, plans, and data submitted to the Section must include an electronic
(pdf) copy.
6. Open burning of solid waste is prohibited. Fires must be reported to the Regional Waste
Management Specialist within twenty-four (24) hours of the occurrence with a written
notification to be submitted within fifteen (15) calendar days of the occurrence. Fire lanes
must be maintained and passable at all times. Dimensions of the fire lanes must be
coordinated with the Fire Marshall having jurisdiction over the site.
7. Processing of materials, shredding, or grinding must not take place at the facility unless
approval has been granted under the special use permit and a revised operations plan has
been submitted to the Solid Waste Section.
8. The facility must be adequately secured by means of gates, chains, berms, fences, or other
security measures approved by the Section to prevent unauthorized entry.
9. Interior roadways must be of all-weather construction and maintained in good condition.
10. The edge of the waste footprint for all disposal units must be identified and maintained with
permanent physical markers.
11. Signs must be posted at the entrance to the facility that state that no hazardous waste or liquid
waste can be received at the facility; and that provide information on dumping procedures,
the hours of operation, the permit number, and other pertinent information. Traffic signs or
Halifax County.
June 3, 2016
DIN 26096
Page 11 of 29
markers must be provided as necessary to promote an orderly traffic pattern to and from the
discharge area and to maintain efficient operating conditions.
12. The following, at a minimum, must not be accepted for disposal at the facility: hazardous
waste, yard trash, liquid wastes, regulated medical waste, sharps not properly packaged, PCB
waste as defined in 40 CFR 761, and wastes banned from disposal in North Carolina by G.S.
130A-309.10(f).
13. The permittee is required to make application for a permit amendment for subsequent phases
of landfill development, in accordance with NCGS 130A-295.8(b)(2).
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Not Applicable
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
General Conditions
14. The permittee must maintain permanent markers that accurately identify the edge of the
approved waste disposal boundary. The boundaries of both the C&DLF unit and the closed
MSWLF unit must be marked.
15. The C&DLF is permitted to receive the following waste types:
a. “Construction or demolition debris” as defined in NCGS 130A-290 (a)(4) means solid
waste resulting solely from construction, remodeling, repair or demolition operations on
pavement, buildings, or other structures, but does not include inert debris, land-clearing
debris or yard debris.
b. “Inert debris” as defined in NCGS 130A-290 (a)(14) means solid waste that consists
solely of material such as concrete, brick, concrete block, uncontaminated soil, rock, and
gravel.
c. “Land-clearing debris” as defined in NCGS 130A-290 (a)(15) means solid waste that is
generated solely from land-clearing activities, limited to stumps, trees, limbs, brush,
grass, and other vegetative material.
d. “Asphalt” in accordance with NCGS 130-294(m).
16. Regulated asbestos-containing material as defined in 40 CFR 61 must be managed in
accordance with 40 CFR 61. Disposal of asbestos waste must be in accordance with 15
NCAC 13B .0542 (c).
17. Those wastes listed in 15A NCAC 13B .0542 (e) must not be accepted for disposal,
including, but not limited to, hazardous waste, municipal solid waste, liquid waste,
commercial or industrial wastes, and yard trash.
18. Wastewater treatment sludge is not approved for disposal. Wastewater treatment sludge may
be accepted, with the approval of the Section, for utilization as a soil conditioner and
incorporated into or applied onto the vegetative growth layer. The wastewater treatment
sludge must not be applied at greater than agronomic rates nor to a depth greater than six
inches.
Halifax County.
June 3, 2016
DIN 26096
Page 12 of 29
19. The permittee must not knowingly dispose of C&D waste that is generated within the
boundaries of a unit of local government that by ordinance:
a. Prohibits generators or collectors of C&D waste from disposing of that type or form of
C&D waste.
b. Requires generators or collectors of C&D waste to recycle that type or form of C&D
waste.
20. The facility operator must complete an approved operator training course in compliance with
NCGS 130A-309.25.
a. A responsible individual certified in landfill operations must be on-site during all
operating hours of the facility at all times while open for public use to ensure compliance
with operational requirements.
b. All pertinent landfill-operating personnel must receive training and supervision necessary
to properly operate the C&DLF in accordance with NCGS 130A-309.25 and addressed
by memorandum dated November 29, 2000.
21. The permittee must actively employ a training and screening program at the facility prepared
in accordance with Section .0544(e) for detecting and preventing the disposal of excluded or
unauthorized wastes. At a minimum, the program must include:
a. Random inspections of incoming loads or other comparable procedures;
b. Records of any inspections;
c. Training of personnel to recognize hazardous, liquid, and other excluded waste types;
d. Development of a contingency plan to properly manage any identified hazardous, liquid,
MSW, or other excluded or unauthorized wastes. The plan must address identification,
removal, storage, and final disposition of these wastes.
22. Financial assurance must be continuously maintained for the duration of the facility in
accordance with Rules 15A NCAC 13B .0547 (4)(e), 15A NCAC 13B .1628, and
NCGS130A-295.2(h). During the active life of the C&DLF, the owner and operator must
annually adjust the cost estimates including closure and post-closure activities for inflation
within 60 days prior to the anniversary date of the establishment of the financial
instrument(s).
23. The permittee must maintain records of:
a. The amount of all accepted solid waste materials as (i) C&D wastes, (ii) alternative cover
material used as alternate periodic cover, and (iii) recyclable material.
b. Daily records of waste received, and origins of the loads.
Scales must be used to weigh the amount of waste received. The daily records are to be
summarized into a monthly report for use in the required annual reports.
Monitoring and Reporting Requirements (CDLF over closed MSWLF)
24. Groundwater and surface water monitoring must be conducted in compliance with Rules 15A
NCAC 13B .1630 through .1637, and .0602, and the approved monitoring plan. Any
proposed modification to an approved plan must be submitted to the Section and approved
prior to implementation.
Halifax County.
June 3, 2016
DIN 26096
Page 13 of 29
25. Groundwater quality is subject to 15A NCAC 2L – Groundwater Classifications Standards
and the Groundwater Protection Standards (GPS) established under Rule .1634(i). Surface
water is subject to 15A NCAC 2B – Surface Water and Wetlands Standards.
26. Ground water wells and surface water locations as specified in the documents for the
approved plan comprise the approved groundwater and surface water monitoring network for
the facility.
a. The permittee must obtain approval from the Section for the design, installation, and
abandonment of any monitoring well or corrective action program well.
b. A licensed geologist must be present to supervise the installation of groundwater
monitoring wells and corrective action program wells. The exact locations, screened
intervals, and nesting of the wells must be established after consultation with the Section
Hydrogeologist prior to well installation.
c. Each groundwater monitoring well and corrective action program well must be surveyed
in accordance with 15A NCAC 13B .1632 (d)(1).
d. Each groundwater monitoring well and corrective action program well must have an
identification plate permanently attached to the well, in accordance with 15A NCAC 2C
.0108(o).
e. Hydraulic conductivity and effective porosity values must be established for each
screened interval in order to develop groundwater flow characteristics.
f. Within thirty (30) days of completed construction of each new groundwater monitoring
well and corrective action program well, the well construction record (GW-1b form), well
schematic, boring log, field log and notes, and description of well development activities
must be submitted to the Section. The submittal must also include a scaled topographic
map, showing the location and identification of new, existing, and abandoned wells and
piezometers, and hydraulic conductivity and effective porosity values, as described in
subparagraphs c and e of this Permit Condition.
g. Within thirty (30) days of the abandonment of a groundwater monitoring well or
corrective action program well, the well abandonment record (GW-30 form) and any
additional information included in the abandonment record must be submitted to the
Section, consistent with 15A NCAC 2C .0114(b), and must be certified by a Licensed
Geologist.
h. Documentation of well completion, development details, repair, abandonment, and all
other pertinent activities associated with each monitoring well and corrective action
program well must be maintained in the facility operating record.
i. A readily accessible, unobstructed path must be maintained so that monitoring wells,
corrective action program wells, and surface water sampling locations are accessible
using four-wheel drive vehicles.
27. The permittee must sample groundwater monitoring wells and surface water locations semi-
annually unless otherwise specified by the Section. Water samples must be analyzed for
constituents listed in Appendix I of 40 CFR Part 258, mercury, chloride, manganese, sulfate,
iron, specific conductance, pH, temperature, alkalinity, and total dissolved solids. Sampling
Halifax County.
June 3, 2016
DIN 26096
Page 14 of 29
frequency and sampling constituents are subject to change according to requirements of the
applicable corrective action program.
28. Monitoring reports of the analytical results for surface water and groundwater monitoring
sampling events, and for corrective action program monitoring, must be submitted to the
Section within 120 days of the sample collection date. Analytical laboratory data must be
submitted in electronic portable document format (pdf) and in a spreadsheet format in an
Electronic Data Deliverable (EDD) Template. All monitoring reports must contain:
a. a potentiometric surface map for the current sampling event,
b. analytical laboratory reports and summary tables,
c. statistical analysis of laboratory data, in accordance with 15A NCAC 13B .1634,
d. a completed Solid Waste Environment Monitoring Data Form, and
e. laboratory data submitted in accordance with the EDD Template.
29. All groundwater, surface water, corrective action program, and methane gas monitoring
forms, reports, maps, plans, data, and correspondence submitted to the Section must include
an electronic (pdf) copy.
30. The permittee must maintain a record of all monitoring events and analytical data in the
operating record.
31. After completion of the post-closure monitoring period, in accordance with 15A NCAC 13B
.1627, and completion of the corrective action program, the Section will determine if further
monitoring and post-closure maintenance will be required.
Groundwater Corrective Action Program Requirements (CDLF over closed MSWLF)
32. Pursuant to Rule 15A NCAC 13B .1637, the permittee must implement a corrective action
program to remediate elevated constituents in groundwater in accordance with the approved
Corrective Action Plan (CAP). Any proposed modifications to the approved CAP must be
submitted to the Section and approved prior to implementation. The CAP documents are
among the list of documents for the approved plan.
33. The Bioremediation performance monitoring network consists of the monitoring wells.
Sampling frequency and constituents to be analyzed must be conducted in accordance with
the approved CAP. The CAP documents are among the list of documents for the approved
plan.
34. Institutional controls (deed recordation, land and groundwater use restrictions) must be
implemented as part of a groundwater treatment system consisting of MNA pursuant to
NCGS 143B-279.9 and 143B-279.10. The land and groundwater use restrictions will be
imposed on the permitted facility and any buffer property that has been acquired to reduce or
eliminate the danger to public health or the environment posed by the presence of
contamination on the property. The permittee must submit to the Section, within 180 days
of notified to do so, a survey plat, in accordance with the requirements of NCGS 143B-
279.10, and as directed by the Section.
Halifax County.
June 3, 2016
DIN 26096
Page 15 of 29
35. The permittee must provide a Corrective Action Evaluation Report to describe of the
performance and effectiveness of the implemented corrective action program, including a
technical evaluation of Bioremediation as a remedy at the facility. The first report must be
submitted in accordance with the list of documents for the approved plan. Subsequent
reports are required every 5 (five) years unless otherwise specified by the Section.
36. After the MNA baseline has been established, an EPA approved MNA screening model is
required at least annually to simulate the groundwater remediation at the facility and
determine the mass flux and mass balance. The model must be submitted annually with a
monitoring report.
37. If the objectives of the corrective action program are not being met, as specified in the
approved CAP, Rules, or as determined by the Section, the permittee must immediately
implement the Contingency Plan in the approved CAP.
38. If constituents in groundwater migrate beyond the landfill property boundary, or it is
suspected to have occurred based on sampling results near the property boundary, the
permittee must immediately notify all persons in writing who own land or reside on land that
directly overlies any part of the contaminant plume with details of the migration. The
permittee must mitigate further releases to the groundwater, reduce threats to human health
and the environment, and immediately implement the Contingency Plan in the approved
CAP.
39. If the corrective action program is modified to include an active groundwater treatment
system:
a. The permittee must operate the groundwater treatment system in a manner that will
prevent spills, releases or other adverse effects to human health and the environment.
b. The permittee must maintain an inspection schedule for the inspection of all parts of the
groundwater treatment system as outlined in the approved CAP.
c. The permittee must train all personnel operating the groundwater treatment system as
outlined in the approved CAP.
d. The permittee must sample the groundwater in the impacted aquifer, the groundwater as
it enters and exits the groundwater treatment system and measure the volume and rate of
flow of groundwater through the groundwater treatment system as indicated in the
approved CAP. The data must be submitted to the Section with a monitoring report.
40. The permittee must continue to operate the corrective action program until the 15A NCAC
2L Groundwater standards and the GPS have been met at all points within the plume of
contamination that lie beyond the relevant point of compliance for 3 (three) consecutive
years, in accordance with 15A NCAC 13B .1637.
Landfill Gas Monitoring Requirements (CDLF over closed MSWLF)
41. Landfill gas monitoring must be conducted at the facility in accordance with the approved
landfill gas monitoring plan and Rule .1626(4). The permittee must sample landfill gas
quarterly unless otherwise required for corrective action or specified by the Section.
Halifax County.
June 3, 2016
DIN 26096
Page 16 of 29
42. Landfill gas probes, select monitoring sites and the landfill facility structures comprise the
approved monitoring network for the facility as found in the list of documents for the
approved plan, unless otherwise approved or specified by the Section.
a. The permittee must obtain approval from the Section for the design, installation, and
abandonment of any landfill gas monitoring probe or well.
b. A licensed geologist must be present to supervise the installation of landfill gas
monitoring probes or wells. The exact locations, screened intervals, and nesting of the
probes or wells must be established after consultation with the Section hydrogeologist
prior to probe or well installation.
c. Each landfill gas monitoring probe or well must be surveyed for location and elevation by
a North Carolina Registered Land Surveyor.
d. Each landfill gas monitoring probe or well must have an identification plate permanently
attached to the well, in accordance with 15A NCAC 2C .0108 (o).
e. Within thirty (30) days of the completed construction of each new landfill gas monitoring
probe or well, a schematic of the probe or well, to include boring log, depth, and screened
interval, must be submitted to the Section. The submittal must also include a scaled
topographic map, showing the location and identification of new, existing, and
abandoned landfill gas monitoring probes and wells.
f. Within thirty (30) days of the abandonment of a landfill gas monitoring probe or well, an
abandonment record must be submitted to the Section. The boring must be abandoned in
accordance with 15A NCAC 2C .0113(d) and be certified by a Licensed Geologist.
g. All records of landfill gas monitoring probe or well installation, repair, abandonment, and
all other pertinent activities associated with each landfill gas monitoring probe or well
must be placed in the facility’s operating record.
h. A readily accessible, unobstructed path must be maintained so that landfill gas
monitoring probes or wells are accessible using four-wheel drive vehicles.
43. All landfill gas monitoring must be conducted by properly trained personnel. Methane
monitoring must include interior monitoring of onsite buildings.
44. Landfill gas monitoring reports must be added to the facility’s operating record within 7 days
of the monitoring event, and must include a description of the monitoring method used, the
sampling results of each well and onsite buildings in percent of the lower explosive limit
(LEL), date of monitoring, weather conditions, calibration report, and signature of the
sampling personnel.
45. The permittee must maintain records of all landfill gas monitoring events in the operating
record, in accordance with 15A NCAC 13B .0542 (n).
46. If landfill gas monitoring reveals detections of methane of at least 25 percent of the LEL in
onsite buildings, or detections of LEL at the compliance boundary, the permittee must
comply with the requirements of 15A NCAC 13B .1626 (4).
Closure and Post-Closure Requirements (CDLF over closed MSWLF)
47. The permittee must conduct closure and post-closure activities in accordance with the
approved plans and Rule 15A NCAC 13B .1627. An updated closure and post-closure plan
Halifax County.
June 3, 2016
DIN 26096
Page 17 of 29
must be submitted for approval at least ninety (90) days prior to closure or partial closure of
any landfill unit. The plan must include all steps and measures necessary to close and
maintain the C&DLF in accordance with all rules in effect at that time. At a minimum, the
plan must address the following:
a. Design of a final cover system in accordance with 15 NCAC 13B .1627 (c) or the solid
waste management rules in effect at the time of closure;
b. Construction and maintenance/operation of the final cover system and erosion control
structures; and
c. Surface water, ground water, and explosive gas monitoring.
48. If the minimum 30-year post-closure period ends before the groundwater corrective action
program is terminated, pursuant to Rule .1627 (d)(2)(B) of 15A NCAC 13B, the post-closure
care period shall be extended at least until such time as the required corrective action
program has been completed.
4204-CDLF-1998 Halifax County CDLF – Area 1, Unit on Top of a Closed MSW Landfill
Specific Conditions
49. Permit to Operate for Area 1 shall expire March 25, 2021. Pursuant to 15A NCAC 13B
.0201(g), no later than September 25, 2020, the permittee must submit to the Section:
a. A permit amendment application prepared in accordance with 15A NCAC 13B .0535 (b),
and
b. A Corrective Action Evaluation Report to demonstrate the effectiveness of the
implemented corrective action program in accordance with 15A NCAC 13B .0547(4)(c)
and approved Corrective Action Plan.
50. This permit approves the continued operation of the C&DLF – Area 1 on top of the closed
MSWLF, as well as the onsite environmental management protection facilities as described
in the approved plans. Operation of any C&DLF future phases or cells requires written
approval of the Section and must be constructed in accordance with applicable statutes and
rules in effect at the time of review.
51. The following table lists the dimensions and details for the existing C&DLF – Area 1 on top
of the closed MSWLF. Total gross capacity for the C&DLF unit is defined as the volume
measured from the bottom of C&D waste (the top of the cover system of the MSWLF)
through the top of final cover of the C&DLF.
C&D Landfill on Top of
Closed MSWLF
Acres
(on top)
Gross Capacity
(cubic yards)
Estimated Service
Life (years)
Status
Area 1
(filled as of May 1, 2008)
6.5 67,399 NA Filled
Area 1 NA 63,868 4.3 Remaining
Total 6.5 131,267 4.3
52. The facility is approved to accept average 54 tons per day or a maximum of 20,000 tons per
year based on 280 working days per year in accordance with the approved plans. Maximum
variance shall be in accordance with NCGS 130A-294(b1)(1).
Halifax County.
June 3, 2016
DIN 26096
Page 18 of 29
53. This facility is permitted to receive C&D waste generated in Halifax County. This service
area is consistent with the local government solid waste management plan(s) and local
government approval
54. In accordance with 130A-295.6 this landfill may use alternative daily cover (ADC) that has
been previously approved at another sanitary landfill in North Carolina. The Solid Waste
Section maintains a list of approved ADC and its appropriate use, which may be referred to,
but is not required to be, in determining ADC types and uses. Soil cover shall be applied at a
minimum of one time per week in accordance with Rule .1626 (2). Soil shall be applied more
frequently, if needed, to control nuisance, odor or vectors.
a. The use of different alternative daily cover requires approval, prior to implementation, by
the Solid Waste Section. Requests for alternative daily cover approval must include a
plan detailing the comprehensive use and a demonstration of the effectiveness of the
alternative daily cover. The plan must be developed according to Section guidelines.
Plans which are approved by the Section will be incorporated into, and made a part of,
the approved documents listed in Attachment 1.
55. On or before August 1 annually, the permittee must submit an annual facility report to the
Section, on forms prescribed by the Section.
a. The reporting period shall be for the previous year beginning July 1 and ending June 30.
b. The annual report must list the amount of waste received and landfilled in tons and be
compiled:
i. On a monthly basis.
ii. By county, city or transfer station of origin.
iii. By specific waste type.
iv. By disposal location within the facility.
v. By diversion to alternative management facilities.
c. A measurement of volume utilized in the C&D cells must be performed during the
second quarter of the calendar year. The date and volumes, in cubic yards, must be
included in the report.
d. The amount of C&D waste, in tons from scale records, disposed in landfill cells since
September 25, 1998, through the date of the annual volume survey must be included in
the report.
e. The tons of C&D waste recycled, recovered or diverted from disposal including a
description of how and where the material was ultimately managed, as applicable, must
be included in the report.
f. The completed report must be forwarded to the Regional Environmental Senior Specialist
for the facility by the date due on the prescribed annual facility report form.
g. A copy of the completed report must be forwarded to each county manager for each
county from which waste was received at the facility. Documentation that a copy of the
report has been forwarded to the county managers must be sent to the Regional
Environmental Specialist by the date due on the prescribed annual facility report form.
Halifax County.
June 3, 2016
DIN 26096
Page 19 of 29
PART IV: INDUSTRIAL LANDFILL UNIT(S)
4204-INDUS-1994 Halifax Coal Ash Landfill
56. The Permit to Operate shall expire March 27, 2017. Pursuant to 15A NCAC 13B .0201(g),
no later than November 27, 2016, the permittee must submit a request to the Section for
permit review and must update pertinent facility plans including, but not limited to, the
facility operation and waste screening plans.
57. This permit approves the continued operation of Cells 1 and 2 of the landfill, as well as the
onsite environmental management and protection facilities as described in the approved
plans. Operation of future phases or cells requires written approval of the Section after
documentation has been submitted that the area has been constructed in accordance with
applicable statutes and rules.
58. The gross capacity of the ash landfill is approximately 2.7 million cubic yards, and
encompasses approximately 36 acres of actual disposal area. Cells 1 and 2 together consist of
approximately 21 acres. The final approved maximum elevation of the ash landfill is
approximately 382 feet, with side slopes of 4:1 and a slope of 4% on the center portion, as
shown on the approved drawings Attachment I, Part IV.
59. The coal ash landfill is permitted to receive only coal combustion by-products in accordance
with the approved plan. Municipal solid waste, construction and demolition debris waste,
land clearing and inert debris, hazardous waste, special waste, and liquid waste are prohibited
from disposal in the coal ash landfill.
60. The landfill is permitted to receive waste only from the coal-fired power plant in Weldon,
NC.
61. The facility operator must complete an approved operator training course in compliance with
G.S. 130A-309.25.
a. A responsible individual certified in landfill operations must be on-site during all
operating hours of the facility while open for public use to ensure compliance with
operational requirements.
b. All pertinent landfill-operating personnel must receive training and supervision necessary
to properly operate the landfill units in accordance with G.S. 130A-309.25 and addressed
by memorandum dated November 29, 2000.
62. Ash which has been placed to final elevations around the perimeter of the facility must be
covered with a minimum of 12 inches of soil. Final cover and seeding must be implemented
within 30 days of an area reaching final grade.
63. An updated closure and post-closure plan must be submitted for approval at least ninety (90) days
prior to closure or partial closure of any landfill unit. The plan must include all steps and
measures necessary to close and maintain the facility in accordance with all rules in effect at that
time. At a minimum, the plan must address the following:
a. Design of a final cover system which minimizes infiltration into the waste and supports
vegetation;
Halifax County.
June 3, 2016
DIN 26096
Page 20 of 29
b. Construction and maintenance/operation of the final cover system, erosion control structures,
and leachate management system;
c. Surface water, groundwater, and effluent monitoring.
Monitoring and Reporting
64. Groundwater, surface water, basin effluent, and stream sediment locations must be established
and monitored as identified in the approved plans. Sampling and analysis must be performed at
least semi-annually or as directed by the Solid Waste Section hydrogeologist. Any proposed
modification to an approved plan must be submitted to the Section and approved prior to
implementation.
65. Semiannual sampling events must also include a visual inspection of the stream sediments below
the sedimentation basin effluent to evaluate potential ash migration. Inspection results should be
noted in each sampling and analysis report.
66. A licensed geologist must be present to supervise the installation of groundwater monitoring
wells. The exact locations, screened intervals, and nesting of the wells must be established after
consultation with the Section Hydrogeologist at the time of well installation.
67. The permittee must obtain approval from the Section for the design, installation, and
abandonment of any groundwater monitoring well.
68. Monitoring reports of the analytical results for surface water, groundwater, basin effluent, and
stream sediment monitoring sampling events must be submitted to the Section within 120 days of
the sample collection date. Analytical laboratory data must be submitted in electronic portable
document format (pdf) and in a spreadsheet format in an Electronic Data Deliverable (EDD)
Template. All monitoring reports must contain:
a. a potentiometric surface map for the current sampling event,
b. analytical laboratory reports and summary tables,
c. a completed Solid Waste Environment Monitoring Data Form, and
d. laboratory data submitted in accordance with the EDD Template.
69. A readily accessible unobstructed path must be maintained so that groundwater monitoring wells,
surface water, basin effluent, and stream sediment sampling locations are accessible using four-
wheel drive vehicles.
70. Documentation of well completion, development details, repair, abandonment, and all other
pertinent activities associated with each groundwater well must be maintained in the facility
operating record. The permittee must maintain a record of all groundwater, surface water, and
landfill gas monitoring events and analytical data in the operating record.
71. Within 30 days of completed construction of each new groundwater monitoring well, a well
construction record (on Form GW-1), well schematic, boring log, field log and notes, and
description of well development activities must be submitted to the Section. The submittal must
also include a scaled topographic map, showing the location and identification of new, existing,
and abandoned wells and piezometers.
72. Within thirty (30) days of the abandonment of any groundwater monitoring well, the well
abandonment record (GW-30 form) and any additional information included in the abandonment
record must be certified by a Licensed Geologist, and submitted to the Section. A copy of the
Halifax County.
June 3, 2016
DIN 26096
Page 21 of 29
well abandonment records submitted to the Division of Water Quality, consistent with 15A
NCAC 2C .0114(b), must be submitted to the Section.
Reporting and Recordkeeping
73. On or before August 1 annually, the Permittee must submit an annual facility report to the
Section, on forms prescribed by the Section.
a. The reporting period shall be for the previous year beginning July 1 and ending June 30.
b. The annual facility report must list the amount of waste received in tons and be compiled:
i. On a monthly basis.
ii. By specific waste type.
iii. By disposal location within the facility.
c. A measurement of volume utilized in the landfill cells must be performed during the second
quarter of the calendar year. The date and volumes, in cubic yards, must be included in the
report.
d. The amount of waste, in tons from scale records, disposed in landfill cells from February 17,
1994 through the date of the annual volume survey must be included in the report.
e. The completed report must be forwarded to the Regional Environmental Senior Specialist for
the facility by the date due on the prescribed annual facility report form.
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
4204-TRANSFER-2013 Halifax County Transfer Station
74. The Permit to Operate shall expire June 20,2018 Pursuant to 15A NCAC 13B .020l(g), no
later than December 20, 2017, the permittee must submit a request to the Section for permit
review and must update pertinent facility plans including, but not limited to, the facility
operation plan and waste screening plans.
75. The transfer facility is permitted to receive "Municipal solid waste" as defined in NCGS
130A-290 (a)(l8a) and means any solid waste resulting from the operation of residential,
commercial, industrial, governmental, or institutional establishments that would normally be
collected, processed, and disposed of through a public or private solid waste management
service. Municipal solid waste does not include hazardous waste, sludge, industrial waste
managed in a solid waste management facility owned and operated by the generator of the
industrial waste for management of that waste, or solid waste from mining or agricultural
operations.
76. Those wastes listed in 15A NCAC 13B .1626 (l)(b-e) are prohibited from disposal at a MSW
transfer station and include at a minimum hazardous waste, yard trash, liquid wastes,
regulated medical waste, sharps not properly packaged, regulated asbestos containing
material as defined in 40 CFR 61, PCB waste as defined in 40 CFR 761, and wastes banned
from disposal in North Carolina by G.S. 130A-309.10(f).
Halifax County.
June 3, 2016
DIN 26096
Page 22 of 29
77. This facility is permitted to receive municipal solid waste generated within Halifax County.
Waste must only be transported to facilities whose service area includes the generation
source. Proposed changes to the service area and/or the disposal facilities must be approved
by the Section are considered a modification to the permit and may be subject to a permitting
fee.
a. MSW waste must be transported for disposal to the East Carolina Regional Landfill in
Bertie County, NC, Permit Number 0803-MSWLF-1993 or the Brunswick Waste
Management Facility in Lawrenceville, VA.
78. The permittee must not knowingly dispose of, or accept for transfer for subsequent disposal,
MSW that is generated within the boundaries of a unit of local government that by ordinance:
a. Prohibits generators or collectors of MSW from disposing of that type or form of solid
waste.
b. Requires generators or collectors of MSW to recycle that form of solid waste.
79. A responsible individual trained and certified in facility operations must be on-site at all
times during all operating hours of the facility, in accordance with G.S. 130A-309.25. An
attendant must be present to oversee the loading and unloading of waste.
80. The permittee must develop and implement a training and screening program at the facility
for detecting and preventing unauthorized wastes from being accepted at the facility. At a
minimum, the program must include:
a. Random inspections of incoming loads or other comparable procedures.
b. Records of all inspections.
c. Training of personnel to recognize hazardous, liquid and other excluded waste types.
d. Development of a contingency plan to properly manage any identified hazardous, liquid,
asbestos or other excluded or unauthorized wastes. The plan must address identification,
removal, storage and final disposition of these wastes.
81. The facility must be adequately secured by means of gates, chains, berms, fences, or other
security measures approved by the Section to prevent unauthorized entry.
82. Interior roadways must be of all-weather construction and maintained in good condition.
83. Signs must be posted at the entrance to the facility that state that no hazardous waste or liquid
waste can be received at the facility; and that provide information on dumping procedures,
the hours of operation, the permit number, and other pertinent information. Traffic signs or
markers must be provided as necessary to promote an orderly traffic pattern to and from the
discharge area and to maintain efficient operating conditions.
84. The facility must not cause nuisance conditions:
a. The tipping floor and transfer trailer loading area must be maintained in a clean, sanitary
condition at all times and must be cleaned at least daily in accordance with the approved
Operation Plan.
b. Effective vector control measures must be applied at all times to control any potential
vectors including flies, rodents, insects, and other vermin.
Halifax County.
June 3, 2016
DIN 26096
Page 23 of 29
c. Control measures must be utilized to minimize and eliminate visible fugitive dust
emissions and blowing litter. Windblown materials must be collected by the end of the
day and no windblown material may be allowed to leave the facility boundary.
85. MSW must only be deposited on the tipping floor or directly into a transfer container in
accordance with the approved Operation Plan. Waste must not be stored on the tipping floor
after operating hours.
86. Any waste stored on site after operating hours must be stored in leak-proof transfer trailers,
with watertight covers, a maximum of 24 hours. However, a minimal amount of waste may
be stored for a maximum of 48 hours when the facility is closed during a weekend and a
maximum of 72 hours when closed for a weekend holiday. Storage of the waste must not
cause any nuisance, such as odor or attraction of vectors.
87. All water or liquid that comes in contact with solid waste, including vehicle wash-down
water, is leachate and must be captured and properly treated before release to the
environment. The leachate control system, such as floor drains, leachate collection devices,
sanitary sewer connections, and leachate storage tanks, must be operational during facility
operations. The tipping floor must drain away from the building entrance and into the
leachate collection system. Incoming waste must not be unloaded onto any uncovered tipping
area during rainfall events. Waste must not be placed in ponded water.
88. The permittee must maintain a record of the amount of solid waste received at the facility,
including daily records of waste received and origins of the loads. The permittee must
identify MSW that is "commercial solid waste" or industrial solid waste" as defined in 15A
NCAC 13B .1602 in the records. Scales must be used to weigh the amount of waste received.
The permittee must maintain a record of the amounts of waste transported out of the facility
for disposal and amounts of waste or material with any other final disposition to be compiled
on a monthly basis. The daily records are to be summarized into a monthly report for use in
the required annual reports, to include a comparison of incoming versus outgoing amounts.
89. Waste source summaries for each outgoing truckload must be maintained, as described in
Section 2.5 Waste Screening Programs of the Operations Manual (Attachment 1, Part IV)
and made available to the Section upon request during normal business hours.
90. On or before August 1 annually, the Permittee must submit an annual facility report to the
Solid Waste Section, on forms prescribed by the Section.
a. The reporting period shall be for the previous year beginning July 1 and ending June 30.
b. The annual facility report must list the amount of waste received in tons and be compiled:
i. On a monthly basis.
ii. By county, city or transfer station of origin.
iii. By specific waste type.
iv. By receiving disposal facility.
v. By diversion to alternative management facilities.
c. The completed report must be forwarded to the Regional Environmental Specialist for the
facility by the date due on the prescribed annual facility report form.
Halifax County.
June 3, 2016
DIN 26096
Page 24 of 29
d. A copy of the completed report must be forwarded to the county manager for each county
from which waste was received the facility. Documentation that a copy of the report has
been forwarded to the county managers must be sent to the Regional Environmental
Specialist by the date due on the prescribed annual facility report form.
91. Processing of materials, shredding, or grinding must not take place at the facility unless
approval has been granted under the special use permit and a revised operations plan has
been submitted to the Solid Waste Section.
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
General
92. The on-site miscellaneous solid waste management units, including the wood waste
processing area, the animal carcass disposal area, the used tire storage area, the white goods
handling area, and the used pesticide container storage area must be located in areas of the
facility as shown on the approved drawings (Figure 1 and Drawing No. S1/Sheet No. 2, DIN
12634). The permittee must obtain Section approval before re-locating any of these
operations or revising the operations.
93. Wastes received and product stored shall be maintained in reasonably sized piles with
adequate fire breaks and lanes in accordance with the approved operational plans and the
pertinent rules.
94. Surface water shall be diverted from all operational and storage areas to prevent standing
water in operational areas and under or around storage piles. Water that comes in contact
with solid waste is deemed to be leachate and shall be contained on-site or properly treated
prior to discharge.
95. These areas shall be operated and maintained with sufficient dust control measures to
minimize airborne emissions and to prevent dust from becoming a nuisance or safety hazard.
96. These areas shall be operated and maintained in a manner so as to minimize odors, prevent
the creation of a nuisance, potential health hazard, or a potential fire hazard.
97. Effective vector control measures shall be applied as necessary to control flies, rodents,
insects, and vermin.
Wood Waste Processing Area
98. The facility is permitted to operate a treatment and processing facility as defined in 15A
NCAC 13B, Rule .0101(49).
99. The facility is permitted to receive and grind clean wood wastes including land clearing
debris, yard waste, and wooden pallets as defined in 15A NCAC 13B, Rules .0101(23) and
.0101(56), and NCGS 130A-290(44a), respectively.
100. The wastes are allowed to stockpile to an approximate height of 15 feet over an area of
approximately 1 acre prior to grinding. The maximum weight of the waste stockpile is
approximate 2,000 pounds.
Halifax County.
June 3, 2016
DIN 26096
Page 25 of 29
Animal Carcass Disposal Area
101. The permittee must manage the animal carcass disposal area in accordance with 02 NCAC
52C .0102, other applicable statutes and rules, and the Operations Manual included in
Attachment 1, Part III, (DIN 12634).
102. Animal carcasses must be buried a minimum of three feet below ground surface or covered
by three feet of soil at the designated area inside the landfill facility as shown on Drawing
No. S1/Sheet No. 2 (DIN 12634).
103. If it is determined during the operation of the animal carcass disposal area that the
operations are adversely impacting ground water, or that the area is a threat to human
health, the permittee must close the disposal area.
Used Tire Storage Area
104. The waste tire collection site must be operated in accordance with the requirements of 15A
NCAC 13B .1107, other applicable statutes and rules, and the Operations Manual included
in Attachment 1, Part III (DIN 12634).
105. The facility is permitted to receive tires and scrap tires, as defined in NCGS Article 9,
Chapter 130A-309.53(6) and (7) with the maximum volumes up to three (3) covered
trailers.
White Goods Handling Area
106. The facility is permitted to receive white goods as defined in NCGS Article 9, Chapter
130A-290(44) and scrap metals. The permittee must manage the white goods in accordance
with the approved Operations Manual included in Attachment 1, Part III (DIN 12634) and
any applicable statutes and rules.
107. The permittee must provide for the proper removal of chlorofluorocarbon refrigerants.
Used Pesticide Container Storage Area
108. The facility is permitted to receive used pesticide containers, approximately 5,000
containers from local agricultural sources in the Halifax County.
109. The permittee must place the collected used pesticide containers inside the sheltered
storage area shown on the as shown on Drawing No. S1/Sheet No. 2 (DIN 12634).
- End of Section –
Halifax County.
June 3, 2016
DIN 26096
Page 26 of 29
ATTACHMENT 4
CONDITIONS OF PERMIT FOR CLOSURE
PART I: GENERAL FACILITY
Not Applicable
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
4204-MSWLF-1981 Halifax County Landfill, Closed Unlined MSW Unit
General Requirements
1. The owner must provide post-closure care and monitoring for the landfill. The post-closure
period begins December 1997. After at least five years of post-closure care and monitoring,
the landfill owner may submit a written request to modify or discontinue post-closure care
and monitoring, depending upon the results of the previous monitoring. However, the owner
must continue to conduct water quality monitoring, landfill gas monitoring, and post-closure
care until the Section provides written approval to discontinue monitoring and/or post-
closure care.
2. The MSW landfill stopped receiving waste on December 1997.
3. The landfill owner must maintain the integrity and effectiveness of the cap system, including
making repairs to the cover as necessary to correct the effects of settlement, subsidence,
erosion, or other events, and prevent surface water from impounding over waste and run-on
and run-off from eroding or otherwise damaging the cap system. Mowing of vegetation on
the landfill cover is required at least once per year. Trees on the final cover must be removed
at least once per year.
4. The owner must maintain permanent markers that accurately identify the edge of the waste
disposal boundary.
5. Public access to the landfill must be prevented by gates, fences, and/or other measures. The
owner must maintain the public access preventive measures during the post-closure period.
6. Any post-closure use of the property, including but not limited to, residential, commercial,
industrial, agricultural, or recreational use, is subject to review and approval by the Section
and must not disturb the integrity of the cap system, or the function of the monitoring
systems. The Section may approve any other disturbance if the owner or operator submits a
modified post-closure plan which describes the planned use of the property and demonstrates
that disturbance of the cap system, including any removal of waste, will not increase the
potential threat to human health or the environment. Post-closure uses approved by the
Section will be included in the List of Approved Documents.
7. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act N.C.G.S. 113A-50, et seq., and rules promulgated under 15A
NCAC 4. All required sedimentation and erosion control measures must be installed and
operable to mitigate excessive on-site erosion and to prevent silt from leaving the area of the
landfill unit.
Halifax County.
June 3, 2016
DIN 26096
Page 27 of 29
8. The owner or operator must ensure that the landfill units do not violate any applicable
requirements developed under a State Implementation Plan approved or promulgated by the
U.S. EPA Administrator pursuant to Section 110 of the Clean Air Act, as amended.
Recordation Requirement
9. Following closure of all landfill units, the owner must record a notation on the deed to the
landfill facility property at the local county Register of Deeds office. The notation on the
deed shall in perpetuity notify any potential purchaser of the property that the land has been
used as a MSW landfill and its use is restricted. To satisfy this requirement in accordance
with N.C.G.S. 161-14.1, the owner must record this permit at the local county Register of
Deeds office, indexed in the grantor index under the name of the owner of the land in the
county or counties in which the land is located. The certified copy of the permit, affixed with
the Register's seal and the date, book, and page number of recording, must be returned to the
Solid Waste Section (Section) within 30 calendar days of issuance of this permit.
Monitoring and Reporting Requirements
10. Groundwater quality at the facility is subject to “Classifications and Water Quality Standards
Applicable to the Groundwaters of North Carolina,” 15A NCAC 2L. This includes, but is
not limited to, the provisions for detection monitoring, assessment, and corrective action.
11. Ground water monitoring wells and surface water sampling location(s) must be sampled on a
semi-annual basis, in accordance with the current policies and guidelines of the Section in
effect at the time of sampling, unless otherwise specified by the Section. Any proposed
modification to an approved plan must be submitted to the Section and approved prior to
implementation. Sampling equipment and methods must conform to specifications in the
“Solid Waste Section Guidelines for Groundwater, Soil, and Surface Water Sampling,” dated
April 2008, available on the Section website.
12. Monitoring reports of the analytical results for surface water and groundwater monitoring
sampling events must be submitted to the Section within 120 days of the sample collection
date. Analytical laboratory data must be submitted in electronic format (pdf or tiff) and in a
spreadsheet format in an Electronic Data Deliverable (EDD) Template. All monitoring
reports must contain:
a. a potentiometric surface map for the current sampling event that also includes surface
water sampling locations,
b. analytical laboratory reports and summary tables,
c. a completed Solid Waste Environment Monitoring Data Form, and
d. laboratory data submitted in accordance with the EDD Template.
13. The owner must monitor landfill gas to ensure that the closed site continues to meet the
design standards for landfill gas found in 15A NCAC 13B .0503(2)(a). The concentration of
explosive gases generated by the site must not exceed:
a. twenty-five percent of the limit for the gases in site structures (excluding gas control or
recovery system components); and
b. the lower explosive limit for the gases at the property boundary.
Halifax County.
June 3, 2016
DIN 26096
Page 28 of 29
14. Landfill gas monitoring must be conducted quarterly, unless otherwise specified by the
Section. Landfill gas monitoring should follow “Landfill Gas Monitoring Guidance
Document,” as provided on the Section webpage. Any proposed modification to an approved
landfill gas monitoring plan must be submitted to the Section and approved prior to
implementation.
15. All landfill gas monitoring must be conducted by properly trained personnel and must
include monitoring for hydrogen sulfide. Landfill gas monitoring must include interior
monitoring of onsite buildings. Landfill gas monitoring equipment must be calibrated
according to the manufacturer’s specifications. Verification of the calibration of the landfill
gas monitoring equipment is required. Landfill gas monitoring results must be recorded on
forms provided by the Section and must be maintained within the facility’s operating record.
16. The owner must maintain the integrity of all groundwater and landfill gas monitoring wells,
including making repairs to well heads, covers, and surface pads, during the post-closure
period.
17. A readily accessible unobstructed path must be maintained so that groundwater and landfill
gas monitoring wells and surface water sampling locations are accessible using four-wheel
drive vehicles.
18. Each groundwater monitoring well and landfill gas well must be surveyed for location and
elevation. Each groundwater monitoring well and landfill gas monitoring well must have an
identification plate permanently attached to the well, in accordance with 15A NCAC 2C
.0108(o).
19. If a new well is required to be installed, either to add to the network or to replace an existing
well, or if a well is required to be abandoned:
a. The permittee must obtain approval from the Section for the design, installation, and
abandonment of any groundwater or landfill gas monitoring well. A licensed geologist
must be present to supervise the installation of groundwater monitoring wells and landfill
gas monitoring wells. The exact locations, screened intervals, and nesting of the wells
must be established after consultation with the Section Hydrogeologist at the time of well
installation.
b. Within 30 days of completed construction of each new groundwater and landfill gas
monitoring well, a well construction record, well schematic, boring log, field log and
notes, and description of well development activities must be submitted to the Section.
Form GW-1 must be used for both groundwater and landfill gas wells. The submittal
must also include a scaled topographic map, showing the location and identification of
new, existing, and abandoned wells and piezometers, and hydraulic conductivity and
effective porosity values.
c. Hydraulic conductivity and effective porosity values must be established for each
screened interval at each monitoring well in order to develop groundwater flow
characteristics.
d. Within thirty (30) days of the abandonment of any groundwater monitoring well, the well
abandonment record (GW-30 form) and any additional information included in the
Halifax County.
June 3, 2016
DIN 26096
Page 29 of 29
abandonment record must be certified by a Licensed Geologist, and submitted to the
Section. A copy of the well abandonment records submitted to the Division of Water
Quality, consistent with 15A NCAC 2C .0114(b), must be submitted to the Section.
e. Within thirty (30) days of the abandonment of a landfill gas monitoring well, an
abandonment record must be submitted to the Section. The boring must be abandoned in
accordance with 15A NCAC 2C .0113(d) and be certified by a Licensed Geologist.
Reporting and Recordkeeping
20. Documentation of well completion, development details, repair, abandonment, and all other
pertinent activities associated with each groundwater and landfill gas monitoring well must
be maintained in the facility operating record. The permittee must maintain a record of all
groundwater, surface water, and landfill gas monitoring events and analytical data in the
operating record.
21. Copies of this permit, the approved plans, and all records required to be maintained in the
operating record by the permittee must be maintained at a location approved by the Section
and made available to the Section upon request during normal business hours.
22. All forms, reports, maps, plans, and data submitted to the Section must include an electronic
(pdf) copy.
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable
- End of Conditions –