Loading...
HomeMy WebLinkAbout9704_WilkesCounty_MSWLF_ResponsetoComments_DIN26167_20160506.pdf 9731-F Southern Pine Blvd. Charlotte, NC 28273 tel: 704/837-2002 fax: 704/837-2010 www.JoyceEngineering.com May 6, 2016 Mr. Allen Gaither Environmental Engineer NC DEQ Division of Waste Management 2090 US HWY 70 Swannanoa, NC 28778 RE: Engineering Technical Review Roaring River Landfill Wilkes County, North Carolina Permit # 9704-MSWLF-1993, Document ID 25985 Dear Mr. Gaither: On behalf of Wilkes County, Joyce Engineering, Inc. (JOYCE) is submitting this response to your April 21, 2016 Technical Review comments on the Permit Renewal Application (DIN 25985). For your reference, your comment is repeated below in italicized print, with our response provided in bold print. Operations Plan 1. Rule .1625(b)(1)(F) states the operation drawings shall illustrate…buffer zones noting restricted use. No buffers are shown on any of the operation plan drawings. Operations Plan drawing (OP-01: Existing Conditions) was revised to illustrate the buffer zones as required by Rule .1625(b)(1)(F). A copy of the revised OP-01 is attached. Closure/Post-closure Plan 2. The Potential Assessment and Corrective Action (PACA) costs as required by N.C.G.S. 130A-295.2(h) were not included with the closure and post-closure cost estimates provided. PACA has been added to the Post-Closure Cost estimate according to NCGS 130A- 295.2(h). Mr. Allen Gaither May 6, 2016 Page 2 of 2 Please do not hesitate to contact us during the review process with any questions or comments you may have. We look forward to working with you to get the County’s permit renewed for continued operation of the landfill. Sincerely, JOYCE ENGINEERING, INC. Amy Davis, P.E. Technical Consultant Attachments Revised OP-01 Revised Post-Closure Cost Estimate Cc: Mr. Kent Brandon, Solid Waste Director Table 2 Estimate of Post-Closure Care Costs: Roaring River Landfill Phases 1-4 ITEM UNIT QUANTITY UNIT COST ANNUAL COST INSPECTIONS/ RECORD KEEPING per trip 4 $500 $2,000 MONITORING Explosive gases (quarterly) per trip 4 $1,000 $4,000 Groundwater/Surfacewater (semi-annually) Sampling per trip 2 $4,000 $8,000 Analysis per trip 2 $2,500 $5,000 Reporting per trip 2 $2,500 $5,000 Surface Water (semi-annually) per trip 2 $2,100 $4,200 Leachate sampling and analysis per trip 2 $500 $1,000 Subtotal $27,200 ROUTINE MAINTENANCE Mowing acre 25.4 $150 $3,810 Fertilizing (once every 3 years) acre 8.5 $255 $2,159 Reseeding (once every 3 years) acre 8.5 $1,600 $13,547 Vector and Rodent Control acre 25.4 $30 $762 Subtotal $20,278 WELL MAINTENANCE Groundwater Wells lump sum 1 $1,000 $1,000 Gas Detection Probes lump sum 1 $500 $500 Subtotal $1,500 CAP REPAIR lump sum 1 $6,000 $6,000 TOTAL OF ABOVE ITEMS $56,978 ENGINEERING - - 3% $1,709 CONTINGENCY - - 5% $2,849 SUBTOTAL ANNUAL POST-CLOSURE COST (IN 2010 DOLLARS)$61,536 SUBTOTAL 30 YEAR POST-CLOSURE COST (IN 2010 DOLLARS)$1,531,963 INFLATION FACTOR PRICE DEFLATOR/MULTIPLIER (2011) - ASSUMED TO BE THE SAME AS 2012 1.021 INFLATION FACTOR PRICE DEFLATOR/MULTIPLIER (2012) - NC DEQ 1.021 INFLATION FACTOR PRICE DEFLATOR/MULTIPLIER (2013) - NC DEQ 1.018 INFLATION FACTOR PRICE DEFLATOR/MULTIPLIER (2014) - NC DEQ 1.015 INFLATION FACTOR PRICE DEFLATOR/MULTIPLIER (2015) - NC DEQ 1.014 SUBTOTAL 30 YEAR POST-CLOSURE COST (IN 2015 DOLLARS) $1,673,214 POTENTIAL ASSESSMENT AND CORRECTIVE ACTION (PACA), NCGS 130A-295.2(h) $2,000,000 TOTAL 30 YEAR POST-CLOSURE COST (IN 2015 DOLLARS) $3,673,214 Notes: 1. All costs include labor by a third party. 2. Water quality monitoring and leachate management costs are estimated. 3. Cost for groundwater wells assumes maintenance of each well during the period. 4. Cost for the gas probes assumes maintenance of each probe during the period. Joyce Engineering, Inc. January 2011 Post-Closure Cost Roaring River Landfill, Permit to Operate Renewal Rev. December 2015 Rev. May 2016