Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 1 of 10
North Carolina Department of Environmental Quality
Division of Waste Management
Pat McCrory Donald R. van der Vaart
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone/Fax 919-707-8200 Internet: http://www.ncdenr.gov
An Equal Opportunity \ Affirmative Action Employer
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WASTE MANAGEMENT
SOLID WASTE SECTION
SOLID WASTE MANAGEMENT FACILITY
Permit No. 9502-LCID-2016
WATAUGA COUNTY
is hereby issued a
PERMIT TO CONSTRUCT
NOT APPLICABLE
PERMIT TO OPERATE
LAND CLEARING & INERT DEBRIS LANDFILL
TREATMENT & PROCESSING UNIT
LANDFILL GAS-TO-ENERGY SYSTEM
PERMIT FOR CLOSURE
MSW LANDFILL
Located at 336 Landfill Road, in Watauga County, North Carolina, in accordance with Article 9, Chapter
130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the
conditions set forth in this permit. The legal description of the site is identified on the deeds recorded
for this property listed in Attachment No. 1 of this permit.
Edward F. Mussler, III, P.E.,
Permitting Branch Supervisor
Solid Waste Section
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 2 of 10
ATTACHMENT 1
Permit to Operate Data Table
Permit Status Issuance Expiration
9502-LCID-2016 Active April 14, 2016 June 15, 2021
PART I: GENERAL PERMIT CONDITIONS
1. This permit is issued by the North Carolina Department of Environment and Natural
Resources, Division of Waste Management, Solid Waste Section (Section). In
accordance with North Carolina Solid Waste Management Rule 15A NCAC
13B.0201(d), a solid waste management facility permit shall have two parts: a Permit to
Construct and a Permit to Operate. The Permit to Construct must be implemented in
accordance with Attachment 2 of this permit. The Permit to Operate must be
implemented in accordance with Attachment 3 of this permit.
2. The persons to whom this permit is issued (“permittee”) are the owners and operators of
the solid waste management facility.
3. The Permit for the Watauga County Transfer Facility, dated May 29, 2015, was recorded
by the Watauga County Register of Deeds on June 13, 2015 in Book 1807 on Pages 464
through 477 (Document ID No. 24483).
4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or
other instrument of transfer shall contain in the description section in no smaller type than
that used in the body of the deed or instrument, a statement that the property has been
used as a sanitary landfill and a reference by book and page to the recordation of the
permit.
5. By initiating construction or receiving waste at this facility the permittee shall be
considered to have accepted the terms and conditions of this permit.
6. Construction and operation of this solid waste management facility must be in accordance
with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of the Chapter
130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions
contained in this permit; and the approved plan. Should the approved plan and the rules
conflict, the Solid Waste Management Rules shall take precedence unless specifically
addressed by permit condition. Failure to comply may result in compliance action or
permit revocation.
7. This permit is issued based on the documents submitted in support of the application for
permitting the facility including those identified in Attachment 1, “List of Documents for
Approved Plan,” and which constitute the approved plan for the facility. Where
discrepancies exist, the most recent submittals and the Conditions of Permit shall govern.
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 3 of 10
8. This permit may be transferred only with the approval of the Section, through the
issuance of a new or substantially amended permit in accordance with applicable statutes
and rules. In accordance with NCGS 130A-295.2(g) the permittee must notify the Section
thirty (30) days prior to any significant change in the identity or business structure of
either the owner or the operator, including but not limited to a proposed transfer of
ownership of the facility or a change in the parent company of the owner or operator of
the facility.
9. The permittee is responsible for obtaining all permits and approvals necessary for the
development of this project including approval from appropriate agencies for a General or
Individual NPDES Stormwater Discharge Permit. Issuance of this permit does not
remove the permittee’s responsibilities for compliance with any other local, state or
federal rule, regulation or statute.
Properties Approved for the Solid Waste Facility
Watauga County, N.C. Register of Deeds
Book Page Acreage Grantee PIN
040 755 39.5± Watauga County 2920482773000
252 739 21.1± Watauga County 2920397780000
085 053 14.9± Watauga County 2920392009000
040 755 40.6± Watauga County 2920584187000
116.1± Total Facility Acreage
Notes:
1. Deed book references are from Watauga County GIS website accessed May 2015.
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Permitting History
1. On April 19, 1984 a Permit to Operate was issued for a sanitary landfill.
2. On January 11, 1991 amendment was made to the Permit for the vertical expansion of the
sanitary landfill.
3. On May 14, 1997 the sanitary landfill closure was certified by Draper Aden Associates.
4. On July 19, 2010 a modification was made to the Permit for the operation of Landfill Gas
to Energy Project.
List of Documents for the Approved Plan
No. Permit Type Date Issued DIN
1. Permit to Operate April 19, 1984
2. Permit Amendment January 11, 1991
3. Closure Certification May 14, 1997
4. Permit Modification July 19, 2010 11171
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 4 of 10
DOCUMENT ID NO. DOCUMENT DESCRIPTION
10372 Watauga County Landfill Gas to Energy Project. Prepared by: Watauga
County. Prepared for: Watauga County. April 13, 2010.
10903 Certification Report: LFG Collection & Control System Modifications.
Prepared by: Carlson Environmental Consultants. Prepared for: Watauga
County. June 16, 2010.
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Permitting History
1. On June 15, 2011 a New Permit was issued for construction and operation of an LCID
landfill unit.
2. One April 14, 2016 an amendment was made to the Permit for the five-year renewal of
operations at the LCID landfill unit. Additionally, the Permit ID was changed was
changed from 9502TP-TP to 9502-LCID-2016.
List of Documents for the Approved Plan
DOCUMENT ID NO. DOCUMENT DESCRIPTION
11369 Watauga County Solid Waste Program Operation Manual. Prepared by:
Watauga County. Prepared for: Watauga County. Revised August 2010.
12899 Watauga County – Proposed LCID Landfill Facility. Prepared by:
Draper Aden Associates. Prepared for: Watauga County. February 8,
2011.
24068 Operations Manual. Prepared by: Watauga County. Prepared for:
Watauga County. March 18, 2015.
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
No. Permit Type Date Issued DIN
1. New Permit April 19, 1984
2. Permit Amendment April 14, 2016 25842
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 5 of 10
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Permitting History
1. On December 18, 2001 a modification was made to the Permit for operation of a Treatment
and Processing facility.
2. On April 20, 2006 an amendment was made to the Permit for the five-year renewal of
operations at the Treatment and Processing facility
3. On October 20, 2008 a modification was made to the Permit for a change in service area.
4. On June 15, 2011 an amendment was made to the Permit for the five-year renewal of
operations at the Treatment and Processing facility.
5. On June 27, 2012 a modification was made to the Permit to remove the operator training
requirements.
6. One April 14, 2016 an amendment was made to the Permit for the five-year renewal of
operations at the Treatment and Processing unit. Additionally, the Permit ID was
changed was changed from 9502TP-TP to 9502-LCID-2016.
List of Documents for the Approved Plan
DOCUMENT ID NO. DOCUMENT DESCRIPTION
Treatment and Processing Facility Permit Amendment Application.
Prepared by: Draper Aden Associates. Prepared for: Watauga County.
October 23, 2001.
Permit Renewal for Treatment and Processing Facility, Mulching
Operations, Watauga County Landfill. Prepared by: Draper Aden
Associates. Prepared for: Watauga County. February 16, 2006.
11369 Watauga County Solid Waste Program Operation Manual. Prepared by:
Watauga County. Prepared for: Watauga County. Revised August 2010.
24068 Operations Manual. Prepared by: Watauga County. Prepared for:
Watauga County. March 18, 2015.
- End of Section -
No. Permit Type Date Issued DIN
1. Permit to Operate December 18, 2001
2. Permit Amendment April 20, 2006
3. Permit Modification October 20, 2008 5945
4. Permit Amendment June 15, 2011 13409
5. Permit Modification June 27, 2012 16825
6. Permit Amendment April 14, 2016 25842
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 6 of 10
ATTACHMENT 2
CONDITIONS OF PERMIT TO CONSTRUCT
PART I: GENERAL FACILITY
Not Applicable
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Not Applicable
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable
- End of Section -
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 7 of 10
ATTACHMENT 3
CONDITIONS OF PERMIT TO OPERATE
PART I: GENERAL FACILITY
1. The Permit to Operate shall expire June 15, 2021. Pursuant to 15A NCAC 13B.0201(g),
no later than January 15, 2021, the owner or operator must submit a request to the
Section for permit review prepared in accordance with Section .1603(a)(2) or (3) as
applicable, and must update pertinent facility plans including, but not limited to, the
facility operation and waste screening plans.
2. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act N.C.G.S. 113A-50, et seq., and rules promulgated under 15A
NCAC 4.
3. The edge of the waste footprint for all disposal units must be identified with permanent
physical markers.
4. The permittee must not knowingly dispose of, or accept for transfer for subsequent
disposal, municipal solid waste that is generated within the boundaries of a unit of local
government that by ordinance:
a. Prohibits generators or collectors of municipal solid waste from disposing of that
type or form of municipal solid waste.
b. Requires generators or collectors of municipal solid waste to recycle that type or
form of municipal solid waste.
5. Copies of this permit, the approved plans and all records required to be maintained by the
permittee must be maintained at the facility, unless otherwise approved by the Section,
and made available to the Section upon request during normal business hours.
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Not Applicable
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable
PART IV: INDUSTRIL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
6. This permit approves the continued operation of Phase 1 and Phase 1 Expansion area of
the land clearing and inert debris landfill, as well as the onsite environmental
management and protection facilities as described in the approved plans.
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 8 of 10
7. This facility is permitted to receive non-hazardous solid waste generated within Ashe,
Avery, Caldwell, Watauga and Wilkes Counties, consistent with the local government
waste management plan and with local government approval and as defined in G.S. 130-
290 (a)(18a) and (35), except where prohibited by the N. C. General Statues Article 9 of
Chapter 130A, and the rules adopted by the Commission for Health Services.
8. This facility must conform to the operational requirements of the NC Solid Waste
Management Rules, 15A NCAC 13B .0566, and to the operational plan required by 15A
NCAC 13B .0565(4).
9. The following table lists the dimensions and details for the LCID landfill unit. The
following waste volumes include waste, daily cover, and intermediate cover, but do not
include final cover.
Unit Acres Gross capacity
(cubic yards)
Status
Phase 1 1.95 Operational
Phase 1 Exp. 0.28 Future
Phase 2 0.72 Future
Phase 3 1.28 Future
Total 4.23 90,850
10. The facility is approved to accept approximately 15,000 tons per year, approximately 48
tons per day (based on 312 days per year), with a maximum variance in accordance with
GS 130A-294(b1)(1) as listed in Attachment 1, Part V.
11. The following, at a minimum, must not be accepted for disposal at the facility: hazardous
waste, yard trash, liquid wastes, regulated medical waste, sharps not properly packaged,
PCB waste as defined in 40 CFR 761, and wastes banned from disposal in North Carolina
by G.S. 130A-309.10(f).
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
General Conditions
12. Wastes received and product stored shall be maintained in reasonably sized piles with
adequate fire breaks and lanes in accordance with the approved operational plans and the
pertinent rules.
13. Surface water shall be diverted from all operational and storage areas to prevent standing
water in operational areas and under or around storage piles. Water that comes in contact
with solid waste shall be contained on-site or properly treated prior to discharge.
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 9 of 10
14. These areas shall be operated and maintained with sufficient dust control measures to
minimize airborne emissions and to prevent dust from becoming a nuisance or safety
hazard.
15. These areas shall be operated and maintained in a manner so as to minimize odors,
prevent the creation of a nuisance, potential health hazard, or a potential fire hazard.
16. Effective vector control measures shall be applied as necessary to control flies, rodents,
insects, or vermin.
Operational Conditions – Treatment & Processing (Wood Grinding)
17. The facility is permitted to operate a treatment and processing facility as defined in 15A
NCAC 13B.0101(49).
18. The facility is permitted to receive land clearing waste as defined in 15A NCAC
13B.0101(23).
19. The facility is permitted to receive wooden pallets constructed of unpainted and untreated
natural wood.
20. The facility is permitted to receive yard trash as defined in 15A NCAC 13B.0101(55).
However, this ground material containing yard trash may not be distributed to the public
unless it has been composted in accordance with 15A NCAC 13B.1400.
21. The facility must manage the treatment and processing according to the Operation Plan
included in Attachment 1, Parts II-VII: "List of Documents for the Approved Plan". This
document is included in the approved plan. Any revisions to the approved plan shall be
approved by the Section, prior to implementation.
Operational Conditions – Type 1 Composting Unit
22. The facility is permitted to operate a compost facility as defined in 15A NCAC
13B.0101(7).
23. The facility is only permitted to receive waste materials described in 15A NCAC
13B.1402(f)(1) and (2).
24. The facility must monitor and maintain records to demonstrate the requirements of 15A
NCAC 13B.1406 are continually being met. In addition, the facility is required to
maintain records on the following information:
a. The amount of waste received into the facility,
b. the amount of compost land applied as a soil amendment,
c. the area of land compost was applied to as a soil amendment, and
d. the amount and final termination of any remaining compost.
- End of Section -
Facility Permit No: 9502-LCID-2016
Permit to Construct / Operate
Watauga County
Issuance: April 14, 2016
Doc ID: 25842
Page 10 of 10
ATTACHMENT 4
CONDITIONS FOR CLOSURE
PART I: GENERAL FACILITY
Not Applicable
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
25. The MSW landfill unit stopped receiving waste in April 1994.
26. Watauga County must maintain the integrity and effectiveness of the cap system,
including making repairs to the cover as necessary to correct the effects of settlement,
subsidence, erosion, or other events, and prevent surface water from impounding over
waste and run-on and run-off from eroding or otherwise damaging the cap system.
27. Post-closure use of the property is subject to review and approval by the Division and
must not disturb the integrity of the cap system, or the function of the monitoring
systems. The Division may approve any other disturbance if the owner or operator
demonstrates that disturbance of the cap system, including any removal of waste, will not
increase the potential threat to human health or the environment.
28. The permittee must continue to conduct groundwater, surface water sampling and landfill
gas monitoring in accordance with the approved plans.
29. The permittee must maintain a record of all monitoring events and analytical data.
Reports of the sampling events and analytical data must be submitted to the Section in a
timely manner.
Any proposed expansion to the closed MSW landfill unit will be considered a new landfill for
purposes of Solid Waste Management permitting
PART III: CONSTRUCTION & DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable
PART V: LAND CLEARING & INERT DEBRIS LANDFILL UNIT(S)
Not Applicable
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable
- End of Permit Conditions –