No preview available
HomeMy WebLinkAboutNC_SWMMAR_FY2023-2024_LandfillCapacityNC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 3/7/2011 5/24/2024 2,193,863.00 7,182,823.00 6,253,355 10,306,000 18,019,000 1.15 4,052,645 11,765,645 13.2 543,510.69 4,655,010.3 13,514,433 * Approximate Constructed Remaining in Years 8.6 24.9 2.1 6.2 Duke Energy Carolinas - Marshall, Industrial 1812-INDUS-2008 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Catawba 12/9/2009 4/26/2024 12,110.00 1,588,647.00 1,293,024 2,082,500 6,040,700 1.23 789,476 4,747,676 14.4 110,482.35 969,973.2 5,833,133 * Approximate Constructed Remaining in Years 8.8 52.8 80.1 481.7 Duke Energy Carolinas - Allen 3612-INDUS-2008 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Gaston 11/25/2003 4/16/2024 2,887,882.00 11,930,152.00 16,066,986 16,328,208 16,328,208 0.74 261,222 261,222 20.4 585,054.78 193,964.1 193,964 * Approximate Constructed Remaining in Years 0.3 0.3 0.1 0.1 Duke Energy Progress - Roxboro 7302-INDUS-2021 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Person 7/10/2014 4/16/2024 841,562.00 2,443,850.00 1,980,492 2,227,886 1,980,492 1.23 247,394 0 9.8 250,172.71 305,274.6 0 * Approximate Constructed Remaining in Years 1.2 0.0 0.4 0.0 Duke Energy, Mayo Steam Electric Plant 7305-INDUS-2012 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Person 2/7/2024 4/15/2024 1,191,087.00 1,191,087.00 416,973 2,210,000 5,320,000 2.86 1,793,027 4,903,027 0.2 6,397,713.63 5,121,797.2 14,005,539 * Approximate Constructed Remaining in Years 0.8 2.2 4.3 11.8 Duke Energy - Mayo Ash Basin Landfill 7307-INDUS-2021 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Person 9/7/2010 4/28/2024 1,667,318.00 8,298,478.00 6,697,833 11,318,000 13,343,000 1.24 4,620,167 6,645,167 13.6 608,394.04 5,724,292.4 8,233,226 * Approximate Constructed Remaining in Years 9.4 13.5 3.4 4.9 Duke Energy Carolinas - Rogers 8106-INDUS-2009 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Rutherford * Calculation equations described on last page of this report. Page 1 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 11/5/2007 4/4/2024 136,602.00 2,921,502.00 2,524,731 6,321,890 24,621,890 1.16 3,797,159 22,097,159 16.4 177,994.76 4,393,896.9 25,569,811 * Approximate Constructed Remaining in Years 24.7 143.7 32.2 187.2 Duke Energy Carolinas - Belews Creek, Craig Road Landfill 8504-INDUS-2007 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Stokes 11/5/2007 4/4/2024 -12,578.00 759,627.00 385,159 1,500,000 1,500,000 1.97 1,114,841 1,114,841 16.4 46,280.86 2,198,736.9 2,198,737 * Approximate Constructed Remaining in Years 47.5 47.5 0.0 0.0 Duke Energy Carolinas - Belews Creek FGD Landfill 8505-INDUS-2008 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Stokes 6/26/2023 4/22/2024 1,678,897.00 1,678,897.00 1,109,919 6,640,000 13,350,000 1.51 5,530,081 12,240,081 0.8 2,037,266.21 8,364,967.5 18,514,716 * Approximate Constructed Remaining in Years 4.1 9.1 5.0 11.0 Duke Energy- Belews Creek Steam Station 8506-INDUS-2021 CCR Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Stokes * Calculation equations described on last page of this report. Page 2 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 9/25/1998 5/17/2024 63,891.00 819,184.00 1,345,116 1,605,176 13,871,806 0.61 260,060 12,526,690 25.6 31,946.08 158,378.2 7,628,832 * Approximate Constructed Remaining in Years 5.0 238.8 2.5 119.4 Tri-Corners C&D Landfill 0105-CDLF-2024 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Alamance 1/1/1998 6/21/2024 4,593.00 85,183.00 169,169 165,661 269,193 0.50 -3,508 100,024 26.5 3,218.15 -1,766.4 50,366 * Approximate Constructed Remaining in Years -0.5 15.7 -0.4 11.0 Alexander County CDLF 0201-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Alexander 7/1/1996 4/21/2022 3.00 75,878.00 222,139 228,450 228,450 0.34 6,311 6,311 25.8 2,940.52 2,155.7 2,156 * Approximate Constructed Remaining in Years 0.7 0.7 718.6 718.6 Avery County C&D Landfill 0603-CDLF-1996 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Avery 7/1/1998 7/17/2024 8,105.00 712,893.00 1,064,469 1,146,100 1,146,100 0.67 81,631 81,631 26.0 27,371.40 54,669.7 54,670 * Approximate Constructed Remaining in Years 2.0 2.0 6.7 6.7 Brunswick County CDLF 1007-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Brunswick 1/21/1998 4/29/2024 68,100.00 1,018,895.00 1,673,993 1,962,600 2,492,600 0.61 288,607 818,607 26.3 38,785.97 175,664.0 498,255 * Approximate Constructed Remaining in Years 4.5 12.8 2.6 7.3 Buncombe County C&D Unit 1107-CDLF-1998 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Buncombe 1/7/1998 7/18/2024 8,333.00 39,831.43 105,474 322,496 3,735,772 0.38 217,022 3,630,298 26.5 1,501.54 81,956.7 1,370,954 * Approximate Constructed Remaining in Years 54.6 913.0 9.8 164.5 Burke County Johns River Waste Management 1203-CDLF-2014 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Burke * Calculation equations described on last page of this report. Page 3 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 12/5/2006 6/11/2024 23,595.00 409,647.00 704,406 711,255 876,581 0.58 6,849 172,175 17.5 23,385.99 3,983.0 100,128 * Approximate Constructed Remaining in Years 0.2 4.3 0.2 4.2 Cabarrus County CDLF 1302-CDLF-2006 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cabarrus 4/4/2000 6/6/2024 216,943.00 2,640,156.00 4,084,230 4,895,188 5,995,188 0.65 810,958 1,910,958 24.2 109,221.54 524,225.0 1,235,295 * Approximate Constructed Remaining in Years 4.8 11.3 2.4 5.7 Highway 49 C&D Landfill & Recycling Greenway Waste 1306-CDLF-2000 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cabarrus 1/1/1998 6/25/2024 59,628.00 1,340,738.00 1,427,656 2,645,400 2,645,400 0.94 1,217,744 1,217,744 26.5 50,631.16 1,143,605.8 1,143,606 * Approximate Constructed Remaining in Years 22.6 22.6 19.2 19.2 Cleveland County CDLF 2301-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cleveland 1/1/1998 3/1/2024 52,267.00 935,153.00 1,333,944 1,697,278 2,026,570 0.70 363,334 692,626 26.2 35,743.47 254,713.0 485,561 * Approximate Constructed Remaining in Years 7.1 13.6 4.9 9.3 Cumberland County C&D Unit 2601-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cumberland 11/15/1995 4/19/2024 15,449.00 469,848.00 1,221,156 1,478,100 3,044,300 0.38 256,944 1,823,144 28.4 16,528.17 98,860.9 701,467 * Approximate Constructed Remaining in Years 6.0 42.4 6.4 45.4 Dare County C&D Landfill 2803-CDLF-1995 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Dare 12/30/1997 1/11/2024 9,684.00 512,804.00 1,089,327 1,700,000 1,700,000 0.47 610,673 610,673 26.0 19,699.38 287,476.2 287,476 * Approximate Constructed Remaining in Years 14.6 14.6 29.7 29.7 Edgecombe County CDLF 3301-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Edgecombe * Calculation equations described on last page of this report. Page 4 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 8/1/1996 1/2/2024 45,736.00 1,733,443.00 3,322,259 4,030,000 4,030,000 0.52 707,741 707,741 27.4 63,219.18 369,275.4 369,275 * Approximate Constructed Remaining in Years 5.8 5.8 8.1 8.1 Winston-Salem, City of Old Salisbury Road CDLF 3412-CDLF-1995 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Forsyth 1/1/1998 6/20/2024 2,397.00 58,306.00 196,421 471,466 471,466 0.30 275,045 275,045 26.5 2,202.99 81,644.9 81,645 * Approximate Constructed Remaining in Years 37.1 37.1 34.1 34.1 Greene County CDLF 4002-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Greene 1/1/1998 7/25/2024 47,570.00 2,104,676.00 2,061,251 2,370,000 2,370,000 1.02 308,749 308,749 26.6 79,234.48 315,253.5 315,254 * Approximate Constructed Remaining in Years 4.0 4.0 6.6 6.6 Greensboro, City of White Street Landfill 4103-CDLF-1998 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Guilford 2/4/2004 1/22/2024 115,027.00 1,586,483.00 2,343,535 3,196,113 4,773,968 0.68 852,578 2,430,433 20.0 79,465.57 577,162.5 1,645,310 * Approximate Constructed Remaining in Years 7.3 20.7 5.0 14.3 WI High Point Landfill, LLC 4116-CDLF-2012 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Guilford 4/19/2009 7/31/2024 59,403.00 1,219,224.00 2,090,977 2,240,000 2,240,000 0.58 149,023 149,023 15.3 79,778.14 86,893.6 86,894 * Approximate Constructed Remaining in Years 1.1 1.1 1.5 1.5 A-1 Sandrock C&D Landfill 4117-CDLF-2008 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Guilford 6/3/2016 6/27/2024 1,013.00 8,091.00 11,667 73,129 266,268 0.69 61,462 254,601 8.1 1,003.14 42,623.6 176,564 * Approximate Constructed Remaining in Years 42.5 176.0 42.1 174.3 Halifax County Landfill 4204-CDLF-2013 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Halifax * Calculation equations described on last page of this report. Page 5 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 1/1/1998 4/10/2024 30,633.00 483,880.00 887,165 2,047,985 2,047,985 0.55 1,160,820 1,160,820 26.3 18,417.80 633,137.7 633,138 * Approximate Constructed Remaining in Years 34.4 34.4 20.7 20.7 Harnett County Dunn-Erwin C&D Landfill 4302-CDLF-2018 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Harnett 12/1/1996 4/18/2024 13,632.00 284,450.00 636,918 671,456 830,081 0.45 34,538 193,163 27.4 10,389.54 15,424.8 86,267 * Approximate Constructed Remaining in Years 1.5 8.3 1.1 6.3 Harnett Co. Anderson Creek C&D Landfill 4303-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Harnett 4/6/2015 7/2/2024 61,495.00 230,444.00 297,856 297,087 586,764 0.77 -769 288,908 9.2 24,939.16 -595.0 223,521 * Approximate Constructed Remaining in Years 0.0 9.0 0.0 3.6 The Maysville Construction and Demolition Landfill 5203-CDLF-2013 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Jones 1/1/1998 5/6/2024 16,101.00 411,522.00 643,643 1,265,400 1,126,540 0.64 621,757 482,897 26.3 15,621.33 397,528.9 308,747 * Approximate Constructed Remaining in Years 25.4 19.8 24.7 19.2 Lenoir County CDLF 5403-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Lenoir 8/28/1992 6/24/2024 0.00 495,676.00 452,564 502,721 502,721 1.10 50,157 50,157 31.8 15,576.50 54,935.0 54,935 * Approximate Constructed Remaining in Years 3.5 3.5 0.0 0.0 Lincoln County C&D Unit 5503-CDLF-1999 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Lincoln 3/25/1999 12/5/2023 47,805.00 1,457,332.00 2,351,619 2,727,347 3,271,000 0.62 375,728 919,381 24.7 59,005.71 232,844.0 569,754 * Approximate Constructed Remaining in Years 3.9 9.7 4.9 11.9 Lake Norman Landfill 5504-CDLF-1999 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Lincoln * Calculation equations described on last page of this report. Page 6 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 11/1/2006 6/17/2024 1,165.00 34,095.00 83,002 209,700 209,700 0.41 126,698 126,698 17.6 1,934.33 52,044.1 52,044 * Approximate Constructed Remaining in Years 26.9 26.9 44.7 44.7 Madison County C&D Unit 5803-CDLF-1995 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Madison 3/12/2006 6/4/2024 17,506.00 1,874,980.00 2,620,838 3,141,000 3,141,000 0.72 520,162 520,162 18.2 102,843.74 372,130.3 372,130 * Approximate Constructed Remaining in Years 3.6 3.6 21.3 21.3 Greenway Waste Solutions of North Meck 6013-CDLF-2021 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Mecklenburg 10/1/1993 7/17/2024 28,402.00 825,569.90 1,620,427 2,500,000 2,500,000 0.51 879,573 879,573 30.8 26,810.65 448,122.0 448,122 * Approximate Constructed Remaining in Years 16.7 16.7 15.8 15.8 Moore County C&D Landfill 6301-CDLF-1992 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Moore 1/3/2000 7/17/2024 16,485.00 310,599.00 913,198 936,406 2,405,358 0.34 23,208 1,492,160 24.5 12,658.59 7,893.6 507,517 * Approximate Constructed Remaining in Years 0.6 40.1 0.5 30.8 Nash County C&D Landfill 6403-CDLF-2000 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Nash 5/31/2005 6/17/2024 18,714.00 182,086.00 377,702 424,000 789,250 0.48 46,298 411,548 19.0 9,559.71 22,319.8 198,403 * Approximate Constructed Remaining in Years 2.3 20.8 1.2 10.6 Orange County CDLF 6804-CDLF-2005 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Orange 4/1/1996 8/10/2024 18,181.00 366,131.00 1,204,619 1,445,382 1,445,382 0.30 240,763 240,763 28.4 12,910.73 73,177.3 73,177 * Approximate Constructed Remaining in Years 5.7 5.7 4.0 4.0 Pasquotank County C&D Landfill 7002-CDLF-1996 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Pasquotank * Calculation equations described on last page of this report. Page 7 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 6/1/2001 7/29/2022 42,379.00 784,203.40 1,545,418 2,267,256 2,267,256 0.51 721,838 721,838 21.2 37,063.96 366,287.6 366,288 * Approximate Constructed Remaining in Years 9.9 9.9 8.6 8.6 C & D Landfill Inc 7407-CDLF-2009 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Pitt 10/19/2001 1/22/2024 25,856.00 329,847.00 594,721 1,104,617 1,104,617 0.55 509,896 509,896 22.3 14,818.77 282,801.0 282,801 * Approximate Constructed Remaining in Years 19.1 19.1 10.9 10.9 Wall Recycling CDLF 7606-CDLF-2021 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Randolph 1/2/1998 5/21/2024 40,079.00 1,058,825.00 1,114,975 2,341,464 2,341,464 0.95 1,226,489 1,226,489 26.4 40,134.48 1,164,723.2 1,164,723 * Approximate Constructed Remaining in Years 29.0 29.0 29.1 29.1 Robeson County CDLF 7803-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Robeson 1/1/2001 7/23/2024 12,720.00 309,936.00 582,141 926,000 3,207,000 0.53 343,859 2,624,859 23.6 13,157.15 183,073.0 1,397,494 * Approximate Constructed Remaining in Years 13.9 106.2 14.4 109.9 Rutherford County C&D 8103-CDLF-2002 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Rutherford 9/16/1996 1/22/2024 607.00 75,697.00 283,204 1,054,182 2,180,681 0.27 770,978 1,897,477 27.3 2,767.88 206,073.1 507,173 * Approximate Constructed Remaining in Years 74.5 183.2 339.5 835.5 Sampson County Disposal, LLC 8202-CDLF-1996 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Sampson 1/1/1998 6/26/2024 10,803.00 354,925.00 670,854 1,144,442 1,144,442 0.53 473,588 473,588 26.5 13,401.88 250,558.6 250,559 * Approximate Constructed Remaining in Years 18.7 18.7 23.2 23.2 Scotland County CDLF 8301-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Scotland * Calculation equations described on last page of this report. Page 8 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 5/31/1998 5/22/2024 12,622.00 447,265.00 892,433 2,390,900 2,390,900 0.50 1,498,467 1,498,467 26.0 17,217.91 750,994.0 750,994 * Approximate Constructed Remaining in Years 43.6 43.6 59.5 59.5 Albemarle, City of CDLF 8401-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Stanly 1/1/1998 6/25/2024 98,034.00 834,733.00 1,776,965 2,130,888 4,773,800 0.47 353,923 2,996,835 26.5 31,522.56 166,256.1 1,407,769 * Approximate Constructed Remaining in Years 5.3 44.7 1.7 14.4 Union County C&D 9001-CDLF-1998 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Union 10/13/1997 5/17/2024 185,509.00 1,834,915.00 4,607,650 5,300,000 9,800,000 0.40 692,350 5,192,350 26.6 69,000.59 275,716.1 2,067,761 * Approximate Constructed Remaining in Years 4.0 30.0 1.5 11.1 Shotwell Landfill, Inc 9226-CDLF-2020 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wake 11/19/2001 1/22/2024 317,689.00 3,866,461.00 6,124,467 8,489,120 19,177,110 0.63 2,364,653 13,052,643 22.2 174,370.28 1,492,838.3 8,240,315 * Approximate Constructed Remaining in Years 8.6 47.3 4.7 25.9 Red Rock Disposal C&D Landfill 9228-CDLF-2001 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wake 10/1/2002 6/10/2024 58,904.00 1,789,211.00 3,215,370 3,432,000 3,432,000 0.56 216,630 216,630 21.7 82,482.56 120,545.0 120,545 * Approximate Constructed Remaining in Years 1.5 1.5 2.0 2.0 Greenway Waste Solutions of Apex, LLC 9230-CDLF-2014 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wake 10/1/2003 1/22/2024 297,278.00 3,144,688.00 5,024,077 6,203,700 8,426,800 0.63 1,179,623 3,402,723 20.3 154,839.21 738,353.8 2,129,844 * Approximate Constructed Remaining in Years 4.8 13.8 2.5 7.2 Brownfield Road C&D Landfill 9231-CDLF-2012 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wake * Calculation equations described on last page of this report. Page 9 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 1/1/1996 6/30/2024 995.00 40,264.00 100,660 147,076 147,076 0.40 46,416 46,416 28.5 1,412.99 18,566.4 18,566 * Approximate Constructed Remaining in Years 13.1 13.1 18.7 18.7 Washington County C&D Landfill 9404-CDLF-1996 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Washington 1/1/1998 1/31/2024 25,238.00 774,849.00 1,911,390 2,736,883 2,736,883 0.41 825,493 825,493 26.1 29,709.59 334,642.6 334,643 * Approximate Constructed Remaining in Years 11.3 11.3 13.3 13.3 Wayne County CDLF 9601-CDLF-1997 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wayne 10/4/2004 1/2/2023 29,078.00 507,731.00 536,895 674,170 2,002,070 0.95 137,275 1,465,175 18.2 27,828.44 129,818.3 1,385,587 * Approximate Constructed Remaining in Years 4.7 49.8 4.5 47.7 Wilson County Westside C&D Landfill (Areas 1 and 2) 9809-CDLF-2004 CD Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wilson * Calculation equations described on last page of this report. Page 10 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 12/30/2002 5/30/2024 58,984.00 2,292,442.00 1,186,638 2,290,150 2,290,150 1.93 1,103,512 1,103,512 21.4 107,046.08 2,131,852.6 2,131,853 * Approximate Constructed Remaining in Years 19.9 19.9 36.1 36.1 International Paper 2402-INDUS-2005 Indus Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Columbus 12/14/2023 4/26/2024 647,491.00 647,491.00 276,854 2,300,000 2,300,000 2.34 2,023,146 2,023,146 0.4 1,764,896.18 4,731,623.3 4,731,623 * Approximate Constructed Remaining in Years 2.7 2.7 7.3 7.3 Duke Energy North Starter Landfill Allen Plant 3619-INDUS-2021 Indus Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Gaston 3/28/1984 1/22/2024 38,298.00 9,663,282.00 6,268,931 8,317,000 8,317,000 1.54 2,048,069 2,048,069 39.8 242,678.34 3,157,008.5 3,157,008 * Approximate Constructed Remaining in Years 13.0 13.0 82.4 82.4 Blue Ridge Paper Products, Inc. 4406-INDUS-1984 Indus Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Haywood 7/30/1992 5/9/2024 753.00 73,120.00 77,163 140,000 140,000 0.95 62,837 62,837 31.8 2,301.14 59,544.6 59,545 * Approximate Constructed Remaining in Years 25.9 25.9 79.1 79.1 Duke Energy Carolinas - McGuire Landfill 2 6004-INDUS-1991 Indus Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Mecklenburg 12/14/2000 3/12/2024 1,131.00 954,544.00 2,240,974 2,692,063 10,749,000 0.43 451,089 8,508,026 23.2 41,070.47 192,141.6 3,623,998 * Approximate Constructed Remaining in Years 4.7 88.2 169.9 3,204.2 Domtar Paper Company Landfill, Lined #3 9401-INDUS-2008 Indus Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Washington * Calculation equations described on last page of this report. Page 11 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 3/18/1994 3/12/2024 136,225.00 2,694,221.00 3,553,744 8,372,250 10,982,800 0.76 4,818,506 7,429,056 30.0 89,852.47 3,653,082.5 5,632,234 * Approximate Constructed Remaining in Years 40.7 62.7 26.8 41.3 Alamance County Austin Quarter Road Landfill Facility 0104-MSWLF-1994 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Alamance 12/12/2000 2/10/2024 984,161.00 11,304,875.00 13,076,892 17,722,470 41,498,367 0.86 4,645,578 28,421,475 23.2 488,073.95 4,016,067.3 24,570,152 * Approximate Constructed Remaining in Years 8.2 50.3 4.1 25.0 Anson Landfill 0403-MSWLF-2010 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Anson 11/1/1993 6/20/2024 25,051.00 579,481.00 1,172,814 1,415,009 1,853,635 0.49 242,195 680,821 30.6 18,916.39 119,667.2 336,390 * Approximate Constructed Remaining in Years 6.3 17.8 4.8 13.4 Ashe County Landfill 0501-MSWLF-1993 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Ashe 8/6/1993 12/8/2023 526,965.00 15,800,800.00 16,189,307 20,129,000 24,833,000 0.98 3,939,693 8,643,693 30.3 520,823.23 3,845,149.2 8,436,264 * Approximate Constructed Remaining in Years 7.4 16.2 7.3 16.0 East Carolina Regional Landfill 0803-MSWLF-1993 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Bertie 9/29/1997 4/29/2024 167,846.00 3,548,525.00 5,389,131 6,878,500 12,477,000 0.66 1,489,369 7,087,869 26.6 133,494.57 980,689.3 4,667,075 * Approximate Constructed Remaining in Years 7.3 35.0 5.8 27.8 Buncombe County MSW Landfill 1107-MSWLF-1996 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Buncombe 3/6/1992 12/6/2023 1,158,435.00 40,472,368.00 40,004,731 47,033,000 47,033,000 1.01 7,028,269 7,028,269 31.8 1,274,685.90 7,110,426.2 7,110,426 * Approximate Constructed Remaining in Years 5.6 5.6 6.1 6.1 BFI-Charlotte Mtr Speedway Landfill V 1304-MSWLF-1992 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cabarrus * Calculation equations described on last page of this report. Page 12 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 8/26/1998 6/13/2024 393,233.00 7,109,077.00 10,893,936 18,040,000 18,040,000 0.65 7,146,064 7,146,064 25.8 275,558.78 4,663,320.9 4,663,321 * Approximate Constructed Remaining in Years 16.9 16.9 11.9 11.9 Foothills Environmental Landfill 1403-MSWLF-1998 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Caldwell 12/30/1997 5/28/2024 236,258.00 4,102,511.00 7,316,570 9,945,000 46,441,000 0.56 2,628,430 39,124,430 26.4 155,343.37 1,473,800.3 21,937,657 * Approximate Constructed Remaining in Years 9.5 141.2 6.2 92.9 Blackburn Resource Recovery Facility 1803-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Catawba 1/9/1998 6/26/2024 17,636.00 460,567.00 775,047 1,349,449 1,934,055 0.59 574,402 1,159,008 26.5 17,405.29 341,334.9 688,734 * Approximate Constructed Remaining in Years 19.6 39.6 19.4 39.1 Cherokee County MSW Facility 2002-MSWLF-1998 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cherokee 5/15/2009 6/24/2024 95,673.00 1,356,780.00 2,508,204 3,234,000 9,470,009 0.54 725,796 6,961,805 15.1 89,792.33 392,609.8 3,765,897 * Approximate Constructed Remaining in Years 4.4 41.9 4.1 39.4 Cleveland County Landfill Self-McNeilly 2301-MSWLF-2009 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cleveland 8/25/1999 6/7/2024 228,354.00 5,094,783.00 7,533,787 11,249,300 13,948,700 0.68 3,715,513 6,414,913 24.8 205,552.80 2,512,645.0 4,338,136 * Approximate Constructed Remaining in Years 12.2 21.1 11.0 19.0 CRSWMA - Long Term Regional Landfill 2509-MSWLF-1999 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Craven 12/17/1997 3/1/2024 149,969.00 3,736,467.00 5,383,797 6,161,871 6,739,400 0.69 778,074 1,355,603 26.2 142,591.64 539,999.5 940,817 * Approximate Constructed Remaining in Years 3.8 6.6 3.6 6.3 Ann Street Cumberland County Landfill 2601-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Cumberland * Calculation equations described on last page of this report. Page 13 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 10/1/1994 4/17/2024 144,267.00 3,368,924.00 5,610,509 5,864,162 12,000,000 0.60 253,653 6,389,491 29.5 114,030.16 152,310.2 3,836,677 * Approximate Constructed Remaining in Years 1.3 33.6 1.1 26.6 Davidson County MSW Lined Landfill 2906-MSWLF-2008 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Davidson 4/7/1997 1/2/2024 250,031.00 4,668,950.00 6,915,799 7,526,000 13,700,000 0.68 610,201 6,784,201 26.7 174,619.49 411,955.0 4,580,106 * Approximate Constructed Remaining in Years 2.4 26.2 1.6 18.3 Hanes Mill Road Landfill 3402-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Forsyth 7/1/1997 6/18/2024 327,710.00 3,913,832.00 6,439,299 11,071,872 11,071,872 0.61 4,632,573 4,632,573 27.0 145,144.39 2,815,696.6 2,815,697 * Approximate Constructed Remaining in Years 19.4 19.4 8.6 8.6 Gaston County Landfill 3606-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Gaston 5/1/2013 7/2/2024 37,845.00 423,026.00 749,542 1,355,000 16,886,000 0.56 605,458 16,136,458 11.2 37,870.16 341,708.0 9,107,083 * Approximate Constructed Remaining in Years 9.0 240.5 9.0 240.6 Oxford Subtitle D MSWLF 3901-MSWLF-2012 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Granville 10/1/1993 6/12/2024 131,324.00 3,541,186.00 5,719,236 5,917,954 10,530,795 0.62 198,718 4,811,559 30.7 115,360.17 123,040.5 2,979,179 * Approximate Constructed Remaining in Years 1.1 25.8 0.9 22.7 High Point, City of Kersey Valley Landfill 4104-MSWLF-1991 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Guilford 12/9/1997 7/25/2024 10,024.00 2,426,479.00 3,509,479 5,058,000 5,058,000 0.69 1,548,521 1,548,521 26.6 91,133.31 1,070,658.5 1,070,659 * Approximate Constructed Remaining in Years 11.7 11.7 106.8 106.8 Greensboro, City of White Street MSWLF 4112-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Guilford * Calculation equations described on last page of this report. Page 14 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 10/15/1993 6/13/2024 177,119.00 2,556,326.00 3,792,501 4,805,703 9,380,078 0.67 1,013,202 5,587,577 30.7 83,373.34 682,946.3 3,766,293 * Approximate Constructed Remaining in Years 8.2 45.2 3.9 21.3 Haywood Co White Oak Landfill 4407-MSWLF-1993 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Haywood 10/8/1993 3/5/2024 245,796.00 5,643,104.00 11,382,296 13,787,533 13,787,533 0.50 2,405,237 2,405,237 30.4 185,588.31 1,192,466.1 1,192,466 * Approximate Constructed Remaining in Years 6.4 6.4 4.9 4.9 Iredell County Sanitary LF 4903-MSWLF-1993 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Iredell 10/1/1997 5/21/2024 166,982.00 2,998,097.00 5,024,261 6,927,217 18,809,727 0.60 1,902,956 13,785,466 26.6 112,555.75 1,135,539.5 8,226,118 * Approximate Constructed Remaining in Years 10.1 73.1 6.8 49.3 Johnston County MSW Landfill 5103-MSWLF-MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Johnston 7/1/2004 5/6/2024 0.00 584,637.00 533,357 676,789 3,096,592 1.10 143,432 2,563,235 19.8 29,457.67 157,222.4 2,809,679 * Approximate Constructed Remaining in Years 5.3 95.4 0.0 0.0 Lenoir County MSW Landfill 5409-MSWLF-MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Lenoir 7/1/1993 6/24/2024 58,263.00 1,312,882.00 2,896,970 4,314,883 6,561,483 0.45 1,417,913 3,664,513 31.0 42,376.29 642,586.0 1,660,726 * Approximate Constructed Remaining in Years 15.2 39.2 11.0 28.5 Lincoln County Landfill 5503-MSWLF-1986 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Lincoln 5/1/1992 6/14/2024 43,736.00 1,004,587.83 1,722,686 1,944,123 5,094,123 0.58 221,437 3,371,437 32.1 31,275.63 129,131.4 1,966,060 * Approximate Constructed Remaining in Years 4.1 62.9 3.0 45.0 Macon County Landfill Open 5703-MSWLF-1992 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Macon * Calculation equations described on last page of this report. Page 15 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 4/1/2000 2/21/2024 145,708.00 2,697,205.00 5,089,052 7,289,046 20,724,550 0.53 2,199,994 15,635,498 23.9 112,898.71 1,166,000.0 8,286,837 * Approximate Constructed Remaining in Years 10.3 73.4 8.0 56.9 Mecklenburg County Landfill 6019-MSWLF-2000 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Mecklenburg 12/11/1995 12/7/2023 619,837.00 17,353,316.00 20,438,579 21,305,000 33,785,000 0.85 866,421 13,346,421 28.0 620,003.78 735,632.2 11,331,740 * Approximate Constructed Remaining in Years 1.2 18.3 1.2 18.3 Uwharrie Env. Reg. Landfill 6204-MSWLF-1995 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Montgomery 1/23/2019 5/29/2024 408,937.00 2,881,902.00 3,143,453 14,239,752 25,726,827 0.92 11,096,299 22,583,374 5.3 538,973.22 10,173,031.5 20,704,324 * Approximate Constructed Remaining in Years 18.9 38.4 24.9 50.6 New Hanover County Landfill 6504-MSWLF-2017 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons New Hanover 1/1/1998 5/23/2024 30,150.00 970,781.00 2,392,750 3,150,346 4,089,000 0.41 757,596 1,696,250 26.4 36,785.74 307,370.1 688,199 * Approximate Constructed Remaining in Years 8.4 18.7 10.2 22.8 Camp Lejeune MSW Landfill 6708-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Onslow 1/1/1998 5/7/2024 115,329.00 4,620,610.00 3,343,984 4,792,780 9,925,630 1.38 1,448,796 6,581,646 26.3 175,379.59 2,001,899.9 9,094,308 * Approximate Constructed Remaining in Years 11.4 51.9 17.4 78.9 Onslow County Subtitle D Landfill 6709-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Onslow 7/30/1997 7/25/2024 389,466.00 6,381,875.00 7,967,724 9,400,000 17,248,397 0.80 1,432,276 9,280,673 27.0 236,479.64 1,147,204.2 7,433,502 * Approximate Constructed Remaining in Years 4.9 31.4 2.9 19.1 Upper Piedmont Regional Landfill 7304-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Person * Calculation equations described on last page of this report. Page 16 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 12/29/2016 12/5/2023 627,841.00 4,142,698.00 5,317,205 8,148,450 41,739,400 0.78 2,831,245 36,422,195 6.9 597,598.91 2,205,856.8 28,376,968 * Approximate Constructed Remaining in Years 3.7 47.5 3.5 45.2 Great Oak Landfill 7607-MSWLF-2015 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Randolph 1/1/1998 5/21/2024 113,939.00 2,391,100.00 3,324,521 4,421,333 6,124,298 0.72 1,096,812 2,799,777 26.4 90,624.60 788,861.7 2,013,688 * Approximate Constructed Remaining in Years 8.7 22.2 6.9 17.7 Robeson County Landfill 7803-MSWLF-1997 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Robeson 5/5/1995 6/25/2024 130,211.00 2,407,485.00 4,327,543 8,930,717 8,930,717 0.56 4,603,174 4,603,174 29.1 82,613.11 2,560,823.2 2,560,823 * Approximate Constructed Remaining in Years 31.0 31.0 19.7 19.7 Rockingham County Landfill 7904-MSWLF-1995 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Rockingham 12/1/1989 5/31/2024 185,717.00 207,340.00 5,071,543 8,751,600 15,071,000 0.04 3,680,057 9,999,457 34.5 6,010.39 150,451.8 408,808 * Approximate Constructed Remaining in Years 25.0 68.0 0.8 2.2 Rowan County Landfill 8003-MSWLF-1988 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Rowan 2/22/1999 1/22/2024 1,911,448.00 29,541,083.00 31,497,667 55,097,069 56,600,000 0.94 23,599,402 25,102,333 24.9 1,185,701.16 22,133,445.4 23,543,017 * Approximate Constructed Remaining in Years 18.7 19.9 11.6 12.3 Sampson County Disposal, LLC 8202-MSWLF-2000 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Sampson 5/20/1999 5/22/2024 67,355.00 1,207,423.00 2,026,764 2,740,403 4,970,842 0.60 713,639 2,944,078 25.0 48,282.38 425,142.8 1,753,903 * Approximate Constructed Remaining in Years 8.8 36.3 6.3 26.0 Albemarle, City of Landfill 8401-MSWLF-1999 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Stanly * Calculation equations described on last page of this report. Page 17 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 12/1/1998 3/20/2024 70,776.00 1,595,549.00 2,955,943 5,932,026 5,932,026 0.54 2,976,083 2,976,083 25.3 63,063.98 1,606,420.1 1,606,420 * Approximate Constructed Remaining in Years 25.5 25.5 22.7 22.7 Surry County MSWLF 8606-MSWLF-1998 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Surry 6/13/1990 6/11/2024 31,010.00 752,520.00 1,357,427 1,387,090 1,923,090 0.55 29,663 565,663 34.0 22,135.61 16,444.3 313,588 * Approximate Constructed Remaining in Years 0.7 14.2 0.5 10.1 Transylvania County Landfill 8807-MSWLF-1990 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Transylvania 2/7/2008 6/8/2024 504,892.00 7,562,331.00 10,602,892 13,331,000 31,001,000 0.71 2,728,108 20,398,108 16.3 462,980.46 1,945,776.3 14,548,601 * Approximate Constructed Remaining in Years 4.2 31.4 3.9 28.8 Wake County South Wake MSWLF 9222-MSWLF-2008 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wake 1/26/1998 1/31/2024 119,846.00 2,143,005.00 3,058,463 3,371,831 5,365,695 0.70 313,368 2,307,232 26.0 82,384.23 219,570.8 1,616,632 * Approximate Constructed Remaining in Years 2.7 19.6 1.8 13.5 Wayne County Landfill 9606-MSWLF-1998 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wayne 10/7/1993 3/21/2024 86,778.00 1,681,964.00 3,523,003 3,726,224 4,629,502 0.48 203,221 1,106,499 30.5 55,231.26 97,022.5 528,268 * Approximate Constructed Remaining in Years 1.8 9.6 1.1 6.1 Wilkes County MSWLF 9704-MSWLF-1993 MSW Open Date Survey Date Volume Used Volume Constructed * Remaining Volume for Future Construction Years Open * Approximate Constructed Remaining in Tons * Remaining Constructed in Fiscal Year Tons Fiscal Year Tons Total Tons Disposed to Date Total Permitted Volume * Compaction Density * Remaining Permitted Volume * Average Tons per Year * Approximate Total Permitted Volume Remaining in Tons * Approximate Total Permitted Volume Remaining in Years * Approximate Total Tonnage Remaining in Fiscal Year Tons Wilkes * Calculation equations described on last page of this report. Page 18 of 19 Printed: 3/18/2025 NC DEQ: Waste Management Solid Waste Section Landfill Capacity Report for Fiscal Year 2023-2024 Calculated Values: Average Tons = (Total Tons Received) / (Years Open) Remaining Volume for Future Construction = (Volume Constructed) - (Volume Used) Compaction Density = (Total Tons) / (Volume Used) Approximate Constructed Remaining in Tons = (Volume Cosntructed Remaining) x (Compaction Density) Approximate Constructed Remaining in Years = (Volume Constructed Remaining in Tons) / (Average Tons) Remaining Permitted Volume = (Volume Overall) - (Volume Used) Approximate Total Permitted Volume Remaining in Tons = (Volume Overall Remaining) x (Compa Approximate Total Permitted Volume Remaining in Years = (Volume Overall Remaining in Tons) / (Average Tons) Remaining Constructed in Fiscal Year Tons = (Volume Constructed Remaining in Tons) / (Fiscal Year Tons) Approximate Total Tonnage Remaining in Fiscal Year Tons = (Volume Overall Remaining in Tons) / (Fiscal Year Tons) The data for these calculations are collected from Annual Facility Reports. The calculations are based on historic tonnage and compaction density data. The approximations may be affected by changes in operations, waste stream characteristics or growth. Note: Number of Reports:100 Page 19 of 19 Printed: 3/18/2025