Loading...
HomeMy WebLinkAbout4903_IredellCoMSWLF_LFGExccedanceProgressUpdateNovember2024_FID1913903_20241118CEC Carlson Environmental Consultants, pc Landfill Gas and Solid Waste Specialists 1127 Curtis Street Ste 100 Monroe NC 28112 Phone 704.283.9765 ·Fax 704.283.9755 Orlando, FL · Tampa, FL · Atlanta, GA · Columbia, SC · Richmond, VA · Statesville, NC Olympia, WA · Cookeville, TN · Tullytown, PA www.cecenv.com November 15, 2024 Ervin Lane Solid Waste Section NCDEQ - Division of Waste Management Raleigh Regional Office 1646 Mail Service Center Raleigh, NC 27699-1646 Subject: Q1 2024 Methane Migration Monitoring Exceedances – Remediation Plan Monthly Progress Update – September 2024 Iredell County Subtitle D Lined Landfills/Closed Unlined C&D Landfill Statesville, North Carolina Solid Waste Permit No. 49-03 Dear Ervin: On behalf of Iredell County (County), Carlson Environmental Consultants, PC (CEC) is submitting to the North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management Solid Waste Section (SWS) the subject remediation plan progress updates for a recent methane migration monitoring exceedance detected at the Subtitle D Lined Landfills/Closed Unlined C&D Landfill facility that is owned and operated by the County. As previously reported to NCDEQ in a notification letter dated March 18, 2024 and the subsequent remediation plan dated May 14, 2024, there was one (1) perimeter gas probe location with methane detections above the 5% lower explosive limit (LEL) during the first quarter 2024 monitoring event: MP-6A (53.1%). Pursuant to NCAC 13B .1626(4)(c)(iii), the County has commenced implementation of the remediation plan for explosive gas release at this location. In accordance with NCAC 13B .1626(4)(c)(iii), the plan describes the nature and extent of the exceedance and proposed remedies. The below remediation plan progress updates are being provided to NCDEQ for the month of September 2024: • MP-6A was monitored weekly in October. Throughout the monitoring period, MP-6A has fluctuated above and below 5%. Methane concentrations were first read below 5% at MP-6A as of May 16, 2024. However, MP-6A was read above 5% again as of May 28, 2024 and remained above the 5% threshold until June 20, 2024, at which time it was read below 5%, and remained below the 5% threshold until July 29, 2024, when it was then read above 5% as of August 7, 2024 and has remained above the 5% throughout October. As stated in the remediation plan submitted to NCDEQ MP-6A must remain below the 5% LEL for a consecutive two (2) months. • Barhole punch and sampling occurred at four (4) locations between MP-6A and the northwestern landfill perimeter on May 23, June 18, July 17, August 21, September 20, and October 24, 2024. Methane was not detected above 5% at any barhole punch location. Monthly barhole punch and sampling at these locations will continue in October. Ervin Lane November 15, 2024 Page 2 • Weekly monitoring at the ICATS office structure was completed in August, and methane was not detected above 1.25% during any monitoring period. Because methane continued to be above 5% at MP-6A, weekly monitoring of the ICATS office structure will continue in November 2024. • During the month of July, the County began the project of extending the toe drain located along the Northwestern side of Phase 4. The project continued through the month of August, upon completion, it will be connected on both ends to the active LFG collection system. As of the end of October, the toe drain lid has been completed and both ends have been connected to the LFG collection system. • Flare upgrades in order to assist with stabilizing system vacuum throughout the wellfield are temporarily delayed due to a parts delay. If you have any questions regarding this remediation plan, or require additional information, please contact the undersigned at (704) 283-9765. Sincerely, Kathryn Fauerby Carlson Environmental Consultants, PC CC: Teddy Boller, Iredell County Jeff Webster, Iredell County Brock McNabb, PE, CEC Amanda Higgs, CEC EXHIBIT A Methane Monitoring Data Summary (March 2024 – October 2024) Permit ID Device ID Date and Time of Day Initial % LEL Stabilized % LEL % CH4 (volume) % O2 (volume) % CO2 (volume) MP-6A IRDLMP6A 3/15/2024 13:32 >100 >100 53.10 0.00 38.10 MP-6A IRDLMP6A 3/22/2024 10:13 >100 >100 52.10 1.80 34.80 MP-6A IRDLMP6A 3/28/2024 10:54 >100 >100 57.60 0.00 38.30 MP-6A IRDLMP6A 4/5/2024 07:56 >100 >100 46.40 1.60 34.50 MP-6A IRDLMP6A 4/11/2024 14:12 >100 >100 61.80 0.10 37.80 MP-6A IRDLMP6A 4/18/2024 10:31 >100 >100 57.80 0.60 38.80 MP-6A IRDLMP6A 4/25/2024 09:59 >100 >100 43.70 1.90 36.10 MP-6A IRDLMP6A 5/2/2024 09:13 >100 >100 30.00 2.70 33.20 MP-6A IRDLMP6A 5/8/2024 13:18 >100 >100 8.00 10.40 16.40 MP-6A IRDLMP6A 5/16/2024 08:12 48.00 48.00 2.40 15.40 8.20 MP-6A IRDLMP6A 5/24/2024 07:53 14.00 14.00 0.70 15.60 6.40 MP-6A IRDLMP6A 5/28/2024 13:15 >100 >100 8.70 6.50 20.80 MP-6A IRDLMP6A 6/7/2024 12:43 >100 >100 25.00 2.80 31.10 MP-6A IRDLMP6A 6/11/2024 12:12 >100 >100 25.50 1.10 34.50 MP-6A IRDLMP6A 6/20/2024 09:56 30.00 30.00 1.50 5.30 22.60 MP-6A IRDLMP6A 6/25/2024 08:03 0.00 0.00 0.00 8.30 17.10 MP-6A IRDLMP6A 7/3/2024 13:02 2.00 2.00 0.10 15.80 10.30 MP-6A IRDLMP6A 7/11/2024 13:27 0.00 0.00 0.00 15.80 9.90 MP-6A IRDLMP6A 7/19/2024 15:14 0.00 0.00 0.00 19.70 3.80 MP-6A IRDLMP6A 7/25/2024 15:07 0.00 0.00 0.00 21.20 2.30 MP-6A IRDLMP6A 7/29/2024 14:15 0.00 0.00 0.00 20.60 1.70 MP-6A IRDLMP6A 8/7/2024 08:27 >100 >100 25.90 3.40 19.40 MP-6A IRDLMP6A 8/12/2024 09:36 >100 >100 37.00 2.90 24.10 MP-6A IRDLMP6A 8/20/2024 14:08 >100 >100 44.30 3.00 29.00 MP-6A IRDLMP6A 8/22/2024 13:52 >100 >100 45.70 2.90 30.70 MP-6A IRDLMP6A 8/30/2024 08:59 >100 >100 37.60 3.80 29.30 MP-6A IRDLMP6A 9/3/2024 08:18 >100 >100 44.70 1.80 34.30 MP-6A IRDLMP6A 9/9/2024 09:14 >100 >100 46.80 0.70 35.20 MP-6A IRDLMP6A 9/16/2024 10:17 >100 >100 35.90 1.20 33.20 MP-6A IRDLMP6A 9/23/2024 11:00 >100 >100 43.80 0.30 34.60 MP-6A IRDLMP6A 10/1/2024 12:45 >100 >100 56.00 0.30 36.70 MP-6A IRDLMP6A 10/8/2024 11:14 >100 >100 59.60 0.60 36.20 MP-6A IRDLMP6A 10/18/2024 08:14 >100 >100 45.40 2.40 30.20 MP-6A IRDLMP6A 10/21/2024 08:44 >100 >100 33.20 2.40 28.20 MP-6A IRDLMP6A 10/28/2024 09:31 >100 >100 9.00 2.00 24.00 GEM 5000 gas analyzers were used for all monitoring events and were calibrated appropriately prior to monitoring. Methane Monitoring Data Summary March 2024 - October 2024 Iredell County Subtitle D Lined Landfills/Closed Unlined C&D Landfill (Permit No. 49-03)