HomeMy WebLinkAbout1101_Buncombe_MSWLF_Fall2024MonitoringStatus_FID1913412_2024111213LJNNELL LAMMONS ENGINEERING November 12, 2024 Solid Waste Section Division of Waste Management NCDEQ-ARO 2090 U.S. 70 Highway Swannanoa, North Carolina 28778 [via email] Attention: Jaclynne Drummond, Hydrogeologist Subject: Status of the Fall 2024 Water Quality Monitoring Event Post Hurricane Helene Update Old Buncombe County Landfill Woodfin, North Carolina Permit No. 1101-MSWLF-1979 BLE Project No. J24-14175-12 Dear Ms. Drummond: Bunnell-Lammons Engineering, Inc. (BLE) is submitting letter to document the status of the second semi-annual water quality monitoring event of 2024 (Fall 2024) to the North Carolina Division of Waste Management (NCDWM) Solid Waste Section (SWS) for the subject site. Groundwater and surface water monitoring is performed semi-annually at the site in general accordance with the following documents: • Corrective Action Plan (CAP) dated September 3, 2014 [FID 102260 (SCS Engineers File No 09204072.06)] prepared by SCS Engineers. • Request for Reduction of MNA Parameters dated November 30, 2016 [FID 583167 (SCS Engineers File No 09204072.14)] prepared by SCS Engineers. • Report of 1,4-Dioxane Sampling and Analysis November 2018 to April 2020 dated September 1, 2020 [FID 145059 (BLE Project No. J20-14175-04)] prepared by BLE. • Corrective Action Evaluation Report, Water Quality Data Through October 2021 dated March 30, 2022 [FID 1661864 (BLE Project No. J20-14175-03)] prepared by BLE. • Report of Limited Assessment of the MW-7 Area dated October 28, 2022 [FID 1740675 (BLE Project No. J22-14175-08)] prepared by BLE. Semi-annual water quality monitoring is typically conducted each April and October and those events are designated "Spring" and "Fall," respectively. I 6004 Ponders Court. Greenville, SC 29615 t�864.28B.1265 AB64,288.4430 M info@hlemrpxom sLECORFIXOM 1s 1m 1i Status of the Fall 2024 Water Quality Monitoring Event November 12, 2024 Old Buncombe County Landfill, Woodfin, North Carolina BLE Project Number J24-14175-12 On September 27, 2024 Hurricane Helene impacted many areas of Western North Carolina resulting in severe flooding and related infrastructure damage. Many parts of the subject facility are either inaccessible and/or unsafe following the hurricane. Additionally, the facility is currently operating as a storm debris management site. Field sampling crews are unable to access the facility to conduct water quality monitoring for the Fall 2024 event as the result of various on -going disaster relief efforts and the unsafe conditions. Therefore, water quality monitoring will not be performed for the second semi-annual water quality monitoring event of 2024 (Fall 2024). Buncombe County intends to resume water quality monitoring as scheduled for the first semi-annual water quality monitoring event of 2025 (Spring 2025). The facility intends to continue to perform disaster relief efforts which may result in increased site accessibility. If conditions improve substantially prior to the Spring 2025 event, the facility will contact the SWS and may perform monitoring in a reduced subset of monitoring points if they become accessible prior to the Spring 2025 event. We appreciate the continued opportunity to work with the SWS to address regulatory requirements. If you have any questions, please do not hesitate to contact us at (864) 288-1265. Sincerely, BUNNELL-LAMMONS ENGINEERING, INC. Ril . Blais, P.G. Andrew W. Al ander, P.G., RSM Project Hydrogeologist Consultant Hydrogeologist Registered, NC #2896 Registered, NC #1475 cc: Kristy Smith — Buncombe County Dane Pedersen — Buncombe County 2 of 2