FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
X
YW
Transfer
Compost
SLAS
COUNTY: HALIFAX
MSWLF
PERMIT NO.: 42A-LCID
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: November 1, 2024
FACILITY NAME AND ADDRESS:
Roanoke Valley LCID Landfill
US Hwy 301
Weldon, North Carolina
GPS COORDINATES: Lat.: 36.40303' Long.:-77.59910'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Ben Rightmyer, Owner
Telephone: (252) 537-3223
Email address: benrightmyer(krightmyer.com
FACILITY CONTACT ADDRESS:
Rightmyer Machine Rentals, Inc.
497 Highway 48
Roanoke Rapids, NC 27870
PARTICIPANTS:
Amanda Thompson — NCDEQ, Solid Waste Section
Ben Rightmyer, Owner
Date of Last Inspection: March 22, 2024
STATUS OF PERMIT:
The permit was issued June 1, 2022. The permit will expire on September 30, 2025.
Renewal paperwork must be submitted to the Section prior to March 30, 2025.
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
Pagel of 3
NORTH CARnLINAD_E Q��
OepaNnent W Environnnnbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
ADDITIONAL COMMENTS
1) Roanoke Valley LCID Landfill is owned and operated by Rightmyer Machine Rentals, Inc. The facility is not open to
the public.
2) This facility is permitted to receive land clearing waste; yard trash; untreated and unpainted wood; uncontaminated soil;
inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-
294(m).
3) The facility has set a maximum disposal rate of 70,000 cubic yards per year (average of 275 cubic yards per day based
on 253 operating days per year).
4) This facility is permitted to receive waste generated Halifax, Bertie, Hertford, Northampton, Warren, Vance, Granville,
Franklin, Nash, Wilson, Edgecombe, Pitt, Martin, Chowan, and Gates Counties in North Carolina and Suffolk,
Southampton, Greensville, Brunswick, Mecklenburg, Lunenburg, Nottoway, Amelia, Chesterfield, Dinwiddie, Prince
George, Sussex, Surry, and Ile of Wright Counties in Virginia.
5) The access road is of all-weather construction and appears to be properly maintained.
6) White edge of waste markers were observed. No land clearing waste was observed outside of the edge of waste markers.
Beneficial fill was identified within the beneficial fill areas along the northwest and southeast side slopes.
7) No unacceptable wastes were observed within the waste stream. Continue to ensure that any unacceptable wastes are
removed and properly disposed of when encountered.
8) Several piles of land clearing debris were observed along the western side slope and in the northern portion of the
landfill. The working face was less than the acre size limit. Several stockpiles of cover soil were observed adjacent to
the working face. Mr. Rightmyer stated that the bulldozer had recently broken down and they were waiting for parts to
repair the equipment. Once the equipment is repaired, the working face would be covered. Another piece of equipment
may need to be brought to the facility to cover the working face, if the bulldozer is not repaired prior to the once monthly
or one acre in size cover requirements. Ensure that all waste is covered with six inches of soil monthly or when the
working face reaches one acre in size, whichever occurs first.
9) Digital photographs were taken during the inspection.
Please contact me if you have any questions or concerns regarding this inspection report.
Amanda Digitally signed by Amanda
Thompson
Thompson Date: 2024.11.06 16:09:13 -05'00' Phone:910-433-3352
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: November 6, 2024 X Email Hand delivery US Mail Certified No. f J
Copies: Wes Hare, Eastern District Supervisor — Solid Waste Section
Page 2 of 3
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
i
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
View of uncovered waste along the western side slope.
2024.
View of the soil stockpiles and uncovered waste in the
northern portion of the facility.
Page 3 of 3