Loading...
HomeMy WebLinkAbout6013_Mecklenburg_NorthMeck_GreenwayWaste_CDLF_LFGTrenchReport_FID1906926_20241105R Griffin Brothers Co. Greenau Waste Solutions Sent Via E-mail to i aclynne.drummond(&deg.nc.2ov November 5, 2024 NC Department of Environmental Quality Solid Waste Section 217 W Jones Street Raleigh, NC 27603 Attn: Ms. Jaclynne Drummond, Re: Soil Gas Ventilation Trench Installation Report Active Infill Disposal Area Greenway Waste Solutions at North Meck, LLC Huntersville, North Carolina Solid Waste Facility Permit Number 60-13 Dear Ms. Drummond: Greenway Waste Solutions at North Meck, LLC (GWSNM) is pleased to present this letter report documenting recent soil gas ventilation trench installation at the Greenway Waste Solutions at North Meck C&D Landfill located at 15300 Holbrooks Rd in Huntersville, NC 28078. In accordance with the Landfill Gas Migration Corrective Action Plan (FID 1891408), dated March 29, 2023, and approved on August 5, 2024 (FID 1891465), the ventilation trench was installed to address elevated methane concentrations in perimeter methane monitoring well MMW-3, as well as landfill gas (LFG) assessment wells GP-1 and GP-2. A map depicting the location of the new soil gas ventilation trench is provided as Figure 1. Soil Gas Ventilation Trench Installation Trench installation activities were conducted by GWSNM staff from October 1 through October 8, 2024. The trench was excavated to a depth of approximately 20 feet below ground surface along a total length of 135 feet. The trench was filled to a depth of six feet below ground surface with NCDOT No. 4A coarse aggregate, upon which 130 linear feet of 6-inch HDPE DR -I I perforated Ms. Jaclynne Drummond November 5, 2024 Page 2 collection pipe was installed along the trench alignment. The perforated pipe was covered with approximately 12 inches of NCDOT No. 4A coarse aggregate, upon which a non -woven geotextile fabric was installed in accordance with the approved trench design (Figure 2). The trench was then backfilled with site soils which were compacted in approximately 18-inch lifts, followed by dozer compaction upon backfilling to the surrounding grade. Vertical ventilation pipes were completed with passive "Whirlybird" rotary turbines. GWSNM will continue monthly monitoring of MMW-3, GP-1, and GP-2 to evaluate the efficacy of this corrective action. Should you have any questions or require any additional information, please feel free to contact me at (914) 844-7048 or brandt@griffinbros.com. Sincerely, Brandt Kayser, P.G. Environmental Compliance Officer Attachments: Figure 1 — Passive Gas Collection Trench Location Map Figure 2 — Passive Gas Collection Trench - Details B Griffin Brothers CO - Green """10 ulaste Solutions LEGEND --- --- PROPERTY LINE b MMW-1 INFILL AREA METHANE MONITORING WELL LANDFILL POINT OF ® MW-4A COMPLIANCE GROUNDWATER MONITORING WELL @GP-1 GAS PROBE REFERENCE TRENCH LOCATION (-135 LF) SCALE IN FEET mommi 0 100 200 '' GP-2 1. AERIAL IMAGERY BY CIVIL & ENVIRONMENTAL CONSULTANTS, DATED JUNE 4, 2024. 200' MAXIMUM VENT PIPE SPACING V� PASSIVE GAS COLLECTION TRENCH DETAIL N.T.S. ♦IA ALL HOLES 6" (TYP.) 1/2" 0 \ 900 \ Al TYP. ,+JA 6"0 HDPE DSECTION A -A R-11 PIPE PERFORATION PATTERN 2 HDPE PIPE PERFORATIONS 2 N.T.S. 6" STAINLESS TURBINE VENTILATOR (TYP.) u DR-11 F _RFORATED PE (TYP.) NON -WOVEN FILTER FABRIC TO BE PLACED BETWEEN AGGREGATE AND SOIL BACKFILL 6" HDPE DR-11 NON - PERFORATED 90 DEGREE ELBOWS (TYP.) 6" HDPE DR-11 PERFORATED EXTRACTION PIPE (SEE DETAIL 2) NCDOT NO. 4A COARSE AGGREGATE NONCALCEROUS STONE ONLY (NO FINES) TERMINATE P OR ROCK, 0« vrviv r«rwnnvv DEPTH LIMIT OF 20 FEET A SECTION 2 N.T.S. SOIL BACKFILL NON -WOVEN 6 OZ/SY GEOTEXTILE TO BE PLACED BETWEEN AGGREGATE AND SOIL BACKFILL 6" HDPE PERFORATED PIPE (SEE DETAIL 2) VCDOT NO. 4A -OARSE AGGREGATE VONCALCEROUS STONE DNLY (NO FINES)