Loading...
HomeMy WebLinkAboutNCD047368642_Chemours_G_O_Residential Samp Sum Maps 10_21 through 10_27TM P 1 O N E E R TECHNOLOGIES CORPORATION FAY Residential Samples Collected Oct 21 - Oct 27, 2024 Fayetteville Consent Order Fayetteville, North Carolina Legend Residential Samples Collected O Oct 21 - Oct 27, 2024 O NCDEQ Samples Collected Residences Visited O Oct 21 - Oct 27, 2024 Residences Offered to Sample O Oct 21 - Oct 27, 2024 Residences Previously Sampled O (by Chemours and NCDEQ) Fayetteville Works Facility Site Boundary -Cape Fear River = County Boundaries Compass Directions Cardinal Directions Primary Intercardinal Directions - - - Secondary Intercardinal Directions Site Buffers (Every 1 Mile) Potential Sampling Infill Sampling Step Out Sampling Oct 21 - Oct 27, 2024 Number of Residences Visited') 0 Sampled 7 Offered to Sample(2) 3 Notes: -Figure includes all Chemours and NCDEQ residential sampling locations. (')Residences visited include reconnaissance activities in preparation for sample letter offers and sampling. (�)Sample offers include initial sample offers, 30- day followup offers, quarterly sampling offers, and door -hanger sample offers. - 3 residences sampled last week were also sent sample offers the same week. These residences are counted in "Offered to Sample" but are not visible since the same location is showing "Sampled". 5 0 5 10 Miles Figure 1 Fayetteville Area N O O 0 W E O O v O s O O O O � O O O O O O O O O O \ Legend 00 O O Residential Samples Collected O O O Oct 21 - Oct 27, 2024 O O O NCDEQ Samples Collected O O Residences Visited Oct 21 - Oct 27, 2024 O O Residences Offered to Sample O Oct 21 - Oct 27, 2024 Residences Previously Sampled O O (by Chemours and NCDEQ) O Fayetteville Works Facility Site Boundary Cape Fear River O O O 0 County Boundaries O Compass Directions O O O O O O O O O Cardinal Directions O O Primary Intercardinal Directions - - - Secondary Intercardinal Directions O Site Buffers (Every 1 Mile) O Potential Sampling O Infill Sampling O Step Out Sampling 0 500 1,000 Feet FAY Residential Samples Collected Oct 21 - Oct 27, 2024 ■ Zoomed -In to Sector 2 TM Figure 1-1 Fayetteville Consent Order P I O N E E R Fayetteville, North Carolina TECHNOLOGIES CORPORATION <;,r= ■ 1&. TM P I O N E E R TECHNOLOGIES CORPORATION FAY Residential Sample Results Received Oct 21 - Oct 27, 2024 Fayetteville Consent Order Fayetteville, North Carolina Legend O Sampling Results Received Oct 21 - Oct 27, 2024 �O NCDEQ Sampling Results Received GAC Eligible (DA>_140) O GAC Eligible (DA>_10 and DA<140) RO Eligible (YPFAS>_70) RO Eligible (PFAS>_10) No Action (Less than CO Criteria) Fayetteville Works Facility Site Boundary Cape Fear River OCounty Boundaries Compass Directions Cardinal Directions Primary Intercardinal Directions - - - - • Secondary Intercardinal Directions Site Buffers (Every 1 Mile) Potential Sampling C Infill Sampling Step Out Sampling Number of Results Received Oct 21 - Oct 27, 2024 ET] Criteria Number of Mitigation Residences Installed GAC Eligible* (DAa140) 270 (Shares Well (17) 171 with GAC Eligible) GAC Eligible* (DA>_10 and DA<140) 1,651 (Shares Well (155) 757 with GAC Eligible) RO Eligible* 5,403 (Shares Well 3,837 with RO Eligible) No Action Residences* 5,137 NA (Shares Well with No Action Res.) 0 5 10 15 Miles Figure 2