HomeMy WebLinkAboutNCD047368642_Chemours_G_O_Residential Samp Sum Maps 10_21 through 10_27TM
P 1 O N E E R
TECHNOLOGIES CORPORATION
FAY Residential Samples Collected Oct 21 - Oct 27, 2024
Fayetteville Consent Order
Fayetteville, North Carolina
Legend
Residential Samples Collected O
Oct 21 - Oct 27, 2024
O NCDEQ Samples Collected
Residences Visited
O Oct 21 - Oct 27, 2024
Residences Offered to Sample O
Oct 21 - Oct 27, 2024
Residences Previously Sampled O
(by Chemours and NCDEQ)
Fayetteville Works Facility Site Boundary
-Cape Fear River
= County Boundaries
Compass Directions
Cardinal Directions
Primary Intercardinal Directions
- - - Secondary Intercardinal Directions
Site Buffers (Every 1 Mile)
Potential Sampling
Infill Sampling
Step Out Sampling
Oct 21 - Oct 27, 2024
Number of Residences
Visited')
0
Sampled
7
Offered to Sample(2)
3
Notes:
-Figure includes all Chemours and NCDEQ
residential sampling locations.
(')Residences visited include reconnaissance
activities in preparation for sample letter offers
and sampling.
(�)Sample offers include initial sample offers, 30-
day followup offers, quarterly sampling offers,
and door -hanger sample offers.
- 3 residences sampled last week were also sent
sample offers the same week. These residences
are counted in "Offered to Sample" but are not
visible since the same location is showing
"Sampled".
5 0 5 10
Miles
Figure 1
Fayetteville Area
N O O
0
W E O
O v O
s
O
O
O
O � O
O
O
O
O
O O
O
O O
\
Legend
00
O
O Residential Samples Collected
O
O O
Oct 21 - Oct 27, 2024
O O
O NCDEQ Samples Collected
O
O
Residences Visited
Oct 21 - Oct 27, 2024
O
O Residences Offered to Sample
O
Oct 21 - Oct 27, 2024
Residences Previously Sampled
O
O
(by Chemours and NCDEQ)
O
Fayetteville Works Facility Site Boundary
Cape Fear River
O O O
0 County Boundaries
O
Compass Directions
O O O O O O O O O
Cardinal Directions
O
O
Primary Intercardinal Directions
- - - Secondary Intercardinal Directions
O
Site Buffers (Every 1 Mile)
O
Potential Sampling
O
Infill Sampling
O
Step Out Sampling
0 500 1,000
Feet
FAY Residential Samples Collected Oct 21 - Oct 27, 2024
■
Zoomed -In to Sector 2
TM
Figure 1-1
Fayetteville Consent Order
P I O N E E R
Fayetteville, North Carolina
TECHNOLOGIES CORPORATION
<;,r=
■
1&.
TM
P
I
O
N
E
E
R
TECHNOLOGIES CORPORATION
FAY Residential Sample Results Received Oct 21 - Oct 27, 2024
Fayetteville Consent Order
Fayetteville, North Carolina
Legend
O Sampling Results Received
Oct 21 - Oct 27, 2024
�O NCDEQ Sampling Results Received
GAC Eligible (DA>_140)
O GAC Eligible (DA>_10 and DA<140)
RO Eligible (YPFAS>_70)
RO Eligible (PFAS>_10)
No Action
(Less than CO Criteria)
Fayetteville Works Facility Site Boundary
Cape Fear River
OCounty Boundaries
Compass Directions
Cardinal Directions
Primary Intercardinal Directions
- - - - • Secondary Intercardinal Directions
Site Buffers (Every 1 Mile)
Potential Sampling
C Infill Sampling
Step Out Sampling
Number of Results Received
Oct 21 - Oct 27, 2024 ET]
Criteria
Number of
Mitigation
Residences
Installed
GAC Eligible*
(DAa140)
270
(Shares Well
(17)
171
with GAC Eligible)
GAC Eligible*
(DA>_10 and DA<140)
1,651
(Shares Well
(155)
757
with GAC Eligible)
RO Eligible*
5,403
(Shares Well
3,837
with RO Eligible)
No Action
Residences*
5,137
NA
(Shares Well with
No Action Res.)
0 5 10 15
Miles
Figure 2