Loading...
HomeMy WebLinkAboutNCD047368642_Chemours_G_O_Residential Samp Sum Maps 10_14 through 10_20_2024_11101SM01111firml L"Mr-All W.-F14 -A, < W—Mm ■ %. TM P 1 O N E E R TECHNOLOGIES CORPORATION FAY Residential Samples Collected Oct 14 - Oct 20, 2024 Fayetteville Consent Order Fayetteville, North Carolina Legend O Residential Samples Collected Oct 14 - Oct 20, 2024 O NCDEQ Samples Collected Residences Visited O Oct 14 - Oct 20, 2024 Residences Offered to Sample O Oct 14 - Oct 20, 2024 Residences Previously Sampled O (by Chemours and NCDEQ) Fayetteville Works Facility Site Boundary Cape Fear River 0 County Boundaries Compass Directions Cardinal Directions Primary Intercardinal Directions - - - Secondary Intercardinal Directions Site Buffers (Every 1 Mile) Potential Sampling Infill Sampling Step Out Sampling Oct 14 - Oct 20, 2024 Number of Residences Visited') 0 Sampled 10 Offered to Sample(2) 0 Notes: -Figure includes all Chemours and NCDEQ residential sampling locations. (')Residences visited include reconnaissance activities in preparation for sample letter offers and sampling. (2)Sample offers include initial sample offers, 30- day followup offers, quarterly sampling offers, and door -hanger sample offers. 5 0 5 10 Miles Figure 1 Fayetteville Area N O W s O O O 00 O O 0 O O O O O O O O O 0 O0000 O 000(000 O O O 0 O 0 00 O O O 00�0 Cb 000 co O Legend O 00 0 0 O 0 Residential Samples Collected O O Oct 14 - Oct 20, 2024 0 0 O NCDEQ Samples Collected 0 0 O Residences Visited 0 0 0 Oct 14 - Oct 20, 2024 00 0 0 0 O Residences Offeredt Sample 0 O 000000 O Oct 14 O Residences Previously Sampled O 00 0 O (by Chemours and NCDEQ) O 0 Fayetteville Works Facility Site Boundary O 00 Cape Fear River 0 0 O O 0 County Boundaries O O O Compass Directions O Cardinal Directions O 0 Primary Intercardinal Directions 8 O - - - • Secondary Intercardinal Directions 000 O 0 Site Buffers (Every 1 Mile) O O Potential Sampling O O O 0 O O Infill Sampling O O 0 0 Step Out Sampling O O CIO 0 O O O CP O 0 1,000 2,000 3,000 Feet FAY Residential Samples Collected Oct 14 - Oct 20, 2024 TM Zoomed -In to Sector 2 Figure 1-1 Fayetteville Consent Order P I O N E E R Fayetteville, North Carolina TECHNOLOGIES CORPORATION Fayetteville Area N W E S O • O O • O O O O O O O O O O o O Legend O O Residential Samples Collected O Oct 14 - Oct 20, 2024 O O O O NCDEQ Samples Collected O O O Residences Visited O Oct 14 - Oct 20, 2024 O Residences Offered to Sample O Oct 14 - Oct 20, 2024 O Residences Previously Sampled O (by Chemours and NCDEQ) Fayetteville Works Facility Site Boundary Cape Fear River 0 0 County Boundaries O Compass Directions Cardinal Directions Primary Intercardinal Directions - - - Secondary Intercardinal Directions O Site Buffers (Every 1 Mile) Potential Sampling Infill Sampling Step Out Sampling O O O Ono O O O O O 00 0000 O 00 00 O O 0000 O O O O 0 500 1,000 1,500 Feet FAY Residential Samples Collected Oct 14 - Oct 20, 2024 TM Zoomed -In to Sector 2 Figure 1-2 Fayetteville Consent Order P I O N E E R Fayetteville, North Carolina TECHNOLOGIES CORPORATION Fayetteville Area N W E • S • 0 0 • -7=M • • O 0 0 0 O 0 0 0 0 • • O O O Legend • O O 0 Residential Samples Collected O O • 0 0 Oct 14 -Oct 20, 2024 • O O O NCDEQ Samples Collected • O O O O Residences Visited O O Oct 14 - Oct 20, 2024 O O • Residences Offered to Sample O • • 0 • O O Oct 14 - Oct 20, 2024 00 O Residences Previously Sampled 0 O O O (by Chemours and NCDEQ) O 0 • • • O Fayetteville Works Facility Site Boundary ® O 00 • • • ® 0 Cape Fear River � • • O O 0 County Boundaries • • • � Compass Directions o o ® O Cardinal Directions • Primary Intercardinal Directions O O 0 0 O - - - • Secondary Intercardinal Directions O O O O Site Buffers (Every 1 Mile) O O Potential Sampling O 0 Infill Sampling O O Step Out Sampling O O O O O 0 0 0 0 0 0 500 1,000 1,500 O Feet FAY Residential Samples Collected Oct 14 - Oct 20, 2024 ■ Zoomed -In to Sector 16 TM Figure 1-3 Fayetteville Consent Order P I O N E E R Fayetteville, North Carolina TECHNOLOGIES CORPORATION <;,r= ■ TM P I O N E E R TECHNOLOGIES CORPORATION FAY Residential Sample Results Received Oct 14 - Oct 20, 2024 Fayetteville Consent Order Fayetteville, North Carolina Legend O Sampling Results Received Oct 14 - Oct 20, 2024 �O NCDEQ Sampling Results Received • GAC Eligible (DA>_140) O GAC Eligible (DA>_10 and DA<140) RO Eligible (YPFAS>_70) RO Eligible (PFAS>_10) No Action - (Less than CO Criteria) Fayetteville Works Facility Site Boundary Cape Fear River OCounty Boundaries Compass Directions Cardinal Directions Primary Intercardinal Directions - - - - - Secondary Intercardinal Directions Site Buffers (Every 1 Mile) Potential Sampling C Infill Sampling _ Step Out Sampling Number of Results Received 14 Oct 14 - Oct 20, 2024 Criteria Number of Mitigation Residences Installed GAC Eligible* (DAa140) 270 (Shares Well (17) 171 with GAC Eligible) GAC Eligible* (DA>_10 and DA<140) 1,651 (Shares Well (155) 757 with GAC Eligible) RO Eligible* 5,403 (Shares Well 3,848 with RO Eligible) No Action Residences* 5,137 NA (Shares Well with No Action Res.) 0 5 10 15 Miles Figure 2