Loading...
HomeMy WebLinkAbout3612_Allen_REVISED_Table10-1_FID1389562_20200206KE ENERGY, February 6, 2020 HAND DELIVERY AND ELECTRONIC MAIL Ms. Shelia Holman Assistant Secretary North Carolina Department of Environmental Quality 1611 Mail Service Center Raleigh, NC 27699-1611 RE: Ash Basin Closure Plans — Revision Allen Steam Station Belews Creek Steam Station Cliffside Steam Station/Rogers Energy Complex Marshall Steam Station Mayo Power Station Roxboro Power Station Dear Ms. Holman: George T. Hamrick Senior Vice President Coal Combustion Products 400 South Tryon Street ST06A Charlotte, NC 28202 Phone., 980-373-8113 Email. george.hamrick@duke-energy.com In accordance with the requirements of North Carolina General Statues § 130A-309. 214(a)(4), Closure of Coal Combustion Residuals Surface Impoundments, and the requirements of the Settlement Agreement, Duke Energy provides revisions to the Basin Closure Plans submitted on December 31, 2019 and January 30, 2020 for the subject stations. This revision consists of an updated Appendix D, Closure Plan Drawings, for the Cliff side Steam Station and the Roxboro Power Station and an updated Table 10-1, Regulatory Permits, Approvals, or Requirements for Basin Closure by Excavation, for each of the subject closure plans. Duke Energy remains committed to safely and permanently closing basins in ways that continue to protect people and the environment and welcomes the opportunity to work constructively with NCDEQ to move forward. Respectfully submitted, Georg . Hamrick Senior Vice President NCDEQ cc: damsafety@ncdenr.gov, deq.coalash@ncdenr.gov, Ed Mussler, Steven Lanter, Toby Vinson Duke Energy cc: Jessica Bednarcik, Dave Renner, Dan Mc Rainey, Jim Wells, Ed Sullivan, Michael Kafka, Randy Hart Table 10-1 Allen Steam Station Regulatory Permits, Approvals, or Requirements for Ash Basin Closure by Excavation Permit/Approv al Type of Existing Regulatory Permit Approval General Permit Regulating (Mechanism if or Name or Subject Agency applicable) Not Required Comments Permit modification likely due to the Permit increased heavy equipment vehicle Air Quality NCDEQ modification traffic and potential dust generated likely during closure activities Gaston A local building permit is required for Building Permit County New Permit installation of construction trailers Modification or abandonment of CAMA CAMA Written NCDEQ program monitoring wells require the Monitoring Plan NCDEQ DWR approval approval of the Division of Water Resources (DWR) CCR Impoundment US EPA Self -Regulating Required postings to Public Record CCR Rule Closure CCR Maintain CCR GW monitoring network Impoundment US EPA Self -Regulating and requirements as stated in 257.90 - Monitoring CCR Rule Network 257.98 USACE and NCDEQ It is anticipated that an individual Clean Water Act DWR 401 Individual permit will be required in relation to 401 Water Permit dam breaching and associated Quality downstream impacts. Permittin g Section It is anticipated that an individual Clean Water Act Individual permit will be required in relation to 404 USACE Permit dam breaching and associated downstream impacts. Applicable and Erosion and sediment controls, natural to be covered Cutting Trees habitat, and endangered species as part of other considerations. permits AAB Dam - Permitting is required to Certificate of modify or abandon wells and Dam Safety NCDEQ GASTO- Approval to instrumentation on regulatory dams 061 Modify through the Division of Energy, Mineral, and Land Resources (DEMLR) AAB Dam - Final approval after abandoning wells and instrumentation GASTO- Certificate of on regulatory dams through the Dam Safety NCDEQ Final Approval Division of Energy, Mineral, and Land 061 (COFA) Resources (DEMLR) in accordance with the Dam Safety Law of 1967, 15A WAS 02K.0220. AAB Dam - Permitting is required to modify and remove the dam in Certificate of accordance with the Dam Safety Law of GASTO- Approval to 1967, § 143-215.27 and § 143-215.27A Dam Safety NCDEQ 061 Modify and (where applicable) and the Dam Safety General Provisions, 15A WAS 02K.0201 Remove (b)(2); an application must be filed with the Division of Energy, Mineral, and Land Resources (DEMLR) AAB Dam - Final approval after Certificate of modifying to remove the Ash Basin Dam Safety NCDEQ GASTO- Final Approval Dam through the Division of Energy, 061 (COFA) Mineral, and Land Resources (DEMLR) in accordance with the Dam Safety Law of 1967, 15A WAS 02K.0220. RAB Dam - Permitting is required to Certificate of modify or abandon wells and Dam Safety NCDEQ GASTO- Approval to instrumentation on regulatory dams 016 Modify through the Division of Energy, Mineral, and Land Resources (DEMLR) RAB Dam - Final approval after abandoning wells and instrumentation Certificate of on regulatory dams through the Dam Safety NCDEQ GASTO- Final Approval Division of Energy, Mineral, and Land 016 (COFA) Resources (DEMLR) in accordance with the Dam Safety Law of 1967, 15A WAS 02K.0220. RAB Dam - Permitting is required to Certificate of modify and remove the dam in GASTO- Approval to accordance with the Dam Safety Law of Dam Safety NCDEQ 016 Modify and 1967, § 143-215.27 and § 143-215.27A (where applicable) and the Dam Safety Remove General Provisions, 15A WAS 02K.0201 (b)(2); an application must be filed with the Division of Energy, Mineral, and Land Resources (DEMLR) RAB Dam - Final approval after Certificate of modifying to remove the Ash Basin Dam Safety NCDEQ GASTO- Final Approval Dam through the Division of Energy, 016 (COFA) Mineral, and Land Resources (DEMLR) in accordance with the Dam Safety Law of 1967, 15A NCAS 02K.0220. Utilization of or modification to state or DOT - General Not anticipated federal highways to transport CCR will at this time require consultation or notification to relevant DOT agency Driveway Permit NCDOT Potential Temporary access or driveway permits as needed Land disturbance activities outside of the ash basin will exceed one acre, therefore in conformance with 15A Erosion and NCAC 04, an E&SC Permit is required Sediment Control NCDEQ New Permit from Land Quality prior to (E&SC) commencement of construction in those areas. Note that land disturbance includes tree clearing and grubbing and vehicular wheel or tracking as disturbance. Removal from or import of material Restriction not could be restricted dependent on the Fire Ants likely potential for fire ants and geographic regions involved Gaston County Floodplain Development Regulations Section 16.3.3 require a Floodplain Gaston Floodplain Development Permit prior to Development County New Permit the start of construction within FEMA- mapped Special Flood Hazard Areas indicated on Flood Insurance Rate Maps. Permits are required to construct any Large Capacity water supply well or water well system Water Supply NCDEQ New Permit with a design capacity equal to or Well possible greater than 100,00 gallons per day - for dewatering outside of the ash basin Multi -State If movement of CCR will cross state Not required lines, multi -state regulations might Agreement apply NPDES (National Pollution Permit Modification of NPDES may be Discharge NCDEQ NC0004 modification necessary if new source or outfall is Elimination 979 likely created. System) NPDES (National Pollution Discharge to existing sitewide permit or Elimination NCDEQ NCSRevision Permit revision new permit may be required for access System) 046 546 likely roads, staging areas, etc. Industrial Stormwater NPDES (National Pollution Discharge New Permit Permit required for temporary and Elimination NCDEQ possible permanent stormwater rerouting. System) Stormwater Removal from or import of vegetated Noxious Weeds Not anticipated material could be restricted dependent at this time on the vegetation and geographic regions involved Railroad Not Construction activities adjacent to Easement, anticipated at tracks/ballast or a new railroad crossing Access, or this time require an agreement or permit Crossing Permit SPCC (Spill In accordance with the Federal Water Prevention Modification of Pollution Control Act (Clean Water Act) Control and EPA existing plan of 1974, Title 40, Code of Federal Countermeasure) Plan Regulations, Part 112. Threatened or Endangered Species: Candidate Conservation Federal and/or state regulations may Agreement apply including agency consultation and Avian Protection It will be done performing site -specific surveys within Plan(s) NCDEQ as part of the proper survey period (e.g., Bird and Bat and EPA 401/404 flowering period for listed plant) to Conservation process determine if Threatened or Endangered Strategies Species or their habitat exist within the Eagle limits of disturbance Conservation Plan Eagle Take Permit Solid Waste Site Suitability NCDEQ Approval by Letter New CCR Landfill Solid Waste Permit to NCDEQ Permit New CCR Landfill Construct Solid Waste Permit to NCDEQ Permit New CCR Landfill Operate