HomeMy WebLinkAboutSLAS8304_INSP_20221129Oepartmenl o� Envimnmental0uali�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
SLAS
X
COUNTY: Scotland
MSWLF
PERMITNO.: SLAS-83-04
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P
Tire
Industrial
DEMO
SDTF
Collection
Monotill
Landfill
Date of Site Inspection: 11/29/2022
FACILITY NAME AND ADDRESS:
Cooper Septic Tank Service
PO Box 645
Wagram, NC 28396
GPS COORDINATES
Date of Last Inspection: 03/08/2022
N: 34.80669
FACILITY CONTACT INFORMATION:
Name:
Emily & Randy Cooper
Address:
Same as above
Telephone:
910-3 69-2713
Email address:
coopere4l@gmail.com
PARTICIPANTS
STATUS OF PERMIT
Chester Cobb (DWM)
Active
PURPOSE OF SITE VISIT: Routine
STATUS OF PAST NOTED VIOLATIONS:
NA
E:-79.36835
EXPIRES: 0710712022
OBSERVED VIOLATIONS:
1) Permit had expired on 07/07/2022. Talked to and emailed Emily on 12/30/2022 about the expired
permit. Application for permit renewal received by email on 01/04/2023. The paper application was
received by mail on 01/09/2023. Failure to submit the application for permit renewal prior to the
expiration date is a violation of Rule .0840(g) that states "Applications for renewal permits issued in
accordance with this Rule shall be submitted to the Division at least 90 days prior to the expiration date
of the permit. The Division shall notify permit holders of facility permit expiration dates 120 days prior
to permit expiration."
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and
any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
Page 1 of 2
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
ADDITIONAL COMMENTS
1) The required signage was present.
2) The access road was in good shape.
3) Required markers were present.
4) No septage discharges noticed outside of the permitted boundaries.
5) Applications appeared to follow the nutrient management plan. No spot dumps or thick applications
noticed.
6) No evidence of a winter cover crop (rye or ryegrass).
7) No objectionable odors noticed today.
8) Checked setback distances. Setback distances ok.
9) Permit had expired on 07/07/2022. Talked to and emailed Emily on 12/30/2022 about the expired
permit. Application for permit renewal received by email on 01/04/2023. The paper application was
received by mail on 01/09/2023. Failure to submit the application for permit renewal prior to the
expiration date is a violation of Rule .0840(g).
e
Looking at the field along the buried gas line towards the highway.
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Chester Cobb
DN: cn=Chester Cobb, ane
ou=Division of Waste Management,
email=chester.cobb@ncdenr.gov, c=US
Date: 2023.02.01 11:47:13-05'00' Phone: (919) 707-8283
Chester R. Cobb, Environmental Program Consultant
Division of Waste Management, NCDEQ
Regional Representative
Sent on: X Email Hand delivery US Mail Certified No. fI
Page 2 of 2