HomeMy WebLinkAbout2803_INSP_20240801FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 6
UNIT TYPE:
MSWLF X X COUNTY: Dare
X PERMIT NO.: 2803-CDLF-1995
X FILE TYPE: COMPLIANCE
Date of Site Inspection: August 1, 2024 Date of Last Inspection:
FACILITY NAME AND ADDRESS:
Dare County C&D Landfill 1603 Cub Road
Manns Harbor, 27953
GPS COORDINATES: N: 35 °83498 E: - 75 °82002
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Shanna Fullmer, Dare County Public Works Director Telephone: 252-475-5844 (o) 252-423-0136 (c)
Email address: shanna@darenc.gov
FACILITY CONTACT ADDRESS: Director
Dare County Department of Public Works PO Box 1000
Manteo, NC 27954
PARTICIPANTS: Jonathan DeWeese, Solid Waste Superintendent Thomas (Bud) Tillett, Landfill and Transfer Station Supervisor Autumn Romanski, NCDEQ-DWM-SWS-FOB James Wallace, NCDEQ-DWM-SWS Permitting Unit
STATUS OF PERMIT:
Active, Life of Site Permit, Issued February 20, 2017. Combined with 2805T-Transfer-1996 permit issued August 24, 2023.
PURPOSE OF SITE VISIT: Comprehensive Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS: None
OBSERVED VIOLATIONS:
None
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 6
ADDITIONAL COMMENTS:
1. Life of Site Permit was issued 2/20/2017 as a combined permit with facility #2805T issued August 24, 2023, and was reviewed along with the operations plan and contingency plan during this inspection. The facility is permitted to receive waste from Dare County, as Passed by the Dare Co. Commissioners on August 02, 2004. It was noticed during the review process that the combined permit dated August 24, 2023, did not contain the language (item 5,
from the 2022 permit) for the permit modification that was approved for the facility to receive waste from Hyde, Tyrrell counties, and the unincorporated areas of aforementioned counties. The Solid Waste Permitting Unit will review the permit and issue any corrections to the permit. The approval of the modification that includes receipt of waste from Hyde, Tyrrell counties, and the unincorporated areas of aforementioned counties will be remedied with the permit correction. Please contact James Wallace with any questions.
2. This facility is approved to receive the following waste: C&D, Inert Debris, Land Clearing Waste, and yard waste (All used as 50/50 (SM) alternative cover after mulched), white goods, and asphalt. 3. The Facility has signage, locking gates and fencing for security.
4. Interior roads are constructed of all-weather materials and well maintained.
5. Incoming load tickets were reviewed during this inspection. 6. Waste screening records were reviewed during this inspection and found to be up to date. 7. Cover records were reviewed and found to be up to date. 8. The working face is kept small (< ¼ acre) for better management and timely covering. Looks good. The maintenance of side slopes looks good.
9. Facility has a one larger pile of Cover material stockpiled on the top of the active cell and cover material stockpiled of 50/50/SM is already mixed ready for use. Site can be covered quickly in the event of bad weather.
10. Loads are being screened at the working face. The loads appeared to be C&D waste only.
11. Tires when received are not left at the landfill. Tires, if received, are stored and then diverted to a scrap tire trailer off-site at the Dare Co. Public Work Recycling Department in Manteo. 12. White goods containing CFC’s were upright until CFC removed and then placed onto scrap metal pile with a red X on the units. CFC removal records were available but not reviewed during this inspection.
13. There was very little windblown trash during this inspection and staff was actively picking up trash the day of the inspection. The Compactor (using bulldozer) is offline, with parts on back order for repair. All windblown trash is being picked up by the end of the workday. The fencing is working fairly well.
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 6
14. The LCID, land clearing waste area looks good with the capacity to receive additional land clearing waste as
needed. 15. Maintenance on side slopes on all cells looks good.
16. Edge of waste markers are present. 17. Facility has 8 Certified Landfill Operations Specialist: Jonathan DeWeese, expires 11/16/2024, Thomas Tillett, expires 10/9/2026, Neal Dennis, expires 5/3/2024, Deborah Equils, expires 11/18/2025, Ashley Walston, expires 2/2/2026. David Wright, expires 2/2/2026, Linwood Hamilton, expires 2/2/2026 and Samuel Moore, expires 2/2/2026. 18. Inspected groundwater monitoring wells MW-8, MW-9, MW-17, and MW-11. All observed were locked and tagged with required information. However, the background monitoring well MW-11 is leaning, and it was unclear if the well is damaged, or if the condition of well could affect the groundwater sampling results. It is
recommended to install yellow caution poles on any unprotected wells. The groundwater table appeared high in this area the day of the inspection. The consultant CDM Smith that completes the groundwater monitoring well sampling should evaluate the MW-11 groundwater well damage and determine if in need of repair.
19. Semi Annual Groundwater reports were available and reviewed. The reported results were from the semi-annual sampling event in April 2023.
20. Gas monitoring reports were available from April 2023 forward since the last inspection, but not reviewed.
21. Digital pictures were taken during this inspection with some attached to this report.
Please contact me if you have any questions or concerns regarding this inspection report.
________________________________________ Phone: 919-268-1524 _ Email: autumn.romanski@deq.nc.gov
Environmental Senior Specialist Regional Representative
Sent on: August 15, 2024 X Email Hand delivery US Mail Certified No. [ _]
Copies: Andrew Hammonds, Eastern District Supervisor - Solid Waste Section
Thomas Tillett, Landfill and Transfer Station Supervisor
Shanna Fulmer, Dare Co. Public Works Director Jonathan DeWeese, Solid Waste Superintendent
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 6
Active Working Face – upper area storage of cover soil Active Working Face – small footprint
Inert Debris – Cement White goods with door and CFC’s removed
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 5 of 6
Scrap metal pile Roads are in good condition
Edge of Waste Markers and good vegetation. Groundwater Monitoring Wells –no yellow caution poles
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 6 of 6
Groundwater Monitoring Wells were observed locked and labelled: MW-8, MW-9, MW-17, and MW-11
*MW-11 –Shown on the righthand side of this report is leaning and may need to be repaired and no yellow caution poles were observed.